CN206931947U CN201720284121.2U CN201720284121U CN206931947U CN 206931947 U CN206931947 U CN 206931947U CN 201720284121 U CN201720284121 U CN 201720284121U CN 206931947 U CN206931947 U CN 206931947U
Authority
CN
China
Prior art keywords
crane span
span structure
bolt
bellows
outer bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720284121.2U
Other languages
Chinese (zh)
Inventor
孙斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZHONGHUAN ELECTRICAL Co Ltd
Original Assignee
JIANGSU ZHONGHUAN ELECTRICAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHONGHUAN ELECTRICAL Co Ltd filed Critical JIANGSU ZHONGHUAN ELECTRICAL Co Ltd
Priority to CN201720284121.2U priority Critical patent/CN206931947U/en
Application granted granted Critical
Publication of CN206931947U publication Critical patent/CN206931947U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)

Abstract

Novel cable bridge, including the first crane span structure, the first bellows, the first bolt, the second crane span structure, the 3rd crane span structure, the 3rd bolt, connecting rod, the second bellows, the second bolt, outer bar and interior bar, the first bellows of installation on the right side of first crane span structure, two the second crane span structures of installation on the right side of first bellows, two the second crane span structure side walls are fixedly linked, outer bar is each side fixedly mounted by the first screw on each second crane span structure, interior bar right-hand member is arranged in outer bar, outer bar is provided with the first bolt, and interior bar is fixed in outer bar by the first bolt;The utility model has the advantages that:The angle of bend of curved logical structure can be adjusted.

Description

Novel cable bridge
Technical field
Novel cable bridge is the utility model is related to, belongs to cable testing bridge technical field.
Background technology
In extra large work project, crane span structure installing space is limited, and equipment amount is very big, and cable has to connect with each equipment It is logical, so the requirement to the curved logical class product of cable testing bridge system is very high, it is necessary to there is a polytropism feature, and the bridge of prior art The angle of bend of the curved logical structure of frame is all fixed angle, without flexibility.In order to solve above-mentioned difficulties, it is necessary to develop a energy Adjust the Novel cable bridge of the angle of bend of curved logical structure.
The content of the invention
The purpose of this utility model is to provide Novel cable bridge.
Problem to be solved in the utility model is that the angle of bend of the curved logical structure of the crane span structure of prior art is all fixed angles The problem of spending.
To realize the purpose of this utility model, the technical solution adopted in the utility model is:
Novel cable bridge, including the first crane span structure, the first bellows, the first bolt, the second crane span structure, the 3rd crane span structure, the 3rd Bolt, connecting rod, the second bellows, the second bolt, outer bar and interior bar, the first bellows of the first crane span structure right side installation, first Two the second crane span structures of installation, two the second crane span structure side walls are fixedly linked on the right side of bellows, on each second crane span structure each side Outer bar is fixedly mounted by the first screw, interior bar right-hand member is arranged in outer bar, and outer bar is provided with the first bolt, and the first bolt is by Bar is fixed in outer bar, and interior bar left end is fixedly mounted in the first crane span structure side wall by the second screw, is installed on the right side of the second crane span structure Bellows, bellows right side install the 3rd crane span structure, each side install two connecting rods by bearing pin on each second crane span structure, even Bar left end is provided with the second bolt, and connecting rod left end is fixed on the second crane span structure by the second bolt, and connecting rod right-hand member is provided with the 3rd bolt, the Connecting rod right-hand member is fixed on the 3rd crane span structure by three bolts.
First crane span structure, the second crane span structure and the 3rd crane span structure are all slot type structures.
The utility model has the advantages that:Unscrew the first bolt, stretch the first bellows, interior bar is stretched out outside outer bar, can expand The distance between big first crane span structure and the second crane span structure;Unscrew the second bolt, the 3rd bolt, bend the second bellows, make above 3rd crane span structure has been bent up the 3rd following crane span structure and has been turned under down, can bow out different angles, realizes the bending of curved logical structure Angle has flexibility, it is possible to achieve different angle of bend.
Brief description of the drawings
Fig. 1 is the utility model Novel cable bridge overall structure figure;
In figure:1st, the first crane span structure 2, the first bellows 3, the first bolt 4, the second crane span structure 5, the 3rd crane span structure 6, 3rd bolt 7, connecting rod 8, the second bellows 9, the second bolt 10, outer bar 11, interior bar.
Embodiment
Below in conjunction with the accompanying drawings and embodiment is further described to the utility model.
The utility model Novel cable bridge, including the first crane span structure 1, the first bellows 2, the first bolt 3, the second crane span structure 4, 3rd crane span structure 5, the 3rd bolt 6, connecting rod 7, the second bellows 8, the second bolt 9, outer bar 10 and interior bar 11, first crane span structure 1 Right side is installed by the first bellows 2, two the second crane span structures 4 of the right side of the first bellows 2 installation, two side wall stationary phases of the second crane span structure 4 Even, outer bar 10 is each side fixedly mounted by the first screw on each second crane span structure 4, the right-hand member of interior bar 11 is arranged on outer bar 10 Interior, outer bar 10 is provided with the first bolt 3, unscrews the first bolt 3, stretches the first bellows 2, interior bar 11 is stretched out outside outer bar 10, The distance between the first crane span structure 1 and the second crane span structure 4 can be expanded;Interior bar 11 is fixed in outer bar 10 by the first bolt 3, and interior bar 11 is left End is fixedly mounted in the side wall of the first crane span structure 1 by the second screw, the right side of the second crane span structure 4 installation bellows, is pacified on the right side of bellows The 3rd crane span structure 5 is filled, two connecting rods 7 are each side installed by bearing pin on each second crane span structure 4, the left end of connecting rod 7 is provided with second The left end of connecting rod 7 is fixed on the second crane span structure 4 by bolt 9, the second bolt 9, and the right-hand member of connecting rod 7 is provided with the 3rd bolt 6, the 3rd bolt 6 The right-hand member of connecting rod 7 is fixed on the 3rd crane span structure 5, the first crane span structure 1, the second crane span structure 4 and the 3rd crane span structure 5 are all slot type structures, are unscrewed Second bolt 9, the 3rd bolt 6, the second bellows 8 is bent, the 3rd crane span structure 5 above has been bent up the 3rd following crane span structure 5 It is turned under down, different angles can be bowed out, realizing the angle of bend of curved logical structure has flexibility, it is possible to achieve different is curved Bent angle.
The utility model application method:Unscrew the first bolt 3, stretch the first bellows 2, interior bar 11 is stretched out outer bar 10 Outside, the distance between the first crane span structure 1 and the second crane span structure 4 can be expanded;Unscrew the second bolt 9, the 3rd bolt 6, bend the second ripple Pipe 8, the 3rd crane span structure 5 for making above have been bent up the 3rd following crane span structure 5 and have been turned under down, can bow out different angles, realize The angle of bend of curved logical structure has flexibility, it is possible to achieve different angle of bend.

Claims (2)

1. Novel cable bridge, including the first crane span structure(1), the first bellows(2), the first bolt(3), the second crane span structure(4), the 3rd Crane span structure(5), the 3rd bolt(6), connecting rod(7), the second bellows(8), the second bolt(9), outer bar(10)And interior bar(11), it is special Sign is:First crane span structure(1)Right side is installed by the first bellows(2), the first bellows(2)Right side is installed by two the second crane span structures (4), two the second crane span structures(4)Side wall is fixedly linked, each second crane span structure(4)On each side pass through the first screw fix peace Fill outer bar(10), interior bar(11)Right-hand member is arranged on outer bar(10)It is interior, outer bar(10)It is provided with the first bolt(3), the first bolt(3) By interior bar(11)It is fixed on outer bar(10)It is interior, interior bar(11)Left end is fixedly mounted on the first crane span structure by the second screw(1)Side wall On, the second crane span structure(4)Bellows is installed on right side, and the 3rd crane span structure is installed on the right side of bellows(5), each second crane span structure(4)Upper left and right Two connecting rods are respectively installed by bearing pin in both sides(7), connecting rod(7)Left end is provided with the second bolt(9), the second bolt(9)By connecting rod(7) Left end is fixed on the second crane span structure(4)On, connecting rod(7)Right-hand member is provided with the 3rd bolt(6), the 3rd bolt(6)By connecting rod(7)Right-hand member is consolidated It is scheduled on the 3rd crane span structure(5)On.
2. Novel cable bridge according to claim 1, it is characterized in that:First crane span structure(1), the second crane span structure(4)With 3rd crane span structure(5)All it is slot type structure.
CN201720284121.2U 2017-03-22 2017-03-22 Novel cable bridge Expired - Fee Related CN206931947U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720284121.2U CN206931947U (en) 2017-03-22 2017-03-22 Novel cable bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720284121.2U CN206931947U (en) 2017-03-22 2017-03-22 Novel cable bridge

Publications (1)

Publication Number Publication Date
CN206931947U true CN206931947U (en) 2018-01-26

Family

ID=61349707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720284121.2U Expired - Fee Related CN206931947U (en) 2017-03-22 2017-03-22 Novel cable bridge

Country Status (1)

Country Link
CN (1) CN206931947U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109149462A (en) * 2018-09-11 2019-01-04 镇江宝源电仪设备有限公司 A kind of electric bridge frame convenient for interconnection between gantry
CN109373105A (en) * 2018-12-29 2019-02-22 重庆科众机械有限公司 A kind of pipeline patching device
CN111130035A (en) * 2020-01-21 2020-05-08 福建成田科技有限公司 Bridge frame
CN113451954A (en) * 2021-07-01 2021-09-28 江苏精通电气工程设备有限公司 Three-way type bridge and installation method thereof
CN114336440A (en) * 2021-11-18 2022-04-12 南京润杰电控设备有限公司 High-adaptability multi-angle elbow bridge

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109149462A (en) * 2018-09-11 2019-01-04 镇江宝源电仪设备有限公司 A kind of electric bridge frame convenient for interconnection between gantry
CN109373105A (en) * 2018-12-29 2019-02-22 重庆科众机械有限公司 A kind of pipeline patching device
CN111130035A (en) * 2020-01-21 2020-05-08 福建成田科技有限公司 Bridge frame
CN113451954A (en) * 2021-07-01 2021-09-28 江苏精通电气工程设备有限公司 Three-way type bridge and installation method thereof
CN114336440A (en) * 2021-11-18 2022-04-12 南京润杰电控设备有限公司 High-adaptability multi-angle elbow bridge
CN114336440B (en) * 2021-11-18 2024-03-19 南京润杰电控设备有限公司 High-adaptability multi-angle elbow bridge

Similar Documents

Publication Publication Date Title
CN206931947U (en) Novel cable bridge
CN205369973U (en) Spatial grid structure bucking restraint reinforcing apparatus
CN102711402B (en) LED display module connecting device
CN202467183U (en) Clamping and fixing device of reinforced concrete beam steel formwork
CN105437149A (en) Deformation retraction self-recovery type mounting tool for unilateral bolt fastener
CN107514135A (en) A kind of steel reinforced concrete beam forms is without support system erecting device and its application method
CN206054945U (en) A kind of low cost list branch pipe(tube) antidetonation crane system
CN105633872B (en) T-shaped elbow attachment structure of plastic rubber cable bridge rack and attaching method thereof
CN106401170B (en) A kind of aluminum alloy mould plate connects high plate exterior wall strengthening device
CN206931946U (en) A kind of cable testing bridge
CN101787737B (en) Structure node meeting spatial constraint requirements in different directions simultaneously
CN203605170U (en) Lamp installing suspension cable hooking clamp
CN203440927U (en) Heat preservation wall
CN208329285U (en) A kind of aluminium-plastic panel mounting connection structure
CN207469749U (en) A kind of steel reinforced concrete beam forms is without support system erecting device
CN203230177U (en) Tool type column formwork fixing fastener
CN205010817U (en) Large -scale thin cylinder strutting arrangement
CN208934224U (en) A kind of end template is detachable and the adjustable steel bar truss floor support plate of thickness
CN202121050U (en) Portable foldable cage antenna
CN208844960U (en) Connection structure is used in a kind of reinforcing of rack
CN105098690A (en) A bundle spacer rod and support members thereof
CN106948531B (en) Curtain skeleton internal connecting type bigeminy connection structure
CN207304432U (en) A kind of dead-weight photovoltaic bracket
CN207000225U (en) A kind of mounting bracket for contact net seal
CN206513097U (en) A kind of new omnipotent auxiliary cross-arm of " D " composite

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180126

Termination date: 20210322

CF01 Termination of patent right due to non-payment of annual fee