CN206942028U - A kind of Anti-seismic decoration stainless steel semi-circular tube - Google Patents

A kind of Anti-seismic decoration stainless steel semi-circular tube Download PDF

Info

Publication number
CN206942028U
CN206942028U CN201720393814.5U CN201720393814U CN206942028U CN 206942028 U CN206942028 U CN 206942028U CN 201720393814 U CN201720393814 U CN 201720393814U CN 206942028 U CN206942028 U CN 206942028U
Authority
CN
China
Prior art keywords
flap
fixedly connected
sleeve
stainless steel
circular tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720393814.5U
Other languages
Chinese (zh)
Inventor
黄桂锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Fubon Stainless Steel Co Ltd
Original Assignee
Foshan Fubon Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Fubon Stainless Steel Co Ltd filed Critical Foshan Fubon Stainless Steel Co Ltd
Priority to CN201720393814.5U priority Critical patent/CN206942028U/en
Application granted granted Critical
Publication of CN206942028U publication Critical patent/CN206942028U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buffer Packaging (AREA)

Abstract

The utility model discloses a kind of Anti-seismic decoration stainless steel semi-circular tube, including body, the outer surface of the body is fixedly connected with retainer ring, the bottom of the retainer ring at the top of elevating lever with being fixedly connected, in the inner chamber of the bottom insertion sleeve of the elevating lever, the inwall bottom of the sleeve is fixedly connected with the bottom of the first spring, and the top of first spring is fixedly connected with the bottom of elevating lever.The utility model is by setting the cooperation of pressing plate and flap, flap can be extruded when pressing plate pushes to be rotated, when flap rotates, the one end of flap away from pressing plate can tilt, and when the other end of flap tilts, meeting mating sleeve drives lifter plate to rise, need to overcome the pulling force of second spring when lifter plate rises, so as to enter row buffering, the performance that antidetonation is buffered for the increase of stainless steel semi-circular tube is reached, so as to the effect that directly can be damaged when avoiding stainless steel semi-circular tube from being hit to wall.

Description

A kind of Anti-seismic decoration stainless steel semi-circular tube
Technical field
Decoration product technical field is the utility model is related to, specially a kind of Anti-seismic decoration stainless steel half Pipe.
Background technology
House decoration be among the various situations " materialization " of life to room, after the completion of civil engineering, house interior dress Design is repaiied from clear water room, to plainly-packed, hard-cover, luxurious finishing.Change the layout that building can change, we want complete with arrival U.S. inhabitation effect, here it is decoration.
A kind of conventional material, is widely used in wearing-resistant tile, abrasion-proof cover plate, anti-friction protecting watt when stainless steel semi-circular tube is decoration, But the stainless steel semi-circular tube that currently there are has the problem of anti seismic efficiency difference, if to cause object to strike stainless for this Directly the wall of decoration can be damaged when on steel semi-circular tube, so as to cause the damage of wall.
Utility model content
The purpose of this utility model is to provide a kind of Anti-seismic decoration stainless steel semi-circular tube possess buffering decompression The advantages of effect is good, solving the stainless steel semi-circular tube that currently there are mentioned in background technology, anti seismic efficiency to be present poor The problem of, if this causes object to strike when on stainless steel semi-circular tube and directly the wall of decoration can be damaged, so as to lead The problem of causing the damage of wall.
To achieve the above object, the utility model provides following technical scheme:A kind of Anti-seismic decoration stainless steel Semi-circular tube, including body, the outer surface of the body are fixedly connected with retainer ring, the bottom of the retainer ring and the top of elevating lever Portion is fixedly connected, in the inner chamber of the bottom insertion sleeve of the elevating lever, the inwall bottom of the sleeve and the bottom of the first spring Portion is fixedly connected, and the top of first spring is fixedly connected with the bottom of elevating lever, the bottom of the sleeve and installing plate Top is fixedly connected.
The top of the installing plate and it is installed with hinged block positioned at side of the sleeve at center, it is described be hinged Flap is provided through on block, the flap is hinged with hinged block, and the both ends of flap extend respectively to the both sides of hinged block, institute State flap and extend hinged block and be hinged away from the side at installing plate center and the side of lifter plate, the lifter plate is away from flap Side of the side with sleeve at installing plate center be slidably connected, and the bottom of lifter plate and the top of second spring are fixed Connection, the bottom of the second spring at the top of installing plate with being fixedly connected, side and pressing plate of the flap away from lifter plate Front and back be flexibly connected, the top of the pressing plate is fixedly connected with the bottom of depression bar, the top of the depression bar and body Bottom be fixedly connected.
Preferably, the quantity of the retainer ring, sleeve and hinged block is two and symmetrical with the axis of installing plate Set.
Preferably, the groove through pressing plate front and back, the internal slide peace of the groove are offered on the pressing plate Equipped with slide bar, and slide bar is fixedly mounted on the side of flap.
Preferably, the sleeve offers chute close to the side of hinged block, sliding block is slidably connected in chute, and lift Plate is slidably connected by chute and sliding block with sleeve.
Preferably, the sleeve offers chute close to the side of hinged block, sliding block is slidably connected in chute, and lift Plate is slidably connected by chute and sliding block with sleeve.
Preferably, the flap opens up fluted close to the side of pressing plate, on the inwall of the groove and is located remotely from The side of groove bottom land is installed with slide bar.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, the utility model is by setting the cooperation of pressing plate and flap, and can extrude flap when pressing plate pushes is rotated, When flap rotates, the one end of flap away from pressing plate can tilt, can mating sleeve drive lifting when the other end of flap tilts Plate rises, and needs to overcome the pulling force of second spring when lifter plate rises, so as to enter row buffering, it is stainless steel semi-circular tube to have reached The performance of increase buffering antidetonation, so as to the effect that directly can be damaged when avoiding stainless steel semi-circular tube from being hit to wall.
2nd, the utility model is by setting the first spring, elevating lever and the cooperation of sleeve, when stainless steel semi-circular tube declines Elevating lever extrusion spring can be driven, so as to once be buffered, and simultaneously, is carried out by the cooperation of pressing plate and flap secondary slow Punching, so as to reach the effect of increase stainless steel semi-circular tube shock-absorbing capacity.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the attachment structure schematic diagram of the utility model pressing plate and flap.
In figure:1 body, 2 retainer rings, 3 elevating levers, 4 sleeves, 5 first springs, 6 installing plates, 7 hinged blocks, 8 flaps, 9 liters Plate, 10 second springs, 11 pressing plates, 12 depression bars, 13 grooves, 14 slide bars, 15 chutes, 16 sliding blocks, 17 cushion pads, 18 grooves drop.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Refer to Fig. 1-2, a kind of Anti-seismic decoration stainless steel semi-circular tube, including body 1, the outer surface of body 1 Retainer ring 2 is fixedly connected with, the bottom of retainer ring 2 is fixedly connected with the top of elevating lever 3, the bottom insertion sleeve 4 of elevating lever 3 Inner chamber in, the outer surface of elevating lever 3 and the inwall of sleeve 4 are slidably connected, the bottom of the inwall bottom of sleeve 4 and the first spring 5 Portion is fixedly connected, and the top of the first spring 5 is fixedly connected with the bottom of elevating lever 3, the bottom of sleeve 4 and the top of installing plate 6 It is fixedly connected, by the way that installing plate 6 is fixedly mounted on wall, so as to complete the installation of stainless steel semi-circular tube, the bottom of installing plate 6 Portion is installed with cushion pad 17, and when being hit, body 1 can decline, and when body 1 declines, elevating lever 3 will extruded sleeve The first spring 5 in cylinder 4, so as to complete buffering and damping, cushion pad 17 is made using elastomeric material, has the function of buffering, So as to buffer when installing plate 6 is hit the impulsive force to caused by wall.
The top of installing plate 6 and hinged block 7 is installed with positioned at side of the sleeve 4 at center, on hinged block 7 Flap 8 is provided through, flap 8 is be hinged with hinged block 7, and the both ends of flap 8 extend respectively to the both sides of hinged block 7, flap 8 Extend hinged block 7 to be hinged away from the side at the center of installing plate 6 and the side of lifter plate 9, lifter plate 9 away from flap 8 one Side of the side with sleeve 4 at the center of installing plate 6 is slidably connected, and sleeve 4 offers chute 15 close to the side of hinged block 7, Sliding block 16 is slidably connected in chute 15, and lifter plate 9 is slidably connected by chute 15 and sliding block 16 with sleeve 4, and lifter plate 9 Bottom be fixedly connected with the top of second spring 10, the bottom of second spring 10 is fixedly connected with the top of installing plate 6, flap 8 side away from lifter plate 9 is flexibly connected with the front and back of pressing plate 11, offered on pressing plate 11 through the front of pressing plate 11 and The groove 13 at the back side, the internal slide of groove 13 is provided with slide bar 14, and slide bar 14 is fixedly mounted on the side of flap 8, flap 8 Fluted 18 are opened up close to the side of pressing plate 11, on the inwall of groove 18 and are located remotely from the side of the bottom land of groove 18 and are fixed peace Equipped with slide bar 14, slide bar 14 can be extruded when pressing plate 11 declines, so that bull stick is rotated, while two slide bars 14 are understood to logical The inwall of the both sides of groove 13 is slided, and the top of pressing plate 11 is fixedly connected with the bottom of depression bar 12, the top of depression bar 12 and the bottom of body 1 Portion is fixedly connected, and the quantity of retainer ring 2, sleeve 4 and hinged block 7 is two and is symmetrical arranged with the axis of installing plate 6, By the way that two groups of retainer rings 2, sleeve 4 and hinged block 7 are symmetrical arranged, so that the decline of body 1 is more uniform, so that peace The impulsive force that loading board 6 is subject to is more uniform.
In use, when the top of body 1 is moved down by shock or the extruding of outside, retainer ring 2 can be driven Decline, when retainer ring 2 declines, elevating lever 3 can extrude the first spring 5 in sleeve 4, so as to carry out preliminary buffering, and together When, it can be declined when body 1 declines by depression bar 12 with dynamic pressure plate 11, can extrude flap 8 when pressing plate 11 declines, surround it Rotated with the hinged place of hinged block 7, when flap 8 rotates, side of the flap 8 away from pressing plate 11 can tilt and simultaneously will lifting Plate 9 is lifted, and second spring 10 can be stretched when lifter plate 9 rises, and needs to overcome spring when lifter plate 9 stretches second spring 10 Elastic force, so as to reach the effect of secondary buffer.
In summary:The utility model can be extruded when pressing plate 11 pushes and turned by setting the cooperation of pressing plate 11 and flap 8 Plate 8 is rotated, and when flap 8 rotates, the one end of flap 8 away from pressing plate 11 can tilt, when the other end of flap 8 tilts, Meeting mating sleeve 4 drives lifter plate 9 to rise, and needs to overcome the pulling force of second spring 10 when lifter plate 9 rises, so as to be delayed Punching, reach for the performance of stainless steel semi-circular tube increase buffering antidetonation, can be straight during so as to avoid stainless steel semi-circular tube from being hit Connect the effect damaged to wall.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Other identical element also be present in process, method, article or equipment including the key element.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of Anti-seismic decoration stainless steel semi-circular tube, including body (1), it is characterised in that:Outside the body (1) Surface is fixedly connected with retainer ring (2), and the bottom of the retainer ring (2) at the top of elevating lever (3) with being fixedly connected, the lifting In the inner chamber of the bottom insertion sleeve (4) of bar (3), the inwall bottom of the sleeve (4) is fixed with the bottom of the first spring (5) to be connected Connect, the top of first spring (5) is fixedly connected with the bottom of elevating lever (3), the bottom of the sleeve (4) and installing plate (6) it is fixedly connected at the top of;
The top of the installing plate (6) and the side positioned at sleeve (4) at the center is installed with hinged block (7), institute State and flap (8) is provided through on hinged block (7), the flap (8) is be hinged with hinged block (7), and the both ends difference of flap (8) The both sides of hinged block (7) are extended to, the flap (8) extends hinged block (7) away from the side at installing plate (6) center and liter The side of drop plate (9) is hinged, and side of the lifter plate (9) away from flap (8) is with sleeve (4) at installing plate (6) center Side be slidably connected, and the bottom of lifter plate (9) is at the top of second spring (10) with being fixedly connected, the second spring (10) Bottom with being fixedly connected at the top of installing plate (6), side and pressing plate (11) of the flap (8) away from lifter plate (9) are just Face and the back side are flexibly connected, and the top of the pressing plate (11) is fixedly connected with the bottom of depression bar (12), the top of the depression bar (12) Portion is fixedly connected with the bottom of body (1).
A kind of 2. Anti-seismic decoration stainless steel semi-circular tube according to claim 1, it is characterised in that:The fixation The quantity of ring (2), sleeve (4) and hinged block (7) is two and is symmetrical arranged with the axis of installing plate (6).
A kind of 3. Anti-seismic decoration stainless steel semi-circular tube according to claim 1, it is characterised in that:The pressing plate (11) groove (13) through pressing plate (11) front and back is offered on, the internal slide of the groove (13) is provided with slide bar (14), and slide bar (14) is fixedly mounted on the side of flap (8).
A kind of 4. Anti-seismic decoration stainless steel semi-circular tube according to claim 1, it is characterised in that:The sleeve (4) chute (15) is offered close to the side of hinged block (7), sliding block (16), and lifter plate (9) is slidably connected in chute (15) It is slidably connected by chute (15) and sliding block (16) with sleeve (4).
A kind of 5. Anti-seismic decoration stainless steel semi-circular tube according to claim 1, it is characterised in that:The installation The bottom of plate (6) is installed with cushion pad (17).
A kind of 6. Anti-seismic decoration stainless steel semi-circular tube according to claim 3, it is characterised in that:The flap (8) opened up fluted (18) close to the side of pressing plate (11), on the inwall of the groove (18) and be located remotely from groove (18) The side of bottom land is installed with slide bar (14).
CN201720393814.5U 2017-04-15 2017-04-15 A kind of Anti-seismic decoration stainless steel semi-circular tube Expired - Fee Related CN206942028U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720393814.5U CN206942028U (en) 2017-04-15 2017-04-15 A kind of Anti-seismic decoration stainless steel semi-circular tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720393814.5U CN206942028U (en) 2017-04-15 2017-04-15 A kind of Anti-seismic decoration stainless steel semi-circular tube

Publications (1)

Publication Number Publication Date
CN206942028U true CN206942028U (en) 2018-01-30

Family

ID=61358456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720393814.5U Expired - Fee Related CN206942028U (en) 2017-04-15 2017-04-15 A kind of Anti-seismic decoration stainless steel semi-circular tube

Country Status (1)

Country Link
CN (1) CN206942028U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110552545A (en) * 2019-09-12 2019-12-10 陕西久益电力工程有限公司 electric tower structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110552545A (en) * 2019-09-12 2019-12-10 陕西久益电力工程有限公司 electric tower structure and construction method thereof
CN110552545B (en) * 2019-09-12 2021-06-22 陕西久益电力工程有限公司 Electric tower structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN108756812A (en) Multistage fracturing sliding sleeve
CN206942028U (en) A kind of Anti-seismic decoration stainless steel semi-circular tube
CN110039247A (en) Hanging code faces upward dress tooling
CN109252530A (en) A kind of base pit engineering support safeguard and its application method
CN110145639A (en) A kind of guide rail of relaying well replacement push-bench quick-assembling push-bench head
CN205134202U (en) Bridge high strength support column
CN207046711U (en) A kind of crane with overturn-preventing function
CN107484367A (en) A kind of communication box being easily installed
CN212452782U (en) Noise-reducing and shock-absorbing well lid
CN206173795U (en) Bridge expansion joint cover plate
CN208487521U (en) A kind of garden landscape LED floor lamp good with translucency
CN207354155U (en) A kind of adjustable fixing for solar panel
CN207914475U (en) A kind of color steel pressing device
CN210370606U (en) Composite shape proppant system for hydraulic fracturing
CN208152996U (en) Anti-moving sand composite well pipe device
CN208456627U (en) A kind of tunnel steel form that bearing capacity is big
CN207776227U (en) A kind of assembled architecture reinforced concrete member
CN202441096U (en) Automatic quake-proof device for intelligent building
CN207364156U (en) A kind of noise isolating seal compression spring
CN206344001U (en) A kind of new arrangement for grinding at tuyere medium jacket of blast furnace hole
CN209011773U (en) A kind of geological resource exploration drilling drilling tool righting centering device
CN211738040U (en) Pressure reducing valve device
CN215367746U (en) Assembly type building structure
CN2578561Y (en) Self-sealing piston
CN206386673U (en) A kind of rod member of anticollision

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130

CF01 Termination of patent right due to non-payment of annual fee