CN206912777U - A kind of quick handling equipment of large-scale sheet metal component - Google Patents

A kind of quick handling equipment of large-scale sheet metal component Download PDF

Info

Publication number
CN206912777U
CN206912777U CN201720427737.0U CN201720427737U CN206912777U CN 206912777 U CN206912777 U CN 206912777U CN 201720427737 U CN201720427737 U CN 201720427737U CN 206912777 U CN206912777 U CN 206912777U
Authority
CN
China
Prior art keywords
sheet metal
metal component
lifting unit
movable part
drive division
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720427737.0U
Other languages
Chinese (zh)
Inventor
冯淑琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Fengshi Intelligent Technology Co ltd
Original Assignee
SUZHOU FENGSHI SHEET METAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU FENGSHI SHEET METAL CO Ltd filed Critical SUZHOU FENGSHI SHEET METAL CO Ltd
Priority to CN201720427737.0U priority Critical patent/CN206912777U/en
Application granted granted Critical
Publication of CN206912777U publication Critical patent/CN206912777U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model provides a kind of quick handling equipment of large-scale sheet metal component, and it includes:Mounting bracket;Lifting unit, the first drive division is provided with upper frame, and the first drive shaft of the first drive division through upper frame and connects the top of lifting unit;First level movable part, it is slidably mounted to the bottom of lifting unit, the bottom of lifting unit is installed with the second drive division, and the second driving axis connection first level movable part of the second drive division, one end of first level movable part is additionally provided with the first sheet metal component location division;Second horizontal anomalous movement portion, it is slidably mounted to the bottom of lifting unit, second horizontal anomalous movement portion and the symmetrical setting of first level movable part, the bottom of lifting unit is installed with the 3rd drive division, 3rd driving the second horizontal anomalous movement of axis connection portion of the 3rd drive division, the one end in the second horizontal anomalous movement portion is additionally provided with the second sheet metal component location division.The utility model can effectively improve processing efficiency and machining accuracy compared to prior art.

Description

A kind of quick handling equipment of large-scale sheet metal component
Technical field
It the utility model is related to sheet metal component manufacture field, and in particular to a kind of large-scale quick handling equipment of sheet metal component.
Background technology
In the processing of present sheet metal component, some more large-scale sheet metal components can be usually run into, it is fixed in transport and processing All more common small-sized sheet metal component has bigger difficulty on position.At present, in the processing of sheet metal component, add in cutting, groove milling etc. Before work starts, it is required for sheet metal component being carried on processing platform, now mostly in production is to hang sheet metal component by turned crane It is attached on processing platform, not only complex operation, and putting position is difficult control, and adjustment position is also needed in post-production, with Ensure the precision of processing.
Utility model content
In consideration of it, the utility model provides and a kind of can improve processing efficiency and the large-scale sheet metal component of machining accuracy is quick Handling equipment.
The utility model provides a kind of quick handling equipment of large-scale sheet metal component, and it includes:
Mounting bracket, mounting bracket include upper frame and chassis, and upper frame is fixedly installed on chassis, and installation sky is formed on the bottom of upper frame Between;
Lifting unit, lifting unit are arranged in installing space, are provided with the first drive division on upper frame, and the first of the first drive division Drive shaft is through upper frame and connects the top of lifting unit;
First level movable part, first level movable part are installed on the bottom of lifting unit horizontally slidablely, lifting unit Bottom is installed with the second drive division, the second driving axis connection first level movable part of the second drive division, and first level is lived The one end in dynamic portion is additionally provided with the first sheet metal component location division;
Second horizontal anomalous movement portion, the second horizontal anomalous movement portion are installed on the bottom of lifting unit horizontally slidablely, and second is horizontal Movable part and the symmetrical setting of first level movable part, the bottom of lifting unit is installed with the 3rd drive division, the 3rd drive division The 3rd driving the second horizontal anomalous movement of axis connection portion, the one end in the second horizontal anomalous movement portion is additionally provided with the second sheet metal component location division.
Further, multiple leading trucks are additionally provided with above-mentioned lifting unit, more first guide pillars are additionally provided with upper frame, the One guide pillar is be arranged in parallel with leading truck, and leading truck is slidably connected on the first guide pillar.
Further, above-mentioned leading truck is slidably connected on the first guide pillar by multiple sliding blocks.
Further, through hole is offered in above-mentioned sliding block, sliding block is placed on the first guide pillar by through hole, on the inwall of through hole Offer cone tank.
Further, axle sleeve is provided with above-mentioned through hole, cushion cover is provided with axle sleeve, cushion cover is placed on the first guide pillar, cushion cover Wavy surface is provided with the upper inwall contacted with the first guide pillar.
Further, above-mentioned first level movable part is C font support bodys, and the top slide of first level movable part is connected to On horizontally disposed second guide pillar, the second guide pillar sets parallel to the second drive division and is installed on the bottom of lifting unit, the first water One end of flat movable part connects the second drive shaft of the second drive division, the other end connects the first sheet metal component location division.
Further, above-mentioned first sheet metal component location division includes the first positioning rotating shaft and is sheathed on the first positioning rotating shaft The first runner, one end of the first positioning rotating shaft is also associated with first liang of connecting rod of L-shaped, and the free end of first liang of connecting rod is connected with Second positioning rotating shaft, the second runner is cased with the second positioning rotating shaft, and the second runner and the first runner are connected.
Further, above-mentioned second horizontal anomalous movement portion is C font support bodys, and the top slide in the second horizontal anomalous movement portion is connected to On horizontally disposed 3rd guide pillar, the 3rd guide pillar sets parallel to the 3rd drive division and is installed on the bottom of lifting unit, the second water One end of flat movable part connects the 3rd drive shaft of the 3rd drive division, the other end connects the second sheet metal component location division.
Further, above-mentioned second sheet metal component location division includes the 3rd positioning rotating shaft and is sheathed on the 3rd positioning rotating shaft The 3rd runner, one end of the 3rd positioning rotating shaft is also associated with second liang of connecting rod of L-shaped, and the free end of second liang of connecting rod is connected with 4th positioning rotating shaft, the 4th runner is cased with the 4th positioning rotating shaft, and the 4th runner and the 3rd runner are connected.
Further, above-mentioned chassis includes more legs.
A kind of large-scale quick handling equipment of sheet metal component provided by the utility model, mainly there is provided mounting bracket, lifting Portion, first level movable part and the second horizontal anomalous movement portion, wherein, lifting unit is arranged in installing space, and is provided with upper frame One drive division, the first drive shaft of the first drive division through upper frame and connect the top of lifting unit, and first level movable part can water The flat bottom for being slidably mounted to lifting unit, the bottom of lifting unit are installed with the second drive division, and the second of the second drive division Axis connection first level movable part is driven, one end of first level movable part is additionally provided with the first sheet metal component location division, the second water Flat movable part is installed on the bottom of lifting unit horizontally slidablely, the second horizontal anomalous movement portion with first level movable part is symmetrical sets To put, the bottom of lifting unit is installed with the 3rd drive division, and the 3rd of the 3rd drive division drives the second horizontal anomalous movement of axis connection portion, The one end in the second horizontal anomalous movement portion is additionally provided with the second sheet metal component location division;By the setting of above-mentioned each part and its structure, lead to Cross the horizontal movement in two the second horizontal anomalous movement portions so that the first sheet metal component location division and the second sheet metal component location division can be in water Square positioned to by sheet metal component, then sheet metal component is raised up to processing platform, the first sheet metal component location division and second by lifting unit again Sheet metal component unclamps sheet metal component, and sheet metal component can complete the loading to processing platform, and can also be by each in loading process The adjustment to sheet metal component position is realized in the control of individual drive division, so as to effectively improve processing efficiency compared to prior art And machining accuracy.
Brief description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this area Technical staff will be clear understanding.Accompanying drawing is only used for showing the purpose of preferred embodiment, and is not considered as to this practicality New limitation.And in whole accompanying drawing, identical part is denoted by the same reference numerals.In the accompanying drawings:
Fig. 1 is a kind of structural representation for large-scale quick handling equipment of sheet metal component that the utility model embodiment provides;
Fig. 2 is a kind of first level activity for large-scale quick handling equipment of sheet metal component that the utility model embodiment provides The structural representation in portion;
Fig. 3 is a kind of the second horizontal anomalous movement of large-scale quick handling equipment of sheet metal component that the utility model embodiment provides The structural representation in portion;
Fig. 4 is the leading truck and cunning for a kind of large-scale quick handling equipment of sheet metal component that the utility model embodiment provides The structural representation of block portion point.
Embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in accompanying drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here Limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure Completely it is communicated to those skilled in the art.
Referring to Fig. 1 to Fig. 4, a kind of large-scale quick loading and unloading of sheet metal component that the utility model embodiment provides are shown in figure Device, it includes:Mounting bracket 1, mounting bracket 1 include upper frame 11 and chassis 12, and upper frame 11 is fixedly installed on chassis 12, upper frame 11 Bottom formed installing space 13;Lifting unit 2, lifting unit 2 are arranged in installing space 13, and the first driving is provided with upper frame 11 Portion 21, the first drive shaft 211 of the first drive division 21 through upper frame 11 and connect the top of lifting unit 2;First level movable part 3, first level movable part 3 is installed on the bottom of lifting unit 2 horizontally slidablely, and the bottom of lifting unit 2 is installed with second Drive division 31, the second drive shaft 311 connection first level movable part 3 of the second drive division 31, one end of first level movable part 3 It is additionally provided with the first sheet metal component location division 32;Second horizontal anomalous movement portion 4, the second horizontal anomalous movement portion 4 are installed on horizontally slidablely Peace is fixed in the bottom of lifting unit 2, the second horizontal anomalous movement portion 4 and the 3 symmetrical setting of first level movable part, the bottom of lifting unit 2 Equipped with the 3rd drive division 41, the 3rd drive shaft 411 of the 3rd drive division 41 connects the second horizontal anomalous movement portion 4, the second horizontal anomalous movement The one end in portion 4 is additionally provided with the second sheet metal component location division 42.Wherein, chassis 12 can specifically include more legs 121.
A kind of large-scale quick handling equipment of sheet metal component that the present embodiment is provided, mainly there is provided mounting bracket, lifting unit, First level movable part and the second horizontal anomalous movement portion, wherein, lifting unit is arranged in installing space, and the first drive is provided with upper frame Dynamic portion, the first drive shaft of the first drive division through upper frame and connect the top of lifting unit, and first level movable part can be horizontal sliding The bottom of lifting unit is installed on dynamicly, and the bottom of lifting unit is installed with the second drive division, the second driving of the second drive division Axis connection first level movable part, one end of first level movable part are additionally provided with the first sheet metal component location division, and second is horizontal living Dynamic portion is installed on the bottom of lifting unit, the second horizontal anomalous movement portion and the symmetrical setting of first level movable part horizontally slidablely, The bottom of lifting unit is installed with the 3rd drive division, and the 3rd of the 3rd drive division drives the second horizontal anomalous movement of axis connection portion, the The one end in two horizontal anomalous movement portions is additionally provided with the second sheet metal component location division;By the setting of above-mentioned each part and its structure, pass through The horizontal movement in two the second horizontal anomalous movement portions so that the first sheet metal component location division and the second sheet metal component location division can be in levels Direction positions sheet metal component, and then sheet metal component is raised up to processing platform, the first sheet metal component location division and the second metal plate by lifting unit again Golden part unclamps sheet metal component, and sheet metal component can complete the loading to processing platform, and can also be by each in loading process Adjustment to sheet metal component position is realized in the control of drive division, so as to compared to prior art can effectively improve processing efficiency and Machining accuracy.
Referring to Fig. 1 and Fig. 4, multiple leading trucks 22 are additionally provided with lifting unit 2, more first are additionally provided with upper frame 11 and is led Post 23, the first guide pillar 23 are be arranged in parallel with leading truck 22, and leading truck 22 is slidably connected on the first guide pillar 23;Leading truck 22 may be used also To be slidably connected to especially by multiple sliding blocks 24 on the first guide pillar 23, through hole 241, sliding block can be specifically offered in sliding block 24 24 are placed on the first guide pillar 23 by through hole 241, and cone tank 242 is offered on the inwall of through hole 241;Specifically may be used in through hole 241 So that provided with axle sleeve 243, cushion cover 244 is provided with axle sleeve 243, cushion cover 244 is placed on the first guide pillar 23, with first on cushion cover 244 Wavy surface 245 is provided with the inwall that guide pillar 23 contacts.By the setting of said structure, lifting unit can be caused in lifting process In, by the effect of the structure of sliding block, the double swerve phenomenon in sliding process is overcome using wavy surface so that slide more steady It is fixed, while the overall noise in sliding process can also be reduced, more adapt to the transport operation of large-scale sheet metal component.
Referring to Fig. 1 and Fig. 2, first level movable part 3 is C font support bodys, and the top slide of first level movable part 3 connects In on horizontally disposed second guide pillar 33, the second guide pillar 33 sets parallel to the second drive division 31 and is installed on the bottom of lifting unit 2 Portion, one end of first level movable part 3 connect the second drive shaft 311 of the second drive division 31, the other end the first sheet metal component of connection Location division 32;First sheet metal component location division 32 includes the first positioning rotating shaft 321 and be sheathed on the first positioning rotating shaft 321 the One runner 322, one end of the first positioning rotating shaft 321 are also associated with first liang of connecting rod 323 of L-shaped, the freedom of first liang of connecting rod 323 End is connected with the second positioning rotating shaft 324, is cased with the second runner 325 on the second positioning rotating shaft 324, the second runner 325 and first turn The drive connection of wheel 322.By the setting of the structure, using the effect of multiple runners and two connecting rods, and using between multiple runners Gearing so that during positioning sheet metal component, using the structure sheet metal component can be overcome overweight to the transverse direction caused by runner and Impact on vertical so that runner can keep accurate position rapidly, using sheet metal component swimmingly is sent into processing platform On.
Referring to Fig. 1 and Fig. 3, the second horizontal anomalous movement portion 4 is C font support bodys, and the top slide in the second horizontal anomalous movement portion 4 connects In on horizontally disposed 3rd guide pillar 43, the 3rd guide pillar 43 sets parallel to the 3rd drive division 41 and is installed on the bottom of lifting unit 2 Portion, the one end in the second horizontal anomalous movement portion 4 connect the 3rd drive shaft 411 of the 3rd drive division 41, the other end the second sheet metal component of connection Location division 42;The second sheet metal component location division 42 includes the 3rd positioning rotating shaft 421 and is sheathed on the 3rd positioning rotating shaft 421 3rd runner 422, one end of the 3rd positioning rotating shaft 421 are also associated with second liang of connecting rod 423 of L-shaped, second liang of connecting rod 423 from 4th positioning rotating shaft 424 is connected with by end, the 4th runner 425, the 4th runner 425 and the 3rd are cased with the 4th positioning rotating shaft 424 Runner 422 is connected.By the setting of the structure, using the effect of multiple runners and two connecting rods, and multiple runners are utilized Between gearing so that positioning sheet metal component when, sheet metal component can be overcome overweight to the transverse direction caused by runner using the structure And it is vertical on impact so that runner can keep accurate position rapidly, and it is flat that sheet metal component is sent into processing using swimmingly On platform.
Obviously, those skilled in the art can carry out various changes and modification without departing from this practicality to the utility model New spirit and scope.So, if these modifications and variations of the present utility model belong to the utility model claims and Within the scope of its equivalent technologies, then the utility model is also intended to comprising including these changes and modification.

Claims (10)

  1. A kind of 1. quick handling equipment of large-scale sheet metal component, it is characterised in that including:
    Mounting bracket (1), the mounting bracket (1) include upper frame (11) and chassis (12), and the upper frame (11) is fixedly installed in described On chassis (12), installing space (13) is formed on the bottom of the upper frame (11);
    Lifting unit (2), the lifting unit (2) are arranged in the installing space (13), and first is provided with the upper frame (11) Drive division (21), the first drive shaft (211) of first drive division (21) through the upper frame (11) and connect the lifting The top in portion (2);
    First level movable part (3), the first level movable part (3) are installed on the lifting unit (2) horizontally slidablely Bottom, the bottom of the lifting unit (2) are installed with the second drive division (31), the second driving of second drive division (31) Axle (311) connects the first level movable part (3), and one end of the first level movable part (3) is additionally provided with the first metal plate Part location division (32);
    Second horizontal anomalous movement portion (4), the second horizontal anomalous movement portion (4) are installed on the lifting unit (2) horizontally slidablely Bottom, the second horizontal anomalous movement portion (4) and the symmetrical setting of the first level movable part (3), the bottom of the lifting unit (2) Portion is installed with the 3rd drive division (41), and the 3rd drive shaft (411) of the 3rd drive division (41) connects second water Flat movable part (4), one end of the second horizontal anomalous movement portion (4) are additionally provided with the second sheet metal component location division (42).
  2. A kind of 2. large-scale quick handling equipment of sheet metal component according to claim 1, it is characterised in that the lifting unit (2) multiple leading trucks (22) are additionally provided with, more first guide pillars (23) are additionally provided with the upper frame (11), described first leads Post (23) is be arranged in parallel with the leading truck (22), and the leading truck (22) is slidably connected on first guide pillar (23).
  3. A kind of 3. large-scale quick handling equipment of sheet metal component according to claim 2, it is characterised in that the leading truck (22) it is slidably connected to by multiple sliding blocks (24) on first guide pillar (23).
  4. A kind of 4. large-scale quick handling equipment of sheet metal component according to claim 3, it is characterised in that the sliding block (24) Through hole (241) is inside offered, the sliding block (24) is placed on first guide pillar (23) by the through hole (241), described logical Cone tank (242) is offered on the inwall in hole (241).
  5. A kind of 5. large-scale quick handling equipment of sheet metal component according to claim 4, it is characterised in that the through hole (241) axle sleeve (243) is provided with, is provided with cushion cover (244) in the axle sleeve (243), the cushion cover (244) is placed on described first On guide pillar (23), wavy surface (245) is provided with the inwall that is contacted on the cushion cover (244) with first guide pillar (23).
  6. A kind of 6. large-scale quick handling equipment of sheet metal component according to claim 1, it is characterised in that the first level Movable part (3) is C font support bodys, and the top slide of the first level movable part (3) is connected to horizontally disposed second guide pillar (33) on, second guide pillar (33) sets parallel to second drive division (31) and is installed on the bottom of the lifting unit (2) Portion, one end of the first level movable part (3) connect the second drive shaft (311) of second drive division (31), the other end Connect the first sheet metal component location division (32).
  7. 7. a kind of large-scale quick handling equipment of sheet metal component according to claim 1 or 6, it is characterised in that described first Sheet metal component location division (32) includes the first positioning rotating shaft (321) and be sheathed on first positioning rotating shaft (321) first Runner (322), one end of first positioning rotating shaft (321) are also associated with first liang of connecting rod (323) of L-shaped, described first liang The free end of connecting rod (323) is connected with the second positioning rotating shaft (324), and the second runner is cased with second positioning rotating shaft (324) (325), second runner (325) is connected with first runner (322).
  8. 8. a kind of large-scale quick handling equipment of sheet metal component according to claim 1, it is characterised in that described second is horizontal Movable part (4) is C font support bodys, and the top slide of the second horizontal anomalous movement portion (4) is connected to horizontally disposed 3rd guide pillar (43) on, the 3rd guide pillar (43) sets parallel to the 3rd drive division (41) and is installed on the bottom of the lifting unit (2) Portion, one end of the second horizontal anomalous movement portion (4) connect the 3rd drive shaft (411) of the 3rd drive division (41), the other end Connect the second sheet metal component location division (42).
  9. 9. a kind of large-scale quick handling equipment of sheet metal component according to claim 1 or 8, it is characterised in that described second Sheet metal component location division (42) includes the 3rd positioning rotating shaft (421) and the be sheathed on the 3rd positioning rotating shaft (421) the 3rd Runner (422), one end of the 3rd positioning rotating shaft (421) are also associated with second liang of connecting rod (423) of L-shaped, described second liang The free end of connecting rod (423) is connected with the 4th positioning rotating shaft (424), and the 4th runner is cased with the 4th positioning rotating shaft (424) (425), the 4th runner (425) is connected with the 3rd runner (422).
  10. A kind of 10. large-scale quick handling equipment of sheet metal component according to claim 1, it is characterised in that the chassis (12) more legs (121) are included.
CN201720427737.0U 2017-04-22 2017-04-22 A kind of quick handling equipment of large-scale sheet metal component Expired - Fee Related CN206912777U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720427737.0U CN206912777U (en) 2017-04-22 2017-04-22 A kind of quick handling equipment of large-scale sheet metal component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720427737.0U CN206912777U (en) 2017-04-22 2017-04-22 A kind of quick handling equipment of large-scale sheet metal component

Publications (1)

Publication Number Publication Date
CN206912777U true CN206912777U (en) 2018-01-23

Family

ID=61305836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720427737.0U Expired - Fee Related CN206912777U (en) 2017-04-22 2017-04-22 A kind of quick handling equipment of large-scale sheet metal component

Country Status (1)

Country Link
CN (1) CN206912777U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106944862A (en) * 2017-04-22 2017-07-14 苏州市冯氏钣金有限公司 A kind of quick handling equipment of large-scale sheet metal component

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106944862A (en) * 2017-04-22 2017-07-14 苏州市冯氏钣金有限公司 A kind of quick handling equipment of large-scale sheet metal component

Similar Documents

Publication Publication Date Title
CN211812921U (en) Fixed hydraulic guide rail lift goods lift
CN206912777U (en) A kind of quick handling equipment of large-scale sheet metal component
CN206086812U (en) Three -dimensional adjustable power battery lifting platform car
CN206743688U (en) A kind of head chip mounter of double track four
CN206974290U (en) Guided missile changes the outfit docking facilities instrument
CN105383711A (en) Assistant positioning system for moving of crawling robot
CN106944862A (en) A kind of quick handling equipment of large-scale sheet metal component
CN203254114U (en) Passenger car body closing tool device
CN105859327B (en) A kind of rotation jacking waterproof workbench
CN209110452U (en) H profile steel overturns centering body
CN204264973U (en) Cam-type lifts registration device
CN206142742U (en) Portable sample sampling equipment that declines is with sample adjusting mount
CN206232379U (en) Cash brick handler
CN205817293U (en) A kind of laser cutting machine bed
CN209795562U (en) target material transport vechicle
CN205200842U (en) Lifting device for be used for in welding machine
CN204221281U (en) The displacement of passenger vehicle gusset is welded platform
CN204177880U (en) Burn-in test lift truck structure
CN208161991U (en) Three station elevating mechanism of separator
CN206882596U (en) A kind of mould skip car based on the translation of support board leading screw and upright type lifting
CN206203810U (en) Cash brick handler
CN207387588U (en) A kind of self-powered platform
CN204128737U (en) Automatic weight charger
CN205520681U (en) Floor truck of two ram structures in area
CN204400533U (en) Self-turnover-type elevator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 215143 Caohu Street, Xiangcheng Economic and Technological Development Zone, Suzhou City, Jiangsu Province, No. 5 Youxiang Road

Patentee after: SUZHOU FENGSHI INTELLIGENT TECHNOLOGY Co.,Ltd.

Address before: 215143 South Chunyao Road and West Yuxiang Road, Xiangcheng Economic Development Zone, Suzhou City, Jiangsu Province

Patentee before: Suzhou Fengshi Sheet Metal Co.,Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180123

CF01 Termination of patent right due to non-payment of annual fee