Prior art keywords
fan
pipeline
gas chamber
gas
outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720165146.0U
Other languages
Chinese (zh)
Inventor
郭红强
卢团飞
荣宝恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Steel Group Hanzhong Iron and Steel Co Ltd
Original Assignee
Shaanxi Steel Group Hanzhong Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Steel Group Hanzhong Iron and Steel Co Ltd filed Critical Shaanxi Steel Group Hanzhong Iron and Steel Co Ltd
Priority to CN201720165146.0U priority Critical patent/CN206916176U/en
Application granted granted Critical
Publication of CN206916176U publication Critical patent/CN206916176U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model discloses a kind of gas chamber to inflate displacement apparatus, including gas chamber, gas chamber is connected to gas cabinet outlet pipeline and nitrogen pipeline, No. two blower fans and No.1 blower fan are connected on gas cabinet outlet pipeline, No. two blower fans and the No.1 blower fan other end are connected to user pipe, No. two fan inlet butterfly valves, No. two fan inlet pipe manholes and No. two fan inlet blank-plate valve are respectively arranged with pipeline between gas cabinet outlet pipeline and No. two blower fans, connecting pipe is connected between No.1 fan outlet pipe manhole and No. two fan inlet pipelines.Gas chamber of the present utility model inflates displacement apparatus, by setting gas chamber, and gas cabinet outlet pipeline is connected on gas chamber, No. two blower fans and No.1 blower fan are connected to by pipeline on gas cabinet outlet pipeline, connecting pipe is connected between No.1 fan outlet pipe manhole and No. two fan inlet pipelines, solves the problems, such as that existing gas chamber excessively causes cost too high using nitrogen.

Description

A kind of gas chamber inflates displacement apparatus
Technical field
The utility model belongs to gas chamber equipment technical field, is related to a kind of gas chamber inflation displacement apparatus.
Background technology
At present, converter gas cabinet used in iron and steel enterprise inflated with nitrogen or air need to cause piston liter in maintenance process into cabinet Drop, is detected and leveling to its internal piston levelness.The method that generally each enterprise takes has two kinds:One kind is The installation and repairing blower fan by gas holder, air is filled into cabinet using blower fan, separately installed blower fan need to spend ten thousand yuan of 2-3 expense;Separately A kind of method is the outside nitrogen pipeline inflated with nitrogen into cabinet of use.First method is due to that need to buy a Fans and its supporting electricity Gas control, which is set up, to be applied, dedicated for maintenance;Second method is because nitrogen use level is big, cost is high, general each maintenance gas about 10 Ten thousand m3Left and right.
Utility model content
The purpose of this utility model is to provide a kind of gas chamber inflation displacement apparatus, solves existing gas chamber and uses nitrogen The problem of gas excessively causes cost too high.
The utility model is the technical scheme adopted is that a kind of gas chamber inflates displacement apparatus, including gas chamber, gas chamber Gas cabinet outlet pipeline and nitrogen pipeline are connected to, No. two blower fans and No.1 blower fan are connected on gas cabinet outlet pipeline, No. two blower fans and the No.1 blower fan other end are connected to user pipe, are set gradually on the pipeline between No.1 blower fan and user pipe There are No.1 fan outlet blank-plate valve, No.1 fan outlet pipe manhole and No.1 fan outlet butterfly valve, gas cabinet outlet pipeline and two No. two fan inlet butterfly valves, No. two fan inlet pipe manholes and No. two blower fans are respectively arranged with pipeline between number blower fan to enter Mouth blank-plate valve, connecting pipe is connected between No.1 fan outlet pipe manhole and No. two fan inlet pipelines.
The characteristics of the utility model, also resides in,
No.1 fan inlet butterfly valve, No.1 blower fan are respectively arranged with pipeline between gas cabinet outlet pipeline and No.1 blower fan Inlet pipeline manhole and No.1 fan inlet blank-plate valve.
No. two fan outlet blank-plate valve, No. two outlets are disposed with No. two pipelines between blower fan and user pipe Road manhole and No. two fan outlet butterfly valves.
The butterfly valve that offers for sale is connected with gas cabinet outlet pipeline.
The beneficial effects of the utility model are that gas chamber of the present utility model inflates displacement apparatus, by setting gas chamber, And gas cabinet outlet pipeline is connected on gas chamber, No. two blower fans and No.1 wind are connected to by pipeline on gas cabinet outlet pipeline Machine, connecting pipe is connected between No.1 fan outlet pipe manhole and No. two fan inlet pipelines, solves existing coal gas The problem of cabinet excessively causes cost too high using nitrogen, or it is individually for cost rise caused by the special maintenance blower fan of gas holder installation The problem of.
Brief description of the drawings
Fig. 1 is a kind of structural representation of gas chamber inflation displacement apparatus of utility model.
In figure, 1. gas chambers, 2. gas cabinet outlet pipelines, 3. offer for sale butterfly valve, 4. No. two fan inlet butterfly valves, 5. No. two blower fans Import blank-plate valve, 6. No. two blower fans, 7. No. two fan outlet blank-plate valve, 8. No. two outlet conduit manholes, 9. No. two fan outlets Butterfly valve, 10. No. two fan outlet pipelines, 11. No.1 fan inlet butterfly valves, 12. No.1 fan inlet pipe manholes, 13. No.1s Fan inlet blank-plate valve, 14. No.1 blower fans, 15. No.1 fan outlet blank-plate valve, 16. No.1 fan outlet pipe manholes, 17. No.1 fan outlet butterfly valve, 18. connecting pipes, 19. nitrogen pots, 20. nitrogen pipelines, 21. user pipes, 22. No. two blower fans enter Mouth pipe manhole.
Embodiment
A kind of gas chamber of the utility model inflation displacement apparatus is carried out with reference to the accompanying drawings and detailed description detailed Explanation.
A kind of gas chamber inflates displacement apparatus, as shown in figure 1, including gas chamber 1, gas chamber 1 is connected to gas holder and gone out Mouthful pipeline 2 and nitrogen pipeline 20, No. two blower fans 6 and No.1 blower fan 14, No. two blower fans 6 are connected on gas cabinet outlet pipeline 2 User pipe 21 is connected to the other end of No.1 blower fan 14, is set gradually on the pipeline between No.1 blower fan 14 and user pipe 21 There are No.1 fan outlet blank-plate valve 15, No.1 fan outlet pipe manhole 16 and No.1 fan outlet butterfly valve 17, gas cabinet outlet pipe 4, No. two fan inlet pipe manholes 22 of No. two fan inlet butterfly valves are respectively arranged with pipeline between road 2 and No. two blower fans 6 With No. two fan inlet blank-plate valve 5, it is connected between No.1 fan outlet pipe manhole 16 and No. two fan inlet pipelines 22 Thread a pipe 18.
No.1 fan inlet butterfly valve 11, one is respectively arranged with pipeline between gas cabinet outlet pipeline 2 and No.1 blower fan 14 Number fan inlet pipe manhole 12 and No.1 fan inlet blank-plate valve 13.
No. two fan outlet blank-plate valve 7, two are disposed with pipeline between No. two blower fans 6 and user pipe 21 to go out Mouth pipe manhole 8 and No. two fan outlet butterfly valves 9.
The butterfly valve 3 that offers for sale is connected with gas cabinet outlet pipeline 2.
A kind of application method of gas chamber inflation displacement apparatus of the utility model is that the normal use process of gas chamber 1, is coal The inside coal gas of gas holder 1 is through gas cabinet outlet pipeline 2, offer for sale the fan inlet blank-plate valve 5 of fan inlet butterfly valve 4, two of butterfly valve 3, two Enter No. two blower fans 6 afterwards, user pipe 21 is added after blower fan pressurizes, for users to use;
When needing to overhaul ventilation, connecting pipe 18 is arranged on No.1 fan outlet pipe manhole 16 and No. two wind On machine inlet pipeline manhole 22, No.1 fan inlet butterfly valve 11 is closed, opens No.1 fan inlet blank-plate valve 13, opens No.1 wind Machine inlet pipeline manhole 12, No.1 fan outlet blank-plate valve 15 is opened, open No. two fan inlet butterfly valves 4, open No. two blower fans Import blank-plate valve 5, start No.1 blower fan 14 to the inside air blast of gas chamber 1, sky is sucked from the inlet pipeline manhole 12 of No.1 blower fan 14 Gas, connecting pipe 18 will be filled with after air pressurized, through No. two fan inlet pipe manholes 22, No. two fan inlet butterfly valves 4, gas holders Outlet conduit 2, the butterfly valve 3 that offers for sale are sent into gas chamber 1, and so as to which No.1 blower fan 14 and No. two blower fans 6 pressurize twice, air enters coal gas Cabinet 1 realizes the purpose that lifting cabinet holds, and does not use a large amount of nitrogen, or the maintenance blower fan that installation is special;
The coal gas in nitrogen displacement gas chamber 1 first can also be partly used, blower fan is reused and is passed through air, for example, using When nitrogen displacement, process is passed through nitrogen into gas chamber 1 by nitrogen pipeline 20 and realizes lifting cabinet to open nitrogen pot 19 Hold, then the gas in gas chamber 1 is finally replaced using the method above by blower fan.
Gas chamber of the present utility model inflates displacement apparatus, by setting gas chamber, and connects gas holder on gas chamber and goes out Mouthful pipeline, No. two blower fans and No.1 blower fan, No.1 fan outlet tube Taoist are connected to by pipeline on gas cabinet outlet pipeline Connecting pipe is connected between hole and No. two fan inlet pipelines, solve existing gas chamber excessively causes cost using nitrogen The problem of too high, or it is individually for the problem of cost caused by gas holder installs special maintenance blower fan raises.

Claims (4)

1. a kind of gas chamber inflates displacement apparatus, it is characterised in that including gas chamber (1), gas chamber (1) is connected to gas holder Outlet conduit (2) and nitrogen pipeline (20), No. two blower fans (6) and No.1 blower fan are connected on gas cabinet outlet pipeline (2) (14), No. two blower fans (6) and No.1 blower fan (14) other end are connected to user pipe (21), No.1 blower fan (14) and user pipe (21) No.1 fan outlet blank-plate valve (15), No.1 fan outlet pipe manhole (16) and one are disposed with the pipeline between Number fan outlet butterfly valve (17), No. two blower fans are respectively arranged with the pipeline between gas cabinet outlet pipeline (2) and No. two blower fans (6) Import butterfly valve (4), No. two fan inlet pipe manholes (22) and No. two fan inlet blank-plate valve (5), the No.1 fan outlet Connecting pipe (18) is connected between pipe manhole (16) and No. two fan inlet pipe manholes (22).
A kind of 2. gas chamber inflation displacement apparatus according to claim 1, it is characterised in that the gas cabinet outlet pipeline (2) No.1 fan inlet butterfly valve (11), No.1 fan inlet pipeline are respectively arranged with the pipeline between No.1 blower fan (14) Manhole (12) and No.1 fan inlet blank-plate valve (13).
A kind of 3. gas chamber inflation displacement apparatus according to claim 2, it is characterised in that No. two blower fans (6) and Be disposed with pipeline between user pipe (21) No. two fan outlet blank-plate valve (7), No. two outlet conduit manholes (8) and No. two fan outlet butterfly valves (9).
A kind of 4. gas chamber inflation displacement apparatus according to claim 1, it is characterised in that the gas cabinet outlet pipeline (2) butterfly valve that offers for sale (3) is connected with.
CN201720165146.0U 2017-02-23 2017-02-23 A kind of gas chamber inflates displacement apparatus Expired - Fee Related CN206916176U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720165146.0U CN206916176U (en) 2017-02-23 2017-02-23 A kind of gas chamber inflates displacement apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720165146.0U CN206916176U (en) 2017-02-23 2017-02-23 A kind of gas chamber inflates displacement apparatus

Publications (1)

Publication Number Publication Date
CN206916176U true CN206916176U (en) 2018-01-23

Family

ID=61310474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720165146.0U Expired - Fee Related CN206916176U (en) 2017-02-23 2017-02-23 A kind of gas chamber inflates displacement apparatus

Country Status (1)

Country Link
CN (1) CN206916176U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109538921A (en) * 2018-11-20 2019-03-29 中国三冶集团有限公司 Gas chamber piston system hangs method for dismounting under a kind of accident condition

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109538921A (en) * 2018-11-20 2019-03-29 中国三冶集团有限公司 Gas chamber piston system hangs method for dismounting under a kind of accident condition

Similar Documents

Publication Publication Date Title
CN209654694U (en) A kind of piston type decompression venting valve
CN206916176U (en) A kind of gas chamber inflates displacement apparatus
CN109514739B (en) Foam cement slurry well cementation equipment and method
CN105065845A (en) Repairing device for municipal sewer bifurcated pipes and construction method of bifurcated pipes
CN204510363U (en) A kind of gaseous prepressing water supplying equipment
CN204556178U (en) A kind of subsurface safety valve test macro
CN105402550A (en) Local repair device and repair method for urban drainage pipeline
CN210221413U (en) Detect device that carat pipe leaked
CN209085841U (en) Suppress platform tap device
CN208937260U (en) Coil pipe air-tightness detection device
CN107065944A (en) A kind of testing equipment of simulation water flowed fluctuation
CN204040109U (en) Without negative pressure constant pressure water supply equipment experimental rig
CN203743815U (en) Double-membrane gas holder
CN207005711U (en) Pressure regulating system air-flow bidirectional flow device
CN204064566U (en) A kind of aluminium casting leak-checking apparatus
CN203924003U (en) A kind of full-automatic integrated form air filling type rubber dam fill-drain syctem
CN204919692U (en) Energy -conserving water supply installation of no negative pressure frequency conversion
CN205689993U (en) A kind of old pipe lining repairs light curring unit
CN211697282U (en) Pipeline pressure testing device
CN207436137U (en) A kind of integrated-type non-negative pressure water-supply installation
CN204492869U (en) Ventilation system in long tunnel hole
CN217463714U (en) Pipeline decompression repairing device
CN202438446U (en) Long-distance hot air conveying drying system for underground pipeline
CN109141765A (en) Coil pipe air-tightness detection device and its detection method
CN204173936U (en) A kind of water treatment gas-adding pipe valve good antiscale property blocking device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180123