CN206916755U - Protective slope structure with concealed beam - Google Patents

Protective slope structure with concealed beam Download PDF

Info

Publication number
CN206916755U
CN206916755U CN201720341139.1U CN201720341139U CN206916755U CN 206916755 U CN206916755 U CN 206916755U CN 201720341139 U CN201720341139 U CN 201720341139U CN 206916755 U CN206916755 U CN 206916755U
Authority
CN
China
Prior art keywords
protection pile
slope protection
waist rail
steel waist
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720341139.1U
Other languages
Chinese (zh)
Inventor
魏尚军
张波
陈春
王自文
于元峰
吴文杰
周天智
王文明
李建红
耿杰攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING AIDI GEOLOGICAL PROSPECTING FOUNDATION ENGINEERING Co Ltd
Original Assignee
BEIJING AIDI GEOLOGICAL PROSPECTING FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AIDI GEOLOGICAL PROSPECTING FOUNDATION ENGINEERING Co Ltd filed Critical BEIJING AIDI GEOLOGICAL PROSPECTING FOUNDATION ENGINEERING Co Ltd
Priority to CN201720341139.1U priority Critical patent/CN206916755U/en
Application granted granted Critical
Publication of CN206916755U publication Critical patent/CN206916755U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of protective slope structure with concealed beam is disclosed in the utility model, including some slope protection piles, and it is connected to the steel waist rail between slope protection pile, the hole side wall of facing of the slope protection pile is provided with a groove to cave in, the steel waist rail is embedded in the groove, and the steel waist rail face hole side wall and slope protection pile to face hole side external surface tangent.It passes through the change to slope protection pile and the steel reinforcement cage set location of steel waist rail so that the hole side wall of facing of steel waist rail flushes with the hole side wall of facing of slope protection pile, reduces occupancy of the steel waist rail to space in foundation ditch.

Description

Protective slope structure with concealed beam
Technical field
It the utility model is related to the slope protection pile constructing structure in ground construction, more particularly to a kind of bank protection knot with concealed beam Structure.
Background technology
The deep pit digging of modern construction engineering, it must typically coordinate using supporting construction, with just can ensure that architectural engineering The normal construction of lower structure, pile-anchor retaining are widely used in pattern foundation pit supporting structure field as a kind of support form of main flow.
In general, anchored pile supporting includes the slope protection pile of some Lin Keng sides for being arranged at foundation pit side-wall, and insertion Prestress anchorage cable in inter-pile soil body, meanwhile, it is attached between slope protection pile and prestress anchorage cable by steel waist rail.General steel waist The structure of beam is similar with bank protection pilework, using reinforced concrete structure, i.e., after the completion of bank protection pile driving construction, what is selected Construction angle-table bracket etc. in several slope protection piles, fixation of the plane then formed using all angle-table brackets as steel waist rail are lifted flat Face, in the steel reinforcement cage of colligation steel waist rail thereon, and last formwork casting concrete, form steel waist rail.Under this execution conditions, steel Waist rail at least extends 300 to 400 millimeters from the Lin Keng sides outer wall of slope protection pile to foundation ditch inside, and therefore, this steel waist rail is also referred to as For plug-in steel waist rail, also, the anchorage of prestress anchorage cable also general provision facing in the side wall of hole to plug-in steel waist rail, drawn with being formed The stretch-draw prestressing force of tight inter-pile soil.
Headspace is less between underground agent structure and supporting construction, or foundation pit side-wall needs to do bank protection wall, risen When lining or waterproof, plug-in steel waist rail can not only take the space in foundation ditch, and can hinder the construction of bank protection wall.
Utility model content
The purpose of this utility model is to provide a kind of protective slope structure with concealed beam, and it passes through to slope protection pile and steel waist The change of the steel reinforcement cage set location of beam so that the hole side wall of facing of steel waist rail flushes with the hole side wall of facing of slope protection pile, reduces steel waist Occupancy of the beam to space in foundation ditch.
Above-mentioned purpose of the present utility model technical scheme is that:A kind of bank protection knot with concealed beam Structure, including some slope protection piles, and the steel waist rail being connected between slope protection pile, the hole side wall of facing of the slope protection pile are provided with one Sunken groove, the steel waist rail are embedded in the groove, and the steel waist rail face hole side wall and slope protection pile face hole side external surface It is tangent.
By using above-mentioned technical proposal, groove is set in slope protection pile, can be by steel waist rail reinforcing bar when doing steel waist rail Cage is directly embedded into groove, and using the bottom land of groove as the plane of lifting of steel waist rail, under this structure, steel waist rail " embedded " is extremely In slope protection pile, concealed beam is formed, compared to plug-in steel breast beam structure, this structure can save the plug-in required occupancy of script steel waist rail Foundation ditch inner space, meanwhile, the outer surface of steel waist rail and slope protection pile to face hole side external surface tangent so that foundation pit side-wall can To form a smooth plane, in order to do bank protection wall and waterproof layer etc. thereon.
Preferably, slope protection pile includes bank protection pile cages, and the bank protection pile cages include some vertical muscle and stirrup, Lin Keng The vertical muscle of side forms the groove to bank protection pile cages internal bend, is fitted together in the groove and is provided with geomery and adapts to Steel waist rail insertion slope protection pile part cuts filling block, can cut at filling block except described in the bank protection pile cages and fill out Filled with slope protection pile concrete bodies.
By using above-mentioned technical proposal, during using reinforced concrete pile, the earth-retaining effect and shearing resistance effect of slope protection pile Preferably, and when welding bank protection pile cages muscle bending is indulged into Lin Keng sides, to avoid place's recess space, then so that filling can be cut Block is embedded in, and so, when pouring slope protection pile concrete bodies into bank protection pile cages, can cut space that filling block is occupied can not Slope protection pile concrete bodies are filled, therefore, this position forms groove after removal can cut filling block, is poured compared in slope protection pile The mode that slope protection pile concrete bodies form groove is cut after building, this mode is more time saving and energy saving, and the groove shapes rule formed It is whole, do not interfere with the setting-in of steel waist rail.
Preferably, tensioning has prestress anchorage cable in the inter-pile soil between the adjacent slope protection pile, and the prestress anchorage cable is worn The anchorage for facing hole side wall no more than steel waist rail is installed with the end gone out.
By using above-mentioned technical proposal, after prestressed anchor cable stretching, it is firm inter-pile soil to play a part of, still, When carrying out spraying mixed to foundation pit side-wall, the flatness of foundation pit side-wall can be influenceed by stretching out the anchorage of the soil body, and by anchorage end set Face hole side wall no more than steel waist rail, when to steel waist rail casting concrete, anchorage is directly embedded in inside steel waist rail by concrete, with Prevent anchorage from protruding foundation pit side-wall, hinder the making of bank protection wall.
Preferably, the groove extends radially to the center of slope protection pile along slope protection pile.
By using above-mentioned technical proposal, depth of the groove along slope protection pile radial direction, be steel waist rail width, in order to more reliable Slope protection pile is connected as a single entity by ground, and depth of groove is extended into bank protection pile center, to increase in the case where not weakening slope protection pile intensity as far as possible The horizontal width of steel waist rail.
In summary, the utility model has the advantages that:Groove is set in slope protection pile, when doing steel waist rail, Steel waist rail steel reinforcement cage can be directly embedded into groove, and plane is lifted using the bottom land of groove as steel waist rail, in the structure Under, in steel waist rail " embedded " to slope protection pile, concealed beam is formed, compared to plug-in steel breast beam structure, this structure can save script steel The inner space of the foundation ditch taken required for waist rail is plug-in, meanwhile, the outer surface of steel waist rail and slope protection pile face hole side external surface It is tangent so that foundation pit side-wall can form a smooth plane, in order to do bank protection wall and waterproof layer etc. thereon.
Brief description of the drawings
Fig. 1 is the concealed beam slope protection pile relative position relation figure for being not filled by concrete;
Fig. 2 is slope protection pile and can cut the matching chart of filling block;
Fig. 3 is slope protection pile and can cut the fit structure explosive view of filling block.
In figure, 1, slope protection pile;10th, muscle is indulged;11st, stirrup;2nd, filling block can be cut;3rd, steel waist rail;4th, anchorage;5th, prestressing force Anchor cable.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Embodiment
A kind of protective slope structure with concealed beam, as shown in fig. 1, include the steel in slope protection pile 1 and embedded slope protection pile 1 Waist rail 3, on adjacent steel waist rail 3, in the inter-pile soil body between adjacent two slope protection piles 1 tensioning have prestress anchorage cable 5, its end is consolidated Surely there is anchorage 4.After the completion of slope protection pile 1 pours with steel waist rail 3, one end of stretch-draw prestressing force anchor cable 5 extends to the stable soil of side slope Anchoring section is formed in vivo, and its other end extends to the center of foundation ditch, and anchorage 4 is fixed in this one end of prestress anchorage cable 5, to be formed Stretching force, using the stretching machine reinforcing side slope soil body, hole side wall is faced in the end of anchorage 4 no more than steel waist rail 3.
Slope protection pile 1 includes the annulus u stirrup 10 of the vertical muscle 11 and ring of some annular distributions outside all vertical muscle 11, Both welding or banding fixed form bank protection pile cages, its internal fill concrete body(It is to clearly show that slope protection pile steel in Fig. 1 Muscle basket structure, is not shown concrete bodies).
With reference to Fig. 1 and Fig. 3, the construction of slope protection pile 1, in order to be embedded steel waist rail 3, is making slope protection pile steel prior to steel waist rail 3 During muscle cage, the vertical muscle 11 in part bend at sustained height, and with the caulking groove 12 of side wall one semicircle column type of formation, caulking groove 12 is along shield At the centre of gyration for extending radially to slope protection pile 1 of slope stake 1.
With reference to Fig. 2 and Fig. 3, before bank protection pile cages pour, setting-in can cut filling block 2 in caulking groove 12, and bending is indulged The bending angle of muscle 11 is 90 degree, so that the bottom surface of caulking groove 12, top surface and side are plane, is convenient to that filling block 2 can be cut The taking-up in later stage.
During construction, existing way colligation bank protection pile cages are first according to, and the vertical muscle 11 in part is bent to form caulking groove 12;
Filling block 2 can be cut by placing in the caulking groove 12, it is noted that can cut filling block 2 can be wooden unit or other The material being adhered with concrete is not easy to, and, it is necessary to ensure that filling block 2 can be cut before decentralization bank protection pile cages enter stake holes Closely it is caught in caulking groove 12;
It will be transferred with the bank protection pile cages that can cut filling block 2 to stake holes, casting concrete;
After intensity on concrete, it can cut filling block 2 using instrument and knock out, concede the space of caulking groove 12;
Steel waist rail 3 is put into caulking groove 12, its structure can be the steel reinforcement cage casting concrete structure shown in Fig. 1, Can be integral steel beam structure, the side wall and slope protection pile 1 of its Lin Keng side are tangent;
The stretch-draw prestressing force anchor cable 5 into the inter-pile soil body of adjacent slope protection pile 1, and no more than the Lin Keng sides outer wall of slope protection pile 1 Position fix anchorage 4;
To 3 outer gunite concrete of steel waist rail, overall foundation pit side-wall is formed.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.

Claims (4)

1. a kind of protective slope structure with concealed beam, including some slope protection piles, and it is connected to slope protection pile(1)Between steel waist rail (3), it is characterized in that:The slope protection pile(1)Face hole side wall be provided with a groove to cave in(12), the steel waist rail(3)It is embedded The groove(12), and the steel waist rail(3)Face hole side wall and slope protection pile(1)Face hole side external surface it is tangent.
2. the protective slope structure according to claim 1 with concealed beam, it is characterized in that:Slope protection pile includes bank protection pile cages, The bank protection pile cages include some vertical muscle(10)With stirrup(11), the vertical muscle of Lin Keng sides(10)To the inside of bank protection pile cages It is bent to form the groove(12), the groove(12)It is interior chimeric to be provided with geomery and adapt to steel waist rail(3)Embedded bank protection Stake(1)Partial cuts filling block(2), the bank protection pile cages are interior can to cut filling block except described(2)Place is filled with Slope protection pile concrete bodies.
3. the protective slope structure according to claim 2 with concealed beam, it is characterized in that:The adjacent slope protection pile(1)Between Tensioning has prestress anchorage cable in inter-pile soil(5), the prestress anchorage cable(5)It is installed with the end passed no more than steel waist rail (3)Face hole side wall anchorage(4).
4. the protective slope structure according to claim 1 with concealed beam, it is characterized in that:The groove(12)Along slope protection pile(1) Extend radially to slope protection pile(1)Center.
CN201720341139.1U 2017-04-01 2017-04-01 Protective slope structure with concealed beam Active CN206916755U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720341139.1U CN206916755U (en) 2017-04-01 2017-04-01 Protective slope structure with concealed beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720341139.1U CN206916755U (en) 2017-04-01 2017-04-01 Protective slope structure with concealed beam

Publications (1)

Publication Number Publication Date
CN206916755U true CN206916755U (en) 2018-01-23

Family

ID=61310867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720341139.1U Active CN206916755U (en) 2017-04-01 2017-04-01 Protective slope structure with concealed beam

Country Status (1)

Country Link
CN (1) CN206916755U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115075261A (en) * 2022-07-20 2022-09-20 北京爱地地质工程技术有限公司 Waist beam structure of foundation pit slope protection pile and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115075261A (en) * 2022-07-20 2022-09-20 北京爱地地质工程技术有限公司 Waist beam structure of foundation pit slope protection pile and construction method
CN115075261B (en) * 2022-07-20 2023-09-22 北京爱地地质工程技术有限公司 Waist beam structure of foundation pit slope protection pile and construction method

Similar Documents

Publication Publication Date Title
CN102011404B (en) Pit supporting structure and construction method thereof
CN201224889Y (en) High and light type anchoring plate retaining wall in high filling branch block engineering
CN105133620B (en) Pit supporting construction and its construction method in local flow's modeling shape Muddy Bottoms soil body hole
CN102162258B (en) Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof
CN103510540B (en) Mortar flag stone retaining wall reinforcement construction method and structure thereof
CN108035361A (en) A kind of advanced support supporting construction and its construction method
CN110924433A (en) Design method of subway foundation pit foot-hanging pile enclosure structure in upper-soft lower-hard rock stratum
CN107059881A (en) The foundation pit supporting method that a kind of campshed is combined with steel sheet pile
CN109024721B (en) Reinforced foundation and method for improving bending and shearing resistance of existing building rigid foundation
CN201873997U (en) Support structure of foundation pit
CN103452120A (en) Pile top crown beam structure of high-strength prestress pipe pile for supporting foundation pit and construction method thereof
CN108360535A (en) Foundation pit supporting construction based on campshed and inner support and its construction method
CN102330436A (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
JP5976373B2 (en) Pile foundation reinforcement structure and reinforcement method
CN206916755U (en) Protective slope structure with concealed beam
JP3756385B2 (en) Composite pile and its construction method
CN109024657B (en) Construction method of super high-rise core tube deep pit edge tower crane foundation under complex conditions
CN111549804A (en) Cutting slope reinforced passive protection system and construction method thereof
CN218346208U (en) Permanent side slope supporting structure based on reinforced concrete pile
CN108589738A (en) Half gravity dam formula foundation pit enclosure structure and its construction method
CN106245673A (en) A kind of rib stake formula peg board retaining wall and construction method thereof
CN216920296U (en) Post-tensioned prestressed fender post with bonding function
CN203668978U (en) Anti-floating structure for subway tunnel
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN214660200U (en) Stiffening beam disposal structure of tunnel bottom karst cave