CN206918482U - With the stronger pipe joint of sealing - Google Patents
With the stronger pipe joint of sealing Download PDFInfo
- Publication number
- CN206918482U CN206918482U CN201720637253.9U CN201720637253U CN206918482U CN 206918482 U CN206918482 U CN 206918482U CN 201720637253 U CN201720637253 U CN 201720637253U CN 206918482 U CN206918482 U CN 206918482U
- Authority
- CN
- China
- Prior art keywords
- block
- fixedly connected
- sealing
- spur gear
- pipeline body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Quick-Acting Or Multi-Walled Pipe Joints (AREA)
Abstract
The utility model discloses with the stronger pipe joint of sealing, including joint body and pipeline body, the pipeline body is located at the left side of joint body, elongation set is fixedly connected with the right side of the pipeline body, the holding tank being adapted with elongation set is offered on the left of the joint body, the right-hand member of the elongation set is movably connected in holding tank, the sealing ring being fixedly connected with the right side of the pipeline body inside elongation set, the right side of the sealing ring and the left contact of joint body, fixed block has been fixedly connected with the top and bottom of the pipeline body.The utility model is by setting elongation set, holding tank, sealing ring, fixed block, rack, connecting rod, gripping block, spur gear, drive link and drive block, the effect of high-intensity sealing is reached, joint and water pipe can be linked together by way of extruding, seal section can be increased, and sealing can be strengthened, so as to prevent seepage, it is easy to people to use.
Description
Technical field
Pipe joint technical field is the utility model is related to, specially has and seals stronger pipe joint.
Background technology
Traditional pipeline connection is general all to be docked using two pipes, then using nut, and by controlling connecting end surface
With screw thread geometric accuracy, sub-gasket compound rubber sealing ring is sealed, but this sealing means are because be to use
The mode fixed -piping of clamping, so seal section is smaller, sealing intensity is not strong, it is impossible to the effect of sealing is played well,
Inconvenient people use.
Utility model content
The purpose of this utility model is to provide with stronger pipe joint is sealed, and possesses the advantages of sealing intensity is high,
Solve the problems, such as that pipe joint sealing intensity is low.
To achieve the above object, the utility model provides following technical scheme:With the stronger pipe joint of sealing, including
Joint body and pipeline body, the pipeline body are located at the left side of joint body, are fixedly connected on the right side of the pipeline body
There is elongation to cover, the holding tank being adapted with elongation set, the right-hand member activity of the elongation set are offered on the left of the joint body
It is connected in holding tank, the sealing ring being fixedly connected with the right side of the pipeline body inside elongation set, the sealing ring
Right side and joint body left contact, be fixedly connected with fixed block at the top and bottom of the pipeline body, it is described solid
The surface for determining block offers port, and receiving block has been fixedly connected with the top and bottom of the joint body, the receiving block
Internal activity is connected with rack, and connecting rod is fixedly connected with the left of the rack, and the left end of the connecting rod sequentially passes through appearance
Receive and block and port and be movably installed with gripping block, the right side of the gripping block is contacted with fixed block, and the inside for accommodating block is lived
Dynamic to be connected with positioned at the positive spur gear of rack, the straight-tooth wheel and rack engagement, the spur gear is away from joint body side
Axle center at be fixedly connected with drive link, the one end of the drive link away from spur gear is through accommodating block and be fixedly connected with driving
Block.
Preferably, contiguous block is fixedly connected with the right side of the gripping block, the right-hand member of the contiguous block extends to connecting rod
Inside and be fixedly connected with fixture block, the fixture block is movably connected in the inside of connecting rod.
Preferably, support block is fixedly connected with axle center of the spur gear away from drive link side, the support block
Surface is fixedly connected with bearing, and the outer wall of the bearing is fixedly connected with accommodating the inwall of block.
Preferably, left end of the drive block away from drive link side opens up fluted, is connected with the groove
Briquetting, the briquetting are fixedly connected with gag lever post close to the side for accommodating block, and the top and bottom for accommodating block offer
Stopper slot, the one end of the gag lever post away from briquetting is through drive block and is connected in stopper slot.
Preferably, side of the briquetting away from gag lever post is fixedly connected with pulling block, and the surface of the pulling block is provided with anti-
Sliding line.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, the utility model by set elongation set, holding tank, sealing ring, fixed block, rack, connecting rod, gripping block, directly
Gear, drive link and drive block, the effect of high-intensity sealing is reached, can have been connected joint with water pipe by way of extruding
Together, by increasing capacitance it is possible to increase seal section, and sealing can be strengthened, so as to prevent seepage, it is easy to people to use.
2nd, the utility model is by setting contiguous block and fixture block that gripping block and connecting rod can link together, and allows clamping
Block is rotatable while will not be separated with connecting rod, by setting support block and bearing can support and fixed spur gear,
Spur gear is allowed to rotate more convenient, it is spacing by setting groove, gag lever post, stopper slot and briquetting to be carried out to drive block,
Drive block can not be rotated, by setting pulling block to increase the contact area of briquetting and user's hand, so as to allow user
Briquetting can more easily be pulled.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the right side structural representation of the utility model pipeline body;
Fig. 3 is the left view structure partial schematic diagram of the utility model fixed block;
Fig. 4 is the utility model A partial structurtes enlarged diagram;
Fig. 5 is the utility model B partial structurtes enlarged diagram;
Fig. 6 is the utility model C partial structurtes enlarged diagram.
In figure:1 joint body, 2 pipeline bodies, 3 elongation sets, 4 holding tanks, 5 sealing rings, 6 fixed blocks, 7 accommodate block, 8 teeth
Bar, 9 connecting rods, 10 gripping blocks, 11 spur gears, 12 drive links, 13 drive blocks, 14 contiguous blocks, 15 fixture blocks, 16 support blocks, 17 axles
Hold, 18 grooves, 19 gag lever posts, 20 stopper slots, 21 pulling blocks, 22 ports, 23 briquettings.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-6 are referred to, has and seals stronger pipe joint, including joint body 1 and pipeline body 2, pipeline body 2
Positioned at the left side of joint body 1, the right side of pipeline body 2 is fixedly connected with elongation set 3, the left side of joint body 1 offer with
The holding tank 4 that elongation set 3 is adapted, the right-hand member of elongation set 3 are movably connected in holding tank 4, and the right side of pipeline body 2, which is fixed, to be connected
The sealing ring 5 being connected to inside elongation set 3, the right side of sealing ring 5 and the left contact of joint body 1, the top of pipeline body 2
Portion and bottom have been fixedly connected with fixed block 6, and the surface of fixed block 6 offers port 22, and the top and bottom of joint body 1 are equal
It is fixedly connected with and accommodates block 7, the internal activity for accommodating block 7 is connected with rack 8, and the left side of rack 8 is fixedly connected with connecting rod 9,
The left end of connecting rod 9, which sequentially passes through, to be accommodated block 7 and port 22 and is movably installed with gripping block 10, and the right side of gripping block 10, which is fixed, to be connected
Contiguous block 14 is connected to, the right-hand member of contiguous block 14 extends to the inside of connecting rod 9 and is fixedly connected with fixture block 15, and the activity of fixture block 15 is even
The inside of connecting rod 9 is connected on, by setting contiguous block 14 and fixture block 15 that gripping block 10 and connecting rod 9 can link together,
Allowing gripping block 10, the right side of gripping block 10 contacts with fixed block 6, accommodates rotatable while will not be separated with connecting rod 9
The internal activity of block 7 is connected with to be consolidated positioned at the positive spur gear 11 of rack 8, spur gear 11 at the axle center away from the side of drive link 12
Surely support block 16 is connected with, the surface of support block 16 is fixedly connected with bearing 17, and the outer wall of bearing 17 is consolidated with accommodating the inwall of block 7
Fixed connection, by setting support block 16 and bearing 17 can support and fixed spur gear 11, allow spur gear 11 rotates more just
Victory, spur gear 11 engage with rack 8, and spur gear 11 is fixedly connected with drive link 12 at the axle center away from the side of joint body 1, pass
The one end of lever 12 away from spur gear 11 is through accommodating block 7 and being fixedly connected with drive block 13, by setting elongation set 3, accommodating
Groove 4, sealing ring 5, fixed block 6, rack 8, connecting rod 9, gripping block 10, spur gear 11, drive link 12 and drive block 13, reach
The effect of high-intensity sealing, joint and water pipe can be linked together by way of extruding, by increasing capacitance it is possible to increase seal section, and
Sealing can be strengthened, so as to prevent seepage, be easy to people to use, left end of the drive block 13 away from the side of drive link 12 offers
Groove 18, briquetting 23 is connected with groove 18, briquetting 23 is fixedly connected with gag lever post 19 close to the side for accommodating block 7, holds
Receiving the top and bottom of block 7 offers stopper slot 20, and the one end of gag lever post 19 away from briquetting 23 is through drive block 13 and clamping
It is spacing by setting groove 18, gag lever post 19, stopper slot 20 and briquetting 23 to be carried out to drive block 13 in stopper slot 20,
Drive block 13 can not be rotated, side of the briquetting 23 away from gag lever post 19 is fixedly connected with pulling block 21, and the surface of pulling block 21 is set
There are anti-slip veins, by setting pulling block 21 to increase the contact area of briquetting 23 and user's hand, so as to allow user can be with
More easily pull briquetting 23.
In use, connecting rod 9 and gripping block 10 are fixed with engaging for rack 8 by spur gear 11, so as to fix
Block 6 is fixed, and allows joint body 1 and pipeline body 2 to link together, and by extending matching somebody with somebody for set 3, holding tank 4 and sealing ring 5
The gap closed between butt joint body 1 and pipeline body 2 is sealed, and ensures the sealing of joint and pipeline.
In summary:This, which has, seals stronger pipe joint, by extending set 3, holding tank 4, sealing ring 5, fixed block
6th, pipe can be pulled by accommodating the cooperation of block 7, rack 8, connecting rod 9, gripping block 10, spur gear 11, drive link 12 and drive block 13
Road body 2 moves right, and allows sealing ring 5 to be in close contact with joint body 1, so as to strengthen the sealing to pipe joint, solves
The problem of pipe joint sealing intensity is low.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. with the stronger pipe joint of sealing, including joint body(1)And pipeline body(2), it is characterised in that:The pipeline
Body(2)Positioned at joint body(1)Left side, the pipeline body(2)Right side be fixedly connected with elongation set(3), it is described to connect
Head body(1)Left side offer with elongation cover(3)The holding tank being adapted(4), the elongation set(3)Right-hand member be flexibly connected
In holding tank(4)It is interior, the pipeline body(2)Right side be fixedly connected with positioned at elongation set(3)Internal sealing ring(5), institute
State sealing ring(5)Right side and joint body(1)Left contact, the pipeline body(2)Top and bottom fixed connect
It is connected to fixed block(6), the fixed block(6)Surface offer port(22), the joint body(1)Top and bottom it is equal
It is fixedly connected with receiving block(7), the receiving block(7)Internal activity be connected with rack(8), the rack(8)Left side consolidate
Surely it is connected with connecting rod(9), the connecting rod(9)Left end sequentially pass through receiving block(7)And port(22)And it is movably installed with
Gripping block(10), the gripping block(10)Right side and fixed block(6)Contact, the receiving block(7)Internal activity be connected with
Positioned at rack(8)Positive spur gear(11), the spur gear(11)With rack(8)Engagement, the spur gear(11)It is remote to connect
Head body(1)Drive link is fixedly connected with the axle center of side(12), the drive link(12)Away from spur gear(11)One end
Through receiving block(7)And it is fixedly connected with drive block(13).
2. the pipe joint according to claim 1 for having sealing stronger, it is characterised in that:The gripping block(10)The right side
Side is fixedly connected with contiguous block(14), the contiguous block(14)Right-hand member extend to connecting rod(9)Inside and be fixedly connected with
Fixture block(15), the fixture block(15)It is movably connected in connecting rod(9)Inside.
3. the pipe joint according to claim 1 for having sealing stronger, it is characterised in that:The spur gear(11)It is remote
Drive link(12)Support block is fixedly connected with the axle center of side(16), the support block(16)Surface be fixedly connected with bearing
(17), the bearing(17)Outer wall with accommodate block(7)Inwall be fixedly connected.
4. the pipe joint according to claim 1 for having sealing stronger, it is characterised in that:The drive block(13)It is remote
Drive link(12)The left end of side opens up fluted(18), the groove(18)Inside it is connected with briquetting(23), the briquetting
(23)Close to receiving block(7)Side be fixedly connected with gag lever post(19), the receiving block(7)Top and bottom offer
Stopper slot(20), the gag lever post(19)Away from briquetting(23)One end run through drive block(13)And it is connected to stopper slot(20)
It is interior.
5. the pipe joint according to claim 4 for having sealing stronger, it is characterised in that:The briquetting(23)Away from limit
Position bar(19)Side be fixedly connected with pulling block(21), the pulling block(21)Surface be provided with anti-slip veins.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720637253.9U CN206918482U (en) | 2017-06-02 | 2017-06-02 | With the stronger pipe joint of sealing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720637253.9U CN206918482U (en) | 2017-06-02 | 2017-06-02 | With the stronger pipe joint of sealing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206918482U true CN206918482U (en) | 2018-01-23 |
Family
ID=61314472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720637253.9U Expired - Fee Related CN206918482U (en) | 2017-06-02 | 2017-06-02 | With the stronger pipe joint of sealing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206918482U (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108397620A (en) * | 2018-02-01 | 2018-08-14 | 东莞市联洲知识产权运营管理有限公司 | A kind of inlet and outlet pipes connector of automobile radiators |
CN108443614A (en) * | 2018-06-15 | 2018-08-24 | 江苏宝地管业有限公司 | A kind of obturator for pipeline connection |
CN109780349A (en) * | 2019-03-27 | 2019-05-21 | 石宏扬 | A kind of leakage prevention gas pipeline flange |
CN110230743A (en) * | 2019-06-22 | 2019-09-13 | 李苏峰 | A kind of environment-friendly PVC tubing |
CN110735956A (en) * | 2019-11-08 | 2020-01-31 | 昆山嘉科环保设备有限公司 | isolating valve for pipeline explosion |
CN110792856A (en) * | 2019-10-29 | 2020-02-14 | 燕山大学 | Automatic locking device of large-scale section of thick bamboo section |
CN111981321A (en) * | 2020-08-27 | 2020-11-24 | 西安石大能源股份有限公司 | Water-coal-slurry potential energy recovery technology |
CN111981216A (en) * | 2020-09-18 | 2020-11-24 | 李云 | Pressure gas pipeline flange |
CN113187967A (en) * | 2021-05-20 | 2021-07-30 | 禹州市洁通塑胶有限公司 | Connecting piece for high-sealing drainage pipe fitting |
CN113588033A (en) * | 2021-09-27 | 2021-11-02 | 江苏伸辰智能仪器有限公司 | Installation structure for replacing traditional water meter based on NB-IoT intelligent water meter |
-
2017
- 2017-06-02 CN CN201720637253.9U patent/CN206918482U/en not_active Expired - Fee Related
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108397620A (en) * | 2018-02-01 | 2018-08-14 | 东莞市联洲知识产权运营管理有限公司 | A kind of inlet and outlet pipes connector of automobile radiators |
CN108397620B (en) * | 2018-02-01 | 2019-08-23 | 宿迁市乐邦电子科技有限公司 | A kind of inlet and outlet pipes connector of automobile radiators |
CN108443614A (en) * | 2018-06-15 | 2018-08-24 | 江苏宝地管业有限公司 | A kind of obturator for pipeline connection |
CN108443614B (en) * | 2018-06-15 | 2023-10-03 | 江苏宝地管业有限公司 | Sealing device for pipeline connection |
CN109780349A (en) * | 2019-03-27 | 2019-05-21 | 石宏扬 | A kind of leakage prevention gas pipeline flange |
CN110230743A (en) * | 2019-06-22 | 2019-09-13 | 李苏峰 | A kind of environment-friendly PVC tubing |
CN110792856A (en) * | 2019-10-29 | 2020-02-14 | 燕山大学 | Automatic locking device of large-scale section of thick bamboo section |
CN110735956A (en) * | 2019-11-08 | 2020-01-31 | 昆山嘉科环保设备有限公司 | isolating valve for pipeline explosion |
CN110735956B (en) * | 2019-11-08 | 2024-04-30 | 昆山嘉科环保设备有限公司 | Isolation valve for pipeline explosion |
CN111981321A (en) * | 2020-08-27 | 2020-11-24 | 西安石大能源股份有限公司 | Water-coal-slurry potential energy recovery technology |
CN111981216A (en) * | 2020-09-18 | 2020-11-24 | 李云 | Pressure gas pipeline flange |
CN113187967A (en) * | 2021-05-20 | 2021-07-30 | 禹州市洁通塑胶有限公司 | Connecting piece for high-sealing drainage pipe fitting |
CN113588033A (en) * | 2021-09-27 | 2021-11-02 | 江苏伸辰智能仪器有限公司 | Installation structure for replacing traditional water meter based on NB-IoT intelligent water meter |
CN113588033B (en) * | 2021-09-27 | 2022-02-08 | 江苏伸辰智能仪器有限公司 | Installation structure for replacing traditional water meter based on NB-IoT intelligent water meter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206918482U (en) | With the stronger pipe joint of sealing | |
CN206268656U (en) | A kind of water pipe special connecting piece | |
CN205152955U (en) | Multiple wing steel sleeve valve pipe reinforcing apparatus | |
CN214331833U (en) | Thread locking type pipeline connecting device | |
CN203571089U (en) | Triplet type full-wrapped ball valve | |
CN206557487U (en) | A kind of movable joint band brush visor | |
CN206046562U (en) | The precision cleaning equipment of electrode material for super capacitor | |
CN212028694U (en) | Pneumatic pin-free butterfly valve | |
CN208935595U (en) | A kind of non-metal pipe connector | |
CN209012590U (en) | A kind of bypass flue connecting sleeve for desulphurization denitration | |
CN206812988U (en) | A kind of engineering automobile gas chamber support | |
CN206667389U (en) | A kind of pinion and-rack Novel washbasin drainage arrangement | |
CN208219817U (en) | A kind of prevention waterlogging catch-basin | |
CN220421364U (en) | Sealing assembly for building electrical pipeline | |
CN204709495U (en) | For the blood mouth sealing device of blood perfusion device | |
CN209870589U (en) | Supporting wheel body capable of stably injecting oil for excavator | |
CN207510638U (en) | A kind of bicycle gears structure | |
CN208750022U (en) | It is a kind of to use labour-saving shut-off valve | |
CN220221817U (en) | Sealing structure of embedded bottle cap | |
CN206595670U (en) | It is a kind of that there is the bus duct for storing function | |
CN218742067U (en) | Saliva sample storage tube | |
CN217081822U (en) | Pipeline joint of a plurality of branch pipes | |
CN210600193U (en) | Ultrahigh vacuum manual valve | |
CN215233005U (en) | Dust collector for building engineering | |
CN215891563U (en) | Rigid sleeve plugging device for sewage pool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180123 Termination date: 20180602 |
|
CF01 | Termination of patent right due to non-payment of annual fee |