CN206917021U - Large-scale slope curtain wall connecting system - Google Patents

Large-scale slope curtain wall connecting system Download PDF

Info

Publication number
CN206917021U
CN206917021U CN201720650574.2U CN201720650574U CN206917021U CN 206917021 U CN206917021 U CN 206917021U CN 201720650574 U CN201720650574 U CN 201720650574U CN 206917021 U CN206917021 U CN 206917021U
Authority
CN
China
Prior art keywords
installed part
curtain wall
scale slope
connecting system
wall connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720650574.2U
Other languages
Chinese (zh)
Inventor
李相林
陈晗
王贺省
余长征
葛啟帅
王强
朱晓中
黄华
余永照
钟颖跃
鲍国强
陈彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Guang Tian founder Co Construction Group Co., Ltd.
Original Assignee
SHENZHEN GRANDLAND FANGTE FACADE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN GRANDLAND FANGTE FACADE TECHNOLOGY Co Ltd filed Critical SHENZHEN GRANDLAND FANGTE FACADE TECHNOLOGY Co Ltd
Priority to CN201720650574.2U priority Critical patent/CN206917021U/en
Application granted granted Critical
Publication of CN206917021U publication Critical patent/CN206917021U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of large-scale slope curtain wall connecting system, wherein the large-scale slope curtain wall connecting system includes multiple spaced first installed parts, multiple second installed parts, multiple shingle nails, and interval is fixedly arranged on multiple connectors of main body, one end connection at least one end of a connection piece away from main body of every one first installed part, the side of every one first installed part connects one second installed part, the first adjacent installed part of each two is with corresponding two the second installed parts formed with two grooves being oppositely arranged, two relative edges of each shingle nail are respectively contained in two grooves being oppositely arranged.Large-scale slope curtain wall connecting system of the present utility model makes shingle nail install more convenient and quicker, improves installation effectiveness.

Description

Large-scale slope curtain wall connecting system
Technical field
Building curtain wall technical field is the utility model is related to, more particularly to a kind of large-scale slope curtain wall connecting system.
Background technology
During the shingle nail installation of current large-scale slope curtain wall connecting system, directly shingle nail is fixedly arranged on skeleton, by It is not easy to adjust after skeleton fixation, causes the installation of shingle nail very inconvenient, influence installation effectiveness.
Utility model content
Main purpose of the present utility model is to provide a kind of large-scale slope curtain wall connecting system, it is intended to makes shingle nail installation more It is convenient and swift, improve installation effectiveness.
To achieve the above object, the utility model proposes a kind of large-scale slope curtain wall connecting system, the large-scale slope curtain wall Connection system includes multiple spaced first installed parts, multiple second installed parts, multiple shingle nails and interval and is fixedly arranged on master Multiple connectors of body, one end connection at least one end of a connection piece away from main body of every one first installed part, every one first peace The side of piece installing connects one second installed part, the first adjacent installed part of each two and corresponding two the second installed parts formed with Two grooves being oppositely arranged, two relative edges of each shingle nail are respectively contained in two grooves being oppositely arranged.
Preferably, each first installed part and each second installed part include a bottom plate and are fixedly arranged on the bottom One connecting plate on the surface of plate one, another surface of the bottom plate of each first installed part are fixed at least one connector, The connecting plate of every one first installed part and the connecting plate of one second installed part are connected with each other, and the bottom plate of every one first installed part, are somebody's turn to do The bottom plate of the connecting plate and second installed part of the connecting plate of first installed part and connected second installed part is collectively forming At least one groove.
Preferably, the bottom plate of every one first installed part, the connecting plate of first installed part and connected second installation The bottom plate of the connecting plate of part and second installed part is collectively forming two grooves, the opening direction of two grooves It is disposed opposite to each other.
Preferably, the large-scale slope curtain wall connecting system also includes multiple regulating parts, the connecting plate of first installed part Through hole is offered with the connecting plate of the second installed part, each regulating part both passes through two corresponding through holes, and first The connecting plate of the connecting plate of installed part and/or the second installed part is slideably sheathed on regulating part.
Preferably, the large-scale slope curtain wall connecting system also includes multiple cushion blocks, and the inwall of each groove is equipped with a pad Block, the end wall that each shingle nail is placed in the groove are connected to the cushion block.
Preferably, the large-scale slope curtain wall connecting system also includes being fixedly arranged on the skeletons of multiple connector sides, and every 1 the One installed part and every one second installed part at least partly both pass through the skeleton, and each shingle nail is not contained in the another of the groove Two relative edges are all connected to the skeleton.
Preferably, the large-scale slope curtain wall connecting system also includes multiple decorative panels, and second installed part is at least partly Manifested by the skeleton, each decorative panel is covered on the part that one second installed part manifests the skeleton.
Preferably, the large-scale slope curtain wall connecting system also includes multiple built-in fittings that interval is fixedly arranged on main body, Mei Yilian The one end of fitting away from first installed part is fixed in a built-in fitting.
Preferably, each first installed part and every one second installed part are T-type structure.
Preferably, the large-scale slope curtain wall connecting system also includes multiple cushion collars, an at least edge for each shingle nail It is wrapped in a cushion collar.
Technical solutions of the utility model connect at least a connection piece away from main body by one end of every one first installed part One end, the side of every one first installed part connect one second installed part, the first adjacent installed part of each two with corresponding two Formed with two grooves being oppositely arranged, two relative edges of each shingle nail are respectively contained in be oppositely arranged second installed part Two grooves.With this make shingle nail edge can tight clamping fit in groove, and the groove is by the first installed part and Two installed parts are formed, and after the edge of shingle nail can be made first to be connected to the first installed part, then install the second installed part by shingle nail Edge be connected in groove, it is not necessary to repeatedly adjusts shingle nail, shingle nail is installed more convenient and quicker, improves installation effect Rate.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to the structure shown in these accompanying drawings.
Fig. 1 is the structural representation of the large-scale embodiment of slope curtain wall connecting system one of the utility model;
Fig. 2 is mplifying structure schematic diagram at Fig. 1 A;
Fig. 3 is the structural representation of the large-scale another embodiment of slope curtain wall connecting system of the utility model.
Drawing reference numeral explanation:
Label Title Label Title
10 First installed part 40 Connector
11 Bottom plate 50 Regulating part
12 Connecting plate 60 Cushion block
13 Groove 70 Skeleton
20 Second installed part 80 Decorative panel
30 Shingle nail
Realization, functional characteristics and the advantage of the utility model purpose will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only part of the embodiment of the present utility model, rather than all Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, belong to the scope of the utility model protection.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute in the utility model embodiment It is only used for explaining relative position relation under a certain particular pose (as shown in drawings) between each part, motion conditions etc., such as When the fruit particular pose changes, then directionality instruction also correspondingly changes therewith.
In the utility model, unless otherwise clearly defined and limited, term " connection ", " fixation " etc. should do broad sense reason Solution, for example, " fixation " can be fixedly connected or be detachably connected, or integrally;Can mechanically connect, also may be used Be electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, can be the connection of two element internals Or the interaction relationship of two elements, limited unless otherwise clear and definite.For the ordinary skill in the art, can be with Concrete meaning of the above-mentioned term in the utility model is understood as the case may be.
In addition, and it can not be managed in the utility model such as relating to the description of " first ", " second " etc. is only used for describing purpose Solve to indicate or implying its relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, define " the One ", at least one this feature can be expressed or be implicitly included to the feature of " second ".In addition, the skill between each embodiment Art scheme can be combined with each other, but must can be implemented as basis with those of ordinary skill in the art, when technical scheme With reference to occurring conflicting or will be understood that the combination of this technical scheme is not present when can not realize, also not in the utility model It is required that protection domain within.
The utility model proposes a kind of large-scale slope curtain wall connecting system.
Referring to Figures 1 and 2, in the embodiment of the utility model one, the large-scale slope curtain wall connecting system includes multiple Main body (not shown) is fixedly arranged on every the first installed part 10 of setting, multiple second installed parts 20, multiple shingle nails 30 and interval Multiple connectors 40, one end connection at least one end of a connection piece 40 away from main body (not shown) of every one first installed part 10, The side of every one first installed part 10 connects one second installed part 20, the first adjacent installed part 10 of each two with corresponding two Second installed part 20 is respectively contained in phase formed with two grooves being oppositely arranged 13, two relative edges of each shingle nail 30 To two grooves 13 of setting.
Above-mentioned the first installed part 10 and the second installed part 20 is metal material, preferably welds firm part;Shingle nail 30 Preferably metallic plate, stone plate, glass plate, preferably shingle nail 30 are double glazing unit or interlaminar board, the layer of main body (not shown) Between may be provided with interlaminar board;Connector 40 therein is preferably metal material, and multiple connectors 40, which can be distributed, is fixedly arranged on main body (not Diagram), and the different length of main body (not shown) is convexly equipped in by multiple connectors 40, one can be formed and be inclined upwardly or dip down Oblique plane, every one first installed part 10 can be attached by bolt or welding at least a connection piece 40, further, should Large-scale slope curtain wall connecting system also includes multiple built-in fittings (not shown) that interval is fixedly arranged on main body (not shown), each connection The one end of part 40 away from the first installed part 10 is fixed in a built-in fitting (not shown).Built-in fitting (not shown) therein can pass through spiral shell Bolt is closely fixed in main body (not shown), can pass through bolt or welding etc. per the one end of a connection piece 40 away from the first installed part 10 It is fixedly arranged on the surface of built-in fitting (not shown);Above-mentioned every one second installed part 20 can be fixedly arranged on one by bolt, buckle etc. One installed part 10, every one first installed part 10 and the second installed part 20 form at least one groove 13, each two it is adjacent first Two grooves 13 that installed part 10 is formed with corresponding two the second installed parts 20 are oppositely arranged, so that the phase of each shingle nail 30 To two edges can tight clamping fit in two grooves being oppositely arranged 13, in order to the installation of shingle nail 30, improve installation Efficiency.
One embodiment is:Multiple connectors 40 are provided, multiple connectors 40 interval is fixedly arranged on main body (not shown);There is provided Multiple spaced first installed parts 10, one end of every one first installed part 10 are all connected at least one connector 40;Carry For second installed part 20, second installed part 20 is connected to one first side of the installed part 10 away from connector 40, should First installed part 10 has been collectively forming an at least groove 13 with second installed part 20;At least one shingle nail 30, metope are provided One edge of plate 30 is placed in the groove 13;Another the second installed part 20 is provided, by another second installed part 20 and phase Another adjacent first installed part 10 is connected with each other, and forms relative another groove 13, and the other edge of shingle nail 30 houses In another groove 13;Above-mentioned steps are circulated, until multiple shingle nails 30 are covered in main body (not shown).Specifically, installation Upper and lower two the first connectors 10, second connector 20 is connected to form a groove 13 with the first connector 10 of downside, The lower edge of shingle nail 30 is placed in the groove 13, the relative top edge of the shingle nail 30 is connected to the first connection of upside Part 10, then another second connector 20 is connected to form another groove 13 with the first connector 10 of upside, and the metope The top edge of plate 30 has been placed in another groove 13, is not required to adjust, the second peace being connected with the first connector 10 of upside Piece installing 20 can closely be connected to the top edge of shingle nail 30, be more convenient the installation of shingle nail 30, structure is more stable.By making metope The edge of plate 30 can tight clamping fit in groove 13, and the groove 13 is formed by the first installed part 10 and the second installed part 20, can After the edge of shingle nail 30 is first connected to the first installed part 10, then the second installed part 20 is installed and carries out the edge of shingle nail 30 It is connected in groove 13, it is not necessary to repeatedly adjustment shingle nail 30, make shingle nail 30 that more convenient and quicker to be installed, improve installation effectiveness.
Technical solutions of the utility model are by one end connection at least a connection piece 40 of every one first installed part 10 away from main One end of body (not shown), the side of every one first installed part 10 connect one second installed part 20, the first adjacent peace of each two Piece installing 10 and corresponding two the second installed parts 20 formed with two grooves being oppositely arranged 13, each shingle nail 30 it is relative two Individual edge is respectively contained in two grooves 13 being oppositely arranged.With this make shingle nail 30 edge can tight clamping fit in groove 13, And the groove 13 is formed by the first installed part 10 and the second installed part 20, the edge of shingle nail 30 can be made first to be connected to the first peace After piece installing 10, then the second installed part 20 is installed and by the edge of shingle nail 30 be connected in groove 13, it is not necessary to repeatedly adjustment Shingle nail 30, make shingle nail 30 that more convenient and quicker to be installed, improve installation effectiveness.
Preferably, every one first installed part 10 and every one second installed part 20 include a bottom plate 11 and are fixedly arranged on the bottom plate One connecting plate 12 on 11 1 surfaces, another surface of the bottom plate of every one first installed part 10 are fixed at least one connector 40, the connecting plate 12 of the installed part 20 of connecting plate 12 and 1 second of every one first installed part 10 is connected with each other, every one first installation The bottom plate 11 of part 10, the connecting plate 12 of first installed part 10 and connected second installed part 20 connecting plate 12 and should The bottom plate 11 of second installed part 20 is collectively forming an at least groove 13.
Bottom plate 11 therein can be formed in one with the connecting plate 12 for being fixedly arranged on bottom plate 11, further, the large-scale slope Curtain wall connecting system also includes multiple regulating parts 50, the connecting plate 12 of the installed part 20 of connecting plate 12 and second of the first installed part 10 Through hole is offered, each regulating part 50 both passes through two corresponding through holes, the connecting plate 12 of the first installed part 10 And/or second the connecting plate 12 of installed part 20 be slideably sheathed on regulating part 50.Regulating part 50 therein can be bolt, run through Kong Kewei waist-shaped holes.One embodiment is that the second installed part 20 offers waist-shaped hole, and one end of regulating part 50 passes through waist-shaped hole, made Second installed part 20 is slidably sheathed on regulating part 50, when the second installed part 20 moves relative to the first installed part 10, The size of groove 13, carries out stablizing installation, strengthens it just to be adapted to the shingle nail 30 of different-thickness corresponding to being adjusted Profit.
Further, the bottom plate 11 of every one first installed part 10, the connecting plate 12 of first installed part 10 and connect with it The connecting plate 12 of the second installed part 20 and the bottom plate 11 of second installed part 20 connect is collectively forming two grooves 13, this two The opening direction of groove 13 is disposed opposite to each other.
One end of connecting plate 12 therein may connect to the middle part on a surface of corresponding connecting plate 12, pass through company with this Bottom plate 11 is divided into two parts by fishplate bar 12, and preferably every one first installed part 10 and every one second installed part 20 are T junction Structure.The bottom plate 11 of the bottom plate 11 of first installed part 10 and the second installed part 20 is oppositely arranged, and form opening direction with this sets opposite to each other Two grooves 13 put.Further, the one of groove 13 being disposed opposite to each other is less than another groove 13, and makes to be oppositely arranged Two grooves 13 be respectively a big groove and a small groove, can make an edge of shingle nail 30 speak for sb. beforehand be placed in it is small In groove, then it is placed in big groove, in order to which shingle nail 30 is installed.
Reference picture 3, further, in the lowermost end of main body (not shown), (can it not scheme away from main body in connector 40 Show) one end be fixedly arranged on a U-shaped installed part, the installed part is formed with the cell body being oppositely arranged with adjacent groove 13, installation A cell body and a groove 13 are respectively contained in the both ends of the shingle nail 30 of main body (not shown) lowermost end, makes this large-scale tiltedly with this The structure of slope curtain wall connecting system is simpler, improves installation effectiveness.
Referring to Figures 1 and 2, it is preferable that the large-scale slope curtain wall connecting system also includes multiple cushion blocks 60, each groove 13 Inwall be equipped with a cushion block 60, the end wall that each shingle nail 30 is placed in the groove 13 is connected to the cushion block 60.
Above-mentioned cushion block 60 can be cushion pad or cushion, be not damaged by when by cushion block shingle nail 30 can be protected to install, And strengthen the close connection between shingle nail 30 and connector 40.Further, the cushion block 60 can be first placed in groove 13, then The edge of shingle nail 30 is placed in groove 13, need not can again lift shingle nail 30 with this places cushion block 60 again, can improve The installation effectiveness of shingle nail 30.Further, the large-scale slope curtain wall connecting system also includes multiple cushion collars (not indicating), An at least edge for each shingle nail 30 is wrapped in a cushion collar (not indicating).Cushion collar (not indicating) is preferably quality of rubber materials, The integrally-built stability of shingle nail 30 is thereby protected, is hardly damaged.
Preferably, the large-scale slope curtain wall connecting system also includes the skeleton 70 for being fixedly arranged on multiple sides of connector 40, often One first installed part 10 and every at least part of one second installed part 20 both pass through skeleton 70, and each shingle nail 30 is not contained in groove The relative edge of 13 another two is all connected to skeleton 70.
The frame structure that above-mentioned skeleton can be multiple lateral keels and multiple vertical keels are interconnected to form, each wall The relative edge of another two that panel 30 is not contained in groove 13 is all connected to skeleton 70, can strengthen the connection of shingle nail 30 with this The overall stability of stability and the large-scale slope curtain wall connecting system.Further, in the connection of shingle nail 30 and skeleton 70 The also settable adhesive-layer in place, is sealed.
Preferably, the large-scale slope curtain wall connecting system also includes multiple decorative panels 80, and the second installed part 20 is at least partly Manifested by skeleton 70, each decorative panel 80 is covered on the part that one second installed part 20 manifests skeleton 70.
Above-mentioned decorative panel 80 can be metal material, and the side of decorative panel 80 can be formed with a holding tank, every one second peace At least part for the installed part 20 of bottom plate 11 and second that the part that piece installing 20 manifests skeleton 70 includes the second installed part 20 connects Fishplate bar 12.Further, the holding tank inwall of the decorative panel 80 is provided with least one buckle structure, the bottom plate of the second installed part 20 11 are placed in the holding tank of the decorative panel 80, and are engaged with buckle structure, make the installation of decorative panel 80 more convenient fast with this Victory, improve installation effectiveness.
Preferred embodiment of the present utility model is the foregoing is only, not thereby limits the scope of the claims of the present utility model, Every equivalent structure under utility model of the present utility model design, made using the utility model specification and accompanying drawing content Conversion, or directly/be used in other related technical areas indirectly and be included in scope of patent protection of the present utility model.

Claims (10)

1. a kind of large-scale slope curtain wall connecting system, it is characterised in that including multiple spaced first installed parts, Duo Ge Two installed parts, multiple shingle nails and interval are fixedly arranged on multiple connectors of main body, and one end connection of every one first installed part is at least The one end of a connection piece away from main body, the side of every one first installed part connect one second installed part, each two it is adjacent first Installed part is with corresponding two the second installed parts formed with two grooves being oppositely arranged, two relative edges of each shingle nail It is respectively contained in two grooves being oppositely arranged.
2. large-scale slope curtain wall connecting system as claimed in claim 1, it is characterised in that each first installed part and every One second installed part includes a bottom plate and is fixedly arranged on a connecting plate on the surface of bottom plate one, each first installed part Another surface of bottom plate be fixed at least one connector, the connecting plate of every one first installed part and one second installed part Connecting plate is connected with each other, the bottom plate of every one first installed part, the connecting plate of first installed part and connected second installation The bottom plate of the connecting plate of part and second installed part is collectively forming an at least groove.
3. large-scale slope curtain wall connecting system as claimed in claim 2, it is characterised in that the bottom plate of every one first installed part, The common shape of bottom plate of the connecting plate and second installed part of the connecting plate of first installed part and connected second installed part Into two grooves, the opening direction of two grooves is disposed opposite to each other.
4. large-scale slope curtain wall connecting system as claimed in claim 2, it is characterised in that the large-scale slope curtain wall connecting system Also include multiple regulating parts, the connecting plate of first installed part and the connecting plate of the second installed part offer through hole, often One regulating part both passes through the connecting plate of two corresponding through holes, the connecting plate of the first installed part and/or the second installed part Slideably it is sheathed on regulating part.
5. large-scale slope curtain wall connecting system as claimed in claim 1, it is characterised in that the large-scale slope curtain wall connecting system Also include multiple cushion blocks, the inwall of each groove is equipped with a cushion block, and the end wall that each shingle nail is placed in the groove supports It is connected to the cushion block.
6. the large-scale slope curtain wall connecting system as described in claim 1-5 is any, it is characterised in that the large-scale slope curtain wall connects Welding system also includes the skeleton for being fixedly arranged on multiple connector sides, and every one first installed part and every one second installed part are at least partly Both pass through the skeleton, the relative edge of another two that each shingle nail is not contained in the groove is all connected to the skeleton.
7. large-scale slope curtain wall connecting system as claimed in claim 6, it is characterised in that the large-scale slope curtain wall connecting system Also include multiple decorative panels, second installed part at least partly manifests by the skeleton, and each decorative panel covers The part of the skeleton is manifested together in one second installed part.
8. the large-scale slope curtain wall connecting system as described in claim 1-5 is any, it is characterised in that the large-scale slope curtain wall connects Welding system also includes multiple built-in fittings that interval is fixedly arranged on main body, affixed per the one end of a connection piece away from first installed part In a built-in fitting.
9. the large-scale slope curtain wall connecting system as described in claim 1-5 is any, it is characterised in that each first installation Part and every one second installed part are T-type structure.
10. the large-scale slope curtain wall connecting system as described in claim 1-5 is any, it is characterised in that the large-scale slope curtain wall Connection system also includes multiple cushion collars, and an at least edge for each shingle nail is wrapped in a cushion collar.
CN201720650574.2U 2017-06-05 2017-06-05 Large-scale slope curtain wall connecting system Active CN206917021U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720650574.2U CN206917021U (en) 2017-06-05 2017-06-05 Large-scale slope curtain wall connecting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720650574.2U CN206917021U (en) 2017-06-05 2017-06-05 Large-scale slope curtain wall connecting system

Publications (1)

Publication Number Publication Date
CN206917021U true CN206917021U (en) 2018-01-23

Family

ID=61313727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720650574.2U Active CN206917021U (en) 2017-06-05 2017-06-05 Large-scale slope curtain wall connecting system

Country Status (1)

Country Link
CN (1) CN206917021U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107178167A (en) * 2017-06-05 2017-09-19 深圳市广田方特幕墙科技有限公司 Large-scale slope curtain wall connecting system and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107178167A (en) * 2017-06-05 2017-09-19 深圳市广田方特幕墙科技有限公司 Large-scale slope curtain wall connecting system and construction method
CN107178167B (en) * 2017-06-05 2023-08-04 深圳广田方特科建集团有限公司 Large-scale slope curtain wall connecting system and construction method

Similar Documents

Publication Publication Date Title
CN201616959U (en) Structure of outdoor cabinet
CN206917021U (en) Large-scale slope curtain wall connecting system
CN203856119U (en) External corner cladding keel of clamp-type main keel
CN202430937U (en) Back bolt fixing structure for wall porcelain plate
CN107178167A (en) Large-scale slope curtain wall connecting system and construction method
CN205063152U (en) Integrated furred ceiling decorative board mounting structure
CN202073241U (en) Connecting piece of metallic roofing daylighting board
CN206625355U (en) Aluminium alloy structure house
CN205153593U (en) Container house with combination formula roof structure
CN201266627Y (en) Battery case
CN209742088U (en) Assembled porcelain powder self preservation temperature wallboard fixed knot constructs
CN204531209U (en) A kind of box-type room back timber being convenient to draining
CN204311650U (en) The metal storehouse plate of anti-layering male and female groove concealed fastener type metal storehouse plate sheet material and formation thereof
CN209339441U (en) A kind of cross aluminium attachment device of horizontally-arranged metal board wall
CN205153583U (en) Container house of top structure with improve
CN205243292U (en) Frame structure
CN201785922U (en) Embedded type metal keel with buckling connection mode
CN105227110A (en) The buckled splicing hermetically-sealed construction of solar photovoltaic assembly
CN205712541U (en) A kind of sound-absorbing wall
CN206722095U (en) A kind of socket type safety color steel
CN206255746U (en) A kind of quick mounting type elevator car bottom
CN202809916U (en) Installation nodes of gapless metal cellular board curtain wall
CN206279658U (en) For the coupling assembly for overlapping
CN206015916U (en) Attachment structure between modularity box type movable board house group and its back timber
CN204212317U (en) The metal storehouse plate of a kind of anti-layered metal storehouse plate sheet material and formation thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 518108 Guangdong Baoan District Shenzhen Shiyan Street Ru rented community Huang Feng Ling Industrial Zone 2 big two, three floors.

Patentee after: Shenzhen Guang Tian founder Co Construction Group Co., Ltd.

Address before: 518000 Fangda Second Industrial Park, Huang Feng Ling Industrial Zone, Shiyan Town, Baoan District, Shenzhen, Guangdong

Patentee before: SHENZHEN GRANDLAND FANGTE FACADE TECHNOLOGY CO., LTD.