CN206902529U - Steel pipe web prestressing force steel reinforced concrete combines main beam structure - Google Patents

Steel pipe web prestressing force steel reinforced concrete combines main beam structure Download PDF

Info

Publication number
CN206902529U
CN206902529U CN201720860106.8U CN201720860106U CN206902529U CN 206902529 U CN206902529 U CN 206902529U CN 201720860106 U CN201720860106 U CN 201720860106U CN 206902529 U CN206902529 U CN 206902529U
Authority
CN
China
Prior art keywords
steel
concrete
steel pipe
web
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720860106.8U
Other languages
Chinese (zh)
Inventor
王保群
董旭
邢德进
李志�
张旭
徐向锋
刘金慧
范圣伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jiaotong University
Original Assignee
Shandong Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jiaotong University filed Critical Shandong Jiaotong University
Priority to CN201720860106.8U priority Critical patent/CN206902529U/en
Application granted granted Critical
Publication of CN206902529U publication Critical patent/CN206902529U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of steel pipe web prestressing force steel reinforced concrete to combine main beam structure, including concrete roof, concrete floor, web steel pipe, prestressing with bond steel strand wires, external prestressing tendon, diaphragm plate, described web steel pipe is embedded between concrete roof and concrete floor, adjacent two web steel pipe tops and bottom are connected by shear connector Bolt plate, form longitudinal triangle rock-steady structure, more steel pipes are connected with each other successively, form beam body web, bear beam body shearing and part moment of flexure, prestress wire is embedded in top inside described, in underplate concrete, described external prestressing tendon is arranged on inside steel reinforced concrete assembled beam frame, described diaphragm plate is located inside steel reinforced concrete assembled beam frame, set together every a segment distance, with top, underplate concrete pours consolidation as entirety.

Description

Steel pipe web prestressing force steel reinforced concrete combines main beam structure
Technical field
It the utility model is related to one kind and be used for civil engineering bridge technology field, be more particularly to a kind of steel pipe web and in advance should Power steel reinforced concrete combines main beam structure.
Background technology
Bridge is in highway, railway, urban road and road and water conservancy construction, in order to cross over various obstacle (such as rivers Stream or other structures) works.By structure type, bridge can typically divide beam bridge, arch bridge, cable-stayed bridge and suspension bridge;By being used Material type, bridge generally can be divided into wooden bridge, masonry bridge, reinforced concrete bridge, steel bridge, steel-concrete combined structure bridge etc..
Beam bridge is using the bridge by the girder based on curved as supporting member.Girder can be solid web girder or girder truss.Steel Mixed combining structure beam bridge is by steel and two kinds of concrete girder material of different nature, a kind of combined novel bridge formed Structure type.The tensile property of steel and the compressive property of concrete are taken full advantage of due to such bridge, steel can be significantly improved The mechanical property and raising economy of structure, and there is the advantages of easy for construction, handsome in appearance, environmental protection and energy saving, therefore increasingly It is widely used in bridge engineering construction field.
Traditional steel concrete combining structure beam bridge is typically using concrete slab and plate girder, steel box-girder or steel truss The mode that beam is combined.Because the deadweight of real abdomen steel reinforced concrete combination beam (steel plate combination beam, composite beam of steel box) is lighter, real abdomen steel plate is easily By Wind effects;Empty stomach steel reinforced concrete combination beam (steel truss combination beam) is without image of Buddha tradition prestressed concrete beam bridge, top, bottom plate Apply prestressing force in concrete to resist dead load and mobile load, therefore span ability is by larger limitation;Traditional girder steel assembling construction When, cantilever construction is more difficult, need to set up floor stand and be used for girder steel assembly temporary support.Thus on the whole, traditional steel reinforced concrete Coagulating the main deficiency of local soil type's conjunction structure beam bridge is:(1) poor (2) the empty stomach steel reinforced concrete combination beam of real abdomen steel reinforced concrete combination beam wind loading rating is pre- Stress applies difficulty, and span ability is complicated by limitation (3) construction, and construction site takes larger.
So under this background, a kind of satisfaction of exploitation possesses bigger span ability and construction is more convenient, new Steel pipe web prestressing force steel-concrete combined structure beam bridge structure form, has great practical value.
Utility model content
The purpose of this utility model is to be to provide a kind of steel pipe web prestressing force steel reinforced concrete combination main beam structure and construction party Method, the bearing capacity of traditional steel-concrete combined structure beam bridge is improved in terms of structural system and inherent force-mechanism, is applied with traditional The linking of work method is good, convenient to carry out.
To achieve these goals, the utility model uses following technical measures:
A kind of steel pipe web prestressing force steel reinforced concrete combines main beam structure, including concrete roof, concrete floor, web steel Pipe, prestressing with bond steel strand wires, external prestressing tendon and diaphragm plate, described web steel pipe are arranged on concrete roof and coagulation Between native bottom plate, web steel pipe top and bottom are provided with shear connector, and web steel pipe passes through shear connector, steel pipe spacer bar and coagulation Tu Ding, bottom plate are connected to form steel reinforced concrete combination main girder frame, and described diaphragm plate is horizontally installed on inside steel reinforced concrete assembled beam frame, often Set together every a segment distance, with concrete top, bottom slab concreting consolidation to be overall, for increasing beam body lateral stiffness;Described Prestressing with bond steel strand wires are embedded in top, in underplate concrete, and described external prestressing tendon is arranged on steel reinforced concrete assembled beam frame Inside, one end are anchored on the diaphragm plate of beam-ends, and the other end is anchored on the diaphragm plate of pier top, and center section is passed through on diaphragm plate External prestressing turn to steel sleeve after, complete design external prestressing vertically turns to.Further, described concrete roof It is segmental construction with bottom plate, the embedded deformed bar pipeline in each section before pouring.
Further, deformed bar passes through corresponding section deformed bar pipeline stretch-draw anchor inside described, and leads to It is common with top, underplate concrete after prestressing with bond reinforcing bar is combined into entirety with top, underplate concrete after piping mud jacking Bear construction loads and a phase dead load.
Further, described web steel pipe is hollow steel tube, along the longitudinal direction side of concrete roof and concrete floor To being arranged symmetrically two row hollow steel tubes, each column hollow steel tube includes multiple hollow steel tubes for being obliquely installed and being sequentially connected.
Further, adjacent two web steel pipe tops and bottom are connected by shear connector Bolt plate, form longitudinal triangle Shape rock-steady structure, more steel pipes are connected with each other successively, form girder web plate, bear shearing and part moment of flexure.
Further, described external prestressing tendon according to design bearing capacity, can it is lateral symmetry set it is a plurality of, bear to transport Battalion's phase mobile load.
Further, described diaphragm plate is reinforced concrete structure, including middle diaphragm plate, pier top diaphragm plate and end tabula Plate, middle diaphragm plate are designed with multiple, the beam body middle part between pier top and beam-ends, its internal pre-buried external prestressing steering steel Sleeve pipe, for aiding in external prestressing tendon to turn to;Pier top diaphragm plate is located at pier top position, and end diaphragm plate is located at beam-ends, inside it Also pre-buried anchoring sleeve, anchored for external prestressing tendon.
Main beam structure construction method, including following steps are combined to described steel pipe web prestressing force steel reinforced concrete:
Step 1:Assembled No. 0 block beam section bottom plate and colligation baseplate reinforcing bar on pier top platform bracket, will according to design Arrangement and pre-buried prestress pipe, this assembled section web steel pipe are asked, and steel pipe bottom shear connector is temporarily fixed at bottom plate phase Answer design attitude;
Step 2:No. 0 block underplate concrete is poured, when concrete reaches the 90% of design strength, is carried out pre- in bottom-plate body Prestress steel strand pipeline lashing, tensioning, anchoring;
Step 3:Full framing and top board construction platform are set up on pier top platform bracket, with step 1, carries out No. 0 block girder Top plate formwork erection, reinforcing bar colligation, concreting, tensioning construction.Fine setting is positioned at steel pipe top in top plate before concreting Portion shears key position, complies with design requirement;
Step 4:In pier top beam section top surface both ends symmetrically assembled Hanging Basket system, and carry out load test;
Step 5:Assembled 1# beam sections bottom plate and colligation baseplate reinforcing bar in Hanging Basket bottom die platform, according to design requirement cloth Put and pre-buried prestress pipe, assembly connects this section web steel pipe, and steel pipe bottom shear connector is temporarily fixed at into bottom plate phase Answer design attitude;
Step 6:No. 1 block beam section underplate concrete is poured, when concrete reaches the 90% of design strength, carries out bottom-plate body Interior prestress wire pipeline lashing, tensioning, anchoring;
Step 7:No. 1 block beam section top plate formwork erection, reinforcing bar colligation, concreting, the prestressing force on Hanging Basket top plate platform Draw construction.Fine setting complies with design requirement positioned at steel pipe top shearing key position in top plate before concreting;
Step 8:Hanging Basket system moves forward, 5~step 7 of repeat step, into next section main girder construction, until full-bridge closes Dragon;
Step 9:When construction to tabula Board position, formwork erection colligation diaphragm plate reinforcing bar, and pre-buried steering or anchor;
Step 10:External prestressing tendon passes through corresponding anchor block and steering block, is stretched to design load anchoring.
The utility model has advantages below relative to prior art:
(1) top plate and bottom plate employ prestressed reinforced concrete construction, with the steel truss combination beam that conventional upper is concrete Compare, greatly improve beam body bearing capacity
(2) web uses steel pipe truss, solves real abdomen steel plate concrete composite beam bridge and is highly prone to Wind effects Deficiency, and material usage is less, has good engineering economy;
(3) Hanging Basket cantilever construction is used, construction safety is reliable, saves construction site and plant.
(4) structure undertakes most moment of flexure using roof and floor concrete and prestressing force, and web steel pipe undertakes major part Shearing, structural system is simple, and structure stress is clear and definite.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are these Some embodiments of utility model, for those of ordinary skill in the art, on the premise of not paying creative work, also Other accompanying drawings can be obtained according to these accompanying drawings.
Fig. 1 is that steel pipe web prestressing force steel reinforced concrete combines main beam structure elevational schematic view;
Fig. 2 is that steel pipe web prestressing force steel reinforced concrete combines main beam structure close-up schematic view;
Fig. 3 is that steel pipe web prestressing force steel reinforced concrete combines main beam structure A-A sectional schematic diagrams;
Fig. 4 is web steel pipe assembly schematic diagram;
Fig. 5 is that steel pipe web prestressing force steel reinforced concrete combines main beam structure cantilever construction schematic diagram;
In figure:1- steel pipe web prestressing force steel reinforced concrete combines main beam structure, 2- concrete rooves, 3- concrete floors, 4- abdomens Slab pipe, 5- prestressing with bond steel strand wires, 6- external prestressing tendons, 7- diaphragm plates, 8- shear connectors, 9- external prestressings turn to steel Sleeve pipe, 10- shear connector Bolt plates, 11- steel pipe spacer bars, diaphragm plate in 12-, 13- pier top diaphragm plates, 14- ends diaphragm plate, 15- Hanging Basket systems, 16- bottom plates platform, 17- top plate platforms.
Embodiment
It is noted that described further below is all exemplary, it is intended to provides further instruction to the application.It is unless another Indicate, all technologies used herein and scientific terminology are with usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
As background technology is introduced, it is poor to there is (1) real abdomen steel reinforced concrete combination beam wind loading rating in the prior art;(2) Empty stomach steel reinforced concrete combination beam prestress application is difficult, and span ability is smaller;(3) rack construction is complicated, and construction site takes larger.For Solves technical problem as above, present applicant proposes a kind of steel pipe web prestressing force steel reinforced concrete combination main beam structure and construction party Method.
Below in conjunction with accompanying drawing, structure of the present utility model is further described.
The utility model provides a kind of relative to traditional steel reinforced concrete combination main beam structure, structure stress mechanism and load-carrying efficiency It is higher, to possess superior bigger span ability, economic performance, field operation amount and a kind of less steel pipe web of difficulty of construction pre- Stress steel reinforced concrete combines main beam structure.
With reference to shown in Fig. 1, Fig. 2, a kind of steel pipe web prestressing force steel reinforced concrete combination main beam structure 1, including concrete roof 2, Concrete floor 3, web steel pipe 4, prestressing with bond steel strand wires 5, external prestressing tendon 6, diaphragm plate 7.
With reference to shown in Fig. 3, Fig. 4, web steel pipe 4 is arranged between concrete roof 2 and concrete floor 3, web steel pipe 4 Top and bottom are provided with shear connector 8, and web steel pipe 4 is connected by shear connector 8, steel pipe spacer bar 11 with top, underplate concrete Form steel reinforced concrete assembled beam frame.
With reference to shown in Fig. 1, Fig. 2, Fig. 3, prestressing with bond steel strand wires 5 are embedded in top, in underplate concrete;External prestressing Rope 6 is arranged on inside steel reinforced concrete assembled beam frame, and one end is anchored on beam-ends diaphragm plate 14, and the other end is anchored at pier top diaphragm plate 13, after center section turns to steel sleeve 9 through diaphragm plate external prestressing, complete design external prestressing vertically turns to;Tabula Plate 7 is located inside steel reinforced concrete assembled beam frame, is set together every a segment distance, and consolidation is poured to be overall with top, underplate concrete, For increasing beam body lateral stiffness.
With reference to shown in Fig. 1, Fig. 2, concrete roof 2 and bottom plate 3 are segmental construction, and each section is embedded before pouring in advance should Power reinforcing bar pipeline.
With reference to shown in Fig. 1, Fig. 2, prestressing with bond reinforcing bar passes through corresponding section deformed bar pipeline stretch-draw anchor, and leads to It is common with top, underplate concrete after prestressing with bond steel strand wires 5 is combined into entirety with top, underplate concrete after piping mud jacking It is same to bear construction loads and a phase dead load.
With reference to shown in Fig. 2, Fig. 3, Fig. 4, web steel pipe 4 is that hollow steel tube includes more, along concrete roof and The longitudinal direction of concrete floor, two row hollow steel tubes being arranged symmetrically, each column hollow steel tube is vertical angularly disposed, and adjacent two Root web steel pipe top and bottom are connected by shear connector Bolt plate 10, form longitudinal triangle rock-steady structure, more steel pipes according to Secondary interconnection, girder web plate is formed, bear shearing and part moment of flexure.
With reference to shown in Fig. 2, Fig. 3, external prestressing tendon 6 according to design bearing capacity, can it is lateral symmetry set it is a plurality of, bear Operation phase mobile load.
With reference to shown in Fig. 1, Fig. 2, Fig. 3, diaphragm plate 7 is reinforced concrete structure, is divided into middle diaphragm plate 12, pier top diaphragm plate 13 turn to end diaphragm plate 14, beam body middle part of the middle diaphragm plate 12 between pier top and beam-ends, internal pre-buried external prestressing Steel sleeve 9, for aiding in external prestressing reinforcing bar to turn to;Pier top diaphragm plate 13 is located at pier top position, and end diaphragm plate 14 is located at beam End, internal pre-buried anchoring sleeve, is anchored for external prestressing tendon.
Girder knot construction method is combined to steel pipe web prestressing force steel reinforced concrete, is described in detail, including following steps:
Step 1:Assembled No. 0 block beam section bottom plate and baseplate reinforcing bar is tied up on pier top platform bracket, according to design requirement Arrangement and pre-buried prestress pipe, assembly connects this section web steel pipe 4, and steel pipe bottom shear connector 8 is temporarily fixed at into bottom Plate respective design position;
Step 2:No. 0 block underplate concrete is poured, when concrete reaches the 90% of design strength, is carried out pre- in bottom-plate body The pipeline lashing of prestress steel strand 5, tensioning, anchoring;
Step 3:Full framing and top board construction platform are set up on pier top platform bracket, with step 1, carries out No. 0 block girder Top plate formwork erection, reinforcing bar colligation, concreting, tensioning construction.Fine setting is positioned at steel pipe top in top plate before concreting The position of portion's shear connector 8, complies with design requirement;
Step 4:In pier top beam section top surface both ends symmetrically assembled Hanging Basket system 15, and carry out load test;
Step 5:Assembled 1# beam sections bottom plate and colligation baseplate reinforcing bar on Hanging Basket bottom plate platform 16, according to design requirement Arrangement and pre-buried prestress pipe, assembly connects this section web steel pipe 4, and steel pipe bottom shear connector 8 is temporarily fixed at into bottom Plate respective design position;
Step 6:No. 1 block beam section underplate concrete is poured, when concrete reaches the 90% of design strength, carries out bottom-plate body The interior pipeline lashing of prestress wire 5, tensioning, anchoring;
Step 7:No. 1 block beam section top plate formwork erection, reinforcing bar colligation, concreting, the prestressing force on Hanging Basket top plate platform 17 Stretching construction.Fine setting complies with design requirement positioned at the position of steel pipe top shear connector 8 in top plate before concreting;
Step 8:Hanging Basket system 15 moves forward, 5~step 7 of repeat step, into next section main girder construction, until full-bridge closes Dragon;
Step 9:When construction to the position of diaphragm plate 7, formwork erection colligation diaphragm plate reinforcing bar, and pre-buried steering or anchor;
Step 10:External prestressing tendon 6 passes through corresponding anchor block and steering block, is stretched to design load anchoring.
It is not new to this practicality although above-mentioned specific embodiment of the present utility model is described with reference to accompanying drawing The limitation of type protection domain, one of ordinary skill in the art should be understood that on the basis of the technical solution of the utility model, ability Field technique personnel need not pay the various modifications that creative work can make or deformation still in protection model of the present utility model Within enclosing.

Claims (7)

1. a kind of steel pipe web prestressing force steel reinforced concrete combines main beam structure, it is characterised in that including concrete roof, concrete bottom Plate, web steel pipe, prestressing with bond steel strand wires, external prestressing tendon and diaphragm plate, described web steel pipe are arranged on concrete Between top plate and concrete floor, web steel pipe top and bottom are provided with shear connector, and web steel pipe is positioned by shear connector, steel pipe Reinforcing bar connects with concrete top, bottom plate to be formed steel reinforced concrete and combines main girder frame, and described diaphragm plate is horizontally installed on steel reinforced concrete combination beam Lower portion, set together every a segment distance, with concrete top, bottom slab concreting consolidation to be overall, for increasing beam body transverse direction Rigidity;Prestress wire is embedded in top, in underplate concrete inside described, and described external prestressing tendon is arranged on steel reinforced concrete Inside assembled beam frame, one end is anchored on the diaphragm plate of beam-ends, and the other end is anchored on the diaphragm plate of pier top, and center section is worn After crossing the external prestressing steering steel sleeve on diaphragm plate, complete design external prestressing vertically turns to.
2. steel pipe web prestressing force steel reinforced concrete as claimed in claim 1 combines main beam structure, it is characterised in that described concrete Top plate and bottom plate are segmental construction, the embedded deformed bar pipeline in each section before pouring.
3. steel pipe web prestressing force steel reinforced concrete as claimed in claim 1 combines main beam structure, it is characterised in that pre- inside described Stress reinforcing bar passes through corresponding section deformed bar pipeline stretch-draw anchor, and by pipeline pneumatic mortar after, make prestressing with bond reinforcing bar After being combined into entirety with top, underplate concrete, construction loads and a phase dead load are born jointly with top, underplate concrete.
4. steel pipe web prestressing force steel reinforced concrete as claimed in claim 1 combines main beam structure, it is characterised in that described web steel Manage as hollow steel tube, along concrete roof and the longitudinal direction of concrete floor, be arranged symmetrically two row hollow steel tubes, each column Hollow steel tube includes multiple hollow steel tubes for being obliquely installed and being sequentially connected, and forms longitudinal triangle rock-steady structure;And then formed Main beam web, bear shearing and part moment of flexure.
5. steel pipe web prestressing force steel reinforced concrete as claimed in claim 4 combines main beam structure, it is characterised in that adjacent two webs Steel pipe top and bottom are connected by shear connector Bolt plate.
6. steel pipe web prestressing force steel reinforced concrete as claimed in claim 1 combines main beam structure, it is characterised in that described is external pre- Stress rope can be symmetrical arranged a plurality of along the longitudinal direction of steel reinforced concrete assembled beam frame, bear the operation phase according to design bearing capacity Mobile load.
7. steel pipe web prestressing force steel reinforced concrete as claimed in claim 1 combines main beam structure, it is characterised in that described diaphragm plate For reinforced concrete structure, including middle diaphragm plate, pier top diaphragm plate and end diaphragm plate, middle diaphragm plate be designed with it is multiple, positioned at pier In the middle part of beam body between top and beam-ends, its internal pre-buried external prestressing turns to steel sleeve, for aiding in external prestressing tendon to turn To;Pier top diaphragm plate is located at pier top position, and end diaphragm plate be located at beam-ends, also pre-buried anchoring sleeve inside it, is answered in advance for external Power rope anchors.
CN201720860106.8U 2017-07-14 2017-07-14 Steel pipe web prestressing force steel reinforced concrete combines main beam structure Expired - Fee Related CN206902529U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720860106.8U CN206902529U (en) 2017-07-14 2017-07-14 Steel pipe web prestressing force steel reinforced concrete combines main beam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720860106.8U CN206902529U (en) 2017-07-14 2017-07-14 Steel pipe web prestressing force steel reinforced concrete combines main beam structure

Publications (1)

Publication Number Publication Date
CN206902529U true CN206902529U (en) 2018-01-19

Family

ID=61313037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720860106.8U Expired - Fee Related CN206902529U (en) 2017-07-14 2017-07-14 Steel pipe web prestressing force steel reinforced concrete combines main beam structure

Country Status (1)

Country Link
CN (1) CN206902529U (en)

Similar Documents

Publication Publication Date Title
AU2015409344B2 (en) Assembled type pier column member with steel-concrete composite structure
WO2019149270A1 (en) Assembled pier for mixed reinforcement of normal steel rebar and finished threaded steel bar
CN106894326B (en) The construction method of assembled pretensioned prestressing corrugated steel web plate composite box girder
CN207194146U (en) Prestressing force assembly concrete frame joint attachment structure
CN103758023B (en) Prestressed concrete and steel truss mixed continuous rigid frame bridge and construction method thereof
CN104988844B (en) Two times tensioning prestressing force assembled Wavelike steel webplate combination beam
CN106906748B (en) Based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder
CN211815489U (en) Super large span flying swallow type concrete filled steel tube arch bridge with self-anchoring suspension cable system
CN111335142A (en) Self-anchored cable-stayed bowstring arch bridge
CN109440623A (en) The interim splicing structure of concrete segment precast bridge
CN113882238A (en) Large-span deck cable-auxiliary beam arch combined rigid frame bridge and construction method thereof
CN103046463A (en) Assembly type saddle-shell-shaped bottom plate continuous box girder bridge and construction method thereof
CN107905084B (en) RPC steel truss combined bridge deck and continuous beam bridge
CN107119582B (en) T-shaped rigid frame bridge back tower cable-stayed reinforcing structure and construction method thereof
CN206570671U (en) Based on the prestressed assembled corrugated steel web plate composite box girder of mixing
CN107142830A (en) Steel pipe web prestressing force steel reinforced concrete combines main beam structure and construction method
CN112982139A (en) Wide-width large-span hybrid beam and short-tower cable-stayed bridge system and construction method thereof
CN104562944A (en) Large span composite beam cable-stayed bridge side steel box temporary anchorage system
CN106948486A (en) Steel tubes Combined concrete frame system and construction method
CN208362941U (en) One kind reinforcing the old hollow slab bridge construction of single hole by real abdomen Bars In Poured Concrete Slab
CN217268348U (en) Hybrid prestressed composite beam
CN206902529U (en) Steel pipe web prestressing force steel reinforced concrete combines main beam structure
CN214089518U (en) Double-amplitude four-cable-plane cable-stayed bridge of single-blade hyperboloid single-column tower
CN114837059A (en) Mountain rock anchor cable-stayed flexible arch cooperation system bridge and construction method thereof
CN210917010U (en) Tube-in-tube bridge tower of space mixed cable net suspension bridge with parabolic arched tower cap

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant