CN206928625U - A kind of high-altitude construction carrier - Google Patents
A kind of high-altitude construction carrier Download PDFInfo
- Publication number
- CN206928625U CN206928625U CN201621336199.6U CN201621336199U CN206928625U CN 206928625 U CN206928625 U CN 206928625U CN 201621336199 U CN201621336199 U CN 201621336199U CN 206928625 U CN206928625 U CN 206928625U
- Authority
- CN
- China
- Prior art keywords
- straight beam
- hanging
- hanging crossbeam
- crossbeam
- basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title abstract description 32
- 229910000831 Steel Inorganic materials 0.000 claims description 19
- 239000010959 steel Substances 0.000 claims description 19
- 230000002787 reinforcement Effects 0.000 claims description 5
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 6
- 230000007812 deficiency Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of high-altitude construction carrier, including the protection basket of hanging crossbeam side is arranged on, protection basket corner is provided with column, and column lower end is connected with bottom shelves;The parallel with hanging crossbeam of basket and the side away from hanging crossbeam are protected, is provided with the crosspiece as railing of connection column upper semisection;Protect the parallel with hanging crossbeam of basket and close to the side of hanging crossbeam, the crosspiece for being used to be set up in hanging crossbeam upper side edge portion being provided with the outside of connection column upper semisection;Protection basket is connected with straight beam, and straight beam crossbearer is on hanging crossbeam and both ends connect two columns of the vertical same side of hanging crossbeam of protection basket respectively.The beneficial effect of this programme can be learnt according to the narration to such scheme, simple in construction, reasonable in design, workmen is set to have foothold, working security is not only provided, and workmen is had the strong point in construction, so as to add the precision of construction and efficiency of construction.
Description
Technical field
It the utility model is related to power station construction field, more particularly to a kind of high-altitude construction carrier.
Background technology
The equipment such as power station generating set are because build is huge, and some hanging crossbeams of setting are liftoff higher, workmen
It is very dangerous when carrying out attended operation to these hanging beams, and due to dangerous larger, it is especially careful during construction, lead
Cause efficiency of construction also not high.At present, also tend to suspend workmen in midair with safety rope using lifting machinery in construction and grasped
Make, such workmen does not have the strong point, in construction, can firmly cause the rotation of body, efficiency of construction is by very big shadow
Ring.Moreover, so doing, lifting machinery is also constantly in seizure condition, wastes the use of equipment.
Utility model content
The utility model is for the deficiency present in prior art, and provides a kind of simple in construction, reasonable in design, is made
Workmen has foothold, not only provides working security, and workmen is had the strong point in construction, so as to
Add the precision of construction and a kind of hanging construction of beam protection carrier of efficiency of construction.
To achieve these goals, the utility model provides a kind of high-altitude construction carrier, including is arranged on hanging crossbeam
The protection basket of side, the protection basket corner are provided with column, and the column lower end is connected with bottom shelves, set between the bottom shelves
There are reinforcement shelves, bottom plate is provided with the upside of the bottom shelves and reinforcement shelves;It is described to protect the parallel and remote with the hanging crossbeam of basket
From the side of the hanging crossbeam, the crosspiece as railing for connecting the column upper semisection is provided with;The protection basket connection
There is straight beam, the straight beam crossbearer is on hanging crossbeam and both ends connect the same of the vertical hanging crossbeam of the protection basket respectively
Two columns of side;Two sides of the vertical hanging crossbeam of the protection basket are provided with the straight beam;Positioned at institute
The column for stating the protection basket of one end of straight beam is welded to connect with the straight beam;Positioned at described in the straight beam other end
The column of protection basket includes two blocks of symmetrical steel plates for being separately positioned on the straight beam both sides, and the steel plate is positioned at described straight
Round pin one is provided with the upside of beam, the steel plate, which is located on the downside of the straight beam, is provided with round pin two;Pin is provided with the upside of the straight beam
Hole, the pin-and-hole are connected with alignment pin, and the alignment pin upper end is provided with hook, and is connected by the hook with the round pin one
Connect.
Further, the side of the hanging crossbeam parallel with the hanging crossbeam and close of the protection basket, if
The crosspiece for being used to be set up in the hanging crossbeam upper side edge portion being equipped with the outside of the connection column upper semisection.
Further, the column being connected with the round pin one and round pin two be connected to a round pin one and
Two round pins two, and the round pin is greater diameter than the round pin two.
Further, the stage casing of the straight beam is provided with buttress brace.
When needing to construct to hanging crossbeam, basket adjustment position on straight beam is protected at both ends, made between two protection baskets
Away from slightly larger than hanging beam width, this programme is sling into crossbearer with lifting machinery and is placed on hanging crossbeam, and workmen is hung
Enter to protect basket, with rope suitably by this programme and hanging crossbeam colligation.Workmen can rely on this programme to enter hanging crossbeam
The constructing operation that row needs.
The beneficial effect of this programme can be learnt according to the narration to such scheme, simple in construction, reasonable in design, make constructor
Member has foothold, not only provides working security, and workmen is had the strong point in construction, so as to add
The precision and efficiency of construction of construction, have liberated lifting machinery again.This programme crossbearer chooses the protection basket on both sides on hanging crossbeam
Get up, therefore, the safety of the linear beam portion of most stress is most important, thus sets buttress brace to aid in counter-bending in straight beam stage casing
Power.The bearing capacity of steel construction piece is mainly reflected in two aspects:One is resistant to stress effect caused by external loads effect
Ability, another resistance external loads effect caused by anamorphic effect ability.Former control condition is requirement steel construction
The design strength standard value of part is greater than the external loads acted on part caused stress value in component, this control
Condition would generally use in the case where component tension and the short piece longitudinal axis are pressurized.Latter control condition is that requirement steel construction piece exists
By external loads(Mainly pressure, moment of flexure, shearing or its combination)There are the ability of enough resistances to deformation, this change under effect
Shape is probably the component parts of the excessive forfeiture for causing steel construction piece stability of the overall deformation of component or steel construction piece because of part
Deform excessive(Local buckling)Component is set to lose stability.In Practical Project, because steelwork component is mostly elongated member, after
A kind of probability of engineering accident caused by control condition deficiency is maximum.Meanwhile steel construction piece stability indicator generally use is critical
Stress, due to critical stress value generally by the slenderness ratio of part, the plate of building block generous when plate between constraint side
Formula etc. controls, and its value is usually less than the strength design standard equal to steel, and the stress effect of the straight beam part of such as this programme is very
A big part comes from moment of flexure, because when resist torque causes to deform, while just resisted stress rupture caused by moment of flexure.
The column of the straight beam other end includes two blocks of symmetrical steel plates for being separately positioned on the straight beam both sides, and steel plate is located on the straight beam
Side is provided with round pin one, and the steel plate, which is located on the downside of the straight beam, is provided with round pin two;Pin-and-hole is provided with the upside of the straight beam, institute
State pin-and-hole and be connected with alignment pin, the alignment pin upper end is provided with hook, and is connected by the hook with the round pin one, so
Connected mode make column be easy to move on straight beam, be conveniently adjusted two protection basket between spacing.Protect basket with it is hanging
The side of the parallel and close hanging crossbeam of crossbeam, it is provided with the outside of the connection column upper semisection and is used to be set up in described hang
The crosspiece of empty crossbeam upper side edge portion, the straight beam on the upside of hanging crossbeam and crosspiece is formed rectangular configuration, increase stability.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 top view;
In figure, 1, hanging crossbeam;2nd, basket is protected;3rd, column;4th, bottom shelves;5th, crosspiece;6th, straight beam;7th, alignment pin;8th, strengthen
Beam;9th, round pin one;10th, round pin two.
Embodiment
For the technical characterstic for illustrating this programme can be understood, below by embodiment, this programme is illustrated.
As shown in Figure 1-2, the present embodiment is a kind of high-altitude construction carrier, including is arranged on the protection of the hanging side of crossbeam 1
Basket 2,2 four jiaos of basket of protection are provided with column 3, and the lower end of column 3 is connected with bottom shelves 4, is provided with reinforcement shelves between bottom shelves 4, bottom shelves 4 and
Strengthen being provided with bottom plate on the upside of shelves;Protect the parallel with hanging crossbeam 1 of basket 2 and the side away from hanging crossbeam 1, the company of being provided with
Connect the crosspiece 5 as railing of the upper semisection of column 3;Protect the parallel with hanging crossbeam 1 of basket 2 and close to the side of hanging crossbeam 1
Face, the crosspiece 5 for being used to be set up in the hanging upper side edge portion of crossbeam 1 being provided with the outside of the connection upper semisection of column 3;Protection basket 2 connects
Have a straight beam 6, the crossbearer of straight beam 6 on hanging crossbeam 1 and both ends connect respectively protection basket vertically the same side of hanging crossbeam 1 two
Individual column 3;The stage casing of straight beam 6 is provided with buttress brace 8;Two sides of the vertical hanging crossbeam 1 of protection basket 2 are provided with straight beam
6;Column 3 positioned at the protection basket 2 of one end of straight beam 6 is welded to connect with straight beam 6;The vertical of basket 2 is protected positioned at the other end of straight beam 6
Post 3 includes two blocks of symmetrical steel plates for being separately positioned on the both sides of straight beam 6, and steel plate is located at the upside of straight beam 6 and is provided with round pin 1, steel
Plate, which is located on the downside of straight beam, is provided with round pin 2 10;The column 3 being connected with round pin 1 and round pin 2 10 is connected to a round pin
One 9 and two round pins 2 10, and the diameter of round pin 1 is more than round pin 2 10;The upside of straight beam 6 is provided with pin-and-hole, and pin-and-hole is connected with fixed
Position pin 11, the upper end of alignment pin 11 is provided with hook, and is connected by linking up with round pin 1.
When needing to construct to hanging crossbeam 1, the adjustment position on straight beam 6 of basket 2 is protected at both ends, makes two protection baskets 2
Spacing be slightly larger than the hanging width of crossbeam 1, this programme is sling into crossbearer with lifting machinery and is placed on hanging crossbeam 1, and will construction
Personnel hang in protection basket 2, with rope suitably by this programme and the hanging colligation of crossbeam 1.Workmen can rely on this programme to outstanding
The constructing operation that empty crossbeam 1 is needed.
Technical characteristic of the utility model without description can be realized by or using prior art, will not be repeated here,
Certainly, described above is not to limitation of the present utility model, and the utility model is also not limited to the example above, this technology neck
The variations, modifications, additions or substitutions that the those of ordinary skill in domain is made in essential scope of the present utility model, it should also belong to
The scope of protection of the utility model.
Claims (1)
- The carrier 1. a kind of high-altitude is constructed, including it is arranged on the protection basket of hanging crossbeam side, it is characterised in that the protection basket four Angle is provided with column, and the column lower end is connected with bottom shelves, and reinforcement shelves, the bottom shelves and reinforcement shelves are provided between the bottom shelves Upside is provided with bottom plate;The side of the hanging crossbeam parallel with the hanging crossbeam and remote of the protection basket, is set There is the crosspiece as railing for connecting the column upper semisection;The protection basket is connected with straight beam, and the straight beam crossbearer is hanging On crossbeam and both ends connect two columns of the same side of the vertical hanging crossbeam of the protection basket respectively;The protection basket Two sides of the vertical hanging crossbeam be provided with the straight beam;The protection basket positioned at one end of the straight beam The column is welded to connect with the straight beam;Include setting respectively positioned at the column of the protection basket of the straight beam other end Two blocks of symmetrical steel plates in the straight beam both sides are put, the steel plate, which is located on the upside of the straight beam, is provided with round pin one, the steel Plate, which is located on the downside of the straight beam, is provided with round pin two;Pin-and-hole is provided with the upside of the straight beam, the pin-and-hole is connected with alignment pin, institute State alignment pin upper end and be provided with hook, and be connected by the hook with the round pin one;The protection basket with it is described hanging horizontal The side of Liangping row the and close hanging crossbeam, is provided with described for being set up on the outside of the connection column upper semisection The crosspiece of hanging crossbeam upper side edge portion;The stage casing of the straight beam is provided with buttress brace.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621336199.6U CN206928625U (en) | 2016-12-07 | 2016-12-07 | A kind of high-altitude construction carrier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621336199.6U CN206928625U (en) | 2016-12-07 | 2016-12-07 | A kind of high-altitude construction carrier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206928625U true CN206928625U (en) | 2018-01-26 |
Family
ID=61349225
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621336199.6U Expired - Fee Related CN206928625U (en) | 2016-12-07 | 2016-12-07 | A kind of high-altitude construction carrier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206928625U (en) |
-
2016
- 2016-12-07 CN CN201621336199.6U patent/CN206928625U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102774743A (en) | Box-type member turn-over lifting appliance with oversized cross section and application method thereof | |
CN104099877A (en) | Connecting bar | |
CN202201618U (en) | Multi-level hoisting beam hoisting tool | |
CN206705511U (en) | A kind of hardware suspending connecting device | |
CN205855767U (en) | A kind of for sheet material shipment, the suspender of transfer | |
CN206928625U (en) | A kind of high-altitude construction carrier | |
CN206928657U (en) | A kind of construction auxiliary device | |
CN206942176U (en) | One kind construction falling proof device | |
CN206928630U (en) | A kind of hanging crossbeam basket of work | |
CN206665955U (en) | A kind of high-strength steel triangle suspender lifts framework constructing device | |
CN203889888U (en) | Steel plate hoisting clamp | |
CN203345925U (en) | Lifting tool for heat treatment of large parts | |
CN205034957U (en) | I -steel is hoist for handling | |
CN203295026U (en) | Cross-shaped round-disc-type lifting appliance | |
CN206245702U (en) | A kind of hanging construction of beam protection carrier | |
CN210064893U (en) | Steel reinforcement cage flat lifting tool | |
CN203255869U (en) | Six-claw chain rotatable lifting appliance | |
CN208650786U (en) | A kind of novel hanging ladder | |
CN202687766U (en) | Overturn lifting appliance for oversized section cube type component | |
CN206928683U (en) | A kind of lifeline standing rigging | |
CN204281030U (en) | A kind of special hanger lifting section bar | |
CN201605089U (en) | Special lifting appliance for rolling mill | |
CN206538090U (en) | One kind lifting steel plate steel shoulder pole | |
CN204752029U (en) | Tower crane jib loading boom safety cable | |
CN204897164U (en) | A truss -like compensating beam for hoist and mount of large -scale electromechanical device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180126 Termination date: 20181207 |
|
CF01 | Termination of patent right due to non-payment of annual fee |