CN206917624U - A kind of mud circulating system for water Bridge bored pile construction - Google Patents
A kind of mud circulating system for water Bridge bored pile construction Download PDFInfo
- Publication number
- CN206917624U CN206917624U CN201720702021.7U CN201720702021U CN206917624U CN 206917624 U CN206917624 U CN 206917624U CN 201720702021 U CN201720702021 U CN 201720702021U CN 206917624 U CN206917624 U CN 206917624U
- Authority
- CN
- China
- Prior art keywords
- mud
- cofferdam
- steel pile
- slush pump
- chute
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a kind of mud circulating system for water Bridge bored pile construction, including the cofferdam in water, there are multiple Bored Pile of Bridge in cofferdam, a vertical steel pile casting is correspondingly configured with the datum hole of each Bored Pile of Bridge;The mud chute for connection is installed between two adjacent steel pile castings, mud chute is in tilted layout;The first slush pump is provided with cofferdam, is directly connected with the steel pile casting that mud chute upper end is connected by pipeline and the outlet of the first slush pump, the entrance of the first slush pump with the mud in cofferdam;The second slush pump is provided with the steel pile casting being connected with mud chute lower end, the steel pile casting being connected with mud chute upper end passes through pipeline and the outlet of the second slush pump.The beneficial effects of the utility model are:By the use of cofferdam as mud pit, without reconstruction mud pit in addition, construction cost is reduced;Meanwhile cofferdam volume is big, the cyclic space is big, mud sediment it is better.
Description
Technical field
It the utility model is related to Bridge Construction field, and in particular to a kind of mud for water Bridge cast-in-situ bored pile
Starch the circulatory system.
Background technology
With the fast development of social economy and traffic transport industry, Urban Bridge Construction just deploys on a large scale, across lake
Pool, the bridge in river are also more and more.During Bridge Pile Foundation Construction, mud pit need to be largely used, it is more using soil at present
Cubic meter of stone cofferdam forms mud pit or finished steel mud pit.However, mud pit or finished steel mud are formed using cubic metre of earth and stone cofferdam
There is the defects of certain in stock tank, such as forming mud pit using cubic metre of earth and stone cofferdam expends substantial amounts of artificial, material and machinery expenses
It is very high, and lake or river course are taken, polluted water and retardance current, particularly easily occur flood in flood season and pour in down a chimney cofferdam, enclose
Weir such as caves at the accident, and potential safety hazard is big, pollutes environment;And finished steel mud pit is used, it will be cleared up first into slag bath before perfusion
Totally, and evacuate internal mud, and ensure mud pit, mud pit, slurry transport truck have enough capacity and filled to store in place
The mud discharged during note, and the Spatial General 6 R of finished steel mud pit is not very big, the buffer-precipitation that mud can not be good,
Borehole cleaning is inefficient, and needs the sediment outward transport inside frequent cleaning, operationalizes very cumbersome, also takes up natively
Limited over-water construction working face.Therefore, it is necessary to prior art is improved.
The content of the invention
The purpose of this utility model is, in view of the shortcomings of the prior art, there is provided a kind of cyclic space is big, mud sediment effect
The good mud circulating system for water Bridge bored pile construction of fruit.
The technical solution adopted in the utility model is:A kind of mud cyclic system for water Bridge bored pile construction
System, including the cofferdam in water, there are multiple Bored Pile of Bridge in cofferdam, be correspondingly configured with the datum hole of each Bored Pile of Bridge
One vertical steel pile casting, the both ends open of steel pile casting;The mud for connection is installed between two adjacent steel pile castings
Chute, mud chute are in tilted layout;The first slush pump is provided with cofferdam, the steel pile casting being connected with mud chute upper end passes through
The outlet of pipeline and the first slush pump, the entrance of the first slush pump directly connect with the mud in cofferdam;With mud chute
The second slush pump is provided with the connected steel pile casting in lower end, the steel pile casting being connected with mud chute upper end passes through pipeline and the second mud
The outlet of pump.
By such scheme, dense mesh is installed in the lower end exit of mud chute.
By such scheme, the lower end of mud chute is provided with gravel outlet.
By such scheme, clay layer that the lower end of the steel pile casting is stretched into datum hole.
By such scheme, the top in the cofferdam is higher by 1m than highest water level on records.
Compared with prior art, the beneficial effects of the utility model are:
1st, by the use of needing the cofferdam of construction bearing platform, without reconstruction mud pit in addition, to reduce and apply as mud pit originally
Work cost;Simultaneously as cofferdam volume is big, the cyclic space is big, mud sediment it is better, and adjacent steel pile casting plays tentatively
Precipitation and buffered water stream percussion, mud in cofferdam can gentle quickly precipitation, can reach the purpose of rapid borehole cleaning.
2nd, will transport outward mud after the completion of all pile foundation constructions in a cushion cap again, mud be precipitated into dregs or
Mud, it is not necessary to frequently transport outward mud, improve efficiency of construction, reduce construction cost;It it also avoid simultaneously to water body environment
Pollution, protect environment.
Brief description of the drawings
Fig. 1 is the structural representation of one specific embodiment of the utility model.
Fig. 2 is the A-A sectional views in Fig. 1.
Wherein:1st, cofferdam;2nd, bridge pile foundation;3rd, the first steel pile casting;4th, the second steel pile casting;5th, mud chute;6th, the first mud
Stock pump;7th, river surface highest water level on records;8th, the second slush pump.
Embodiment
In order to more fully understand the utility model, the utility model is made with specific embodiment below in conjunction with the accompanying drawings further
Ground describes.
A kind of mud circulating system for water Bridge bored pile construction as shown in Figure 1, including as mud
The cofferdam 1 being located in water of circulatory pool, there is multiple Bored Pile of Bridge 2 in cofferdam 1, corresponding in the datum hole of each Bored Pile of Bridge 2
It is configured with a vertical steel pile casting, the both ends open of steel pile casting, the clay layer that its lower end is stretched into datum hole;It is adjacent at two
The mud chute 5 for connection is installed between steel pile casting, mud chute 5 is in tilted layout;The first mud is provided with cofferdam 1
Pump 6, with the steel pile casting that the upper end of mud chute 5 is connected by pipeline and the outlet of the first slush pump 6, the first slush pump 6
Entrance directly connects with the mud in cofferdam 1;The second slush pump 8 is provided with the steel pile casting being connected with the lower end of mud chute 5, with mud
The connected steel pile casting in slurry chute 5 upper end passes through pipeline and the outlet of the second slush pump 8.
Preferably, dense mesh is installed in the lower end exit of mud chute 5, the sand in mud is flowed through with filtering
Gravel;The lower end of mud chute 5 is provided with gravel outlet, and the gravel of filtering is discharged into cofferdam 1.
In the present embodiment, the cofferdam 1 can be Larsen steel sheet-pile cofferdam or other steel cofferdams;Wherein with mud chute 5
End be connected for the first steel pile casting 3, be connected with the lower end of mud chute 5 for the second steel pile casting 4.
The Specific construction process of the present embodiment comprises the following steps:
1st, the construction in cofferdam 1:Construction area injection Larsen steel sheet pile in river forms cofferdam 1, ensures that cofferdam 1 is not leaked
Water;The top in cofferdam 1 is higher by 1m than highest water level on records 7 simultaneously, to ensure that flood season river will not pour in down a chimney into cofferdam 1.
2nd, steel pile casting is embedded:Bored Pile of Bridge is provided with cofferdam 1(The present embodiment includes the bridge that two rows are arranged symmetrically
Pile foundation 2), and steel pile casting, the both ends open of steel pile casting are correspondingly arranged in the datum hole of each Bored Pile of Bridge 2, its lower end is inserted
The mud entered in datum hole gos deep into clay layer.
3rd, the arrangement of mud chute 5:Install between the first steel pile casting 3 and the second steel pile casting 4 and slipped for the mud of connection
Groove 5, and in the lower end of mud chute 5(Close on one end of the second steel pile casting 4)Dense mesh is installed, for filtering in mud
Gravel.
4th, the arrangement of the first slush pump 6 and the second slush pump 8:The first slush pump 6 is provided with cofferdam 1, in the second steel
The second slush pump 8 is installed in casing 4, the first steel pile casting 3 passes through pipeline and the outlet of the first slush pump 6, the first slush pump 6
Entrance directly connected with the mud in cofferdam 1;The entrance of second slush pump 8 directly connects with the mud in the second steel pile casting 4,
The outlet of second slush pump 8 is connected by pipeline with the first steel pile casting 3.
Realize that the process that mud circulates is using the present embodiment:The pulping in cofferdam 1, with 3 corresponding bridge of the first steel pile casting
When beam pile foundation 2 drills, mud is pumped into the first steel pile casting 3 through the first slush pump 6 from cofferdam 1;When rig is crept into, the first steel pile casting
Mud in 3 is flowed into the second steel pile casting 4 after the dense mesh of mud chute 5 filters coarse gravel and clod(Slipped by mud
The coarse gravel and soil block that groove 5 filters are discharged into cofferdam 1);Mud is in the second steel pile casting 4 through the second slush pump after buffer-precipitation
8 the first steel pile castings 3 of backflow, retaining wall is carried out to the bridge pile foundation 2 to drill, reaches the effect of mud circulation retaining wall.Treat cofferdam 1
After mud off reaches design strength requirement in the interior datum hole of all Bored Pile of Bridge 2, the steel shield in the datum hole of Bored Pile of Bridge 2 is taken out
Cylinder(Namely first steel pile casting 3), and the mud cleared up in datum hole, mud now have become dregs or mud, with long-armed digging
Machine, which is dug out, entrucks and carries away;The mud transported in cofferdam 1, for mud because putting time length, sedimentation effect is good, voluntarily air-dries in cofferdam 1
Consolidation;Water separates with mud, and transhipment is convenient, and volume is also smaller.
Finally it should be noted that these are only preferred embodiment of the present utility model, the utility model is not limited to,
Although the utility model is described in detail with reference to embodiment, for those skilled in the art, it still may be used
To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic,
But it is all within the spirit and principles of the utility model, any modification, equivalent substitution and improvements made etc., it should be included in
Within the scope of protection of the utility model.
Claims (4)
1. a kind of mud circulating system for water Bridge bored pile construction, it is characterised in that including in water
Cofferdam, there are multiple Bored Pile of Bridge in cofferdam, a vertical steel pile casting be correspondingly configured with the datum hole of each Bored Pile of Bridge,
The both ends open of steel pile casting;The mud chute for connection is installed between two adjacent steel pile castings, mud chute tilts
Arrangement;The first slush pump is provided with cofferdam, the steel pile casting being connected with mud chute upper end passes through pipeline and the first slush pump
Outlet, the entrance of the first slush pump directly connects with the mud in cofferdam;The steel pile casting being connected with mud chute lower end
The second slush pump is inside provided with, the steel pile casting being connected with mud chute upper end passes through pipeline and the outlet of the second slush pump.
2. it is used for the mud circulating system of water Bridge bored pile construction as claimed in claim 1, it is characterised in that
The lower end exit of mud chute is installed on dense mesh.
3. it is used for the mud circulating system of water Bridge bored pile construction as claimed in claim 2, it is characterised in that mud
The lower end of slurry chute is provided with gravel outlet.
4. it is used for the mud circulating system of water Bridge bored pile construction as claimed in claim 1, it is characterised in that institute
State the clay layer that the lower end of steel pile casting is stretched into datum hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720702021.7U CN206917624U (en) | 2017-06-16 | 2017-06-16 | A kind of mud circulating system for water Bridge bored pile construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720702021.7U CN206917624U (en) | 2017-06-16 | 2017-06-16 | A kind of mud circulating system for water Bridge bored pile construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206917624U true CN206917624U (en) | 2018-01-23 |
Family
ID=61321631
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720702021.7U Active CN206917624U (en) | 2017-06-16 | 2017-06-16 | A kind of mud circulating system for water Bridge bored pile construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206917624U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108301797A (en) * | 2018-03-08 | 2018-07-20 | 中铁建大桥工程局集团第四工程有限公司 | A kind of new-type mortar circulatory system for underwater platform drilled pile construction |
CN108755665A (en) * | 2018-05-31 | 2018-11-06 | 诚邦生态环境股份有限公司 | Enclose the integrated platform construction method of brill |
CN109441381A (en) * | 2019-01-09 | 2019-03-08 | 中国建筑第四工程局有限公司 | One kind recycling construction system for clump of piles mud in water |
CN110258539A (en) * | 2019-04-28 | 2019-09-20 | 安徽省公路桥梁工程有限公司 | Cast-in-situ bored pile and its construction method in water |
CN111706276A (en) * | 2020-06-24 | 2020-09-25 | 中建四局土木工程有限公司 | Gas lift slag-returning pore-forming construction method |
CN113738275A (en) * | 2021-09-02 | 2021-12-03 | 中铁二十三局集团第四工程有限公司 | Anti-pollution construction method for cast-in-situ bored pile in pile foundation engineering |
CN114458197A (en) * | 2022-01-24 | 2022-05-10 | 中交二航局第四工程有限公司 | Water-land cross-connection area pile group drilling mud circulation device and method |
CN114753357A (en) * | 2022-04-08 | 2022-07-15 | 中铁七局集团有限公司 | Construction method of underwater drilled pile |
CN114961600A (en) * | 2022-05-13 | 2022-08-30 | 中国铁建大桥工程局集团有限公司 | Deep-water large-diameter pile foundation mud recycling device and construction method |
-
2017
- 2017-06-16 CN CN201720702021.7U patent/CN206917624U/en active Active
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108301797A (en) * | 2018-03-08 | 2018-07-20 | 中铁建大桥工程局集团第四工程有限公司 | A kind of new-type mortar circulatory system for underwater platform drilled pile construction |
CN108755665A (en) * | 2018-05-31 | 2018-11-06 | 诚邦生态环境股份有限公司 | Enclose the integrated platform construction method of brill |
CN109441381A (en) * | 2019-01-09 | 2019-03-08 | 中国建筑第四工程局有限公司 | One kind recycling construction system for clump of piles mud in water |
CN110258539A (en) * | 2019-04-28 | 2019-09-20 | 安徽省公路桥梁工程有限公司 | Cast-in-situ bored pile and its construction method in water |
CN110258539B (en) * | 2019-04-28 | 2021-02-12 | 安徽省公路桥梁工程有限公司 | Underwater cast-in-situ bored pile and construction method thereof |
CN111706276A (en) * | 2020-06-24 | 2020-09-25 | 中建四局土木工程有限公司 | Gas lift slag-returning pore-forming construction method |
CN113738275A (en) * | 2021-09-02 | 2021-12-03 | 中铁二十三局集团第四工程有限公司 | Anti-pollution construction method for cast-in-situ bored pile in pile foundation engineering |
CN113738275B (en) * | 2021-09-02 | 2024-02-27 | 中铁二十三局集团第四工程有限公司 | Anti-pollution construction method for bored pile of pile foundation engineering |
CN114458197A (en) * | 2022-01-24 | 2022-05-10 | 中交二航局第四工程有限公司 | Water-land cross-connection area pile group drilling mud circulation device and method |
CN114753357A (en) * | 2022-04-08 | 2022-07-15 | 中铁七局集团有限公司 | Construction method of underwater drilled pile |
CN114961600A (en) * | 2022-05-13 | 2022-08-30 | 中国铁建大桥工程局集团有限公司 | Deep-water large-diameter pile foundation mud recycling device and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206917624U (en) | A kind of mud circulating system for water Bridge bored pile construction | |
CN107119691B (en) | Square deep foundation pit suitable for high bearing pressure of water-rich sand egg layer and excavation method thereof | |
CN104695879B (en) | A kind of stake holes is rinsed and takes out sand hole method | |
CN107386195B (en) | A kind of Dredging Construction method for the canal that drains off floodwaters | |
CN108193606A (en) | A kind of means of defence of local scour near pier | |
CN104711968B (en) | Negative-pressure three-dimensional flow-guiding disturbance impact solidification dredger filling method | |
CN110409420B (en) | Underground continuous wall with pit facing surface and precipitation function | |
JP5213216B2 (en) | Ground improvement method | |
CN112627212B (en) | Water-faced cofferdam inner tube well dewatering dry excavation construction method | |
CN204959757U (en) | Protect a mud circulating device | |
CN111827247A (en) | Method for reinforcing soft foundation | |
JP4114944B2 (en) | Ground improvement method | |
CN105155421B (en) | Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water | |
CN109024711B (en) | Underground structure anti-floating system and construction method thereof | |
CN211037023U (en) | Pipe well dewatering well arranged at bottom of underground diaphragm wall | |
CN214273568U (en) | Sand gravel geology bored concrete pile pore-forming device | |
CN205954646U (en) | Deep basal pit excavation precipitation device | |
CN114232622A (en) | Pile foundation construction method adopting limiting steel box | |
CN211144529U (en) | Rich water loess tunnel precipitation construction structures | |
CN110409474B (en) | Pipe well dewatering well arranged at bottom of underground diaphragm wall | |
CN208023598U (en) | A kind of base pit dewatering pipe well | |
CN204589985U (en) | A kind of silt that uses backfills foundation pit construction water plug | |
CN109630192A (en) | A kind of precipitation method suitable for the construction of half diagenesis bored tunnel | |
CN216664165U (en) | Spacing steel case is used in pile foundation construction | |
CN218932867U (en) | Construction structure of caisson with bottom at water collection pit and elevator shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |