CN206941595U - 旋挖桩灌注砼导管连接装置 - Google Patents
旋挖桩灌注砼导管连接装置 Download PDFInfo
- Publication number
- CN206941595U CN206941595U CN201720855173.0U CN201720855173U CN206941595U CN 206941595 U CN206941595 U CN 206941595U CN 201720855173 U CN201720855173 U CN 201720855173U CN 206941595 U CN206941595 U CN 206941595U
- Authority
- CN
- China
- Prior art keywords
- fixed mount
- concrete
- conduit
- rotary digging
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本实用新型给出了一种旋挖桩灌注砼导管连接装置;包括固定架和两块旋转盖板,固定架中部设有贯穿其上下端面的通孔,两块旋转盖板分别铰接在通孔两侧的固定架上,所述旋转盖板边缘位置开有限位槽,两块旋转盖板的限位槽共同组成了与灌注砼导管外壁轮廓吻合的限位孔。本实用新型的有益技术效果为:能有效减少砼导管装配时间,且能保证导管连接的牢固性,确保桩心砼浇筑的及时有效,提高旋挖钻孔灌注桩施工效率;而且固定架放置在桩孔上侧,相当于在桩孔处增设临时的防护网,增加安全性;另外固定架强度高,工作人员可直接站在固定架上侧作业,增加导管连接的效率。
Description
技术领域
本实用新型涉及一种辅助管道件连接的装置,特别涉及一种旋挖桩灌注砼导管之间连接的装置。
背景技术
旋挖桩灌注砼工艺是一种较先进的桩基施工工艺,广泛应用于公路、铁路、桥梁和大型建筑的基础桩施工上;旋挖钻机成孔后,先将钢筋笼放入桩孔中,对不同直径、深度的桩孔分别计算出混凝土浇筑初灌量。施工中要保证浇筑初灌量,导管通过吊装伸入桩孔内,浇筑时导管控制在2~6m,并做记录,浇筑混凝土接近桩顶标高时,应控制最后一次浇筑量,确保桩顶标高符合设计要求,导管采用分段安装形式,灌注作业前,需要将若干导管组装,直至导管达到桩孔的预定深度,但是目前导管的组装都是在现场通过工人手动组装,费时费力,而且桩孔周围没有临边防护,容易产生安全隐患。
实用新型内容
本实用新型所要解决的技术问题是提供一种结构简单、安全性高的旋挖桩灌注砼导管连接装置。
为解决上述技术问题,本实用新型提供了一种旋挖桩灌注砼导管连接装置;
包括固定架和两块旋转盖板,固定架中部设有贯穿其上下端面的通孔,两块旋转盖板分别铰接在通孔两侧的固定架上,所述旋转盖板边缘位置开有限位槽,两块旋转盖板的限位槽共同组成了与灌注砼导管外壁轮廓吻合的限位孔。
采用这样的结构后,固定架放置在桩孔上侧,固定架覆盖桩孔,固定架的通孔与桩孔相通,作业时,利用导管与翻转盖板组配合,导管侧壁的凸起可以有效支撑在翻转盖板上,导管与导管之间采用卡箍连接,待两节导管安装完成后打开翻转盖板放下已连接好导管至下一导管的凸起处,重复上述安装过程至多根导管长度达到旋挖桩桩长深度,可继续灌注砼作业。
本实用新型的有益技术效果为:能有效减少砼导管装配时间,且能保证导管连接的牢固性,确保桩心砼浇筑的及时有效,提高旋挖钻孔灌注桩施工效率;而且固定架放置在桩孔上侧,相当于在桩孔处增设临时的防护网,增加安全性;另外固定架强度高,工作人员可直接站在固定架上侧作业,增加导管连接的效率。
为了更清楚的理解本实用新型的技术内容,以下将本旋挖桩灌注砼导管连接装置简称为本连接装置。
本连接装置的固定架为框架结构,固定架上除通孔以外的区域都间隔固定有若干连接杆;采用这样的结构后,固定架为框架结构可以减轻固定架的重量,方便运输,通过连接杆将固定架中空的区域间隔固定可以防止作业人员从固定架之间区域落入桩孔内,增加本连接装置的安全性。
本连接装置的固定架上侧两端分别固定连接有若干吊环;采用这样的结构后,方便架板的吊运及周转使用。
本连接装置的旋转盖板的限位槽槽壁上设有橡胶垫片;采用这样的结构后,橡胶垫片可以使旋转盖板与导管紧密接触,也可缓冲由振动产生二者之间碰撞。
附图说明
图1是本连接装置实施例的使用状态图。
图2是本连接装置实施例的结构示意图之一。
图3是本连接装置实施例的结构示意图之二。
具体实施方式
如图1至3所示
本连接装置包括固定架1和两块旋转盖板2。
固定架1主体为六根槽钢11焊接构成长方形状的框架结构,两根长度为2200mm的槽钢11为长边,四根长度为800mm的槽钢11两端分别焊接在两根长槽钢11之间,使固定架1中部构成通孔12,除通孔12以外的固定架1内侧区域都间隔焊接有多根连接杆13,连接杆13为φ16钢筋,固定架1上侧两端的短槽钢11上分别焊接有吊环14,吊环14选用φ18的圆钢。
旋转盖板2采用两块Q235钢板,两块旋转盖板2对应位置分别开一个直径150mm半圆形的限位槽21,限位槽21的槽壁上粘合有橡胶垫片22;
两块旋转盖板2分别铰接在在通孔12两侧的固定架1上,两块旋转盖板2可完全遮盖固定架1的通孔12,遮盖后两块旋转盖板2的限位槽21共同组成了与灌注砼导管4外壁轮廓吻合的限位孔3,限位孔3的孔径小于通孔12的孔径,便于导管4上下提升。
在桩基施工过程中,待旋挖桩成型并放置好钢筋笼后,用起重机的钢丝绳通过焊接好的吊环14将本连接装置吊运至旋挖桩成孔上方,闭合翻转盖板,两块旋转盖板2完全覆盖固定架1的通孔12,然后开始安装砼导管4,导管4采用分段安装形式,避免因导管4过长造成存放不便等问题。导管4直径与翻转盖板组成的限位孔3直径相同,导管4上有凸起41可以有效支撑在翻转盖板上,导管4与导管4之间采用卡箍连接,待两节导管4安装完成后打开翻转盖板放下已连接好导管4至下一导管4凸起41处,重复上述安装过程至导管4长度达到旋挖桩桩长深度,本连接装置有较高的强度,能有效减少砼导管4装配时间,且能保证导管4连接的牢固性,确保桩心砼浇筑的及时有效,提高旋挖钻孔灌注桩施工效率。
以上所述的仅是本实用新型的一种实施方式,应当指出,对于本领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以作出若干变型和改进,这些也应视为属于本实用新型的保护范围。
Claims (4)
1.一种旋挖桩灌注砼导管连接装置,其特征为:
包括固定架和两块旋转盖板,固定架中部设有贯穿其上下端面的通孔,两块旋转盖板分别铰接在通孔两侧的固定架上,所述旋转盖板边缘位置开有限位槽,两块旋转盖板的限位槽共同组成了与灌注砼导管外壁轮廓吻合的限位孔。
2.根据权利要求1所述的旋挖桩灌注砼导管连接装置,其特征是:
所述的固定架为框架结构,固定架上除通孔以外的区域都间隔固定有若干连接杆。
3.根据权利要求1所述的旋挖桩灌注砼导管连接装置,其特征是:
所述固定架上侧两端分别固定连接有若干吊环。
4.根据权利要求1所述的旋挖桩灌注砼导管连接装置,其特征是:
所述旋转盖板的限位槽槽壁上设有橡胶垫片。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720855173.0U CN206941595U (zh) | 2017-07-14 | 2017-07-14 | 旋挖桩灌注砼导管连接装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720855173.0U CN206941595U (zh) | 2017-07-14 | 2017-07-14 | 旋挖桩灌注砼导管连接装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206941595U true CN206941595U (zh) | 2018-01-30 |
Family
ID=61368753
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720855173.0U Expired - Fee Related CN206941595U (zh) | 2017-07-14 | 2017-07-14 | 旋挖桩灌注砼导管连接装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206941595U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108385672A (zh) * | 2018-03-07 | 2018-08-10 | 中国建筑第八工程局有限公司 | 钻孔灌注桩的施工平台装置及其施工方法 |
CN109252511A (zh) * | 2018-10-23 | 2019-01-22 | 杭州市市政工程集团有限公司 | 一种钢筋笼安装及混凝土浇筑平台 |
CN112030972A (zh) * | 2020-07-30 | 2020-12-04 | 中国二十冶集团有限公司 | 一种灌注桩二次清孔装置及方法 |
-
2017
- 2017-07-14 CN CN201720855173.0U patent/CN206941595U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108385672A (zh) * | 2018-03-07 | 2018-08-10 | 中国建筑第八工程局有限公司 | 钻孔灌注桩的施工平台装置及其施工方法 |
CN109252511A (zh) * | 2018-10-23 | 2019-01-22 | 杭州市市政工程集团有限公司 | 一种钢筋笼安装及混凝土浇筑平台 |
CN112030972A (zh) * | 2020-07-30 | 2020-12-04 | 中国二十冶集团有限公司 | 一种灌注桩二次清孔装置及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206941595U (zh) | 旋挖桩灌注砼导管连接装置 | |
CN206267139U (zh) | 一种桩基钢筋笼定位及砼灌注支架 | |
CN207392772U (zh) | 一种无缆风绳钢立柱调直体系 | |
CN106120544B (zh) | 一种用于空心墩封顶的装置及施工方法 | |
CN106988300A (zh) | 一种软土地基灌注桩水平承载增强体及其施工方法 | |
CN206677447U (zh) | 用于锅炉受热面水冷壁高空对口焊接的平台 | |
CN207419261U (zh) | 一种斜拉桥塔柱混凝土布料器 | |
CN202390843U (zh) | 灌注桩浇注导管固定平台 | |
CN105951683B (zh) | 闸墩牛腿钢筋施工方法 | |
CN207109546U (zh) | 一种拱肋临时铰装置 | |
CN206680951U (zh) | 一种水利工程用的河道防护结构 | |
CN206667233U (zh) | 一种钢丝绳、钢管、卡扣组合可拆卸吊筋 | |
CN105696468B (zh) | 水中桥梁施工中的水下混凝土浇筑方法 | |
CN206616561U (zh) | 混合式混凝土泵送管槽 | |
CN209025446U (zh) | 一种铝模传料洞口施工装置 | |
CN205330673U (zh) | 一种下煤立眼浇筑装置 | |
CN203924411U (zh) | 预制装配式防火墙 | |
CN208965547U (zh) | 一种新型简便可循环使用的吊筋装置 | |
CN209555785U (zh) | 一种适用于高墩桥梁的墩身外观涂装施工平台 | |
CN207047705U (zh) | 一种扭曲截面形式的钢塔环缝工作业平台 | |
CN206902553U (zh) | 一种钢制砂顶装置 | |
CN206903206U (zh) | 一种新型电动爬升模板系统 | |
CN207033471U (zh) | 隧道边墙仰拱混凝土成环浇注自行移动全弧模板 | |
CN206308705U (zh) | 一种混凝土装配式基础 | |
CN206752485U (zh) | 真空降水井封堵结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180130 Termination date: 20180714 |
|
CF01 | Termination of patent right due to non-payment of annual fee |