CN206903174U - A kind of civil engineering work construction bracket - Google Patents

A kind of civil engineering work construction bracket Download PDF

Info

Publication number
CN206903174U
CN206903174U CN201720827082.6U CN201720827082U CN206903174U CN 206903174 U CN206903174 U CN 206903174U CN 201720827082 U CN201720827082 U CN 201720827082U CN 206903174 U CN206903174 U CN 206903174U
Authority
CN
China
Prior art keywords
vertical supporting
block
supporting bar
bottom plate
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720827082.6U
Other languages
Chinese (zh)
Inventor
彭振宇
张霞
陶莉娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Hengshengyuan Group Construction Co Ltd
Original Assignee
Qingdao Hengshengyuan Group Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Hengshengyuan Group Construction Co Ltd filed Critical Qingdao Hengshengyuan Group Construction Co Ltd
Priority to CN201720827082.6U priority Critical patent/CN206903174U/en
Application granted granted Critical
Publication of CN206903174U publication Critical patent/CN206903174U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of civil engineering work construction bracket, including bottom plate, transverse support bar and vertical supporting bar, end positions are provided with the first perforation on the bottom plate;First perforated inner is provided with fixing glue;Below the bottom plate, sophisticated upper end is provided with weighted plate;Fixed block is symmetrically arranged with left and right sides of the bottom plate upper end;The fixed block upper vertical is connected with vertical supporting bar upwards;The vertical supporting bar is provided with two second perforation from top to bottom;The vertical supporting bar top and bottom are symmetrically arranged with limited block.The contiguous block of the utility model first moves up and down in vertical supporting bar, while limited block makes the first contiguous block can not depart from vertical supporting bar;Vertical supporting bar is vertically disposed on the second contiguous block by user, projecting block is set to be connected in groove, the first contiguous block is rotated afterwards, the first contiguous block and the second contiguous block is combined closely, and vertical supporting bar is vertically fixed in transverse support bar while is conveniently dismantled.

Description

A kind of civil engineering work construction bracket
Technical field
Architectural Equipment technical field is the utility model is related to, specially a kind of civil engineering work construction bracket.
Background technology
At present, in the work progress of skyscraper, the periphery use for being frequently in building from bottom to top, is integrally surrounded The ground steel pipe scaffold of building is constructed, as the rise of building, scaffold also rising in layer are this Scaffold builds density requirements height to steel pipe, needs substantial amounts of steel pipe in build process, exist steel demand is big, build and The labor intensity of dismounting is very high, vertical transport is inconvenient, without flexibility and it is comprehensive long in time limit the shortcomings that, and be barricaded as anyhow Construction bracket less stable, intersect the method built and compare waste of materials.
Utility model content
The purpose of this utility model is to provide a kind of civil engineering work construction bracket, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the utility model provides following technical scheme:A kind of civil engineering work construction bracket, bag Bottom plate, transverse support bar and vertical supporting bar are included, end positions are provided with the first perforation on the bottom plate;In first perforation Portion is provided with fixing glue;Below the bottom plate, sophisticated upper end is provided with weighted plate;It is symmetrical arranged at left and right sides of the bottom plate upper end There is fixed block;The fixed block upper vertical is connected with vertical supporting bar upwards;The vertical supporting bar is provided with from top to bottom Two second perforation;The vertical supporting bar top and bottom are symmetrically arranged with limited block;On the upside of the upper end limited block with End limited block lower central position is provided with projecting block;The vertical supporting bar upper and lower ends are provided with the first contiguous block;It is described First contiguous block interior surface position is surrounded with the first screw thread;The transverse support bar is symmetrically arranged with second in both sides up and down Contiguous block;Setting is fluted below second contiguous block, and groove and projecting block mutually agree with;The vertical supporting bar upper end Tilting bar is provided between two perforation and the perforation of adjacent vertical supporting bar lower end second;Fixed spiral shell is provided with the left of the tilting bar Line;Nut is provided with the fixed thread;Hole is set on the right side of the tilting bar.
Preferably, immediately below the bottom plate, three tips have been placed equidistant between fixing glue.
Preferably, the upper end second is perforated to the left, and lower end second is perforated to the right.
Preferably, the second contiguous block outer surface is surrounded with the second screw thread, and the second screw thread and the first screw thread are mutual Agree with.
Preferably, intert on described hole and be provided with cuttage block.
Compared with prior art, the beneficial effects of the utility model are:Fixing glue is used for stablizing bottom plate;Tip is used for strengthening The stablizing effect of fixing glue;Weighted plate is used for increasing the stability of bottom plate;First contiguous block moves up and down in vertical supporting bar, Limited block makes the first contiguous block can not depart from vertical supporting bar simultaneously;Vertical supporting bar is vertically disposed in the second connection by user On block, projecting block is connected in groove, rotate the first contiguous block afterwards, the first contiguous block and the second contiguous block is closely tied Close, vertical supporting bar is vertically fixed in transverse support bar while is conveniently dismantled;After user's installation vertical supporting bar, Tilting bar is tilted in two second perforation of insertion, cuttage block is close in vertical supporting bar insertion hole afterwards, while will be solid The nut determined on screw thread is fixed tightly, adjacent vertical supporting bar is divided into triangle, is strengthened the stability of whole device.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the utility model vertical supporting bar;
Fig. 3 is the structural representation of the contiguous block of the utility model second;
Fig. 4 is the structural representation of the utility model tilting bar;
Fig. 5 is the structural representation that the utility model first is perforated;
In figure:1- bottom plates;2- transverse support bars;3- vertical supporting bars;4- fixing glues;5- tips;6- tilting bars;7- second Contiguous block;The contiguous blocks of 8- first;9- second perforates;10- limited blocks;The screw threads of 11- first;12- grooves;The screw threads of 13- second;14- Nut;15- fixed threads;16- holes;17- cuttage blocks;18- first perforates;19- weighted plates;20- fixed blocks;21- projecting blocks.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Refer to Fig. 1-5, a kind of embodiment provided by the utility model:A kind of civil engineering work construction bracket, including Bottom plate 1, transverse support bar 2 and vertical supporting bar 3, end positions are provided with the first perforation 18 on bottom plate 1;Inside first perforation 18 Fixing glue 4 is provided with, fixing glue 4 is used for stablizing bottom plate 1;Immediately below bottom plate 1, three tips have been placed equidistant between fixing glue 4 5, tip 5 is used for strengthening the stablizing effect of fixing glue 4;The lower section of bottom plate 1, sophisticated 5 upper ends are provided with weighted plate 19, and weighted plate 19 is used To increase the stability of bottom plate 1;Fixed block 20 is symmetrically arranged with left and right sides of the upper end of bottom plate 1;The upper vertical of fixed block 20 is upward It is connected with vertical supporting bar 3;Vertical supporting bar 3 is provided with two second perforation 9 from top to bottom;The perforation 9 of upper end second is to the left, under The perforation 9 of end second is to the right;The top and bottom of vertical supporting bar 3 are symmetrically arranged with limited block 10;The upside of upper end limited block 10 is with The end lower central position of limited block 10 is provided with projecting block 21;The upper and lower ends of vertical supporting bar 3 are provided with the first contiguous block 8, the One contiguous block 8 moves up and down in vertical supporting bar 3, while limited block 10 makes the first contiguous block 8 can not depart from vertical supporting bar 3;The interior surface position of first contiguous block 8 is surrounded with the first screw thread 11;Transverse support bar is symmetrically arranged with both sides about 2 Two contiguous blocks 7;The lower section of second contiguous block 7 sets fluted 12, and groove 12 and projecting block 21 mutually agree with;Outside second contiguous block 7 Surface is surrounded with the second screw thread 13, and the second screw thread 13 and the first screw thread 11 mutually agree with, and user hangs down vertical supporting bar 3 Directly it is placed on the second contiguous block 7, projecting block 21 is connected in groove 12, rotate the first contiguous block 8 afterwards, make the first connection The contiguous block 8 of block 7 and second is combined closely, and vertical supporting bar 3 is vertically fixed in transverse support bar 2 while is conveniently dismantled;It is perpendicular Tilting bar 6 is provided between the upper end second of support bar 3 perforation 9 and the lower end second of adjacent vertical supporting bar 3 perforation 9;Tilting bar 6 Left side is provided with fixed thread 15;Nut 14 is provided with fixed thread 15;The right side of tilting bar 6 sets hole 16;Hole 16 Above intert and be provided with cuttage block 17, after user's installation vertical supporting bar 3, tilting bar 6 is tilted into insertion two second and worn In hole 9, cuttage block 17 is close to vertical supporting bar 3 afterwards and inserted in hole 16, while the nut 14 in fixed thread 15 is consolidated It is fixed tight, adjacent vertical supporting bar 3 is divided into triangle, strengthen the stability of whole device.
Specifically used mode:In use, after bottom plate 1 is fixed on into destination by fixing glue 4 and tip 5, user Vertical supporting bar 3 is vertically disposed on the second contiguous block 7, projecting block 21 is connected in groove 12, first is rotated afterwards and connects Block 8 is connect, the first contiguous block 7 and the second contiguous block 8 is combined closely, vertical supporting bar 3 is vertically fixed in transverse support bar 2 It is simultaneously convenient to dismantle, after user's installation vertical supporting bar 3, tilting bar 6 is tilted in two second perforation 9 of insertion, it Cuttage block 17 is close into vertical supporting bar 3 afterwards to insert in hole 16, while the nut 14 in fixed thread 15 is fixed tightly, makes phase Adjacent vertical supporting bar 3 is divided into triangle, strengthens the stability of whole device.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.

Claims (5)

1. a kind of civil engineering work construction bracket, including bottom plate(1), transverse support bar(2)With vertical supporting bar(3), it is special Sign is:The bottom plate(1)Upper end positions are provided with the first perforation(18);First perforation(18)It is internally provided with fixation Nail(4);The bottom plate(1)Lower section, tip(5)Upper end is provided with weighted plate(19);The bottom plate(1)It is symmetrical at left and right sides of upper end It is provided with fixed block(20);The fixed block(20)Upper vertical is connected with vertical supporting bar upwards(3);The vertical supporting bar (3)Two second perforation are provided with from top to bottom(9);The vertical supporting bar(3)Top and bottom are symmetrically arranged with limited block (10);The upper end limited block(10)Upside and lower end limited block(10)Lower central position is provided with projecting block(21);It is described Vertical supporting bar(3)Upper and lower ends are provided with the first contiguous block(8);First contiguous block(8)Interior surface position ring winding It is equipped with the first screw thread(11);The transverse support bar(2)Upper and lower both sides are symmetrically arranged with the second contiguous block(7);Described second connects Connect block(7)Lower section sets fluted(12), groove(12)And projecting block(21)Mutually agree with;The vertical supporting bar(3)Upper end Second perforation(9)With adjacent vertical supporting bar(3)Perforate lower end second(9)Between be provided with tilting bar(6);The tilting bar (6)Left side is provided with fixed thread(15);The fixed thread(15)On be provided with nut(14);The tilting bar(6)Right side Hole is set(16).
2. civil engineering work construction bracket according to claim 1, it is characterised in that:The bottom plate(1)Underface, Gu Fixed nail(4)Between be placed equidistant three tips(5).
3. civil engineering work construction bracket according to claim 1, it is characterised in that:Perforate the upper end second(9) To the left, lower end second is perforated(9)It is to the right.
4. civil engineering work construction bracket according to claim 1, it is characterised in that:Second contiguous block(7)Outside Surface is surrounded with the second screw thread(13), the second screw thread(13)With the first screw thread(11)Mutually agree with.
5. civil engineering work construction bracket according to claim 1, it is characterised in that:Described hole(16)It is above interspersed to set It is equipped with cuttage block(17).
CN201720827082.6U 2017-07-10 2017-07-10 A kind of civil engineering work construction bracket Expired - Fee Related CN206903174U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720827082.6U CN206903174U (en) 2017-07-10 2017-07-10 A kind of civil engineering work construction bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720827082.6U CN206903174U (en) 2017-07-10 2017-07-10 A kind of civil engineering work construction bracket

Publications (1)

Publication Number Publication Date
CN206903174U true CN206903174U (en) 2018-01-19

Family

ID=61293530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720827082.6U Expired - Fee Related CN206903174U (en) 2017-07-10 2017-07-10 A kind of civil engineering work construction bracket

Country Status (1)

Country Link
CN (1) CN206903174U (en)

Similar Documents

Publication Publication Date Title
CN206903174U (en) A kind of civil engineering work construction bracket
CN207121928U (en) A kind of new prefabricated assembled piping lane
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN207739086U (en) A kind of spliced interim subgrade case for building
CN207420002U (en) A kind of scaffold fixed structure for building
CN203846795U (en) Novel construction riding track
CN207839395U (en) A kind of furnace of calcium carbide dispensing vibrating screen
CN207619847U (en) Column and Coping Construction assembled adjustable operating platform
CN206784418U (en) A kind of agricultural greenhouse concrete pipe base
CN206047484U (en) A kind of pipeline group welding stage rack device
CN206554515U (en) A kind of column cap concrete separating device
CN215065609U (en) Mortar sieving mechanism for concrete mixture setting time
CN106917498A (en) A kind of Portable scaffold
CN211815972U (en) A extract template component for concrete core wall
CN206318604U (en) A kind of municipal bridge steel structure spiral ball lifting construction device
CN103643790A (en) Self-crawling type operating platform applicable to colossal column
CN207714767U (en) A kind of firm pump line fixed structure
CN207130761U (en) A kind of easy pile foundation structure
CN207363254U (en) A kind of regularization constructional column dustpan mouth
CN207003968U (en) A kind of dismountable scaffold of architectural engineering
CN205360501U (en) Multi -functional dance barre
CN205875694U (en) Novel aluminum alloy template
CN204475893U (en) A kind of building operations multifunctional stairway pedal
CN206737539U (en) A kind of annular concrete electric pole
CN211949620U (en) Fender is enclosed in portable construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180119

Termination date: 20180710