CN206912440U - A kind of flame preheating device - Google Patents

A kind of flame preheating device Download PDF

Info

Publication number
CN206912440U
CN206912440U CN201720878388.4U CN201720878388U CN206912440U CN 206912440 U CN206912440 U CN 206912440U CN 201720878388 U CN201720878388 U CN 201720878388U CN 206912440 U CN206912440 U CN 206912440U
Authority
CN
China
Prior art keywords
gas
pipe
distribution pipe
sub
inwall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720878388.4U
Other languages
Chinese (zh)
Inventor
尹中霞
暴军英
曾豪勇
方喜庆
田涛涛
李莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum Pipeline Engineering Co Ltd Second
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
Original Assignee
China Petroleum Pipeline Engineering Co Ltd Second
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum Pipeline Engineering Co Ltd Second, China National Petroleum Corp, China Petroleum Pipeline Engineering Corp filed Critical China Petroleum Pipeline Engineering Co Ltd Second
Priority to CN201720878388.4U priority Critical patent/CN206912440U/en
Application granted granted Critical
Publication of CN206912440U publication Critical patent/CN206912440U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Feeding And Controlling Fuel (AREA)

Abstract

The utility model discloses a kind of flame preheating device, belongs to pipeline preheating field.The device includes:Gas-distribution pipe, gas-distributing pipe, multiple roll wheel assemblies, multiple nozzle assemblies, sebific duct component and locking member.Gas-distribution pipe is in opening and closing type torus structure;The curved structure of gas-distributing pipe, and the both ends of gas-distributing pipe are connected and turned on the body of gas-distribution pipe respectively;Multiple roll wheel assemblies are circumferentially disposed on the inwall of gas-distribution pipe;Multiple nozzle assemblies are circumferentially disposed on the inwall of gas-distribution pipe, and are connected with the inner chamber of gas-distribution pipe;One end of sebific duct component is connected and turned on gas-distributing pipe, and the other end is used to connect source of the gas;It is closed type torus that locking member, which is used for gas-distribution pipe locking,.Preheating device preheating speed is fast, preheating is uniform, easy to carry, simple to operate, suitable for field extreme environment.

Description

A kind of flame preheating device
Technical field
It the utility model is related to pipeline preheating field, more particularly to a kind of flame preheating device.
Background technology
When long distance pipeline welds, in order to ensure welding quality, generally require the docking mouth of pipe to long distance pipeline and carry out in advance Heat.So, there is provided a kind of pipeline pre-heating device is highly important.
Prior art provides a kind of pipeline pre-heating device of heating in medium frequency type, and it includes retractable shell, intermediate frequency Cable, terminal plate, wherein, immediate frequency cable is arranged on the inwall of shell, and terminal plate is arranged on the opening both ends of shell, with intermediate frequency Cable connection, also, when enclosure closed, the terminal plate conductive contact at the both ends that are open.Terminal plate passes through extraction wire and power supply Connection.
Designer has found that prior art at least has problems with:
Prior art uses heating in medium frequency mode, is not suitable for field extreme environment.
Utility model content
In order to solve the above-mentioned technical problem, the utility model embodiment provides a kind of flame preheating device.Particular technique Scheme is as follows:
A kind of flame preheating device, described device include:Gas-distribution pipe, in opening and closing type torus structure;
Arc gas-distributing pipe, both ends are connected and turned on the body of the gas-distribution pipe respectively;
Multiple roll wheel assemblies, it is circumferentially disposed on the inwall of the gas-distribution pipe;
Multiple nozzle assemblies, be circumferentially disposed on the inwall of the gas-distribution pipe, and with the inner chamber of the gas-distribution pipe Connection;
Sebific duct component, one end are connected and turned on the gas-distributing pipe, and the other end is used to connect source of the gas;
Locking member, for being closed type torus by gas-distribution pipe locking.
Specifically, preferably, the gas-distribution pipe includes:Two groups of sub- gas-distribution pipes of semicircular arc, sub- gas-distribution pipe described in two groups Relative first end is hinged by articulated elements, and the second relative end is connected by the locking member;
Sub- gas-distribution pipe described in every group is corresponding with a gas-distributing pipe to be connected.
Specifically, preferably, sub- gas-distribution pipe includes described in every group:Two parallel relative semicircular arc pipes;
Two transverse tubes, the both ends side wall vertical connection relative with two sub- pipes respectively;
The both ends of the gas-distributing pipe are bent downwardly, and are connected respectively with two transverse tubes.
Specifically, preferably, the roll wheel assembly includes:Rolling wheel support, roller, connector;
One end of the rolling wheel support is connected with the inwall of the gas-distribution pipe, and the other end is connected by connector and the roller Connect, the roller is rotated along the mouth of pipe to be preheated.
Specifically, preferably, the nozzle assembly includes:Igniter cap, igniter cap base, nozzle;
One end of the igniter cap base is connected with the inwall of the sub- pipe, also, the inner chamber of the igniter cap base with it is described The inner chamber connection of sub- pipe;
The other end of the igniter cap base is connected with the igniter cap and the nozzle simultaneously, and the inner chamber of the igniter cap base Connected with the nozzle, the nozzle is located in the inner chamber of the igniter cap.
Specifically, preferably, for sub- gas-distribution pipe described in every group, punching is intersected on the inwall of two sub- pipes, with It is respectively used to be connected with the igniter cap base.
Specifically, preferably, the sebific duct component includes:Connector and sebific duct;
One end of the connector connects with the gas-distributing pipe, and the other end connects with the sebific duct;
The free end of the sebific duct is used to connect the source of the gas.
Specifically, preferably, the locking member includes:First hinge ear supporter, hook, U-bracket, handle;
Two hinge ear supporters are oppositely arranged on the lower surface at the second end of sub- gas-distribution pipe described in two groups;
The the first hinge ear supporter of hook-type Duan Yuyi of the hook is hinged;
The flat segments of the hook are threadedly coupled with the U-shaped bottom of the U-bracket;
The openend of the U-bracket and one end of the handle are hinged;
The shank body of the handle is also hinged with cutting with scissors ear supporter another described.
Specifically, preferably, the articulated elements includes:Second hinge ear supporter, bearing pin;
Two the second hinge ear supporters are oppositely arranged on the upper surface of the first end of sub- gas-distribution pipe described in two groups;
The bearing pin and two the second hinge ear supporter pin joints.
The beneficial effect brought of technical scheme that the utility model embodiment provides is:
The preheating device that the utility model embodiment provides, forms the skeleton of the device by gas-distribution pipe, gas-distributing pipe, and Roll wheel assembly, nozzle assembly, sebific duct component and locking member are set thereon, and the preheating device formed uses flame line up pre- Heat, there is the advantages of preheating speed is fast, preheating is uniform, easy to carry, simple to operate, suitable for field extreme environment.
Brief description of the drawings
, below will be to needed for embodiment description in order to illustrate more clearly of the technical scheme in the embodiment of the utility model The accompanying drawing to be used is briefly described, it should be apparent that, drawings in the following description are only some realities of the present utility model Example is applied, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is the structural representation for the flame preheating device that the utility model embodiment provides;
Fig. 2 is the profile for the flame preheating device that the utility model embodiment provides;
Fig. 3 is the structural representation for the roll wheel assembly that the utility model embodiment provides;
Fig. 4 is the structural representation for the nozzle assembly that the utility model embodiment provides;
Fig. 5-1 is the structural representation for the hook that the utility model embodiment provides;
Fig. 5-2 is the structural representation for the U-bracket that the utility model embodiment provides;
Fig. 5-3 is the structural representation for the handle that the utility model embodiment provides;
Fig. 6 is the structural representation for the articulated elements that the utility model embodiment provides.
Reference represents respectively:
1- gas-distribution pipes,
The sub- gas-distribution pipes of 101-, 1011- pipes, 1012- transverse tubes,
2- gas-distributing pipes,
3- roll wheel assemblies,
301- rolling wheel supports, 302- rollers, 303- connectors,
4- nozzle assemblies,
401- igniter caps, 402- igniter cap bases, 403- nozzles,
5- sebific duct components,
501- connectors, 502 sebific ducts,
6- locking members,
601- first cuts with scissors ear supporter, and 602- is linked up with, 603-U shape supports, 604- handles,
7- articulated elements,
701- second cuts with scissors ear supporter, 702- bearing pins.
Embodiment
Unless otherwise defined, all technical terms used in the utility model embodiment are respectively provided with and those skilled in the art The identical implication being generally understood that.To make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with attached Figure is described in further detail to the utility model embodiment.
The utility model embodiment provides a kind of flame preheating device, and as shown in Figure 1, the device includes:Gas-distribution pipe 1st, gas-distributing pipe 2, multiple roll wheel assemblies 3, multiple nozzle assemblies 4, sebific duct component 5 and locking member 6.
Wherein, gas-distribution pipe 1 is in opening and closing type torus structure;
2 curved structure of gas-distributing pipe, and the both ends of gas-distributing pipe 2 are connected and turned on the body of gas-distribution pipe 1 respectively;
Multiple roll wheel assemblies 3 are circumferentially disposed on the inwall of gas-distribution pipe 1;
Multiple nozzle assemblies 4 are circumferentially disposed on the inwall of gas-distribution pipe 1, and are connected with the inner chamber of gas-distribution pipe 1;
One end of sebific duct component 5 is connected and turned on gas-distributing pipe 2, and the other end is used to connect source of the gas;
Locking member 6 is used to lock gas-distribution pipe 1 for closed type torus.
The operation principle with regard to the flame preheating device, which is given, below sketches:
When the mouth of pipe to Target pipe preheats, gas-distribution pipe 1 is opened, it is enclosed at the mouth of pipe to be preheated, it is ensured that Welded seam area on the mouth of pipe is relative with the inwall of gas-distribution pipe 1.Then, gas-distribution pipe 1 is locked as closed type annulus using locking member 6 Body, and ensure that the roll wheel assembly 3 in it can rotate along the mouth of pipe.
Sebific duct component 5 is connected with source of the gas, source of the gas is opened and combustion medium is passed through into sebific duct component 5, combustion medium passes through Gas-distributing pipe 2 is evenly distributed in gas-distribution pipe 1, and is sprayed by nozzle assembly 4.Combustion medium is lighted at nozzle assembly 4 and produces fire Flame, preheated using the flame line up welded seam area.In warm, the flame preheating device is rotated, to ensure There is welded seam area to obtain full and uniform heating.
After mouth of pipe temperature reaches welding requirements, source of the gas is closed, locking member 6 is opened, opens gas-distribution pipe 1, from the mouth of pipe Remove the flame preheating device.
It can be seen that the utility model embodiment provide preheating device, by gas-distribution pipe 1, gas-distributing pipe 2 formed the device bone Frame, and roll wheel assembly 3, nozzle assembly 4, sebific duct component 5 and locking member 6 are being set thereon, the preheating device formed uses fire Flame line up preheats, and has the advantages of preheating speed is fast, preheating is uniform, easy to carry, simple to operate, suitable for the severe ring in field Border.
Gas-distribution pipe 1 is arranged to opening and closing type, and in order to realize its retractable function, as shown in Figure 1, the gas-distribution pipe 1 includes: The sub- gas-distribution pipe 101 of two groups of semicircular arcs, the relative first end of two groups of sub- gas-distribution pipes 101 is be hinged by articulated elements 7, and relative second End is connected by locking member 6;The connection corresponding with a gas-distributing pipe 2 of every group of sub- gas-distribution pipe 101.
It is understood that two groups of sub- gas-distribution pipes 101 are semicircular arc structure, both two ends are docked respectively can To form torus, it is sleeved on the mouth of pipe.For the ease of describing its structure, by both relative ends be referred to as first end and Second end, first end and the second end are closing, to avoid gas leakage.Wherein, both first ends are be hinged by articulated elements 7, Opening and closing in order to both.And both the second ends are connected by locking member 6, it can be ensured that two groups of sub- gas-distribution pipes 101 close up Into relative locking during torus.
Further, as shown in Figure 2, every group of sub- gas-distribution pipe 101 includes:Two parallel relative semicircular arc pipes 1011;Two transverse tubes 1012, the both ends side wall vertical connection relative with two sub- pipes 1011 respectively;The both ends of gas-distributing pipe 2 are downward Bending, and connected respectively with two transverse tubes 1012.
By the way that every group of sub- gas-distribution pipe 101 is arranged to be made up of two parallel sub- pipes 1011 of relative semicircular arc, so, Settable nozzle assembly 4, is arranged such on inwall per height pipe 1011, on the one hand, double annular flame heating can be carried out, The heated perimeter of the preheating device line up is widened, temperature quickly reduces after can so avoiding mouth of pipe welding, ensures weld strength; On the other hand, in use, the centre for the two row's nozzle assemblies 4 that mouth of pipe welded seam area can be arranged on two sub- pipes 1011 Position, it can so avoid flame from aligning and weld seam is heated, and then avoid impurity caused by combustion medium from entering in weld seam, and then really Protect welding quality.
In addition, by the way that gas-distributing pipe 2 is set as above, it is also used as the handle when preheating device is rotated, and makes it It is more time saving and energy saving to rotate.
It will be appreciated by persons skilled in the art that gas-distributing pipe 2 is minor arc, i.e., its radian is less than semi arch.But in order to Ensure that combustion medium is evenly distributed, can make the both ends of gas-distributing pipe 2 respectively with 2/4 and 3/4 separation of the sub- arc length of pipe 1011 It is corresponding.
The utility model embodiment makes the preheating device be rotated along the mouth of pipe using roll wheel assembly 3, as a kind of example, such as Shown in accompanying drawing 3, the roll wheel assembly 3 includes:Rolling wheel support 301, roller 302, connector 303;
Wherein, one end of rolling wheel support 301 is connected with the inwall of gas-distribution pipe 1, and the other end passes through connector 303 and roller 302 connections, make roller 302 be rotated along the mouth of pipe to be preheated.
In use, the outer wall of roller 302 and the mouth of pipe offsets, and rotates along the mouth of pipe to be preheated, to ensure line up Uniformly heated.
It is understood that rolling wheel support 301 is provided with for accommodating opening for roller 302 with one end that roller 302 is connected Mouth groove, the connector 303 can be bearing pin, bearing pin is passed through two side plates and roller 302 of the open slot, you can to realize roller The support of the pair roller 302 of support 301, while ensure the rotatable of roller 302.
The utility model embodiment is sprayed combustion medium and its burning of support is formed flame using nozzle assembly 4, is made For a kind of example, as shown in Figure 4, the nozzle assembly 4 includes:Igniter cap 401, igniter cap base 402, nozzle 403;
One end of igniter cap base 402 is connected with the inwall of sub- pipe 1011, also, the inner chamber of igniter cap base 402 is managed with son 1011 inner chamber connection;
The other end of igniter cap base 402 is connected with igniter cap 401 and nozzle 403 simultaneously, and the inner chamber of igniter cap base 402 and spray Mouth 403 connects, and nozzle 403 is located in the inner chamber of igniter cap 401.
By setting igniter cap 401, flame is formed in order to carry out igniting to combustion medium;By setting nozzle 403 with true Protect combustion medium to spray at a high speed, it is ensured that the sustainability and intensity of burning.By setting igniter cap base 402, so that sub- pipe 1011 Inwall and the nozzle assembly 4 form annexation.
Specifically, igniter cap base 402 is arranged to hollow cylinder, and its one end sets external screw thread and internal thread respectively, accordingly , internal thread is provided with the inner wall of end of igniter cap 401, and external screw thread is provided with the end outer wall of nozzle 403, make igniter cap bottom The outer wall of 402 one end of seat is threadedly coupled with igniter cap 401, and the inwall at the end is threadedly coupled with nozzle 403, is ensureing stable connection On the premise of, in order to dismount.
As shown in Figure 4, the length of igniter cap 401 will be longer than nozzle 403, to ensure the stability of flame.For example, may be used So that the length of nozzle 403 is the 1/10-1/5 of igniter cap 401.
In order to ensure line up is carried out effectively and uniform preheating, for every group of sub- gas-distribution pipe 101, two sub- pipes 1011 Intersect punching on inwall, to be respectively used to be connected with igniter cap base 402.
It is arranged such, is provided with a circle nozzle assembly 4 per the inwall of height pipe 1011, on the inwall of another height pipe 1011 A circle nozzle assembly 4 is also equipped with, is staggered in this two circles nozzle assembly 4 so that their inwalls in the sub- gas-distribution pipe 101 On distribution it is wider.
In addition, roll wheel assembly 3 is staggered with nozzle assembly 4 on the inwall of gas-distribution pipe 1.
The utility model embodiment forms connection using sebific duct component 5 for the preheating device and external air source, as one Kind example, as shown in Figure 1, the sebific duct component 5 includes:Connector 501 and sebific duct 502;
One end of connector 501 connects with gas-distributing pipe 2, and the other end connects with sebific duct 502;
The free end of sebific duct 502 is used to connect source of the gas.
Wherein, the connector 501 can be arranged to hollow cylindrical, and its one end can be threadedly coupled with the wall of gas-distributing pipe 2, The other end can be arranged to undergauge end, also, multi-ring annular boss is provided with the outer wall at undergauge end, by by the undergauge end with When sebific duct 502 connects, it can be ensured that both connect fastening.
The utility model embodiment is locked gas-distribution pipe 1 by locking member 6, will two groups of sub- gas-distribution pipes of semicircular arc 101 lockings, as a kind of example, as shown in Figure 1, the locking member 6 includes:First hinge ear supporter 601, hook 602, U-shaped branch Frame 603, handle 604;
Two hinge ear supporters 601 are oppositely arranged on the lower surface at the second end of two groups of sub- gas-distribution pipes 101;
Duan Yuyi first hinge ear supporter 601 of hook-type of hook 602 is be hinged;
The flat segments of hook 602 are threadedly coupled with the U-shaped bottom of U-bracket 603;
The openend of U-bracket 603 and one end of handle 604 are hinged;
The shank body of handle 604 is also be hinged with another hinge ear supporter 601.
By the way that locking member 6 is set as above, specifically, by the Duan Yuyi first hinge ear supporter 601 of hook-type for making hook 602 It is be hinged, so hook 602 can be enable to rotate, when linking up with 602 rotation, due to the U-shaped bottom of its flat segments U-bracket 603 Threaded connection, the length that the flat segments are stretched in the U-shaped bottom of U-bracket 603 is so can adjust, and then realize locking member 6 Tense-lax regulation, ensure locking property it is good on the premise of, moreover it is possible to make the preheating device be applied to different tube diameters the mouth of pipe.
In addition, Duan Yuyi first hinge ear supporter 601 of the hook-type of above-mentioned hook 602 is be hinged, and the shank body of handle 604 Be hinged with another hinge ear supporter 601, the hinged relationship can be realized by using bearing pin.
Wherein, the structure for linking up with 602 may refer to accompanying drawing 5-1, and the structure of U-bracket 603 may refer to accompanying drawing 5-2, hand The structure of handle 604 may refer to accompanying drawing 5-3, and by the way that handle 604 is arranged to flat segments and updip section, the purpose is to convenient Operation and self-locking.When operation updip section turns to along bearing pin to be turned to form angle with U-bracket 603 in flat segments, locking member 6 is sent out Lock is born from, the sub- locking of gas-distribution pipe 101 of two groups of semicircular arcs can not be opened, turned when operation updip section is turned in flat segments along bearing pin During with the shape of U-bracket 603 in line, locking member 6 unties self-locking, and the sub- gas-distribution pipe 101 of two groups of semicircular arcs can be opened.
In the utility model embodiment, make the action that two groups of sub- gas-distribution pipes 101 are opened and closed using articulated elements 7, make For a kind of example, in order to realize above-mentioned function, while both connective stabilities are ensured, as shown in Figure 6, the articulated elements 7 includes: Second hinge ear supporter 701, bearing pin 702;
Two second hinge ear supporters 701 are oppositely arranged on the upper surface of the first end of two groups of sub- gas-distribution pipes 101;
Bearing pin 702 and the two second hinge pin joints of ear supporter 701.
In summary, the preheating device that the utility model embodiment provides has advantages below:
(1) double annular flame can be used to heat, in heating, nozzle 403 is arranged in the both sides of mouth of pipe weld seam, and right Tube wall heats, and avoids flame directly to weld seam, the defects of reducing commissure oxide layer layer generation, be advantageous to improve welding matter Amount.
(2) preheating device is rotated by using roll wheel assembly 3 along the mouth of pipe so that the mouth of pipe is heated evenly, and is further improved Welding quality.
(3) preheating device to the mouth of pipe of weld seam both sides can heat simultaneously, and preheating speed is fast, and heat range is big, Heat loss is small, is advantageous to improve the efficiency of heating surface and reduces burning cost.
(4) preheating device can be process using seamless steel pipe, and its is simple in construction, in light weight, easy to operate, be saved Worker's usage time and transition cost of transportation.
Preferred embodiment of the present utility model is the foregoing is only, not to limit the scope of protection of the utility model, All any modification, equivalent substitution and improvements within the spirit and principles of the utility model, made etc., should be included in this reality Within new protection domain.

Claims (9)

1. a kind of flame preheating device, it is characterised in that described device includes:Gas-distribution pipe (1), in opening and closing type torus knot Structure;
Arc gas-distributing pipe (2), both ends are connected and turned on the body of the gas-distribution pipe (1) respectively;
Multiple roll wheel assemblies (3), are circumferentially disposed on the inwall of the gas-distribution pipe (1);
Multiple nozzle assemblies (4), are circumferentially disposed on the inwall of the gas-distribution pipe (1), and with the gas-distribution pipe (1) Inner chamber connects;
Sebific duct component (5), one end are connected and turned on the gas-distributing pipe (2), and the other end is used to connect source of the gas;
Locking member (6), for being closed type torus by the gas-distribution pipe (1) locking.
2. device according to claim 1, it is characterised in that the gas-distribution pipe (1) includes:Two groups of sub- distributions of semicircular arc Manage (101), the relative first end of sub- gas-distribution pipe (101) described in two groups is be hinged by articulated elements (7), and the second relative end passes through institute State locking member (6) connection;
Sub- gas-distribution pipe (101) described in every group is corresponding with a gas-distributing pipe (2) to be connected.
3. device according to claim 2, it is characterised in that sub- gas-distribution pipe (101) includes described in every group:Two parallel phases To semicircular arc pipe (1011);
Two transverse tubes (1012), the both ends side wall vertical connection relative with two sub- pipes (1011) respectively;
The both ends of the gas-distributing pipe (2) are bent downwardly, and are connected respectively with two transverse tubes (1012).
4. device according to claim 1, it is characterised in that the roll wheel assembly (3) includes:Rolling wheel support (301), rolling Take turns (302), connector (303);
One end of the rolling wheel support (301) is connected with the inwall of the gas-distribution pipe (1), and the other end passes through the connector (303) it is connected with the roller (302), the roller (302) is rotated along the mouth of pipe to be preheated.
5. device according to claim 3, it is characterised in that the nozzle assembly (4) includes:Igniter cap (401), igniter cap bottom Seat (402), nozzle (403);
One end of the igniter cap base (402) is connected with the inwall of the sub- pipe (1011), also, the igniter cap base (402) Inner chamber connected with the inner chamber of the sub- pipe (1011);
The other end of the igniter cap base (402) is connected with the igniter cap (401) and the nozzle (403) simultaneously, and the fire The inner chamber of cap base (402) connects with the nozzle (403), and the nozzle (403) is located in the inner chamber of the igniter cap (401).
6. device according to claim 5, it is characterised in that for sub- gas-distribution pipe (101) described in every group, two sons Manage and intersect punching on the inwall of (1011), to be respectively used to be connected with the igniter cap base (402).
7. device according to claim 1, it is characterised in that the sebific duct component (5) includes:Connector (501) and glue Manage (502);
One end of the connector (501) connects with the gas-distributing pipe (2), and the other end connects with the sebific duct (502);
The free end of the sebific duct (502) is used to connect the source of the gas.
8. device according to claim 2, it is characterised in that the locking member (6) includes:First hinge ear supporter (601), Link up with (602), U-bracket (603), handle (604);
Two hinge ear supporters (601) are oppositely arranged on the lower surface at the second end of sub- gas-distribution pipe (101) described in two groups;
The first hinge ear supporter (601) of hook-type Duan Yuyi of the hook (602) is be hinged;
The flat segments of the hook (602) are threadedly coupled with the U-shaped bottom of the U-bracket (603);
The openend and one end of the handle (604) of the U-bracket (603) are hinged;
The shank body of the handle (604) is also hinged with cutting with scissors ear supporter (601) another described.
9. device according to claim 8, it is characterised in that the articulated elements (7) includes:Second hinge ear supporter (701), Bearing pin (702);
Two second hinge ear supporters (701) are oppositely arranged on the upper surface of the first end of sub- gas-distribution pipe (101) described in two groups;
The bearing pin (702) and two described second hinge ear supporter (701) pin joints.
CN201720878388.4U 2017-07-19 2017-07-19 A kind of flame preheating device Active CN206912440U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720878388.4U CN206912440U (en) 2017-07-19 2017-07-19 A kind of flame preheating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720878388.4U CN206912440U (en) 2017-07-19 2017-07-19 A kind of flame preheating device

Publications (1)

Publication Number Publication Date
CN206912440U true CN206912440U (en) 2018-01-23

Family

ID=61347810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720878388.4U Active CN206912440U (en) 2017-07-19 2017-07-19 A kind of flame preheating device

Country Status (1)

Country Link
CN (1) CN206912440U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109623084A (en) * 2019-01-31 2019-04-16 重庆川亚柔杰机械有限公司 Damper welder

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109623084A (en) * 2019-01-31 2019-04-16 重庆川亚柔杰机械有限公司 Damper welder
CN109623084B (en) * 2019-01-31 2020-12-11 重庆川亚柔杰机械有限公司 Welding device for shock absorber

Similar Documents

Publication Publication Date Title
CN205702952U (en) Flame preheating device before the weldering of a kind of thick-walled pressure vessel cylinder
CN206912440U (en) A kind of flame preheating device
CN208933437U (en) Pipeline-weld annealing device
CN203162946U (en) Weld preheating device for circumferential weld of cylinder body of cylindrical mixing machine
CN209189979U (en) Cutting support and cutting equipment
CN204372922U (en) Duct products external heating device
CN206335274U (en) A kind of arc flame heats dolly
CN104625347B (en) Throttling protection device for bottom argon arc welding in power station pipe fabrication
CN206779654U (en) A kind of pressure vessel welding groove preheats frock
CN214037815U (en) Heating device for spinning steel cylinder and steel cylinder spinning device
CN204513396U (en) A kind of weld heating device
CN201373211Y (en) Infrared heating device for pipeline joint coating
CN201184742Y (en) Pre-heating device for secondary air and tertiary air of rotary kiln
CN206768191U (en) Segmented oxygen-eliminating device terminating girth joint heat treatment auxiliary device
CN209902512U (en) Offshore wind power single-pile heating device
CN205909682U (en) Novel water seal structure of portable rotary kiln movable flue
CN110181203A (en) A kind of welding for steel structure pre-heating device
CN110280928A (en) A kind of adjustable flange resurfacing welding heating device
CN217394118U (en) Welding preheating device
CN217513163U (en) Welding heating device
CN208992017U (en) A kind of multifunctional wind tower doorframe weld seam prognosis thermal
CN214867883U (en) Multidirectional heating device suitable for welding seam of cylinders with different diameters
CN208772783U (en) Heating device for blower fan pylon
CN203664955U (en) Connecting pipe welding heating device
CN214332704U (en) Preheating device before pipeline welding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant