CN206897141U - A kind of pulse generating unit for gas cleaning - Google Patents

A kind of pulse generating unit for gas cleaning Download PDF

Info

Publication number
CN206897141U
CN206897141U CN201720739122.1U CN201720739122U CN206897141U CN 206897141 U CN206897141 U CN 206897141U CN 201720739122 U CN201720739122 U CN 201720739122U CN 206897141 U CN206897141 U CN 206897141U
Authority
CN
China
Prior art keywords
pulse
generating unit
energy
pulse generating
insulator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720739122.1U
Other languages
Chinese (zh)
Inventor
孔春林
任燕
刘杰
赵雄威
杜佳棋
徐斌
丁泽坤
周方圆
张卫杰
马建中
卢星宇
龚金花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU TEAMS ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd
Original Assignee
HANGZHOU TEAMS ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU TEAMS ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd filed Critical HANGZHOU TEAMS ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd
Priority to CN201720739122.1U priority Critical patent/CN206897141U/en
Application granted granted Critical
Publication of CN206897141U publication Critical patent/CN206897141U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Plasma Technology (AREA)
  • Generation Of Surge Voltage And Current (AREA)

Abstract

The utility model provides a kind of pulse generating unit for gas cleaning, on the one hand the device improves the technical scheme that traditional pulse generating means sets pulse power insulator and discharge electrode insulator respectively, directly the pulse power is connected with discharge electrode with an insulator, so as to reduce the inductance of cable length and loop, rising edge of a pulse is diminished, improve the efficiency that unit of electrical energy produces plasma;On the other hand by using tandem high pressure switches set, the voltage of primary pulse is added, so as to reduce the no-load voltage ratio of pulse transformer, improves the efficiency of pulse transformer;Gas cleaning is used it for improve gas cleaning efficiency on the basis of energy consumption is reduced, meet environmental requirement.Flue gas pollutant concentration of emission can be reduced to test result indicates that pulse generating unit provided by the utility model is used for gas cleaning:SO2 35mg/m3, NOx 50mg/m3, dust 5mg/m3;And 38KV, energy-conservation 24% are reduced to by 50KW compared to traditional pulse generating means power consumption.

Description

A kind of pulse generating unit for gas cleaning
Technical field
Atmosphere pollution Treatment process field is the utility model is related to, is to be related to that a kind of to be used for flue gas net more specifically The pulse generating unit of change.
Background technology
In recent years, with the getting worse of China's environmental problem, the environmental protection standard in China also get over by more and more higher, environmental protection policy Come stricter.Such as《Fossil-fuel power plant atmospheric pollutant emission standard (GB 13223-2011)》Define the thermal power generation of key area The flue gas pollutant concentration of emission limit value of factory is:SO2 50mg/m3, NOx100mg/m3, dust 20mg/m3;And National Development and Reform Committee, Chinese Ministry of Environmental Protection, National Energy Board combined what is printed and distributed in 2014《The energy-saving and emission-reduction of coal electricity upgrade and transformation action plan (2014-2020 Year)》, the flue gas pollutant concentration of emission limit value in the thermal power plant of some areas is entered one and is reduced to:SO2 35mg/m3, NOx50mg/m3, dust 10mg/m3.In addition, the provincial standard more tightened up than national standard, such as Shanxi have also been put into effect in some provinces General office of provincial people's government《On promoting the implementation guideline of the whole province's Thermal generation unit minimum discharge》, the firepower of Shanxi Province is sent out The flue gas pollutant concentration of emission limit value of power plant enters one and is reduced to:SO2 35mg/m3, NOx50mg/m3, dust 5mg/m3.And And issued according in November, 2016《Control pollutant emission licence system embodiment》, the discharge implementation total amount control of pollutant System, it is meant that under certain condition, the concentration of emission of pollutant will further decrease.Therefore, skill is administered for atmosphere pollution For art, it is badly in need of Innovation & environment technology.
At present, pulsed plasma flue gases purification as it is a kind of it is novel, can realize multiple pollutant integration The atmosphere pollution Treatment process of removing, by researcher's extensive concern.The technology be using wait caused by gas discharge from Daughter chemically reacts produce pollutant component, the method for generating innocuous substance.Specifically, gas discharge produces between electrode Raw plasma, the molecule of neutrality free radical is excited into, with H2Exemplified by O molecules, it is free that H and OH can be provoked into Base, these free radicals are by SO2Become H2SO4, NOxBecome HNO3, simple substance Hg becomes HgO etc.;Wherein, H2SO4And HNO3One can be entered Step is with adding the NH in reactor3Gas changes into ammonium sulfate and ammonium nitrate, and ammonium sulfate, ammonium nitrate and HgO are solids Matter, it can be collected in electrostatic field caused by gas discharge, so as to realize the purified treatment of flue gas.
But the key of the technology is to provide pulse voltage, it is necessary to using pulse generating unit, on the one hand due to commercially available Low-voltage semiconductor switch pressure voltage typically in 2000-3000V, therefore, use the arteries and veins of the pulse generating unit of single switch It is bigger to rush the change of transformer, typically more than 30, and the no-load voltage ratio of armature winding and secondary windings is big, and system inductance is big, pulse Forward position is delayed, so that reactor energy injection efficiency is low, energy consumption is big, and high energy consumption seriously constrains pulsed plasma flue gas one The development of body purification techniques, in the demonstration project of some early stages, power consumption is about the 2% of power plant generated energy, therefore, the skill Art occurred so far, not realizing large-scale engineer applied from 1986;It is used for gas cleaning in another aspect conventional art Pulse generating unit voltage waveform in, rising edge is too slow, cause unit of electrical energy produce plasma it is less efficient, so as to Constrain gas cleaning efficiency, it is impossible to meet increasingly strict flue gas pollutant emission concentration standard.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of pulse generating unit for gas cleaning, this reality Gas cleaning efficiency can be improved on the basis of energy consumption is reduced by being used for gas cleaning with the pulse generating unit of new offer, Meet environmental requirement.
The utility model provides a kind of pulse generating unit for gas cleaning, including:
Power supply fuel tank;
It is arranged on the pulse power of the power supply fuel tank internal;
The pulse power includes:
Energy-storage capacitor, the input of the energy-storage capacitor are connected with dc source;
The pulse transformer that input is connected with the output end of the energy-storage capacitor, the pulse transformer and energy storage electricity Tandem high pressure switches set and the first magnetic switch are in series between container;
The first magnetic compression capacitor that input is connected with the output end of the pulse transformer, the first magnetic compression electricity The output end of container is provided with the second magnetic switch;
The second magnetic compression capacitor that input is connected with the output end of the first magnetic compression capacitor, second magnetic The output end of compression capacitor is provided with the 3rd magnetic switch;
It is arranged on the insulator of the power supply tank bottoms;
The field case being connected with the insulator;
The discharge electrode being arranged on inside the field case, the input of the discharge electrode under the cladding of insulator with institute The output end for stating the second magnetic compression capacitor is connected.
Preferably, the oil in the power supply fuel tank carries out forced circulation by oil pump;It is described to carry out the oily of forced circulation Flow velocity is 0.5m/s~1.5m/s.
Preferably, the energy-storage capacitor is made up of the pulsed capacitance connection in series-parallel of multiple low inductance;
The voltage stabilization of the energy-storage capacitor is in 8KV~12KV.
Preferably, the pulse transformer is the pulse transformer with Fe-based amorphous alloy iron core.
Preferably, the tandem high pressure switches set is in series by multiple reverse-conducting transistors;The reverse-conducting is brilliant The number of body pipe is 5~20.
Preferably, it is provided with metal fin between two neighboring reverse-conducting transistor.
Preferably, first magnetic switch is iron based nano crystal magnetic switch.
Preferably, the conducting voltage of second magnetic switch is 80KV~120KV.
Preferably, the insulator draws insulator for the internal high pressure for being provided with electric heater unit;The insulator stretches into In field case.
The utility model provides a kind of pulse generating unit for gas cleaning, including:Power supply fuel tank;It is arranged on institute State the pulse power of power supply fuel tank internal;The pulse power includes:Energy-storage capacitor, the input of the energy-storage capacitor with Dc source is connected;The pulse transformer that input is connected with the output end of the energy-storage capacitor, the pulse transformer and Tandem high pressure switches set and the first magnetic switch are in series between energy-storage capacitor;The output end of input and the pulse transformer The first connected magnetic compression capacitor, the output end of the first magnetic compression capacitor are provided with the second magnetic switch;Input and institute State the second connected magnetic compression capacitor of the output end of the first magnetic compression capacitor, the output end of the second magnetic compression capacitor Provided with the 3rd magnetic switch;It is arranged on the insulator of the power supply tank bottoms;The field case being connected with the insulator;Set Discharge electrode inside the field case, the input of the discharge electrode under the cladding of insulator with second magnetic compression The output end of capacitor is connected.Compared with prior art, on the one hand pulse generating unit provided by the utility model improves biography System pulse generating unit sets the technical scheme of pulse power insulator and discharge electrode insulator respectively, directly with an insulator The pulse power is connected with discharge electrode, so as to reduce the inductance of cable length and loop, rising edge of a pulse is diminished, improves Unit of electrical energy produces the efficiency of plasma;On the other hand by using tandem high pressure switches set, the electricity of primary pulse is added Pressure, so as to reduce the no-load voltage ratio of pulse transformer, improves the efficiency of pulse transformer;It follows that arteries and veins provided by the utility model Generating means is rushed to improve gas cleaning efficiency on the basis of energy consumption is reduced, meet environmental requirement for gas cleaning.It is real Test result to show, pulse generating unit provided by the utility model, which is used for gas cleaning, to drop flue gas pollutant concentration of emission It is low to arrive:SO2 35mg/m3, NOx50mg/m3, dust 5mg/m3;And reduced compared to traditional pulse generating means power consumption by 50KW To 38KV, energy-conservation 24%.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is embodiment of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, also Other accompanying drawings can be obtained according to the accompanying drawing of offer.
Fig. 1 is the structural representation for the pulse generating unit for gas cleaning that the utility model embodiment provides;
Fig. 2 is the structural representation for the pulse generating unit for gas cleaning that comparative example provides.
Embodiment
Below in conjunction with the utility model embodiment, the technical solution of the utility model is clearly and completely described, Obviously, described embodiment is only the utility model part of the embodiment, rather than whole embodiments.Based on this practicality Embodiment in new, the every other reality that those of ordinary skill in the art are obtained under the premise of creative work is not made Example is applied, belongs to the scope of the utility model protection.
The utility model provides a kind of pulse generating unit for gas cleaning, including:
Power supply fuel tank;
It is arranged on the pulse power of the power supply fuel tank internal;
The pulse power includes:
Energy-storage capacitor, the input of the energy-storage capacitor are connected with dc source;
The pulse transformer that input is connected with the output end of the energy-storage capacitor, the pulse transformer and energy storage electricity Tandem high pressure switches set and the first magnetic switch are in series between container;
The first magnetic compression capacitor that input is connected with the output end of the pulse transformer, the first magnetic compression electricity The output end of container is provided with the second magnetic switch;
The second magnetic compression capacitor that input is connected with the output end of the first magnetic compression capacitor, second magnetic The output end of compression capacitor is provided with the 3rd magnetic switch;
It is arranged on the insulator of the power supply tank bottoms;
The field case being connected with the insulator;
The discharge electrode being arranged on inside the field case, the input of the discharge electrode under the cladding of insulator with institute The output end for stating the second magnetic compression capacitor is connected.
Fig. 1 is referred to, Fig. 1 is the structure for the pulse generating unit for gas cleaning that the utility model embodiment provides Schematic diagram, wherein, 1 is power supply fuel tank, and 2 be energy-storage capacitor, and 3 be pulse transformer, and 4 be tandem high pressure switches set, and 5 be One magnetic switch, 6 be the first magnetic compression capacitor, and 7 be the second magnetic switch, and 8 be the second magnetic compression capacitor, and 9 be the 3rd magnetic switch, 10 be insulator, and 11 be field case, and 12 be discharge electrode.
In the utility model, the pulse generating unit for gas cleaning includes power supply fuel tank (1), pulse electricity Source, insulator (10), field case (11) and discharge electrode (12).In the utility model, it is filled with the power supply fuel tank (1) The oil of cooling, it can make the pulse power that there is preferable heat endurance;To the energy-storage capacitor (2) in the pulse power, first Magnetic compression capacitor (6) and the second magnetic compression capacitor (8), the utility model are real by being placed in power supply fuel tank (1) Cooled down now in oil, so as to improve heat-sinking capability, improve reliability;And to the tandem high pressure switches set (4) in the pulse power, arteries and veins The larger component of the caloric value such as transformer (3) is rushed, the utility model is set by carrying out water conservancy diversion to oil stream road in power supply fuel tank (1) Meter, limit cooling oil and circulating cooling is carried out under certain flow rate, ensure its normal work.In the utility model, the electricity Oil in source fuel tank (1) preferably carries out forced circulation by oil pump;The oily flow velocity for carrying out forced circulation is preferably 0.5m/ S~1.5m/s, more preferably 1m/s.
In the utility model, the pulse power is arranged on power supply fuel tank (1) inside, is used for gas cleaning for producing Pulse voltage.In the utility model, the pulse power includes:
Energy-storage capacitor (2), the input of the energy-storage capacitor are connected with dc source;
The pulse transformer (3) that input is connected with the output end of the energy-storage capacitor (2), the pulse transformer (3) tandem high pressure switches set (4) and the first magnetic switch (5) are in series between energy-storage capacitor (2);
The first magnetic compression capacitor (6) that input is connected with the output end of the pulse transformer (3), first magnetic The output end of compression capacitor (6) is provided with the second magnetic switch (7);
The second magnetic compression capacitor (8) that input is connected with the output end of the first magnetic compression capacitor (6), institute The output end for stating the second magnetic compression capacitor (8) is provided with the 3rd magnetic switch (9).
In the utility model, the energy-storage capacitor (2) is used to form primary pulse;The energy-storage capacitor (2) sets There are input and output end, wherein, the input of the energy-storage capacitor (2) is connected with dc source, so as to realize charging;Institute The output end for stating energy-storage capacitor (2) is connected with the input of pulse transformer (3), so that energy-storage capacitor (2) and pulse Transformer (3) side inductance forms LC resonance and produces current impulse.
In the utility model, the dc source by series parallel resonance circuit conversion be Constant Electric Current to energy-storage capacitor (2) charged, the charging interval, it is not specifically limited to this for the utility model preferably within 1ms.
In the utility model, the energy-storage capacitor (2) is preferably made up of the pulsed capacitance connection in series-parallel of multiple low inductance; The voltage of the energy-storage capacitor (2) is preferred to be stablized in 8KV~12KV, so as to be advantageous to control the no-load voltage ratio of pulse transformer (3).
In the utility model, the pulse transformer (3) is used to boost primary pulse;The pulse transformer (3) Provided with input and output end, wherein, the input of the pulse transformer (3) and the output end of the energy-storage capacitor (2) It is connected, so that pulse transformer (3) forms closed circuit with low-pressure side of the energy-storage capacitor (2) in pulse transformer (3); The output end of the pulse transformer (3) is connected with the input of the first magnetic compression capacitor (6), so that pulse transformer (3) closed circuit is formed in the high-pressure side of pulse transformer (3) with the first magnetic compression capacitor (6).In the utility model, institute It is preferably the pulse transformer with Fe-based amorphous alloy iron core to state pulse transformer (3), it is possible to increase efficiency.
In the utility model, tandem high pressure switch is in series between the pulse transformer (3) and energy-storage capacitor (2) Group (4) and the first magnetic switch (5), so that energy-storage capacitor (2), tandem high pressure switches set (4), the first magnetic switch (5) and arteries and veins The low-pressure side that transformer (3) is rushed in pulse transformer (3) is sequentially connected in series to form closed circuit.In the utility model, the string Connection high-voltage switch gear group (4) can increase the voltage of primary pulse, so as to reduce the no-load voltage ratio of pulse transformer, improve pulse transforming The efficiency of device.In the utility model, the tandem high pressure switches set (4) is preferably gone here and there by multiple reverse-conducting transistors (RSD) Connection forms;The number of the reverse-conducting transistor is preferably 5~20, more preferably 8~10.
In the utility model, metal fin is preferably provided between two neighboring reverse-conducting transistor;The metal Fin can increase the area of dissipation of two neighboring reverse-conducting transistor, so that tandem high pressure switches set (4) can be steady Fixed work.In the utility model, the metal fin is clamped on the contact surface of two neighboring reverse-conducting transistor, then Fastened with insulating materials, connection side of the utility model to the metal fin and two neighboring reverse-conducting transistor Formula is not particularly limited.In the utility model, the area of dissipation of the metal fin is preferably two neighboring reverse-conducting 10 times of the contact surface area of transistor~15 times.
In the utility model, first magnetic switch (5) can turn on after magnetic core saturation, be switched for tandem high pressure Group (4) turns on when reversely preliminary filling triggers.In the utility model, first magnetic switch (5) is preferably that iron based nano crystal magnetic is opened Close.
In the utility model, the first magnetic compression capacitor (6) is used for the arteries and veins that will be boosted through pulse transformer (3) Rush voltage and carry out the first second compression sharpening, improve gas cleaning effect;The first magnetic compression capacitor (6) be provided with input and Output end, wherein, the input of the first magnetic compression capacitor (6) is connected with the output end of the pulse transformer (3), from And pulse transformer (3) is set to form closed circuit in the high-pressure side of pulse transformer (3) with the first magnetic compression capacitor (6);Institute The output end for stating the first magnetic compression capacitor (6) is connected with the input of the second magnetic compression capacitor (8), for will be through the first magnetic The pulse voltage that the second compression of compression capacitor (6) first sharpens carries out the second second compression sharpening.In the utility model, described One magnetic compression capacitor (6) is preferably made up of the pulsed capacitance connection in series-parallel of multiple low inductance, and the utility model is not special to this Limitation.
In the utility model, the output end of the first magnetic compression capacitor (6) is provided with the second magnetic switch (7), is used for Reach in the voltage of the first magnetic compression capacitor (6) when output requires and turn on.In the utility model, second magnetic switch (7) it is preferably iron based nano crystal magnetic switch.In the utility model, the conducting voltage of second magnetic switch (7) is preferably 80KV~120KV, more preferably 100KV.
In the utility model, the second magnetic compression capacitor (8) is used for will be through the first magnetic compression capacitor (6) first The pulse voltage that second compression sharpens carries out the second second compression sharpening, further improves gas cleaning effect;Second magnetic compression Capacitor (8) is provided with input and output end, wherein, input and first magnetic of the second magnetic compression capacitor (8) The output end of compression capacitor (6) is connected;The output end of the second magnetic compression capacitor (8) is defeated with the discharge electrode (12) Enter end to be connected, for exporting the pulse voltage for gas cleaning to electric field.In the utility model, the second magnetic compression electricity Container (8) is preferably made up of the pulsed capacitance connection in series-parallel of multiple low inductance, and it is not specifically limited to this for the utility model.
In the utility model, the output end of the second magnetic compression capacitor (8) is provided with the 3rd magnetic switch (9), is used for Reach in the voltage of the second magnetic compression capacitor (8) when output requires and turn on.In the utility model, the 3rd magnetic switch (9) it is preferably iron based nano crystal magnetic switch.In the utility model, the conducting voltage of the 3rd magnetic switch (9) is preferably 80KV~120KV, more preferably 100KV.
In the utility model, the insulator (10) is arranged on power supply fuel tank (1) bottom.In the utility model In, the insulator (10) is used to realize insulation between field case (11) and discharge electrode (12).It is described in the utility model Insulator (10) is preferably that the internal high pressure for being provided with electric heater unit draws insulator;Electric heater unit is set to ensure to insulate Under conditions of sub (10) and smoke contacts, surface does not condense.
In the utility model, the field case (11) is connected with the bottom of insulator (10).In the utility model, The insulator (10) is preferably extended into field case.In the utility model, electric discharge is provided with inside the field case (11) Pole (12).In the utility model, the input of the discharge electrode (12) under the cladding of insulator (10) with second magnetic The output end of compression capacitor (8) is connected.
The utility model additionally provides a kind of application of pulse generating unit in pulsed plasma gas cleaning;It is described Pulse generating unit is the pulse generating unit for gas cleaning described in above-mentioned technical proposal.In the utility model, institute The course of work for stating the pulse generating unit for gas cleaning is as follows:
First, dc source is that Constant Electric Current charges to energy-storage capacitor (2) by series parallel resonance circuit conversion, is reached To after operating voltage, provide reverse trigger current to tandem high pressure switches set (4) and turn on, now the first magnetic switch (5) due to Magnetic core saturation is also switched on, and energy-storage capacitor (2) and pulse transformer (3) side inductance form LC resonance and produce primary pulse;
Then, primary pulse boosts through pulse transformer (3), then carries out first time pressure through the first magnetic compression capacitor (6) Contracting sharpens, and voltage reaches when output requires the second magnetic switch (7) and turned on, and further carries out the through the second magnetic compression capacitor (8) Second-compressed is sharpened, and voltage reaches to be turned on by the 3rd magnetic switch (9) again when output requires, voltage pulse output is in insulator (10) Cladding under to discharge electrode (12);
Finally, pulse voltage carries out gas cleaning by discharge electrode (12) in field case (11) to gas discharge.
The utility model provides a kind of pulse generating unit for gas cleaning, including:Power supply fuel tank;It is arranged on institute State the pulse power of power supply fuel tank internal;The pulse power includes:Energy-storage capacitor, the input of the energy-storage capacitor with Dc source is connected;The pulse transformer that input is connected with the output end of the energy-storage capacitor, the pulse transformer and Tandem high pressure switches set and the first magnetic switch are in series between energy-storage capacitor;The output end of input and the pulse transformer The first connected magnetic compression capacitor, the output end of the first magnetic compression capacitor are provided with the second magnetic switch;Input and institute State the second connected magnetic compression capacitor of the output end of the first magnetic compression capacitor, the output end of the second magnetic compression capacitor Provided with the 3rd magnetic switch;It is arranged on the insulator of the power supply tank bottoms;The field case being connected with the insulator;Set Discharge electrode inside the field case, the input of the discharge electrode under the cladding of insulator with second magnetic compression The output end of capacitor is connected.Compared with prior art, on the one hand pulse generating unit provided by the utility model improves biography System pulse generating unit sets the technical scheme of pulse power insulator and discharge electrode insulator respectively, directly with an insulator The pulse power is connected with discharge electrode, so as to reduce the inductance of cable length and loop, rising edge of a pulse is diminished, improves Unit of electrical energy produces the efficiency of plasma;On the other hand by using tandem high pressure switches set, the electricity of primary pulse is added Pressure, so as to reduce the no-load voltage ratio of pulse transformer, improves the efficiency of pulse transformer;It follows that arteries and veins provided by the utility model Generating means is rushed to improve gas cleaning efficiency on the basis of energy consumption is reduced, meet environmental requirement for gas cleaning.It is real Test result to show, pulse generating unit provided by the utility model, which is used for gas cleaning, to drop flue gas pollutant concentration of emission It is low to arrive:SO2 35mg/m3, NOx50mg/m3, dust 5mg/m3;And reduced compared to traditional pulse generating means power consumption by 50KW To 38KV, energy-conservation 24%.
In order to further illustrate the utility model, it is described in detail below by following examples.
Embodiment 1
Using the pulse generating unit for gas cleaning described in above-mentioned technical proposal, wherein, tandem high pressure switches set (4) it is in series by 10 reverse-conducting transistors, the operating voltage of each reverse-conducting transistor is 1KV, and tandem high pressure is opened Pass group (4) operating voltage is 10KV;The design capacitance amount of energy-storage capacitor (2) is 2 μ F, rated insulation voltage value 16KV, in design work It is 100J to make storage energy under voltage 10KV;
The design no-load voltage ratio of pulse transformer (3) is 10, and design output voltage is 100KV, it is desirable to pulse transformer (3) leakage inductance For 5 μ H;The pulsactor of first magnetic switch (5) is 3 μ H, and wiring inductance is less than 2 μ H, is made in pulse transformer (3) output pulse It is about 10 μ s to rise the time;
Pulse transformer (3) output voltage is 100KV, the pulse that pulsewidth is 20us, the first magnetic compression electric capacity to 15nF Device (6) charges, and when voltage reaches 100KV, the second magnetic switch (7) conducting, further exports the second magnetic compression electric capacity to 15nF Device (8) charges, and when voltage reaches 100KV, the 3rd magnetic switch (9) conducting, the two level magnetic compression for completing pulse voltage sharpens, and obtains Pulse voltage is 100KV, pulse front edge 200ns, pulse width 500ns;
The pulse voltage carries out gas cleaning by discharge electrode (12) in field case (11) to gas discharge.
Flue gas flow to be clean is 20000m3/ h, dye waste concentration is respectively in raw flue gas:SO2 50mg/m3, NOx100mg/m3, dust 20mg/m3, pollutant concentration is reduced to SO after carrying out gas cleaning2 35mg/m3, NOx50mg/m3, Dust 5mg/m3.Meanwhile the power consumption of the pulse generating unit for gas cleaning of the offer of embodiment 1 is 38KW.
Embodiment 2
Using the pulse generating unit for gas cleaning described in above-mentioned technical proposal, wherein, tandem high pressure switches set (4) it is in series by 8 reverse-conducting transistors, the operating voltage of each reverse-conducting transistor is 1KV, and tandem high pressure switchs Group (4) operating voltage is 8KV;The design capacitance amount of energy-storage capacitor (2) is 2 μ F, rated insulation voltage value 16KV, in design work electricity It is 64J to press storage energy under 8KV;
The design no-load voltage ratio of pulse transformer (3) is 10, and design output voltage is 80KV, it is desirable to pulse transformer (3) leakage inductance For 5 μ H;The pulsactor of first magnetic switch (5) is 3 μ H, and wiring inductance is less than 2 μ H, is made in pulse transformer (3) output pulse It is about 10 μ s to rise the time;
Pulse transformer (3) output voltage is 80KV, the pulse that pulsewidth is 20us, the first magnetic compression capacitor to 15nF (6) charge, when voltage reaches 80KV, the second magnetic switch (7) conducting, further export the second magnetic compression capacitor to 15nF (8) charge, when voltage reaches 80KV, the 3rd magnetic switch (9) conducting, the two level magnetic compression for completing pulse voltage sharpens, and obtains arteries and veins It is 80KV, pulse front edge 200ns, pulse width 500ns to rush voltage;
The pulse voltage carries out gas cleaning by discharge electrode (12) in field case (11) to gas discharge.
Flue gas flow to be clean is 20000m3/ h, dye waste concentration is respectively in raw flue gas:SO2 50mg/m3, NOx100mg/m3, dust 20mg/m3, pollutant concentration is reduced to SO after carrying out gas cleaning2 35mg/m3, NOx50mg/m3, Dust 5mg/m3
Comparative example
Using embodiment 1 provide the pulse generating unit for gas cleaning, distinguish be by insulator (10) according to The design method of traditional pulse generating means sets pulse power insulator and discharge electrode insulator shown in Figure 2 respectively, its In, 1 is power supply fuel tank, and 2 be energy-storage capacitor, and 3 be pulse transformer, and 4 be tandem high pressure switches set, and 5 be the first magnetic switch, 6 It is the second magnetic switch for the first magnetic compression capacitor, 7,8 be the second magnetic compression capacitor, and 9 be the 3rd magnetic switch, and 10 be pulse electricity Source insulator, 11 be field case, and 12 be discharge electrode, and 13 be discharge electrode insulator.
The power consumption for the pulse generating unit for gas cleaning that comparative example provides is 50KW.
The described above of the disclosed embodiments, professional and technical personnel in the field are enable to realize or new using this practicality Type.A variety of modifications to these embodiments will be apparent for those skilled in the art, determine herein The General Principle of justice can be realized in other embodiments in the case where not departing from spirit or scope of the present utility model.Cause This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The most wide scope consistent with features of novelty.

Claims (9)

1. a kind of pulse generating unit for gas cleaning, including:
Power supply fuel tank;
It is arranged on the pulse power of the power supply fuel tank internal;
The pulse power includes:
Energy-storage capacitor, the input of the energy-storage capacitor are connected with dc source;
The pulse transformer that input is connected with the output end of the energy-storage capacitor, the pulse transformer and energy-storage capacitor Between be in series with tandem high pressure switches set and the first magnetic switch;
The first magnetic compression capacitor that input is connected with the output end of the pulse transformer, the first magnetic compression capacitor Output end be provided with the second magnetic switch;
The second magnetic compression capacitor that input is connected with the output end of the first magnetic compression capacitor, second magnetic compression The output end of capacitor is provided with the 3rd magnetic switch;
It is arranged on the insulator of the power supply tank bottoms;
The field case being connected with the insulator;
The discharge electrode being arranged on inside the field case, the input of the discharge electrode is under the cladding of insulator with described The output end of two magnetic compression capacitors is connected.
2. pulse generating unit according to claim 1, it is characterised in that the oil in the power supply fuel tank is entered by oil pump Row forced circulation;The oily flow velocity for carrying out forced circulation is 0.5m/s~1.5m/s.
3. pulse generating unit according to claim 1, it is characterised in that the energy-storage capacitor is by multiple low inductance Pulsed capacitance connection in series-parallel forms;
The voltage stabilization of the energy-storage capacitor is in 8KV~12KV.
4. pulse generating unit according to claim 1, it is characterised in that the pulse transformer is with Fe-based amorphous The pulse transformer of alloy-iron core.
5. pulse generating unit according to claim 1, it is characterised in that the tandem high pressure switches set is by multiple reverse Conducting transistor is in series;The number of the reverse-conducting transistor is 5~20.
6. pulse generating unit according to claim 5, it is characterised in that set between two neighboring reverse-conducting transistor There is metal fin.
7. pulse generating unit according to claim 1, it is characterised in that first magnetic switch is iron based nano crystal magnetic Switch.
8. pulse generating unit according to claim 1, it is characterised in that the conducting voltage of second magnetic switch is 80KV~120KV.
9. pulse generating unit according to claim 1, it is characterised in that the insulator is provided with electrical heating dress to be internal The high pressure put draws insulator;The insulator is stretched into field case.
CN201720739122.1U 2017-06-23 2017-06-23 A kind of pulse generating unit for gas cleaning Expired - Fee Related CN206897141U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720739122.1U CN206897141U (en) 2017-06-23 2017-06-23 A kind of pulse generating unit for gas cleaning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720739122.1U CN206897141U (en) 2017-06-23 2017-06-23 A kind of pulse generating unit for gas cleaning

Publications (1)

Publication Number Publication Date
CN206897141U true CN206897141U (en) 2018-01-19

Family

ID=61285647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720739122.1U Expired - Fee Related CN206897141U (en) 2017-06-23 2017-06-23 A kind of pulse generating unit for gas cleaning

Country Status (1)

Country Link
CN (1) CN206897141U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107081046A (en) * 2017-06-23 2017-08-22 杭州天明环保工程有限公司 A kind of pulse generating unit for gas cleaning

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107081046A (en) * 2017-06-23 2017-08-22 杭州天明环保工程有限公司 A kind of pulse generating unit for gas cleaning
CN107081046B (en) * 2017-06-23 2023-10-17 杭州天明环保工程有限公司 Pulse generating device for purifying flue gas

Similar Documents

Publication Publication Date Title
CN102847610B (en) DC composite pulse high voltage power supply for electrostatic precipitator
CN101850301A (en) DC superposed pulse electric precipitation method
CN204442176U (en) A kind of switched inductors type accurate Z source DC-DC converter circuit
CN108718158A (en) Corona discharge pulse plasma electrical source frequency multiplier circuit
CN203507790U (en) Double-medium low-temperature plasma reactor based on steep front edge nanosecond pulsed power supply
CN206897141U (en) A kind of pulse generating unit for gas cleaning
CN107081046A (en) A kind of pulse generating unit for gas cleaning
CN103580501A (en) Switched switch capacitor type AC-AC converter with fixed transformation ratio of 1/4 or 4
CN1373558A (en) High-voltage pulse power supply device for pulse corona plasma flue gas desulfurization
CN105024585A (en) Serial-type pulse voltage generating device and method
CN204538976U (en) Realize 1/2 nthe variable stage switching capacity type AC-AC converter of no-load voltage ratio
CN201904738U (en) Bipolar nanosecond high-voltage narrow-pulse generator
CN204069467U (en) A kind of soft switching power of activated plasma
CN108889096B (en) Pulse corona discharge plasma power supply based on module superposition
CN204794715U (en) A high voltage power supply for getting angry but, energy recuperation device and energy recuperation of bulk plasmon reactor
CN204179950U (en) A kind of 2-3 type multiple no-load voltage ratio switching capacity type AC-AC converter
CN101924489B (en) Non-thermal plasma pulse power supply
CN105944837A (en) Novel efficient wet type electrical precipitator based on pulse power supply
CN104779808A (en) Variable switch capacitive type AC-AC convertor achieving 1/2 n no-load voltage ratio
CN109768715A (en) A kind of 220kV super-pressure static dust-removing power
CN209184500U (en) Corona discharge pulse plasma electrical source frequency multiplier circuit
CN203355882U (en) Pulse power supply for electric dust removal
CN105097189B (en) A kind of pulse transformer and the electrostatic precipitator including the pulse transformer
CN112054786A (en) Nanosecond high-voltage pulse power supply, ozone generator and electrostatic dust collector
CN205887177U (en) New and effective wet -type electrostatic precipitator based on pulse generator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180119

CF01 Termination of patent right due to non-payment of annual fee