CN206927640U - The mounting structure of sewage-treatment plant - Google Patents

The mounting structure of sewage-treatment plant Download PDF

Info

Publication number
CN206927640U
CN206927640U CN201720844945.0U CN201720844945U CN206927640U CN 206927640 U CN206927640 U CN 206927640U CN 201720844945 U CN201720844945 U CN 201720844945U CN 206927640 U CN206927640 U CN 206927640U
Authority
CN
China
Prior art keywords
welded
groove
gag lever
lever post
sewage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720844945.0U
Other languages
Chinese (zh)
Inventor
陈铁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Boao Zongheng Network Technology Co ltd
Nantong Shanshui Chemical Technology Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720844945.0U priority Critical patent/CN206927640U/en
Application granted granted Critical
Publication of CN206927640U publication Critical patent/CN206927640U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of mounting structure of sewage-treatment plant, including sewage pipe, current limiting plate is welded with the inwall of the sewage pipe, the side of the current limiting plate is welded with erecting bed, erecting bed is located at the side of sewage pipe, and mounting hole is offered on the erecting bed, processing unit body is slidably fitted with mounting hole, two symmetrically arranged first grooves are offered on the erecting bed, draw bar is slidably fitted with two the first grooves.The utility model is simple in construction, convenient operation, processing unit body is positioned in mounting hole, processing unit body is fixed jointly for the first gag lever post, the second gag lever post and mounting hole, completes the installation to processing unit body;Handle is pulled, presses the 3rd gag lever post, the first gag lever post and the second gag lever post release the fixation to processing unit body, complete the dismounting to processing unit body, overhauled or changed so as to which processing unit body is taken out.

Description

The mounting structure of sewage-treatment plant
Technical field
It the utility model is related to sewage-treatment plant technical field, more particularly to a kind of installation knot of sewage-treatment plant Structure.
Background technology
Sewage-treatment plant is mainly used in handling sanitary wastewater and industrial wastewater, and the waste water after processing removes wherein Harmful substance, can be re-used in the production and living of people, improve the utilization rate of water resource.
Common sewage-treatment plant installs cumbersome, is not easy to staff and sewage-treatment plant is entered at any time Row maintenance, when sewage-treatment plant breaks down, sewage-treatment plant quickly can not be dismantled and carried out by staff Change, it is necessary to sewage-treatment plant using a kind of quick for installation while mounting structure that is readily disassembled, therefore, it is proposed that The mounting structure of sewage-treatment plant is used to solve the above problems.
Utility model content
The purpose of this utility model is and the sewage-treatment plant that proposes in order to solve shortcoming present in prior art Mounting structure.
To achieve these goals, the utility model employs following technical scheme:
The mounting structure of sewage-treatment plant, including sewage pipe, current limiting plate is welded with the inwall of the sewage pipe, it is described The side of current limiting plate is welded with erecting bed, and erecting bed is located at the side of sewage pipe, mounting hole is offered on the erecting bed, installation Processing unit body is slidably fitted with hole, offers two symmetrically arranged first grooves on the erecting bed, two first Draw bar is slidably fitted with groove, the side close to each other of two draw bars is welded with same first gag lever post, institute State the first gag lever post and be located at side of the erecting bed away from current limiting plate, the second groove is offered on the first groove top inwall, Gear is rotatablely equipped with second groove, rack, rack and pinion engagement, the second groove side are welded with the top of draw bar First through hole is offered on inwall, rotating shaft is rotatablely equipped with first through hole, one end of the rotating shaft is extended in the second groove And the side of gear is welded in, the other end of the rotating shaft is welded with L-type support, and L-type support is located at the outside of erecting bed, described The 3rd groove is offered on first bottom portion of groove inwall, the first card column, the draw bar bottom are slidably fitted with the 3rd groove The first neck is offered, the first neck is adapted with the first card column, and the second through hole is offered on the 3rd bottom portion of groove inwall, Pull bar is slidably fitted with second through hole, one end of the pull bar extends in the 3rd groove and is welded in the one of the first card column End, the erecting bed top side are welded with the first pillar, and the first pillar side is rotatablely equipped with the second gag lever post, described Erecting bed is welded with the second pillar away from the first pillar side, and the second pillar side is rotatablely equipped with the 3rd gag lever post, institute State the 3rd gag lever post side and be welded with the second card column, the second neck, the second neck and second are offered on second gag lever post Card column is adapted.
Preferably, water inlet pipe is installed with the processing unit body water inlet, offered on the current limiting plate into Water hole, inlet opening are adapted with water inlet pipe, and outlet pipe is installed with the processing unit body delivery port.
Preferably, sealing ring is installed with the inlet opening, the water inlet pipe is slidingly sealed cooperation with sealing ring.
Preferably, the L-type support includes transverse axis and vertical pivot, and transverse axis is welded in a side bottom of vertical pivot, and vertical pivot is welded in One end of rotating shaft.
Preferably, the draw bar both sides are welded with card article, are offered on the first groove both sides inwall and card article The card article groove being adapted, card article are slidably connected with card article groove.
Preferably, the pull bar outer sheath is provided with the first spring, and one end of the first spring is welded in one end of the first card column, The other end of first spring is welded on the 3rd groove side inwall, and one end of the pull bar is welded with handle, and handle is positioned at peace Fill below platform, the erecting bed side is welded with one end of second spring, and the other end of second spring is welded in the 3rd gag lever post Side.
Compared with prior art, the beneficial effects of the utility model are:Pass through sewage pipe, current limiting plate, erecting bed, rotating shaft, L Type support, draw bar, water inlet pipe, the 3rd gag lever post, processing unit body, the first gag lever post, outlet pipe, the second card column, second Gag lever post, the first pillar, the second pillar, pull bar, the first card column, gear, the first spring are engaged with second spring, are realized pair The Fast Installation of processing unit body and dismounting, facilitate people and processing unit body is overhauled or changed at any time.
In the utility model, the mounting structure of the sewage-treatment plant is simple in construction, convenient operation, by processing unit sheet Body is positioned in mounting hole, and processing unit body is fixed jointly for the first gag lever post, the second gag lever post and mounting hole, is completed Installation to processing unit body;Handle is pulled, presses the 3rd gag lever post, the first gag lever post and the second gag lever post are released to processing The fixation of device body, the dismounting to processing unit body is completed, overhauled or more so as to which processing unit body is taken out Change.
Brief description of the drawings
Fig. 1 be the utility model proposes sewage-treatment plant mounting structure subjective sectional view;
Fig. 2 be the utility model proposes sewage-treatment plant mounting structure vertical view cutaway drawing;
Fig. 3 be the utility model proposes sewage-treatment plant mounting structure part A structure sectional view;
Fig. 4 be the utility model proposes sewage-treatment plant mounting structure part B structure sectional view.
In figure:It is 1 sewage pipe, 2 current limiting plates, 3 erecting beds, 4 rotating shafts, 5L types support, 6 draw bars, 7 water inlet pipes, 8 the 3rd spacing Bar, 9 processing unit bodies, 10 first gag lever posts, 11 outlet pipes, 12 second card columns, 13 second gag lever posts, 14 first pillars, 15 Second pillar, 16 pull bars, 17 first card columns, 18 gears.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.
Reference picture 1-4, the mounting structure of sewage-treatment plant, including sewage pipe 1, weld on the inwall of sewage pipe 1 limited Flowing plate 2, the side of current limiting plate 2 are welded with erecting bed 3, and erecting bed 3 is located at the side of sewage pipe 1, installation is offered on erecting bed 3 Hole, processing unit body 9 is slidably fitted with mounting hole, offer two symmetrically arranged first grooves on erecting bed 3, two It is slidably fitted with draw bar 6 in first groove, it is spacing that the sides close to each other of two draw bars 6 is welded with same first Bar 10, the first gag lever post 10 are located at side of the erecting bed 3 away from current limiting plate 2, and it is recessed to offer second on the first groove top inwall Groove, gear 18 is rotatablely equipped with the second groove, the top of draw bar 6 is welded with rack, and rack and pinion 18 engages, the second groove First through hole is offered on the inwall of side, rotating shaft 4 is rotatablely equipped with first through hole, one end of rotating shaft 4 extends to the second groove Side that is interior and being welded in gear 18, the other end of rotating shaft 4 are welded with L-type support 5, and L-type support 5 is located at the outside of erecting bed 3, The 3rd groove is offered on first bottom portion of groove inwall, the first card column 17 is slidably fitted with the 3rd groove, the bottom of draw bar 6 is opened Provided with the first neck, the first neck is adapted with the first card column 17, offers the second through hole on the 3rd bottom portion of groove inwall, and second Pull bar 16 is slidably fitted with through hole, one end of pull bar 16 extends in the 3rd groove and is welded in one end of the first card column 17, The top side of erecting bed 3 is welded with the first pillar 14, and the side of the first pillar 14 is rotatablely equipped with the second gag lever post 13, erecting bed 3 The second pillar 15 is welded with away from the side of the first pillar 14, the side of the second pillar 15 is rotatablely equipped with the 3rd gag lever post 8, the 3rd limit The position side of bar 8 is welded with the second card column 12, and the second neck, the second neck and the phase of the second card column 12 are offered on the second gag lever post 13 It is adapted to, is installed with water inlet pipe 7 in the water inlet of processing unit body 9, inlet opening is offered on current limiting plate 2, inlet opening is with entering Water pipe 7 is adapted, and outlet pipe 11 is installed with the delivery port of processing unit body 9, sealing ring is installed with inlet opening, Water inlet pipe 7 is slidingly sealed cooperation with sealing ring, and L-type support 5 includes transverse axis and vertical pivot, and transverse axis is welded in a side bottom of vertical pivot, Vertical pivot is welded in one end of rotating shaft 4, and the both sides of draw bar 6 are welded with card article, is offered on the first groove both sides inwall and card article The card article groove being adapted, card article are slidably connected with card article groove, and the outer sheath of pull bar 16 is provided with the first spring, one end weldering of the first spring One end of the first card column 17 is connected to, the other end of the first spring is welded on the 3rd groove side inwall, one end weldering of pull bar 16 Handle is connected to, for handle positioned at the lower section of erecting bed 3, the side of erecting bed 3 is welded with one end of second spring, the other end of second spring It is welded in the side of the 3rd gag lever post 8.
Operation principle:Processing unit body 9 is positioned in mounting hole, shakes L-type support 5, the drive shaft 4 of L-type support 5 With gear 18, gear 18 is promoted processing unit body 9, made by the gag lever post 10 of rack draw bar 6 and first, the first gag lever post 10 Processing unit body 9 is brought into close contact with current limiting plate 2, and the first spring force promotes the first card column 17, and the first card column 17 is caught in first Neck, the side of processing unit body 9 is fixed, rotates the second gag lever post 13, the second gag lever post 13 is placed in processing unit The top of body 9, second spring elastic force promote the 3rd gag lever post 8, and the 3rd gag lever post 8 is driven the second card column 12, the second card column 12 The second neck is caught in, the second gag lever post 13 is fixed, the first gag lever post 10, the second gag lever post 13 are with mounting hole jointly to place Reason device body 9 is fixed, and completes the installation to processing unit body 9;Handle is pulled, handle shackle rod 16 and first blocks Post 17, the first card column 17 depart from the first neck, and the first gag lever post 10 releases the fixation to processing unit body 9, the limit of pressing the 3rd Position bar 8, the 3rd gag lever post 8 are driven the second card column 12, and the second card column 12 departs from the second neck, and the second gag lever post 13 is released to processing The fixation of device body 9, complete the dismounting to processing unit body 9, so as to by processing unit body 9 take out overhauled or Change.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model Within enclosing.

Claims (6)

1. the mounting structure of sewage-treatment plant, including sewage pipe (1), current limiting plate is welded with the inwall of the sewage pipe (1) (2), it is characterised in that the side of the current limiting plate (2) is welded with erecting bed (3), and erecting bed (3) is located at the one of sewage pipe (1) Side, mounting hole is offered on the erecting bed (3), processing unit body (9), the erecting bed are slidably fitted with mounting hole (3) two symmetrically arranged first grooves are offered on, are slidably fitted with draw bar (6) in two the first grooves, two are led The side close to each other for drawing bar (6) is welded with same first gag lever post (10), and first gag lever post (10) is positioned at installation Side of the platform (3) away from current limiting plate (2), the second groove is offered on the first groove top inwall, is rotated in the second groove Gear (18) is installed, rack is welded with the top of draw bar (6), rack and pinion (18) engages, in the second groove side First through hole is offered on wall, is rotatablely equipped with rotating shaft (4) in first through hole, it is recessed that one end of the rotating shaft (4) extends to second In groove and the side of gear (18) is welded in, the other end of the rotating shaft (4) is welded with L-type support (5), and L-type support (5) is located at The outside of erecting bed (3), the 3rd groove is offered on the first bottom portion of groove inwall, first is slidably fitted with the 3rd groove Card column (17), draw bar (6) bottom offer the first neck, and the first neck is adapted with the first card column (17), and described The second through hole is offered on three bottom portion of groove inwalls, is slidably fitted with pull bar (16) in the second through hole, the one of the pull bar (16) End extends in the 3rd groove and is welded in one end of the first card column (17), and erecting bed (3) top side is welded with first Pillar (14), the first pillar (14) side are rotatablely equipped with the second gag lever post (13), and the erecting bed (3) is away from first Post (14) side is welded with the second pillar (15), and the second pillar (15) side is rotatablely equipped with the 3rd gag lever post (8), described 3rd gag lever post (8) side is welded with the second card column (12), and the second neck, the second card are offered on second gag lever post (13) Groove is adapted with the second card column (12).
2. the mounting structure of sewage-treatment plant according to claim 1, it is characterised in that the processing unit body (9) water inlet pipe (7) is installed with water inlet, inlet opening, inlet opening and water inlet pipe (7) are offered on the current limiting plate (2) It is adapted, outlet pipe (11) is installed with processing unit body (9) delivery port.
3. the mounting structure of sewage-treatment plant according to claim 2, it is characterised in that fixed peace in the inlet opening Equipped with sealing ring, the water inlet pipe (7) is slidingly sealed cooperation with sealing ring.
4. the mounting structure of sewage-treatment plant according to claim 1, it is characterised in that the L-type support (5) includes Transverse axis and vertical pivot, transverse axis are welded in a side bottom of vertical pivot, and vertical pivot is welded in one end of rotating shaft (4).
5. the mounting structure of sewage-treatment plant according to claim 1, it is characterised in that draw bar (6) both sides Card article is welded with, the card article groove being adapted with card article is offered on the first groove both sides inwall, card article is slided with card article groove Dynamic connection.
6. the mounting structure of sewage-treatment plant according to claim 1, it is characterised in that pull bar (16) outer sheath Provided with the first spring, one end of the first spring is welded in one end of the first card column (17), and the other end of the first spring is welded in On three groove side inwalls, one end of the pull bar (16) is welded with handle, and handle is below erecting bed (3), the installation Platform (3) side is welded with one end of second spring, and the other end of second spring is welded in the side of the 3rd gag lever post (8).
CN201720844945.0U 2017-07-13 2017-07-13 The mounting structure of sewage-treatment plant Expired - Fee Related CN206927640U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720844945.0U CN206927640U (en) 2017-07-13 2017-07-13 The mounting structure of sewage-treatment plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720844945.0U CN206927640U (en) 2017-07-13 2017-07-13 The mounting structure of sewage-treatment plant

Publications (1)

Publication Number Publication Date
CN206927640U true CN206927640U (en) 2018-01-26

Family

ID=61354444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720844945.0U Expired - Fee Related CN206927640U (en) 2017-07-13 2017-07-13 The mounting structure of sewage-treatment plant

Country Status (1)

Country Link
CN (1) CN206927640U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108358250A (en) * 2018-02-06 2018-08-03 成都明杰科技有限公司 Sewage disposal floating head system buoyant structure driving device
CN108439526A (en) * 2018-04-25 2018-08-24 郑州嘉晨化工科技有限公司 A kind of wastewater from chemical industry chlorine residue emission reduction device
CN108960591A (en) * 2018-06-15 2018-12-07 国网山东省电力公司蓬莱市供电公司 A kind of Electric Power Network Planning integrated data platform management system
CN112648456A (en) * 2020-12-14 2021-04-13 天津爱尔普科技发展有限公司 Welded type air heater water inlet and outlet pipe joint
CN114592305A (en) * 2022-03-08 2022-06-07 江苏富邦纺织集团有限公司 Fabric finishing structure with protective structure for fiber textile

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108358250A (en) * 2018-02-06 2018-08-03 成都明杰科技有限公司 Sewage disposal floating head system buoyant structure driving device
CN108358250B (en) * 2018-02-06 2018-11-30 福州鑫厦鑫计算机有限公司长乐区分公司 Sewage treatment floating head system buoyant structure driving device
CN108439526A (en) * 2018-04-25 2018-08-24 郑州嘉晨化工科技有限公司 A kind of wastewater from chemical industry chlorine residue emission reduction device
CN108439526B (en) * 2018-04-25 2020-02-18 中原工学院 Chemical wastewater residual chlorine emission reduction device
CN108960591A (en) * 2018-06-15 2018-12-07 国网山东省电力公司蓬莱市供电公司 A kind of Electric Power Network Planning integrated data platform management system
CN108960591B (en) * 2018-06-15 2022-02-08 国网山东省电力公司蓬莱市供电公司 Power grid planning integrated data platform management system
CN112648456A (en) * 2020-12-14 2021-04-13 天津爱尔普科技发展有限公司 Welded type air heater water inlet and outlet pipe joint
CN112648456B (en) * 2020-12-14 2022-07-05 天津爱尔普科技发展有限公司 Welded type air heater water inlet and outlet pipe joint
CN114592305A (en) * 2022-03-08 2022-06-07 江苏富邦纺织集团有限公司 Fabric finishing structure with protective structure for fiber textile

Similar Documents

Publication Publication Date Title
CN206927640U (en) The mounting structure of sewage-treatment plant
CN204275641U (en) Sewage separating and filtering device
CN209756167U (en) Traditional chinese medical science is traditional chinese medicine dregs of a decoction squeezes device for internal medicine
CN107285424A (en) A kind of solid particle sewage treatment equipment
CN211634289U (en) Traditional chinese medical science tumour rehabilitation physiotherapy equipment
CN104986883B (en) A kind of Portable water purifier
CN207347190U (en) A kind of high-efficiency sewage process tank
CN109174239A (en) A kind of Physical Experiment experimental bench
CN206927641U (en) Device for recycling sewage with warning function
CN204824409U (en) Portable water filter equipment
CN206927635U (en) Portable sewage purifier
CN208748153U (en) A kind of large-size complex-cross-section aluminum profile press quenching equipment
CN207361966U (en) A kind of efficient sewage-treatment plant
CN208678493U (en) A kind of sewage treatment filter screen replacement mechanism
CN211538713U (en) Novel paediatrics nursing is washd device
CN204058168U (en) A kind of city sewage disposal device
CN208825617U (en) A kind of modified chamfering device
CN202289676U (en) Hair filter for swimming pool
CN207451824U (en) A kind of remote controlled purifier
CN206930484U (en) Environment monitoring Sewage Sampler
CN205816364U (en) A kind of decomposer as the high-purity oxalic acid of effective catalyst scabs material processing device
CN206925785U (en) A kind of nut pin locating tool of automatic nut machine
CN216768984U (en) Chinese-medicinal material extract concentrates jar interior liquid level monitoring devices with alarm
CN202770689U (en) Dyeing rack for clinical laboratory
CN205771253U (en) A kind of organic wastewater from lab collection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200107

Address after: 226000 Jiangsu city of Nantong province Gangzha Xingtai Road No. 18

Patentee after: NANTONG SHANSHUI CHEMICAL TECHNOLOGY DEVELOPMENT CO.,LTD.

Address before: 510000 Guangzhou High-tech Industrial Development Zone Science Avenue 231, 233 Skirt Building B1B2, 1st, 2nd, 3rd and 4th floors

Patentee before: BOAO ZONGHENG NETWORK TECHNOLOGY Co.,Ltd.

Effective date of registration: 20200107

Address after: 510000 Guangzhou High-tech Industrial Development Zone Science Avenue 231, 233 Skirt Building B1B2, 1st, 2nd, 3rd and 4th floors

Patentee after: BOAO ZONGHENG NETWORK TECHNOLOGY Co.,Ltd.

Address before: No. 99, daga Town, Zhuji City, Zhuji, Zhejiang

Patentee before: Chen Tie

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180126

Termination date: 20210713