CN206922358U - One kind combination layered cable bridge - Google Patents

One kind combination layered cable bridge Download PDF

Info

Publication number
CN206922358U
CN206922358U CN201720890919.1U CN201720890919U CN206922358U CN 206922358 U CN206922358 U CN 206922358U CN 201720890919 U CN201720890919 U CN 201720890919U CN 206922358 U CN206922358 U CN 206922358U
Authority
CN
China
Prior art keywords
groove
division board
plate
riser
transverse slat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720890919.1U
Other languages
Chinese (zh)
Inventor
黄洪成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Morning Kun Electrical Equipment Co Ltd
Original Assignee
Sichuan Morning Kun Electrical Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Morning Kun Electrical Equipment Co Ltd filed Critical Sichuan Morning Kun Electrical Equipment Co Ltd
Priority to CN201720890919.1U priority Critical patent/CN206922358U/en
Application granted granted Critical
Publication of CN206922358U publication Critical patent/CN206922358U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model proposes one kind to combine layered cable bridge, including bottom plate and the left plate and right plate that are arranged on bottom plate both sides, also include division board, the division board includes transverse slat and sets transverse slat one end and the riser vertical with transverse slat, left plate is provided with least two isolated grooves in the horizontal direction, isolated groove level is corresponded on right plate and is provided with isolation through groove, isolated groove and isolation through groove are in same level, the transverse slat of division board is through isolation through groove and is connected in isolated groove, division board is detachably connected by the locking device on riser with right plate, the standing groove for placing division board is additionally provided with the bottom plate.Cable testing bridge can be isolated into two layers or multilayer by the division board of of the present utility model cable testing bridge, avoid the situation placed for layering and set multiple cable testing bridges, and can be placed into when that need not be layered in standing groove, convenient installation.

Description

One kind combination layered cable bridge
Technical field
The utility model belongs to cable distribution support equipment field, and in particular to one kind combination layered cable bridge.
Background technology
At present, in China's supplying electricity and power distribution technical field, crane span structure is the support for bearing electric wire or cable.But traditional The intensity of the load-bearing of crane span structure and not ideal to the level of institute's laying wire or cable.Common crane span structure is steel plate by folding It is curved, groove profile is converted into, then electric wire is placed in groove, then cover plate is added above, the crane span structure of this structure is needing to divide During class laying wire cable, it is merely able to by the way of multiple crane span structures are set, takes up space larger.In addition, electricity traditional at present Cable crane span structure has using the structure for setting riser near center line in groove, and the space in groove is divided into two, but in narrow space Place, not enough width, therefore also not bery practical, and the riser set are when without separating, using directly turning over The mode of cell body bottom is poured on, occupies the placement space of a part of electric wire, and easily scratches damage cable.
Utility model content
The purpose of this utility model is:Laying wire cable of classifying is being needed for existing cable crane span structure set forth above When, it is merely able to by the way of multiple crane span structures are set, takes up space the problem of larger, the utility model provides a kind of combination layering Formula cable testing bridge.
The technical solution adopted in the utility model is as follows:
One kind combination layered cable bridge, including bottom plate and the left plate and right plate that are arranged on bottom plate both sides, are also wrapped Division board is included, the division board includes transverse slat and sets transverse slat one end and the riser vertical with transverse slat, and left plate is in the horizontal direction At least two isolated grooves are provided with, isolated groove level is corresponded on right plate and is provided with isolation through groove, isolated groove and isolation are logical Groove is in same level, and the transverse slat of division board through isolation through groove and is connected in isolated groove, and division board passes through riser On locking device be detachably connected with right plate, the standing groove for placing division board is additionally provided with the bottom plate.
The operation principle of this cable testing bridge is:The orthogonal composition T-type structure of transverse slat and riser of division board, division board are put Put in standing groove, when in use, when cable used, which needs to be layered, to be placed, division board is taken out from standing groove, and inserts Enter the isolated groove and isolation through groove respectively on left plate and right plate, whole cable testing bridge is divided into two layers, without again More setting cable testing bridges, it is convenient and practical;The isolated groove on left plate and right plate and isolation through groove be in the horizontal direction simultaneously It is correspondingly arranged multigroup, when cable testing bridge need not be layered, division board is put back into standing groove, at this moment isolation through groove just serves logical The effect of wind cooling;Also, isolation through groove is through the groove of right plate, the horizontal stroke for acting as clamping division board of isolated groove Plate, can be the groove through left plate, or not through the neck of left plate;On the whole, this cable testing bridge every Cable testing bridge can be isolated into two layers or multilayer from plate, avoid the situation placed for layering and multiple cable testing bridges are set, And it can be placed into when that need not be layered in standing groove, convenient installation.
Further, the locking device includes being arranged on tapped through hole and screw on riser, on right plate every Mounting hole is provided with from tapped through hole is corresponded at the notch of groove, riser screws in tapped through hole and mounting hole and right plate by screw It is fixed.The mounting hole and tapped through hole of locking device are arranged on the both sides up and down of isolation through groove.
Further, the left plate is provided with least two groups of isolated grooves in vertical direction, and right plate is in vertical direction Upper corresponding isolated groove is horizontal to be provided with isolation through groove.Isolated groove and isolation through groove not only set in the horizontal direction it is multigroup, It is also provided with vertical direction multigroup, you can with logical by the way that division board to be inserted to different isolated grooves and isolation in vertical direction Groove, cable testing bridge is divided into the space of different-thickness.
Further, in addition to the division board of partition plate structure identical second, the second division board include the second transverse slat and Second riser, the second transverse slat is identical with the length of transverse slat, and the second riser is identical with riser size structure, and the division board is in transverse slat Length direction be provided with the groove that connect with riser, the second transverse slat insertion groove is interior and passes through the second riser and the screw thread of riser Hole and screw are detachably connected.Second division board can be sleeved in the groove of division board, needing cable testing bridge being separated into During a few sheaf spaces, standing groove, which places multiple division boards, needs very big space, and division board is made can be with composite assembly to one The structure risen, can greatly save the space of standing groove, also make the volume of cable testing bridge smaller, be more convenient to use.
Further, the standing groove includes to accommodate transverse slat and the cell body connected with sidewall of the bottom plate, on sidewall of the bottom plate It also is provided with mounting hole corresponding with the tapped through hole of riser.Standing groove on bottom plate be arranged to transverse slat volume identical cell body, Transverse slat can just be inserted, and can be fixed by mounting hole and riser.
Further, the width of the bottom plate is less than the height of left plate and right plate.Side plate is highly baseplate width 2-4 times, make whole cable testing bridge compared to prior art, be particularly suited for the place of narrow space.
In summary, by adopting the above-described technical solution, the beneficial effects of the utility model are:
1. cable testing bridge can be isolated into two layers or multilayer by the division board of of the present utility model cable testing bridge, avoid The situation that multiple cable testing bridges are set is placed for layering, and can be placed into when that need not be layered in standing groove, it is convenient Installation;
2. the utility model can by the way that division board to be inserted to different isolated grooves and isolation through groove in vertical direction, Cable testing bridge is divided into the space of different-thickness;
3. division board of the present utility model, which is made, can greatly save standing groove with composite assembly to structure together Space, also make the volume of cable testing bridge smaller, be more convenient to use;
4. the width of the utility model bottom plate is less than the height of side plate, compared to prior art, it is narrow to be particularly suited for space Narrow place.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the combining structure schematic diagram of division board of the present utility model and the second division board;
Fig. 3 is right side structure schematic diagram when the utility model does not carry out layered shaping;
Fig. 4 is right side structure schematic diagram when the utility model carries out layered shaping.
Wherein, wherein:1-bottom plate, 2-left plate, 3-right plate, 4-transverse slat, 5-riser, 6-isolated groove, 7- Isolation through groove, 8-tapped through hole, 9-screw, 10-mounting hole, the 11-the second transverse slat, the 12-the second riser, 13-groove, 14-cell body.
Embodiment
The utility model is described in further detail with reference to embodiment, but embodiment of the present utility model is not It is limited to this.
Embodiment 1:
As Figure 1-4, a kind of combination layered cable bridge, including bottom plate 1 and the left plate for being arranged on the both sides of bottom plate 1 2 and right plate 3, in addition to division board, the division board include transverse slat 4 and setting one end of transverse slat 4 and the riser vertical with transverse slat 4 5, left plate 2 is provided with least two isolated grooves 6 in the horizontal direction, and horizontal be provided with of isolated groove 6 is corresponded on right plate 3 and is isolated Groove 7, isolated groove 6 and isolation through groove 7 are in same level, and the transverse slat 4 of division board through isolation through groove 7 and is connected to In isolated groove 6, division board is detachably connected by the locking device on riser 5 and right plate 3, is additionally provided with the bottom plate 1 For placing the standing groove of division board.
The operation principle of this cable testing bridge is:The orthogonal composition T-type structure of transverse slat 4 and riser 5 of division board, division board It is placed in standing groove, when in use, when cable used, which needs to be layered, to be placed, division board is taken out from standing groove, and Insertion is located at isolated groove 6 and isolation through groove 7 on left plate 2 and right plate 3 respectively, and whole cable testing bridge is divided into two layers, It is convenient and practical without more setting cable testing bridges again;The isolated groove 6 on left plate 2 and right plate 3 and isolation through groove 7 exist simultaneously It is correspondingly arranged multigroup in horizontal direction, when cable testing bridge need not be layered, division board is put back into standing groove, at this moment isolation through groove 7 just serve aeration-cooling effect;Also, isolation through groove 7 is the groove through right plate 3, isolated groove 6 act as card The transverse slat 4 of division board is connect, can be the groove through left plate 2, or not through the neck of left plate 2;On the whole, Cable testing bridge can be isolated into two layers or multilayer by the division board of this cable testing bridge, avoid and set multiple electricity for layering placement The situation of cable crane span structure, and can be placed into when that need not be layered in standing groove, convenient installation.
Embodiment 2:
The present embodiment is on the basis of above-described embodiment, is further limited, and the locking device is perpendicular including being arranged on Tapped through hole 8 and screw 9 on plate 5, tapped through hole 8 is corresponded at the notch of isolation through groove 7 on right plate 3 and is provided with mounting hole 10, riser 5 screws in tapped through hole 8 by screw 9 and mounting hole 10 is fixed with right plate 3.The mounting hole 10 and spiral shell of locking device Line through hole 8 is arranged on the both sides up and down of isolation through groove 7.Left plate 2 is provided with least two groups of isolated grooves 6 in vertical direction, right Side plate 3 corresponds to the level of isolated groove 6 and is provided with isolation through groove 7 in vertical direction.Isolated groove 6 and isolation through groove 7 are not only in water Square set up multigroup, be also provided with vertical direction multigroup, you can with by the way that division board is inserted not in vertical direction Same isolated groove 6 and isolation through groove 7, cable testing bridge is divided into the space of different-thickness.
The present embodiment other parts are same as the previously described embodiments, repeat no more here.
Embodiment 3:
The present embodiment is on the basis of above-described embodiment, is further limited, in addition to partition plate structure identical Second division board, the second division board include the second transverse slat 11 and the second riser 12, and the second transverse slat 11 is identical with the length of transverse slat 4, Second riser 12 is identical with the size structure of riser 5, and the division board is provided with what is connected with riser 5 on the length direction of transverse slat 4 Groove 13, the second transverse slat 11 insertion groove 13 are interior and detachable by the tapped through hole 8 and screw 9 of the second riser 12 and riser 5 Connection.Second division board can be sleeved in the groove 13 of division board, when needing cable testing bridge being separated into a few sheaf spaces, put Putting groove and placing multiple division boards needs very big space, and division board is made can be with composite assembly to structure together, can be with The space of standing groove is greatlyd save, also makes the volume of cable testing bridge smaller, is more convenient to use.
The present embodiment other parts are same as the previously described embodiments, repeat no more here.
Embodiment 4:
The present embodiment is on the basis of above-described embodiment, is further limited, and standing groove includes that transverse slat 4 can be accommodated simultaneously The cell body 14 connected with the side wall of bottom plate 1, mounting hole 10 corresponding with the tapped through hole of riser 58 also is provided with the side wall of bottom plate 1.Bottom Standing groove on plate 1 be arranged to the volume identical cell body 14 of transverse slat 4, transverse slat 4 can just be inserted, and peace can be passed through Dress hole 10 is fixed with riser 5.
The present embodiment other parts are same as the previously described embodiments, repeat no more here.
Embodiment 5:
The present embodiment is on the basis of above-described embodiment, is further limited, and the width of bottom plate 1 is less than the He of left plate 2 The height of right plate 3, side plate are highly 2-4 times of the width of bottom plate 1, whole cable testing bridge is more suitable for compared to prior art Place for narrow space.
The present embodiment other parts are same as the previously described embodiments, repeat no more here.
It is described above, only it is preferred embodiment of the present utility model, any formal limit is not done to the utility model System, every any simple modification made according to the technical essence of the utility model to above example, equivalent variations, each falls within Within the scope of protection of the utility model.

Claims (6)

1. one kind combination layered cable bridge, including bottom plate (1) and the left plate (2) and the right side that are arranged on bottom plate (1) both sides Plate (3), it is characterised in that also including division board, the division board include transverse slat (4) and be arranged on transverse slat (4) one end and with horizontal stroke The vertical riser (5) of plate (4), left plate (2) are provided with least two isolated grooves (6), right plate (3) on pair in the horizontal direction Answer isolated groove (6) is horizontal to be provided with isolation through groove (7), isolated groove (6) and isolation through groove (7) are in same level, every Transverse slat (4) from plate through isolation through groove (7) and is connected in isolated groove (6), and division board is filled by the locking on riser (5) Put and be detachably connected with right plate (3), the standing groove for placing division board is additionally provided with the bottom plate (1).
2. a kind of combination layered cable bridge according to claim 1, it is characterised in that the locking device includes setting Tapped through hole (8) and screw (9) on riser (5) are put, right plate corresponds to spiral shell on (3) at the notch of isolation through groove (7) Line through hole (8) is provided with mounting hole (10), and riser (5) screws in tapped through hole (8) and mounting hole (10) and right plate by screw (9) (3) it is fixed.
3. a kind of combination layered cable bridge according to claim 1 or 2, it is characterised in that the left plate (2) exists Vertical direction is provided with least two groups of isolated grooves (6), and right plate (3) corresponds to isolated groove (6) level and set in vertical direction There is isolation through groove (7).
4. a kind of combination layered cable bridge according to claim 3, it is characterised in that also include and partition plate structure The division board of identical second, the second division board include the second transverse slat (11) and the second riser (12), the second transverse slat (11) and transverse slat (4) length is identical, and the second riser (12) is identical with riser (5) size structure, length direction of the division board in transverse slat (4) Be provided with the groove (13) that connect with riser (5), in the second transverse slat (11) insertion groove (13) and by the second riser (12) and The tapped through hole (8) and screw (9) of riser (5) are detachably connected with division board.
5. a kind of combination layered cable bridge according to claim 3, it is characterised in that the standing groove includes can Transverse slat (4) and the cell body (14) connected with bottom plate (1) side wall are accommodated, also is provided with leading to the screw thread of riser (5) in bottom plate (1) side wall Mounting hole (10) corresponding to hole (8).
A kind of 6. combination layered cable bridge according to claim 1 or 2, it is characterised in that the width of the bottom plate (1) Height of the degree less than left plate (2) and right plate (3).
CN201720890919.1U 2017-07-21 2017-07-21 One kind combination layered cable bridge Expired - Fee Related CN206922358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720890919.1U CN206922358U (en) 2017-07-21 2017-07-21 One kind combination layered cable bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720890919.1U CN206922358U (en) 2017-07-21 2017-07-21 One kind combination layered cable bridge

Publications (1)

Publication Number Publication Date
CN206922358U true CN206922358U (en) 2018-01-23

Family

ID=61348670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720890919.1U Expired - Fee Related CN206922358U (en) 2017-07-21 2017-07-21 One kind combination layered cable bridge

Country Status (1)

Country Link
CN (1) CN206922358U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108879510A (en) * 2018-06-15 2018-11-23 合肥兴联通讯有限公司 A kind of outdoor use cable bearer
CN108879521A (en) * 2018-08-15 2018-11-23 江苏金利电气有限公司 A kind of broad-adjustable high-strength cable bridge
CN109244983A (en) * 2018-10-06 2019-01-18 东台市飞凌电气设备有限公司 A kind of combination gantry

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108879510A (en) * 2018-06-15 2018-11-23 合肥兴联通讯有限公司 A kind of outdoor use cable bearer
CN108879521A (en) * 2018-08-15 2018-11-23 江苏金利电气有限公司 A kind of broad-adjustable high-strength cable bridge
CN109244983A (en) * 2018-10-06 2019-01-18 东台市飞凌电气设备有限公司 A kind of combination gantry

Similar Documents

Publication Publication Date Title
CN206922358U (en) One kind combination layered cable bridge
CN106410085B (en) Combined battery mould group
CN107276426B (en) A kind of building block system electric energy router power cell structure
CN103065805B (en) A kind of rectangular block shape has the aluminium electrolutic capacitor module and structure of radiating surface
CN206412380U (en) A kind of lithium-ion power battery box
CN209150189U (en) A kind of battery pack fixed mechanism
CN104780749A (en) Insulation shielding supporting plate and stacked power module
CN207250601U (en) A kind of mounting structure of bilayer power battery module
CN209626853U (en) A kind of reinforced cable bridge
CN104505481B (en) Lithium ion battery for automobile
CN206059460U (en) A kind of novel lithium battery inclusion
CN209071403U (en) A kind of energy storage device based on echelon battery
CN206470296U (en) A kind of battery case waterproof test support
CN207504080U (en) A kind of battery case structure
CN207459569U (en) A kind of winding displacement plate with anti-winding function
CN206076674U (en) A kind of intelligent sphere is with intelligent bar and using the intelligent sphere and the building system of intelligent bar
CN205489023U (en) High -efficient heat dissipation electric power cabinet of light
CN205159407U (en) Electric automobile lithium cell group install bin with heat radiation structure
CN204089109U (en) A kind of intensive copper-aluminum compound bus duct
CN202917996U (en) Multi-layer building-block type battery charging rack
CN215722138U (en) Cultural industry creative comprehensive public service platform
CN204614634U (en) A kind of dry-type transformer with convenient pulling plate structure
CN202957742U (en) Current transformer power cabinet
CN209860515U (en) Cable bridge convenient to lay cable
CN209126504U (en) A kind of battery pack installing mechanism and automobile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180123