CN206898869U - Steel tube charging device - Google Patents

Steel tube charging device Download PDF

Info

Publication number
CN206898869U
CN206898869U CN201720625581.7U CN201720625581U CN206898869U CN 206898869 U CN206898869 U CN 206898869U CN 201720625581 U CN201720625581 U CN 201720625581U CN 206898869 U CN206898869 U CN 206898869U
Authority
CN
China
Prior art keywords
steel pipe
material loading
loading platform
glidepath
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720625581.7U
Other languages
Chinese (zh)
Inventor
巩文建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Golden Composite Steel Tube Co Ltd
Original Assignee
Tianjin Golden Composite Steel Tube Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Golden Composite Steel Tube Co Ltd filed Critical Tianjin Golden Composite Steel Tube Co Ltd
Priority to CN201720625581.7U priority Critical patent/CN206898869U/en
Application granted granted Critical
Publication of CN206898869U publication Critical patent/CN206898869U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of steel tube charging device, its drip irrigation device is to include material loading platform, the side of material loading platform is provided with inclined glidepath, termination of the glidepath away from material loading platform is provided with striker plate, the first runner assembly is provided between glidepath and material loading platform, glidepath is connected with the first drive component of its rotation of driving, the side of glidepath is provided with check plate in material loading platform, the second turning discreteness is provided between check plate and material loading platform, the second turning discreteness is rotated such that the upper surface of check plate protrusion material loading platform for check plate, the second drive component that driving check plate rotates is provided between check plate and material loading platform, first runner assembly is parallel with the pivot center of the second turning discreteness, reach the effect for saving manpower.

Description

Steel tube charging device
Technical field
It the utility model is related to a kind of steel pipe processing field, more particularly to a kind of steel tube charging device.
Background technology
With the raising of steel pipe's production technology, the purposes of steel pipe is also more and more, and use range is also more and more extensive.No matter It is that steel pipe is all be unable to do without in daily life or in industrial production.Steel pipe can be not only pipe water, gas and oil, may be used also To be processed into the support of various equipment and the railing of transporting equipment by the technique such as cutting and welding.
During steel pipe carries out post-processing, it is necessary to which steel pipe is cut.If manually cut one by one Then operating efficiency is very low, so being cut using automatic cutting device.This just needs to be equipped with steel pipe transmission Device.
The existing Chinese patent for referring to Application No. CN204660588U, it discloses a kind of steel pipe transmission equipment, Including support and the installing plate for being fixedly connected on pedestal upper end face, multiple power transmission shafts arranged in parallel are fixed with installing plate, The axis of power transmission shaft and the direction of transfer of steel pipe are perpendicular, are exposed to the power transmission shaft of installing plate outer edge and can be filled with transfer motion power Put and be connected, transmission shaft end is fixed with transmission baffle plate, is also fixed with and is driven on each power transmission shaft outer circumferential surface The parallel baffle plate of the circular cross section of axle, the left and right sides of installing plate be fixed with respectively for and other steel pipe transmission equipments The built-in inserted plate and flag being connected.Pass through steel pipe outer circumferential surface and power transmission shaft outer circumference table in steel pipe transmit process Stiction between face transmits to realize, contact area is larger, so the steel pipe outer circumference table that will not cause to be transmitted goes out The phenomenon of existing cut.
But, it is necessary to which steel pipe is manually carried from steel pipe storeroom when by steel pipe transporting to above-mentioned steel pipe transmission equipment It is very inconvenient on to above-mentioned steel pipe transmission equipment, waste a large amount of manpowers.
Utility model content
The purpose of this utility model is to provide a kind of steel tube charging device for saving manpower.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of steel tube charging device, including material loading platform, the side of material loading platform is provided with inclined glidepath, under Termination of the rail away from material loading platform is provided with striker plate, and the first rotating group is provided between glidepath and material loading platform Part, glidepath are connected with the first drive component of its rotation of driving, are provided with material loading platform close to the side of glidepath Check plate, is provided with the second turning discreteness between check plate and material loading platform, the second turning discreteness is rotated such that for check plate Check plate protrudes the upper surface of material loading platform, and the second driving that driving check plate rotates is provided between check plate and material loading platform Component, the first runner assembly are parallel with the pivot center of the second turning discreteness.
Some steel pipes are concentrated to place and are laid on the upper surface of material loading platform by Pass through above-mentioned technical proposal, worker, and second Drive component driving check plate is rotated by the second turning discreteness so that and check plate rises to the upper surface of protrusion material loading platform, Steel pipe abuts with check plate, is stopped plate stop, can not slide and go to glidepath.When needing to steel pipe feeding, the first driving group Part driving glidepath is rotated by the first runner assembly, and glidepath rises so that glidepath is higher than steel pipe place to be placed Height.Then the second drive component driving check plate is rotated by the second turning discreteness so that check plate drops to non-bulging The upper surface of material loading platform, worker, which gives, is placed on the steel pipe applying power of material loading platform upper surface so that steel pipe is from material loading platform Upper surface is moved to glidepath.Check plate rises on other steel pipe whereabouts glidepaths stopped on material loading platform.Striker plate It can play a part of preventing steel pipe from skidding off from upper rail so that steel pipe is stable to be placed on glidepath.First driving Component driver glidepath is rotated by the first runner assembly, and glidepath declines, and with the decline of glidepath, is driven and is placed Steel pipe on glidepath declines, until steel pipe bottom wall abuts with steel pipe place to be placed, steel pipe will not continue to decline, and glide Track continues to decline, and glidepath separates with steel pipe.Glidepath is no longer played a supporting role to steel pipe, the stable placement of steel pipe At steel pipe place to be placed.Be placed on place to be placed steel pipe be transported away after, glidepath rises to original position, so it is past It is multiple, the feeding work of steel pipe is completed, reaches the effect for saving manpower.
Preferably, the striker plate top tilts to the side away from material loading platform.
Pass through above-mentioned technical proposal so that striker plate is in open state on glidepath, is easy to steel pipe in blanking track Stable placement, reduce the shock of outer wall of steel pipe and striker plate.
Preferably, being provided with sliding assembly between the striker plate and glidepath, sliding assembly supplies striker plate to feeding Platform is remote or close, and sliding assembly connects the fixation kit of restricted striker plate sliding.
Pass through above-mentioned technical proposal, by the cooperation of sliding assembly and fixation kit, regulation striker plate is on glidepath Stop position, when when the diameter difference of steel pipe or needing the position of placing steel tubes to have slight change, can pass through adjust gear The position of flitch is so that steel pipe stops at corresponding position.
Preferably, the sliding assembly includes the chute being opened on glidepath, slid in chute and be connected with sliding block, it is sliding Block is affixed with striker plate.
Pass through above-mentioned technical proposal, sliding block sliding motion in chute, can drive the striker plate affixed with sliding block along The length direction sliding of chute, the cooperation of sliding block and slide rail make it that the sliding of striker plate and glidepath connection is reliable so that gear The sliding of flitch is smooth, and the sliding trajectory of striker plate can be avoided to shift.
Preferably, the fixation kit includes the fixed plate affixed with sliding block, fixing bolt is threaded with fixed plate, The termination of fixing bolt abuts with chute.
Pass through above-mentioned technical proposal, when fixing bolt is tightened, the termination of fixing bolt tightly abuts with the outer wall of chute, limit Sliding motion of the affixed sliding block of fixed plate in chute is formed on, so as to which striker plate is fixed on chute, fixing bolt is consolidated It is fixed reliable.When needing to move the position of striker plate, fixing bolt only need to be unscrewed so that the termination of fixing bolt and chute Separation, it is convenient and swift, it is easy to operation.
Preferably, the striker plate is provided with cushion pad close to the side of material loading platform.
Pass through above-mentioned technical proposal, it is by being put down with striker plate close to feeding during due on steel pipe movement to glidepath The side of platform just stop after abutting it is mobile, so the power that the setting of cushion pad can strike on striker plate to steel pipe play it is slow Punching is acted on, and striker plate and steel pipe can be played a protective role simultaneously, improves the service life of striker plate, reduces steel pipe in movement During collide with, ensure the appearance looks elegant and quality of steel pipe.
Connector is detachably fixed preferably, being provided between the cushion pad and striker plate.
Pass through above-mentioned technical proposal, buffer board are fixed on striker plate by being detachably fixed connector, during using one section Between after, cushion pad has worn, and buffering effect has weakened.Cushion pad is changed by being detachably fixed connector, energy Enough ensure the buffering effect of cushion pad, improve the whole service life of equipment.
Preferably, the demounting bolt for being detachably fixed connector and including cushion pad being threadedly coupled with striker plate, tears open It is dormant bolt to unload bolt.
Cushion pad is fixed on striker plate by Pass through above-mentioned technical proposal, demounting bolt, when often needing to change cushion pad, only Demounting bolt need to be pulled down by rotating demounting bolt, you can cushion pad is changed.The termination of dormant bolt will not protrude The surface of cushion pad, avoid steel pipe from being produced with demounting bolt and collide with and make it that demounting bolt loosens, while ensure the quality of steel pipe.
Preferably, the material loading platform is provided with limited block, linear telescopic group is provided between limited block and material loading platform Part, linear telescopic component drive limited block to be risen or fallen along vertical direction, when limited block rises, rise to and are supported with check plate The side of the remote check plate of the steel pipe connect.
Pass through above-mentioned technical proposal,, now will be only by steel pipe strap between limited block and check plate when limited block rises Dynamic plate declines, can be by steel pipe movement to the glidepath being stuck between limited block and check plate, positioned at limited block away from only The steel pipe of dynamic plate side is maintained at the stable placement on material loading platform, will not produce and rock, can avoid all steel pipes together Produce unnecessary rock.
Preferably, the gap between limited block steel pipe adjacent with two is adapted.
Pass through above-mentioned technical proposal so that what limited block was more bonded connects with steel pipe, between two adjacent steel pipes of reduction Rock variable so that steel pipe is more stable.
In summary, the utility model has the advantages that:
1st, the feeding of steel pipe is realized with the cooperation of material loading platform and glidepath, substitutes the muscle power that fully relies on of worker to remove Fortune, reach the effect for saving manpower;
2nd, by adjusting the position of striker plate so that steel pipe stops at corresponding position;
4th, steel pipe colliding with moving process is reduced, ensures the quality of the appearance looks elegant sum of steel pipe;
5th, ensure the buffering effect of cushion pad, improve the whole service life of equipment;
6th, cause steel pipe is stable to be placed on material loading platform.
Brief description of the drawings
Fig. 1 is the structural representation of steel tube charging device;
Fig. 2 is the close-up schematic view at A in Fig. 1;
Fig. 3 is the close-up schematic view at B in Fig. 1;
Fig. 4 is partial schematic diagram when steel tube charging device uses;
Fig. 5 is the close-up schematic view at C in Fig. 4;
Fig. 6 is partial sectional view when steel tube charging device uses;
Fig. 7 is to embody the partial sectional view for being that limited block is dropped in accommodating groove.
In figure, 1, material loading platform;11st, limited block;12nd, the 3rd cylinder;13rd, accommodating groove;2nd, glidepath;3rd, striker plate; 31st, sliding assembly;311st, chute;312nd, sliding block;32nd, fixation kit;321st, fixed plate;322nd, fixing bolt;33rd, cushion pad; 331st, demounting bolt;4th, the first runner assembly;41st, the first rotary shaft;42nd, the first rotation hole;5th, the first cylinder;6th, check plate; 61st, stop surface;7th, the second turning discreteness;71st, the second rotary shaft;72nd, the second rotation hole;8th, the second cylinder;9th, steel pipe transmission is set It is standby;91st, steel pipe.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.Wherein identical parts identical accompanying drawing Mark represents.It should be noted that the word "front", "rear", "left", "right", the "up" and "down" that are used below in description refer to It is the direction in accompanying drawing, word " bottom surface " and " top surface ", " interior " and " outer " are referred respectively to towards or away from particular elements geometry The direction at center.
A kind of feeding device of steel pipe 91, as shown in figure 1, as shown in figure 1, including placing material loading platform 1 on the ground, on Material platform 1 is overall to be rectangle, and the upper surface of material loading platform 1 is horizontal, during placing steel tubes 91, the bottom of steel pipe 91 and material loading platform 1 upper surface abuts, and the axial direction of steel pipe 91 is parallel with the width of material loading platform 1.
With reference to Fig. 6 and Fig. 7, accommodating groove 13 is offered on material loading platform 1, close to the side of length direction termination, is stored Limited block 11 is provided with groove 13, the section of limited block 11 is substantially in isosceles triangle shape, its base and the upper table of material loading platform 1 Face is parallel, and two relative waist is in the arc structure that caves inward so that the just steel pipe 91 adjacent with two of limited block 11 Between gap be adapted.
Linear telescopic component is provided between limited block 11 and material loading platform 1, including the feeding that is arranged on of general vertical is put down The 3rd cylinder 12 on platform 1, the top of the 3rd cylinder 12 and material loading platform 1 are affixed, and the external part of the 3rd cylinder 12 stretches to hand It is affixed with the bottom of limited block 11 in accommodating groove 13.Limited block 11 just stretches into two adjacent steel pipes 91 when 3rd cylinder 12 extends Between, when the 3rd cylinder 12 shortens, drive limited block 11 to drop in accommodating groove 13, the top of limited block 11 is less than material loading platform 1 Upper surface.
As shown in figures 1 and 3, check plate 6 is provided with material loading platform 1, check plate 6 is located at limited block 11 away from feeding The side at the center of platform 1.The top of check plate 6 is provided with smooth stop surface 61.It is provided between check plate 6 and material loading platform 1 First runner assembly 4, the first runner assembly 4 include first rotary shaft 41 affixed with check plate 6, opened up on material loading platform 1 Have the first rotation hole 42 being adapted with the first rotary shaft 41, the axis of the first rotation hole 42 and the second rotation hole 72 overlap and with The width of material loading platform 1 is parallel.First rotary shaft 41 is inserted in the first rotation hole 42, can be driven and the first rotary shaft 41 Affixed check plate 6 rotates around the axis of the first rotary shaft 41.
The second drive component is provided between check plate 6 and material loading platform 1, the second drive component includes being arranged on check plate 6 and second the second cylinder 8 between drive component, the axis general vertical of the second cylinder 8 set, the bottom of the second cylinder 8 with Material loading platform 1 is rotatablely connected, and is connected at the top of the external part of the second cylinder 8 with the lower rotation of check plate 6, and the second cylinder 8 is with stopping It is located at side of the check plate 6 away from the second turning discreteness 7 at the dynamic rotation connection of plate 6 so that check plate 6 there can be longer turn Kinetic moment.Second cylinder 8, which extends, jacks up check plate 6 so that check plate 6 rotates around the axis of the second rotary shaft 71, stop The side that plate 6 is connected with the second cylinder 8 rises and the upper surface of protrusion material loading platform 1, stop surface 61 are obliquely installed, stop surface 61 One end is higher than the upper surface of material loading platform 1, and the other end of stop surface 61 is less than the upper surface of material loading platform 1.Leaned on positioned at check plate 6 The blocking due to stop surface 61 of steel pipe 91 of the nearly center side of material loading platform 1, the side of check plate 6 can not be set from material loading platform 1 Edge leaves material loading platform 1.When second cylinder 8 shortens, check plate 6 is driven to decline, axis of the check plate 6 around the second rotary shaft 71 Rotate, until driving stop surface 61 horizontal and being not higher than the upper surface of material loading platform 1.Now because check plate 6 does not play screening Gear acts on, and steel pipe 91 can set the edge of check plate 6 to leave material loading platform 1 from material loading platform 1 in the presence of other external force.
As shown in Figure 3 and Figure 5, it is provided with the side of the setting striker plate 3 of material loading platform 1 under being connected with material loading platform 1 Rail 2,2 inclined setting of glidepath, its higher one end flushed with the height of material loading platform 1 and with material loading platform 1 it Between the first runner assembly 4 is set.First runner assembly 4 includes first rotary shaft 41 affixed with material loading platform 1, in glidepath The first rotation hole 42 being adapted with the first rotary shaft 41 is offered on 2, the first rotary shaft 41 is inserted in the first rotation hole 42, energy Enough so that with feeding track relative rotation occurs for blanking slideway.
With reference to Fig. 2, striker plate 3 is provided with the one end of glidepath 2 away from material loading platform 1, the bottom of striker plate 3 is with Rail 2 is connected by sliding assembly 31 and fixation kit 32, and the top of striker plate 3 is to the side away from the center of material loading platform 1 Tilt, in open state.Cushion pad 33 is equipped with close to the side at the center of material loading platform 1 in striker plate 3, cushion pad 33 is by with slow The material for rushing characteristic is made, such as rubber.It is provided between cushion pad 33 and striker plate 3 and is detachably fixed connector, including is set The demounting bolt 331 at 33 4 jiaos of cushion pad is put, demounting bolt 331 is dormant bolt, and the top of dormant bolt is less than buffering The surface of pad 33.
Sliding assembly 31 includes the chute 311 being installed on glidepath 2, length direction and the glidepath 2 of chute 311 Length direction it is parallel, the section of chute 311 is in dovetail shaped.Sliding is connected with sliding block 312, sliding block 312 and gear in chute 311 The bottom of flitch 3 is affixed.
Fixation kit 32 includes the fixed plate 321 affixed with sliding block 312, and fixed plate 321 is located at sliding block 312 and put down away from feeding The side of platform 1, is threaded with fixing bolt 322 in fixed plate 321, and the termination of fixing bolt 322 is stretched into chute 311 simultaneously Abutted with chute 311.When fixing bolt 322 is tightened, sliding block 312 is fixed in chute 311.Pass through sliding assembly 31 and fixed group The cooperation of part 32, stop position of the regulation striker plate 3 on glidepath 2, when the diameter difference of steel pipe 91 or needs to place , can be by adjusting the position of striker plate 3 so that steel pipe 91 stops at corresponding position when there is slight change the position of steel pipe 91.
Wherein, some steel pipes 91 are concentrated placement to be laid on the upper surface of material loading platform 1 by worker, and the second cylinder 8 drives Check plate 6 is rotated by the second turning discreteness 7 so that check plate 6 rise to protrusion material loading platform 1 upper surface, steel pipe 91 with Check plate 6 abuts, and is stopped plate 6 and stops, can not slide and go to glidepath 2.3rd cylinder 12 extends, and driving limited block 11 rises Between the steel pipe 91 adjacent to two, abutted positioned at the side of steel pipe 91 of the length direction of material loading platform 1 most termination with stop surface 61, Opposite side abuts with limited block 11.
When needing to 91 feeding of steel pipe, the first cylinder 5 driving glidepath 2 is rotated by the first runner assembly 4, glidepath Road 2 rises so that glidepath 2 is higher than the height at 91 place to be placed of steel pipe.Then the second cylinder 8 driving check plate 6 passes through the Two runner assemblies 7 rotate so that check plate 6 drops to the upper surface of non-bulging material loading platform 1, and worker is placed on limited block 11 The applying power of steel pipe 91 of side away from the center of material loading platform 1 so that steel pipe 91 is moved to downslide from the upper surface of material loading platform 1 Track 2, and it is moved to along inclined glidepath 2 lower section of glidepath 2.Check plate 6 rises, and then causes limited block 11 Decline, after a steel pipe 91 is moved between check plate 6 and limited block 11, limited block 11 is risen.Check plate 6 stops and is located at On the whereabouts glidepath 2 of steel pipe 91 between check plate 6 and limited block 11.Striker plate 3, which can play, prevents steel pipe 91 from upper cunning The effect that track skids off so that steel pipe 91 is stable to be placed on glidepath 2.First cylinder 5 drives glidepath 2 by the One runner assembly 4 rotates, and glidepath 2 declines, and with the decline of glidepath 2, drives the steel pipe being placed on glidepath 2 91 decline, until the bottom wall of steel pipe 91 abuts with 91 place to be placed of steel pipe, steel pipe 91 will not continue to decline, and glidepath 2 continues Decline, glidepath 2 separates with steel pipe 91.Glidepath 2 is no longer played a supporting role to steel pipe 91, the stable placement of steel pipe 91 At 91 place to be placed of steel pipe.Be placed on place to be placed steel pipe 91 be transported away after, glidepath 2 rises to original position, such as This is reciprocal, completes the feeding work of steel pipe 91, reaches the effect for saving manpower.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.

Claims (10)

1. a kind of steel pipe (91) feeding device, including material loading platform (1), it is characterised in that:Set in the side of material loading platform (1) There is inclined glidepath (2), termination of the glidepath (2) away from material loading platform (1) is provided with striker plate (3), glidepath (2) the first runner assembly (4) is provided between material loading platform (1), glidepath (2) is connected with the first drive of its rotation of driving Dynamic component, the side of glidepath (2) is provided with check plate (6), check plate (6) and material loading platform in material loading platform (1) (1) the second turning discreteness (7) is provided between, the second turning discreteness (7) is rotated such that check plate (6) is convex for check plate (6) Go out the upper surface of material loading platform (1), driving check plate (6) rotates second is provided between check plate (6) and material loading platform (1) Drive component, the first runner assembly (4) are parallel with the pivot center of the second turning discreteness (7).
2. steel pipe (91) feeding device according to claim 1, it is characterised in that:Striker plate (3) top is to remote The side of material loading platform (1) tilts.
3. steel pipe (91) feeding device according to claim 1, it is characterised in that:The striker plate (3) and glidepath (2) sliding assembly (31) is provided between, sliding assembly (31) is remote or close to material loading platform (1) for striker plate (3), sliding Component (31) connects the fixation kit (32) of restricted striker plate (3) sliding.
4. steel pipe (91) feeding device according to claim 3, it is characterised in that:The sliding assembly (31) includes opening up Chute (311) on glidepath (2), the interior sliding of chute (311) are connected with sliding block (312), sliding block (312) and striker plate (3) it is affixed.
5. steel pipe (91) feeding device according to claim 3, it is characterised in that:The fixation kit (32) includes and cunning The affixed fixed plate (321) of block (312), fixing bolt (322) is threaded with fixed plate (321), fixing bolt (322) Termination abuts with chute (311).
6. steel pipe (91) feeding device according to claim 1, it is characterised in that:The striker plate (3) is put down close to feeding The side of platform (1) is provided with cushion pad (33).
7. steel pipe (91) feeding device according to claim 6, it is characterised in that:The cushion pad (33) and striker plate (3) it is provided between and is detachably fixed connector.
8. steel pipe (91) feeding device according to claim 7, it is characterised in that:The connector that is detachably fixed includes The demounting bolt (331) that cushion pad (33) is threadedly coupled with striker plate (3), demounting bolt (331) are dormant bolt.
9. steel pipe (91) feeding device according to claim 1, it is characterised in that:The material loading platform (1) sets limited Position block (11), is provided with linear telescopic component between limited block (11) and material loading platform (1), linear telescopic component drives limited block (11) risen or fallen along vertical direction, when limited block (11) rises, rise to the steel pipe (91) that is abutted with check plate (6) Side away from check plate (6).
10. steel pipe (91) feeding device according to claim 9, it is characterised in that:The limited block (11) is adjacent with two Gap between steel pipe (91) is adapted.
CN201720625581.7U 2017-05-31 2017-05-31 Steel tube charging device Expired - Fee Related CN206898869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720625581.7U CN206898869U (en) 2017-05-31 2017-05-31 Steel tube charging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720625581.7U CN206898869U (en) 2017-05-31 2017-05-31 Steel tube charging device

Publications (1)

Publication Number Publication Date
CN206898869U true CN206898869U (en) 2018-01-19

Family

ID=61286621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720625581.7U Expired - Fee Related CN206898869U (en) 2017-05-31 2017-05-31 Steel tube charging device

Country Status (1)

Country Link
CN (1) CN206898869U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108820951A (en) * 2018-05-08 2018-11-16 绩溪县众成精密机械有限公司 A kind of printer axle mills the feeding device of flat technique
CN109746480A (en) * 2019-03-19 2019-05-14 南昌联达机械有限公司 Flywheel bores telltale hole special plane
CN111038938A (en) * 2018-10-12 2020-04-21 中国石油化工股份有限公司 Single pipe rod transfer device and method
CN111531221A (en) * 2020-05-12 2020-08-14 无锡市竞杰物联网科技有限公司 Silicon steel cutting machine
CN116475579A (en) * 2023-06-26 2023-07-25 中数智科(杭州)科技有限公司 Wheel is to surface laser paint removal device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108820951A (en) * 2018-05-08 2018-11-16 绩溪县众成精密机械有限公司 A kind of printer axle mills the feeding device of flat technique
CN111038938A (en) * 2018-10-12 2020-04-21 中国石油化工股份有限公司 Single pipe rod transfer device and method
CN109746480A (en) * 2019-03-19 2019-05-14 南昌联达机械有限公司 Flywheel bores telltale hole special plane
CN111531221A (en) * 2020-05-12 2020-08-14 无锡市竞杰物联网科技有限公司 Silicon steel cutting machine
CN116475579A (en) * 2023-06-26 2023-07-25 中数智科(杭州)科技有限公司 Wheel is to surface laser paint removal device
CN116475579B (en) * 2023-06-26 2023-09-26 中数智科(杭州)科技有限公司 Wheel is to surface laser paint removal device

Similar Documents

Publication Publication Date Title
CN206898869U (en) Steel tube charging device
CN108480961A (en) Double mode wheel pin demountor
CN206203444U (en) Pull grain-pushing equipment
CN209651787U (en) A kind of adjustable gantry lifting machine of support arm
CN114084583A (en) Coal mine electromechanical transportation transmission equipment with horizontal adjustment function
CN202707078U (en) Ejection support and wet spray machine
CN112875581B (en) Laborsaving removal municipal administration device for well lid
CN207770752U (en) A kind of automation riveting device of chain
CN108750636B (en) Colliery turning conveyor
CN101543851B (en) Steel belt straightening machine
CN203946452U (en) A kind of breaking dredging machine with shock attenuation unit
CN208932365U (en) A kind of screw elevator
CN110125453A (en) A kind of smallpox plate drilling device fixed for ceiling triangulation location
CN206625625U (en) A kind of rotary drive mechanism of revolving stage
CN214494448U (en) Pipeline transportation device for petroleum exploitation
CN205204019U (en) Cable duct reaches scraper conveyor including this cable duct
CN217482166U (en) Pipeline positioning device for gas engineering
CN216514948U (en) Road surface drainage ditch for ultrahigh road section of high expressway
CN108372595A (en) A kind of wall drilling equipment with Fast Fixed-point
CN214838929U (en) Protection device for high-pressure water pipe
CN217439145U (en) Automatic dredging device for water supply and drainage system
CN220011142U (en) Slag removal device for TBM construction
CN216179032U (en) Grinding device for pipe bending
CN211598742U (en) Colliery PVC pipe automatic feeding device
CN218550807U (en) Retaining wall slope storage structure for mine ecological restoration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180119

Termination date: 20210531

CF01 Termination of patent right due to non-payment of annual fee