CN206897162U - A kind of new blow-off pipe for wet desulfurization system - Google Patents
A kind of new blow-off pipe for wet desulfurization system Download PDFInfo
- Publication number
- CN206897162U CN206897162U CN201720596673.7U CN201720596673U CN206897162U CN 206897162 U CN206897162 U CN 206897162U CN 201720596673 U CN201720596673 U CN 201720596673U CN 206897162 U CN206897162 U CN 206897162U
- Authority
- CN
- China
- Prior art keywords
- pipe
- hollow
- bolt
- desulfurization system
- wet desulfurization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Cleaning In General (AREA)
Abstract
The utility model provides a kind of new blow-off pipe for wet desulfurization system, including:One rubber-lined pipe, the slurries delivery pipe of wet desulfurization system is connected to, which is provided with a bulge-structure, the bulge-structure is provided with the through hole connected with rubber-lined pipe, and a hollow bolt is detachably connected by the through hole;The hollow bolt contains one and is located at center and both ends insertion hollow-core construction, and a solid bolt is detachably connected by the hollow-core construction;One transparent lucite tube, it is connected with rubber-lined pipe by a flange, a blowoff valve is provided with the flange connections.This new blow-off pipe visualization, easily dredging, alleviates the easy blockage problem of blow-off pipe, considerably increases the reliability that slurries conveyance conduit uses, simple operation, safeguards simple.
Description
Technical field
It the utility model is related to a kind of blow-off pipe, and in particular to a kind of easy dredging, visualization for wet desulfurization system
New blow-off pipe.
Background technology
Coal is the main energy sources in China, and by the end of the year 2015, thermoelectricity installed capacity in the whole nation will have reached 9.5 hundred million kilowatts, account for electricity
The 68% of power installation total amount, and in the following quite a long time, supply of electric power general layout of the China based on coal fired power generation
Basic change will not occur.Coal-burning power plant is the important emission source of various pollutants in China's air simultaneously, according to statistics, about
90% SO2, 67% NOXSource of Dust with 70% is in coal fired power generation.With increasingly raising of the people to environmental requirement, pin
To the increasingly strict of coal-burning power plant's pollutant emission, it is proposed that thermal power generation minimum discharge standard.Gypsum Wet flue gas
Desulfurization (WFGD) technology is used as presently the most effective coal unit SO2Emission control technique, there is desulfuration efficiency height, operation phase
To it is reliable, good to coal adaptability the features such as, be widely used in coal fired power plant flue gas desulfurization.
Many slurries conveyance conduits, including slurry circulating pump pipeline, limestone slurry liquid pump in wet desulfurization system be present
Pipeline, gypsum excavationg pump pipeline, filtrate water pump pipeline etc., these pipelines are used to convey accordingly in desulphurization system running
Slurries, then need during stoppage in transit to empty remaining slurries in pipeline, and it is using process water that pipe flushing is clean, to prevent slurries from conveying
Pipeline scale blocks influence system normal operation.But there is following major defect in existing blow-off pipe:
1) blow-off pipe is opaque.Because pit-hole existing for regulation field ground must be spread in wet desulfurization system safety code
If the firm cover plate flushed with ground, to prevent occurring personnel's fallen accident, therefore blow-off pipe go to the low-lying place of melt pit use it is firm
Cover plate covers.When needing to empty in slurries in pipeline after slurries delivery pipe deactivation, due to the opaque design of blow-off pipe, cause not
Be easy to observe blow-off pipe whether excessively stream.Simultaneously when being rinsed emptying to pipeline, it is also not susceptible to observe whether excessively stream is clear stream
To judge whether pipe flushing is thorough.
2) blowdown blockage is not easily cleaned.Because what is conveyed in wet desulfurization system pipeline is that limestone-gypsum mixes mostly
Slurries are closed, the slurries have the characteristic of easily accumulation precipitation, and the blow-off pipe of each slurries conveyance conduit is generally in relative low level
Put, cause blow-off line easily to block.If being not easily cleaned after blowdown blockage, may influence the normal of slurries conveyance conduit makes
With so as to run generation interference to whole desulphurization system.
3) it is not easy to be sampled analysis to slurries in pipeline.At present during sampling, there are two kinds of sampling methods mostly, first,
Slurry tank designs special sample tap, while sets up flushing water to ensure that sampling pipe is unobstructed;Second, blowoff valve is opened, and adjust
Blowdown valve opening is saved, sampling bottle then is placed in into the blow-off pipe mouth of pipe is sampled.Both sampling methods, otherwise design is multiple
It is miscellaneous, increase construction cost, or operation is complex, potential safety hazard be present.
Utility model content
To overcome prior art shortcoming, the utility model provides a kind of new blow-off pipe for wet desulfurization system, can
Depending on change, easily dredging, alleviate the easy blockage problem of blow-off pipe, considerably increase the reliability that slurries conveyance conduit uses, simple operation,
Safeguard simple.
In order to solve the above technical problems, the utility model adopts the following technical scheme that:
A kind of new blow-off pipe for wet desulfurization system, including:
One rubber-lined pipe, the slurries delivery pipe of wet desulfurization system is connected to, which is provided with a bulge-structure, the bulge-structure
The through hole connected with rubber-lined pipe is provided with, a hollow bolt is detachably connected by the through hole;The hollow bolt contains one and is located at
Center and both ends insertion hollow-core construction, a solid bolt is detachably connected by the hollow-core construction;
One transparent lucite tube, it is connected with rubber-lined pipe by a flange, a blowoff valve is provided with the flange connections.
Further, rubber-lined pipe includes a stainless steel tube, and one layer of elastomeric material is lined with the stainless steel inside pipe wall.
Further, the stainless steel tube of rubber-lined pipe welds with slurries delivery pipe.
Further, the through-hole wall of bulge-structure contains the screw thread being engaged with the screw thread of hollow bolt, bulge-structure
It is threadedly coupled with hollow bolt.
Further, the hollow-core construction inwall of hollow bolt contains the screw thread being engaged with the screw thread of solid bolt, hollow
Bolt is connected with solid bolt thread.
Further, blowoff valve is handle type butterfly valve.
Further, bulge-structure, hollow bolt and solid bolt are stainless steel material.
The beneficial effects of the utility model are:
1st, blow-off pipe overcurrent condition can be directly observed through transparent lucite tube, judges whether blow-off pipe blocks, together
When using flushing water heel row space-time is rinsed to slurries delivery pipe, by observing lucite tube current clean-up performance and pipe
The clean level of wall, you can judge whether slurries delivery pipe rinses thoroughly.
2nd, rotation hollow bolt brings it about displacement, passes in and out inside rubber-lined pipe, the deposition obturator that can be cleared up in blow-off pipe,
Reach the effect easily dredged, while periodically rotate hollow bolt to slow down blow-off pipe blockage problem.
3rd, slurries can be flowed out by the hollow-core construction of hollow bolt, conveniently be sampled detection.
4th, hollow bolt and solid bolt are detachable, are easy to cleaning and change.
Brief description of the drawings
Fig. 1 is a kind of overall structure diagram of new blow-off pipe of embodiment.
Fig. 2 is the front view of hollow bolt and solid bolt.
Fig. 3 is Fig. 2 right view.
In figure:1- slurries delivery pipes, 2- rubber-lined pipes, 3- lucite tubes, 4- blowoff valves, 5- flanges, 6- bulge-structures, 7-
Hollow bolt, the solid bolts of 8-, 9- hollow bolt screw rods, the solid bolt screw rods of 10-, 11- screw threads, 12- hollow-core constructions, 13- are real
Heart bolt handle, 14- hollow bolt handles.
Embodiment
To enable features described above and advantage of the present utility model to become apparent, special embodiment below, and appended by cooperation
Figure is described in detail below.
The present embodiment discloses a kind of new blow-off pipe for wet desulfurization system, as shown in Figure 1, Figure 2 and Figure 3, including:
Connect rubber-lined pipe 2, lucite tube 3, blowoff valve 4, flange 5, bulge-structure 6, hollow bolt 7, the solid spiral shell of slurries delivery pipe 1
Bolt 8, hollow bolt screw rod 9, solid bolt screw rod 10, screw thread 11, hollow-core construction 12, solid bolt handle 13 and hollow bolt hand
Handle 14.
Slurries delivery pipe 1 is the conveying main body of system slurry pipeline, is connected with rubber-lined pipe 2, and the outer layer of rubber-lined pipe 2 is stainless
Steel pipe, welded with slurries delivery pipe 1, stainless steel inside pipe wall is lined with one layer of elastomeric material, and stainless steel tube can be protected from corrosion.Lining
Sebific duct 2 and lucite tube 3 are connected by flange 5, and blowoff valve 4 is located at the junction of flange 5, and the blowoff valve 4 uses handle type
Butterfly valve, whole blow-off pipe agent structure is collectively constituted, blow-off pipe excessively stream feelings can be directly observed through transparent lucite tube 3
Condition, judges whether blow-off pipe blocks.Emptied be rinsed using flushing water to slurries delivery pipe 1 simultaneously after, it is organic by observing
The current clean level of glass tube 3 and tube wall clean-up performance, you can judge whether slurries delivery pipe 1 rinses thoroughly.
Rubber-lined pipe 2 is provided with a bulge-structure 6, and it contains a through hole, and the through hole connects with rubber-lined pipe 2, and bulge-structure 6 is logical
Hole inwall is provided with the screw thread 11 (left side screw thread in Fig. 2) being engaged with the screw thread of hollow bolt 7, and hollow spiral shell is installed in the through hole
Bolt 7, rotating hollow bolt handle 14 makes hollow bolt screw rod 9 pass in and out blow-off pipe, can loosen deposit in blow-off pipe, make blow-off pipe
Blockage problem is handled, simple to operate.
The center of hollow bolt 7 is hollow-core construction 12, and both ends penetrate, and inwall is provided with and is engaged with the screw thread of solid bolt 8
Screw thread 11 (in Fig. 2 the right screw thread), rotating solid bolt handle 13 makes solid bolt screw rod 10 come in and go out the hollow of hollow bolt 7
Structure 12, you can realize the region excessively stream of hollow-core construction 12, slurries are sampled with monitoring analysis so as to convenient.Meanwhile hollow spiral shell
Bolt 7 and solid bolt 8 convenient cleaning, add being applicable for this new blow-off pipe due to using being threadedly coupled, can freely dismantle
Property and reliability.Bulge-structure 6, hollow bolt 7 and solid bolt 8 are stainless steel material, can prevent slurry erosion, and extension makes
Use the life-span.
Claims (7)
- A kind of 1. new blow-off pipe for wet desulfurization system, it is characterised in that including:One rubber-lined pipe, the slurries delivery pipe of wet desulfurization system is connected to, which is provided with a bulge-structure, the bulge-structure is provided with The through hole connected with rubber-lined pipe, a hollow bolt is detachably connected by the through hole;The hollow bolt contains one and is located at center And both ends insertion hollow-core construction, a solid bolt is detachably connected by the hollow-core construction;One transparent lucite tube, it is connected with rubber-lined pipe by a flange, a blowoff valve is provided with the flange connections.
- 2. a kind of new blow-off pipe for wet desulfurization system according to claim 1, it is characterised in that rubber-lined pipe includes One stainless steel tube, one layer of elastomeric material is lined with the stainless steel inside pipe wall.
- 3. a kind of new blow-off pipe for wet desulfurization system according to claim 2, it is characterised in that rubber-lined pipe is not The steel pipe that becomes rusty welds with slurries delivery pipe.
- 4. a kind of new blow-off pipe for wet desulfurization system according to claim 1, it is characterised in that bulge-structure Through-hole wall contains the screw thread being engaged with the screw thread of hollow bolt, and bulge-structure is threadedly coupled with hollow bolt.
- 5. a kind of new blow-off pipe for wet desulfurization system according to claim 1, it is characterised in that hollow bolt Hollow-core construction inwall contains the screw thread being engaged with the screw thread of solid bolt, and hollow bolt is connected with solid bolt thread.
- 6. a kind of new blow-off pipe for wet desulfurization system according to claim 1, it is characterised in that blowoff valve is hand Shank type butterfly valve.
- A kind of 7. new blow-off pipe for wet desulfurization system according to claim 1, it is characterised in that bulge-structure, Hollow bolt and solid bolt are stainless steel material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720596673.7U CN206897162U (en) | 2017-05-25 | 2017-05-25 | A kind of new blow-off pipe for wet desulfurization system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720596673.7U CN206897162U (en) | 2017-05-25 | 2017-05-25 | A kind of new blow-off pipe for wet desulfurization system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206897162U true CN206897162U (en) | 2018-01-19 |
Family
ID=61288332
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720596673.7U Active CN206897162U (en) | 2017-05-25 | 2017-05-25 | A kind of new blow-off pipe for wet desulfurization system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206897162U (en) |
-
2017
- 2017-05-25 CN CN201720596673.7U patent/CN206897162U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202418740U (en) | Improved water seal system for torch gas | |
CN206897162U (en) | A kind of new blow-off pipe for wet desulfurization system | |
CN108223850A (en) | A kind of water seal back purge system and water seal arrangement | |
CN213300187U (en) | Heating pipeline with filter equipment | |
CN102351081B (en) | Mutual recovery device and method of cement silos | |
CN216381489U (en) | Coal mine gas extraction pipeline cleaning device | |
CN215138225U (en) | Efficient sand remover for reclaimed water and surface water | |
CN203417497U (en) | Peripheral transmission-type scraping suction dredge | |
CN208042871U (en) | A kind of efficient primary cooler of automatically cleaning | |
CN207755844U (en) | A kind of through type back-washing dirt separator | |
CN219011418U (en) | Bending communicating vessel for municipal sewage pipeline | |
CN201992141U (en) | Clean-free gas cut-off device | |
CN209856786U (en) | Device for preventing blockage of gas dehydrator | |
CN217411106U (en) | Novel ash discharging and slag flushing barrel | |
CN220918556U (en) | Automatic flushing and draining device for organic matter aerobic fermentation waste gas collecting pipe | |
CN211329261U (en) | Mine stirring device capable of discharging slag at any time | |
CN110078152A (en) | A kind of sewage treatment air flotation machine revolves type Residue extraction pipeline equipment | |
CN209464849U (en) | A kind of Novel anti-blockage system of desulfuration absorbing tower entrance original flue | |
CN209820251U (en) | Supercritical boiler high-temperature oxide skin cleaning system | |
CN215332870U (en) | Shield constructs takeover abandonment mud collection device | |
CN208535580U (en) | A kind of gas piping dehydrator pipe-blocking-proof | |
CN205939177U (en) | Water -drain mast line knot constructs | |
CN209701800U (en) | Differential pressure type economizer fly ash carry device | |
CN209130504U (en) | Anti-blocking condensate drain device | |
CN209327267U (en) | A kind of protection of desulfurization slurry PH meter and on-line rinsing detection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |