CN206899169U - Ready-package high intensity pipe sleeve joint device - Google Patents

Ready-package high intensity pipe sleeve joint device Download PDF

Info

Publication number
CN206899169U
CN206899169U CN201621202401.6U CN201621202401U CN206899169U CN 206899169 U CN206899169 U CN 206899169U CN 201621202401 U CN201621202401 U CN 201621202401U CN 206899169 U CN206899169 U CN 206899169U
Authority
CN
China
Prior art keywords
split ring
sloping platform
screw thread
nut
high intensity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621202401.6U
Other languages
Chinese (zh)
Inventor
方福政
方鹤
周建
费玉春
何平
陈�胜
黄超
宛永江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yibin Nanxi District Kecheng Electromechanical Factory
Original Assignee
Yibin Nanxi District Kecheng Electromechanical Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yibin Nanxi District Kecheng Electromechanical Factory filed Critical Yibin Nanxi District Kecheng Electromechanical Factory
Priority to CN201621202401.6U priority Critical patent/CN206899169U/en
Application granted granted Critical
Publication of CN206899169U publication Critical patent/CN206899169U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Packaging Of Annular Or Rod-Shaped Articles, Wearing Apparel, Cassettes, Or The Like (AREA)

Abstract

A kind of ready-package high intensity pipe sleeve joint device, including top tube and down tube assembly are the utility model is related to, has sloping platform in lower pipe assembly, split ring is placed with sloping platform;Lower pipe assembly outer wall or inwall are provided with screw thread;Nut is provided with, nut outer wall or inwall are provided with screw thread;There is sloping platform in nut;Split ring is placed with sloping platform B;Screw thread and screw thread coordinate;Bushing is provided between two split rings;Upper tube can be in nut, in lower pipe assembly and in bushing slidably.The beneficial effects of the utility model are:Sleeve structure can effectively solve the problems, such as multitube storage, the innovative cooperation using sloping platform and split ring, split ring is oppressed using bushing, it is allowed to shrink along gradient, and holds upper tube tightly, reaches the purpose of the axial restraint locking of high intensity, very big impulsive force can be born, and upper and lower two springs are locked, and ensure that overall rigidity simultaneously, the swag phenomenon after installing between two pitch circle pipes is avoided.

Description

Ready-package high intensity pipe sleeve joint device
Technical field
The utility model discloses a kind of pipe sleeve joint device.
Background technology
In many occasions, it is required for using longer pipe, such as:Axial nailing device is in actual use, it is necessary to top Canopy carries out nailing processing, it is necessary to nailing device is arranged on to the top of pipe (support bar), personnel hold pipe end on ground Axial force distribution operation is carried out, because the floor height in all kinds of houses is different, is actually also impossible to be equipped with the pipe of different lengths, so Need to carry out adjustable design to the length of pipe.
Conventional length adjustment mode is by pipe merogenesis, and joint sets internal and external threads respectively, and multiple pipes spin it After increase length, but such device has the drawback that:Storage, arrangement and the transport of multiple pipes are all extremely inconvenient, and Wasted time and energy during assembly and disassembly, in addition, when the joint number of pipe is excessive, the nailing device of upper end has dancing, and (reason is spiral shell All the time there is gap, locking function deficiency in line) between coordinating.
In order to overcome disadvantages mentioned above, there is pipe sleeve joint device again in the market, i.e., using the pipe of different tube diameters, upper one The pipe of level can be received into next stage pipe, without using when length it is shorter, will can justify as needed during use Pipe stretches out step by step, then coordinates pin-and-hole regular length with latch.The device of this type preferably resolves storage problem, but latch The defects of fixed form of formula will additionally increase annex and fabrication hole, and positioning is also more inconvenient during use, and maximum is:Nailing When device nailing acts, larger impulsive force (20-30 newton) is produced, and this power can be formed to pin-and-hole fit structure and greatly broken Bad, in fact, using after several times, pin-and-hole will gross distortion.
The content of the invention
The purpose of this utility model is to provide a kind of ready-package high intensity pipe sleeve joint device to make up prior art deficiency.
The utility model is to realize that the technical scheme that purpose uses is:
Ready-package high intensity pipe sleeve joint device, including top tube and down tube assembly, it is characterized in that:
There is sloping platform A in lower pipe assembly, split ring A is placed with sloping platform A;Lower pipe assembly outer wall or inwall are provided with screw thread A;
Nut is provided with, nut outer wall or inwall are provided with screw thread B;There is sloping platform B in nut;Opening is placed with sloping platform B Spring B;
Screw thread A and screw thread B coordinates;
Bushing is provided between split ring A and split ring B;Two end faces of bushing can put forth effort on opening bullet respectively Spring A and split ring B;
Before screw thread A and screw thread B be not fully mated, upper tube can in nut, in lower pipe assembly, in split ring A, open Slided in mouth spring B, in bushing.
Further optimization:Upper pipe outer wall is provided with annular blind slot.
Further optimization:Peep hole is provided with lower pipe assembly, it may be observed that split ring A.
Further optimization:Telltale mark is provided with upper tube.
Further optimization:There is spring anti-dropping groove in sloping platform A and sloping platform B.
Further optimization:Lower pipe assembly is outer and nut has force application apparatus outside.
The beneficial effects of the utility model are:Sleeve structure can effectively solve the problems, such as multitube storage, innovative The cooperation using sloping platform and split ring, oppress split ring using bushing, be allowed to shrink along gradient, and hold upper tube tightly, Reach the purpose of the axial restraint locking of high intensity, very big impulsive force can be born, and upper and lower two springs are locked simultaneously, Overall rigidity is ensure that, avoids the swag phenomenon after installing between two pitch circle pipes.
The utility model is further described below by embodiment, and with reference to accompanying drawing.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment.
Fig. 2 is Fig. 1 sectional view.
Fig. 3 is not lock view.
Fig. 4 is Fig. 3 sectional view.
Fig. 5 is locking state schematic diagram.
Embodiment
In figure:1 is upper tube, and it is sloping platform B that lower pipe assembly, which includes lower tube body 17 and outer sleeve 2,3, and 4 be split ring A, 5 It is screw thread A, 6 be nut, and 7 be screw thread B, and 8 be sloping platform A, and 9 be split ring B, and 10 be bushing, and 11 be annular blind slot, and 12 be observation Hole, 16 be spring anti-dropping groove.
Embodiment 1:
Under unused state, the caliber of upper tube 1 is less than the caliber of lower pipe assembly, so upper tube 1 can be accommodated in lower pipe assembly It is interior.
In use, upper tube 1 is pulled out to required position, because the caliber of upper tube 1 is less than nut 6, bushing 10 and opening bullet Spring A4, split ring B9 internal diameter, so nut 6 and bushing 10 also will not have obstruction to the action of upper tube 1.
Needed for being pulled out to when upper tube 1 behind position (now the lower end of upper tube 1 is still in lower pipe assembly), nut 6 is tightened, by Coordinate in screw thread A5 and screw thread B7, so nut 6 can downward pipe assembly movement.
Connect it is lower it is described be this technology core:During nut 6 moves down, the transitive relation of power is:Nut 6- Pipe assembly under sloping platform B3- split ring B9- bushing 10- split ring A4- sloping platforms A8-.Nut 6, sloping platform B3, bushing 10, sloping platform A8, lower pipe assembly are rigid body, and only split ring B9 and split ring A4 have metamorphosis.
That is:10 pairs of bushing and the split ring B9 and split ring A4 of its two end in contact exert a force, and are open in addition Spring B 9 and split ring A4 are respectively placed on sloping platform B3 and sloping platform A8, so this power can make two split rings along oblique Contraction distortion is spent, so as to tightly embrace the upper tube 1 in it, has the function that fixed locking upper tube 1.
When needing to discharge upper tube 1, unscrew nut 6, two split rings can reset, and will also discharge upper tube 1.
Embodiment 2:
In embodiment 1, what two split rings were held tightly is the tube wall of upper tube 1, in order to obtain bigger axial direction endurance, On the basis of embodiment 1, annular blind slot 11 is provided with upper tube 1, allows split ring A4 to hold annular blind slot 11 tightly, so that it may Bear bigger axial impact force.
Embodiment 3:
It is total in down tube in order to accurately realize split ring A4 and annular blind slot 11 cooperation on the basis of embodiment 2 Into peep hole 12 is above provided with, to observe, to position, then nut 6 is tightened, to ensure that split ring A4 can accurately hold annular tightly Blind slot 11.
Embodiment 4:
On the basis of embodiment 2, also in order to accurately realize split ring A4 and annular blind slot 11 cooperation, Take the mode different with embodiment 3:Telltale mark is provided with upper tube 1, and telltale mark is always positioned at observable position Put, the same spacing for controlling each part, when making telltale mark concordant with the upper surface of nut 6, split ring A4 and annular are blind Groove 11 just can accurate fit.
Embodiment 5:
In assembling process, split ring B9 and split ring A4 are to be sent to from end on sloping platform B3 and sloping platform A8, In order to prevent that two split rings can come off, so all processing a spring anti-dropping groove in sloping platform A8 and sloping platform B3 when being inverted When 16, split ring B9 and split ring A4 are assembled, somewhat there is a point deformation to fall into spring anti-dropping groove 16.Fall into it Afterwards, even if being inverted, two split rings also will not fall off.
Embodiment 6:
Nut 6 is tightened and unscrewed and needs larger power after all, can be in nut 6 and lower pipe assembly for the ease of operation Outer setting force application apparatus, force application apparatus can be following forms:Annular knurl, groove milling, the forms such as flat are processed into, to use spanner Deng additional equipment.

Claims (6)

1. ready-package high intensity pipe sleeve joint device, including top tube and down tube assembly, it is characterized in that:
There is sloping platform A in lower pipe assembly, split ring A is placed with sloping platform A;Lower pipe assembly outer wall or inwall are provided with screw thread A;
Nut is provided with, nut outer wall or inwall are provided with screw thread B;There is sloping platform B in nut;Split ring is placed with sloping platform B B;
Screw thread A and screw thread B coordinates;
Bushing is provided between split ring A and split ring B;
Before screw thread A and screw thread B be not fully mated, upper tube can in nut, in lower pipe assembly, in split ring A, opening bullet Slided in spring B, in bushing.
2. ready-package high intensity pipe sleeve joint device according to claim 1, it is characterized in that:Upper pipe outer wall is provided with annular Blind slot.
3. ready-package high intensity pipe sleeve joint device according to claim 1 or 2, it is characterized in that:Set on lower pipe assembly There is peep hole, it may be observed that split ring A.
4. ready-package high intensity pipe sleeve joint device according to claim 1 or 2, it is characterized in that:It is fixed to be provided with upper tube Position mark.
5. ready-package high intensity pipe sleeve joint device according to claim 1 or 2, it is characterized in that:In sloping platform A and sloping platform B There is spring anti-dropping groove.
6. ready-package high intensity pipe sleeve joint device according to claim 1 or 2, it is characterized in that:Lower pipe assembly is outer and spiral shell There is force application apparatus outside female.
CN201621202401.6U 2016-11-08 2016-11-08 Ready-package high intensity pipe sleeve joint device Expired - Fee Related CN206899169U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621202401.6U CN206899169U (en) 2016-11-08 2016-11-08 Ready-package high intensity pipe sleeve joint device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621202401.6U CN206899169U (en) 2016-11-08 2016-11-08 Ready-package high intensity pipe sleeve joint device

Publications (1)

Publication Number Publication Date
CN206899169U true CN206899169U (en) 2018-01-19

Family

ID=61293939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621202401.6U Expired - Fee Related CN206899169U (en) 2016-11-08 2016-11-08 Ready-package high intensity pipe sleeve joint device

Country Status (1)

Country Link
CN (1) CN206899169U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106475976A (en) * 2016-11-08 2017-03-08 宜宾市南溪区科诚机电厂 Ready-package high intensity pipe sleeve joint device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106475976A (en) * 2016-11-08 2017-03-08 宜宾市南溪区科诚机电厂 Ready-package high intensity pipe sleeve joint device
CN106475976B (en) * 2016-11-08 2024-02-27 宜宾市南溪区科民机电有限公司 Quick-assembling high-strength round tube sleeving device

Similar Documents

Publication Publication Date Title
CN204450409U (en) Adjustablely draw horse
CN206899169U (en) Ready-package high intensity pipe sleeve joint device
CN206522311U (en) High intensity ready-package pipe sleeve joint device
CN106767348B (en) Locking cap centering device and centering method
CN215057557U (en) Fixing device for mine intelligent filling self-adaptive pipeline
CN106475976A (en) Ready-package high intensity pipe sleeve joint device
CN202418130U (en) Rapid connecting structure for rod member and base
CN106078583A (en) A kind of Labor-saving wrench for building sites
CN204532202U (en) The fuzzy fisher of bar class junk
CN215254364U (en) Scaffold frame securing device
CN211589970U (en) Adjustable bearing puller
CN105888233A (en) Steel pipe scaffold independent rod support and system
CN101158230A (en) Lifting screw fine-adjustment outer-bushing regulation rod
CN216382160U (en) Expansion screw fixing device for roof surface
CN219212835U (en) Supporting device for manufacturing electrolytic tank shell
CN203826472U (en) Storage battery terminal post correction structure
CN211029840U (en) Linear bearing disassembly mechanism
CN206180485U (en) Formula of circling round preformed armor rods puller
CN205363756U (en) Novel horse is drawn in screw rod connection
CN110911019A (en) Nuclear reactor control rod assembly for preventing control rod from falling
CN217276819U (en) Steel wire thread insert detects frock
CN215942784U (en) Simple tool for assisting assembly of O-shaped ring
CN203485124U (en) Manual pin pulling device
CN219027403U (en) Special frock of dismantling of vertical plunger metering pump squirrel cage
CN103256283A (en) Expansion bolt, expansion bolt wrench and dismantling method of expansion bolt

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180119

Termination date: 20201108

CF01 Termination of patent right due to non-payment of annual fee