CN206925182U - A kind of construction site steel pipe bender - Google Patents

A kind of construction site steel pipe bender Download PDF

Info

Publication number
CN206925182U
CN206925182U CN201720426602.2U CN201720426602U CN206925182U CN 206925182 U CN206925182 U CN 206925182U CN 201720426602 U CN201720426602 U CN 201720426602U CN 206925182 U CN206925182 U CN 206925182U
Authority
CN
China
Prior art keywords
guide rail
steel pipe
workbench
fixed
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720426602.2U
Other languages
Chinese (zh)
Inventor
汪大勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shirongxing Engineering Technology (jiangsu) Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720426602.2U priority Critical patent/CN206925182U/en
Application granted granted Critical
Publication of CN206925182U publication Critical patent/CN206925182U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of construction site steel pipe bender, including workbench, the workbench bottom is welded with firm banking, strip hole is provided with the workbench procapsid center, the strip hole is provided with fixed block, and the second fixation guide rail is fixed with fixed block, both sides are respectively arranged with the first fixation guide rail and the 3rd and fix guide rail below the second fixation guide rail on the workbench procapsid, the fixed block is connected by threaded rod and motor, the limiting plate both sides are provided with motor fixing plate, the chute engages connection by the connection gear on inner surface wall with toothed disc gear, and toothed disc is fixedly connected by connecting rod with motor.In the utility model, the construction site utilizes the lifting of motor driven threaded rod with steel pipe bender first so that the second fixation guide rail moves up and down, the bending of steel pipe is carried out, compared to traditional artificial bending, bending will more fast standard, labour is saved, adds economic benefit.

Description

A kind of construction site steel pipe bender
Technical field
It the utility model is related to equipment technical field, more particularly to a kind of construction site steel pipe bender.
Background technology
Bender is divided into steel pipe bender and bender for sheet metal, and its structure of bender for sheet metal mainly includes support, workbench And clamping plate, workbench are placed on support, workbench is made up of base and pressing plate, and base is connected by hinge with clamping plate, bottom Seat is made up of seat shell, coil and cover plate, and coil is placed in the depression of seat shell, and recessed top is covered with cover plate.By wire pair during use Coil electricity, gravitation is produced to pressing plate after energization, so as to realize the clamping to thin plate between pressing plate and base.As a result of electricity Magnetic force clamps so that pressing plate can make various workpieces requirement, and the workpiece that have side wall can be processed, also ten in operation Divide simplicity, bend pipe bender, its structure is relatively simple, and typically steel pipe is fixed by guide rail, adjusts the position of guide rail Put, realize the bending of steel pipe.
But existing construction site with steel pipe bender in use there is in place of some shortcomings, be typically all Manual bending, more arduously, and the time of bending is longer.
Utility model content
The purpose of this utility model is to solve shortcoming present in prior art, and a kind of construction site proposed is used Steel pipe bender.
To achieve these goals, the utility model employs following technical scheme:A kind of steel pipe bending of construction site Machine, including workbench, the workbench bottom is welded with firm banking, and nut bore is offered on firm banking, the work Strip hole is provided with platform procapsid center, the strip hole is provided with fixed block, and it is solid that second is fixed with fixed block Determine guide rail, fixing both sides below guide rail positioned at second on the workbench procapsid is respectively arranged with the first fixation guide rail and the 3rd Fixed guide rail, the fixed block are connected by threaded rod and motor, and limiting plate is provided with the bench-top center, The limiting plate both sides are provided with motor fixing plate, and chute, the cunning are offered at the center of two motor fixing plate opposite faces Groove engages connection with toothed disc gear by the connection gear on inner surface wall, and toothed disc is fixed by connecting rod and motor and connected Connect.
As further describing for above-mentioned technical proposal:
The first fixation guide rail and the 3rd fixation guide rail are symmetrical on the second fixation guide rail.
As further describing for above-mentioned technical proposal:
The screwed hole that matching thread bar uses is offered at the center of the limiting plate.
As further describing for above-mentioned technical proposal:
The motor fixing plate is provided with two altogether, and two motor fixing plates are symmetrical on limiting plate.
As further describing for above-mentioned technical proposal:
Described first fixes guide rail, the second fixation guide rail and the 3rd fixes guide rail into three-legged structure.
In the utility model, the construction site utilizes the lifting of motor driven threaded rod with steel pipe bender first so that Second fixation guide rail moves up and down, and carries out the bending of steel pipe, compared to traditional artificial bending, bending more will be marked quickly Standard, labour is saved, add economic benefit, secondly the length that threaded rod moves down can be controlled, so as to adjust steel pipe bending Angle so that the construction site steel pipe bender can fold place different angle bend pipe, it is practical, using more Convenient, the construction site is reasonable in design with steel pipe bender, and motor passes through the tooth connection gear teeth on toothed disc and motor fixing frame Wheel engagement connection, so as to which when moving up and down, motor can be moved up and down with matching thread bar, ensure its safety in threaded rod Stable work.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of construction site steel pipe bender structural representation;
Fig. 2 is the structural representation of the utility model motor.
Marginal data:
1- firm bankings, 2- nut bores, 3- workbench, 4- first fix guide rail, 5- second fixes guide rail, 6- bar holes Hole, 7- the 3rd fix guide rail, 8- fixed blocks, 9- threaded rods, 10- limiting plates, 11- motors, 12- motor fixing plates, 13- chutes, 14- connection gears, 15- toothed discs, 16- connecting rods.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.
Reference picture 1-2, a kind of construction site steel pipe bender, including workbench 3, the bottom of workbench 3 are welded with fixation Base 1, and nut bore 2 is offered on firm banking 1, workbench 3 is provided with strip hole 6, strip hole 6 at procapsid center Fixed block 8 is provided with, and the second fixation guide rail 5 is fixed with fixed block 8, guide rail 5 is fixed positioned at second on the procapsid of workbench 3 Lower section both sides are respectively arranged with the first fixation guide rail 4 and the 3rd and fix guide rail 7, and fixed block 8 is driven by threaded rod 9 and motor 11 Connect, be provided with limiting plate 10 at the top center of workbench 3, the both sides of limiting plate 10 are provided with motor fixing plate 12, and two motors Chute 13 is offered at the center of the opposite face of fixed plate 12, chute 13 passes through the connection gear 14 on inner surface wall and the tooth of toothed disc 15 Wheel engagement connection, and toothed disc 15 is fixedly connected by connecting rod 16 with motor 11.
First fixation guide rail 4 and the 3rd fixation guide rail 7 is symmetrical on the second fixation guide rail 5, the center of limiting plate 10 Place offers the nut bore that matching thread bar 9 uses, and motor fixing plate 12 is provided with two altogether, and two motor fixing plates 12 close Symmetrical in limiting plate 10, first, which fixes guide rail 4, second, fixes the fixation guide rail 7 of guide rail 5 and the 3rd into three-legged structure.
Motor 11 for can clockwise and anticlockwise motor, motor 11 nibbled by toothed disc 15 and the connection gear 14 on motor fixing plate 12 Close and fix, so as to which motor 11 when moving up and down, can be moved up and down in threaded rod 9 with matching thread bar 9.
Operation principle:In use, the construction site steel pipe bender is consolidated by the top nut hole 2 of firm banking 1 first Dingan County installs, in use, connecting power supply, steel pipe engaging is fixed on into the first fixation guide rail 4, second fixes guide rail 5 and the 3rd Between fixed guide rail 7, motor 11 is opened, motor 11 drives threaded rod 9 to rotate, and threaded rod 9 declines so as to drive the second fixation to lead Rail 5 declines, and carries out bending to steel pipe, after the completion of bending, can now be inverted with controlled motor 11, and threaded rod 9 rises, and unclamps steel Pipe, turns off power supply, removes the steel pipe of bending, the steel pipe bender entire run of whole building building site.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model Within enclosing.

Claims (5)

1. a kind of construction site steel pipe bender, including workbench(3), it is characterised in that the workbench(3)Weld bottom There is firm banking(1), and firm banking(1)On offer nut bore(2), the workbench(3)Procapsid is provided with center Strip hole(6), the strip hole(6)It is provided with fixed block(8), and fixed block(8)On be fixed with the second fixation guide rail (5), the workbench(3)On procapsid guide rail is fixed positioned at second(5)Lower section both sides are respectively arranged with the first fixation guide rail(4) Guide rail is fixed with the 3rd(7), the fixed block(8)Pass through threaded rod(9)With motor(11)Drive connection, the workbench(3) Limiting plate is provided with top center(10), the limiting plate(10)Both sides are provided with motor fixing plate(12), and two motors are consolidated Fixed board(12)Chute is offered at the center of opposite face(13), the chute(13)Pass through the connection gear on inner surface wall(14)With Toothed disc(15)Gear engagement connection, and toothed disc(15)Pass through connecting rod(16)With motor(11)It is fixedly connected.
2. a kind of construction site steel pipe bender according to claim 1, it is characterised in that described first fixes guide rail (4)Guide rail is fixed with the 3rd(7)Guide rail is fixed on second(5)It is symmetrical.
A kind of 3. construction site steel pipe bender according to claim 1, it is characterised in that the limiting plate(10)'s Matching thread bar is offered at center(9)The screwed hole used.
A kind of 4. construction site steel pipe bender according to claim 1, it is characterised in that the motor fixing plate (12)Two, and two motor fixing plates are provided with altogether(12)On limiting plate(10)It is symmetrical.
5. a kind of construction site steel pipe bender according to claim 1, it is characterised in that described first fixes guide rail (4), second fix guide rail(5)Guide rail is fixed with the 3rd(7)Into three-legged structure.
CN201720426602.2U 2017-04-21 2017-04-21 A kind of construction site steel pipe bender Expired - Fee Related CN206925182U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720426602.2U CN206925182U (en) 2017-04-21 2017-04-21 A kind of construction site steel pipe bender

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720426602.2U CN206925182U (en) 2017-04-21 2017-04-21 A kind of construction site steel pipe bender

Publications (1)

Publication Number Publication Date
CN206925182U true CN206925182U (en) 2018-01-26

Family

ID=61349997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720426602.2U Expired - Fee Related CN206925182U (en) 2017-04-21 2017-04-21 A kind of construction site steel pipe bender

Country Status (1)

Country Link
CN (1) CN206925182U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108580620A (en) * 2018-07-05 2018-09-28 张家港市圣鼎源制管有限公司 A kind of steel pipe apparatus for bending
CN111924742A (en) * 2020-07-07 2020-11-13 唐灶虎 Adjustable rail bender
CN112122422A (en) * 2020-08-20 2020-12-25 利辛县泓坤美思家具科技有限公司 Steel bending forming device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108580620A (en) * 2018-07-05 2018-09-28 张家港市圣鼎源制管有限公司 A kind of steel pipe apparatus for bending
CN111924742A (en) * 2020-07-07 2020-11-13 唐灶虎 Adjustable rail bender
CN112122422A (en) * 2020-08-20 2020-12-25 利辛县泓坤美思家具科技有限公司 Steel bending forming device
CN112122422B (en) * 2020-08-20 2023-12-08 徐州玄腾机械有限公司 Steel bending and forming device

Similar Documents

Publication Publication Date Title
CN206925182U (en) A kind of construction site steel pipe bender
CN220372525U (en) Steel plate welding device for steel structure building
CN113414526A (en) Welding set for electrical engineering
CN108857196A (en) A kind of mechanical frock positioning formula welding mechanism
CN214768516U (en) Bending machine with flexible size adjustment
CN219745950U (en) Continuous type coiled pipe bending machine
CN208146965U (en) A kind of architectural precast drilling device
CN207930156U (en) A kind of laser soldering device of copper aluminium dissimilar metal
CN113953667A (en) Multi-angle welded pipeline laser spot welding robot and welding method thereof
CN215941379U (en) Correcting and pressing device for mesh belt metal piece
CN208117084U (en) A kind of welding for steel structure manipulator
CN203245666U (en) Carrier roller lifting device of band steel edge milling machine
CN209272527U (en) A kind of Z-shape steel surface perforating device
CN209078121U (en) The fixture of the silencer bonding machine of adjustable holding height
CN215179261U (en) Plastic tubing multi-angle experimental apparatus that buckles
CN211072732U (en) Automobile body side wall clamp
CN218135910U (en) Furniture frame multi-angle rotating fine steel welding machine tool
CN212349967U (en) Sheet metal bending machine
CN208162505U (en) A kind of wire rod Bending Mould
CN211564969U (en) Elevator accessory welding position frock
CN220329690U (en) Auxiliary positioning device of bending machine
CN207709586U (en) A kind of straightener convenient for blanking
CN219052544U (en) Bending machine capable of conveniently adjusting bending angle
CN215699173U (en) Multi-angle oscillating automatic weld machine for electrical engineering
CN214392736U (en) Side wall fixture device that brazes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190430

Address after: 215311 Room 4, 136 Dongrong Road, Bacheng Town, Kunshan City, Suzhou City, Jiangsu Province

Patentee after: Shirongxing Engineering Technology (Jiangsu) Co., Ltd.

Address before: 312000 Yuewang 59, Fung Le Village, Jianhu Town, Yuecheng District, Shaoxing, Zhejiang

Patentee before: Wang Qiao

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180126