CN206890759U - A kind of water supply pre-heating system of high performance moisture device for central air conditioning - Google Patents

A kind of water supply pre-heating system of high performance moisture device for central air conditioning Download PDF

Info

Publication number
CN206890759U
CN206890759U CN201720513492.3U CN201720513492U CN206890759U CN 206890759 U CN206890759 U CN 206890759U CN 201720513492 U CN201720513492 U CN 201720513492U CN 206890759 U CN206890759 U CN 206890759U
Authority
CN
China
Prior art keywords
heat
water
exchanger rig
humidifier
airhandling equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720513492.3U
Other languages
Chinese (zh)
Inventor
周敏
罗东磊
宋晗
薄蓉
陶鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Northwest Architecture Design and Research Institute Co Ltd
Original Assignee
China Northwest Architecture Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Northwest Architecture Design and Research Institute Co Ltd filed Critical China Northwest Architecture Design and Research Institute Co Ltd
Priority to CN201720513492.3U priority Critical patent/CN206890759U/en
Application granted granted Critical
Publication of CN206890759U publication Critical patent/CN206890759U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of water supply pre-heating system of high performance moisture device for central air conditioning, and air enters from the air inlet of airhandling equipment, after filtered successively, heating or refrigeration and humidifier humidifies, is discharged from air outlet;The water drenching that the water system is used for humidifier humidifies carries out two-stage preheating or precooling.Air conditioner water backwater of the water supply of humidifier first with airhandling equipment is exchanged heat, and is then exchanged heat in the water supply with airhandling equipment, the running water after heat exchange is used for humidifier humidifies.Water system of the present utility model, is exchanged heat using two-stage, is both improved humidification capability, is saved system energy consumption again.

Description

A kind of water supply pre-heating system of high performance moisture device for central air conditioning
Technical field
It the utility model is related to central air conditioning humidifier, and in particular to a kind of high performance moisture device for central air conditioning Water supply pre-heating system.
Background technology
Northern area winter indoor relative humidity is generally relatively low, and generally below 15%, relatively low relative humidity is to indoor people The comfort level and health of member has adverse effect on, therefore air-conditioning system generally need to set humidification function to make winter air-conditioning environment Relative humidity reaches requirement.
Wet-membrane humidifier is gradually widely applied in recent years due to the advantages of equipment is simple, small investment.But using During find that wet-film humidifying mode tends not to the wet-film humidifying that reaches preferable humidifying effect, especially inner region air-conditioning system Device humidifying effect is worse.
The content of the invention
In view of the deficienciess of the prior art, the purpose of this utility model be to provide it is a kind of for the efficient of central air conditioning The water supply pre-heating system of humidifier, solves humidification amount not foot phenomenon in northern area air handling process, to meet Various Seasonal Or when indoor High Quality Environment demand.
In order to solve the above-mentioned technical problem, the utility model, which adopts the following technical scheme that, is achieved:
A kind of water supply pre-heating system of high performance moisture device for central air conditioning, air inlet of the air from airhandling equipment 1 Mouth air inlet processing equipment 1, after filtered successively, heating or refrigeration and humidifier 2 humidify, from going out for airhandling equipment 1 Discharge in air port;The water drenching that the water system is used for the humidification of humidifier 2 carries out two-stage preheating or precooling.
The water system includes water return pipeline 3, heat-exchanger rig 4, humidifier supply channel 5 and airhandling equipment and supplied water Pipeline 6;
The heat-exchanger rig 4 is arranged on humidifier supply channel 5, including first order heat-exchanger rig 7 and second level heat exchange Device 8, first order heat-exchanger rig 7 and second level heat-exchanger rig 8 are setting up and down and separated with dividing plate, and the length of dividing plate is less than heat exchange The length of device 4 so that running water can flow to second level heat-exchanger rig 8 by first order heat-exchanger rig 7;
The air conditioning hot backwater for coming from airhandling equipment 1 flows into heat-exchanger rig 4 through water return pipeline 3, is changed through the first order First heat exchange occurs for the running water provided after thermal 7 with humidifier supply channel 5;Come from airhandling equipment feed pipe The water supply part on road 6 carries out secondary heat exchange after second level heat-exchanger rig 8 with the running water of first heat exchange, and second heat is handed over Running water after changing humidifies for humidifier 2.
The first order heat-exchanger rig 7 or second level heat-exchanger rig 8 use coil exchanger or finned heat exchanger,
The humidifier 2 is wet-membrane humidifier.
The airhandling equipment 1 includes Fresh air handling units, combined air processing group, air-cooled ducted air conditioner.
A kind of airhandling equipment, the airhandling equipment include above-mentioned water system.The airhandling equipment bag Include Fresh air handling units, combined air processing group, air-cooled ducted air conditioner.
The utility model has the advantages that:
1. the system is simple and easy, without separately setting heating source and other devices, play a part of making the best use of everything, heating cost Minimum, investment, operating cost are relatively low, and control simple.
2. the system winter is supplied water using air conditioning hot for backwater heating wet-membrane humidifier, make wet-membrane humidifier water drenching temperature Improve to 40 DEG C, humidification amount is bigger, and humidification efficiency can improve 36%, and reduce water consumption, and not interfere with wind pushing temperature.Summer profit The control of indoor environment is realized with vaporation cooling refrigeration technology, investment and operating cost are reduced, using this system to wet-film humidifying Device water drenching carries out precooling, and wet-membrane humidifier can undertake the sub-load of surface cooler, can reduce or reduce table in airhandling equipment The utilization rate of cooler, while the temperature and humidity in place is improved, reduce investment and the operating cost of system.
3. the system realizes " cascaded utilization of energy ", i.e., first with the water drenching of air conditioner water backwater preheating and humidifying device, (air-conditioning returns Coolant-temperature gage is low), recycle air conditioner water water supply preheating and humidifying device water drenching (air-conditioning supply water temperature is high), in this case, humidifier leaching Water is possible to be heated to the temperature of air conditioner water backwater, realizes the maximum utilization of energy.
Brief description of the drawings
Fig. 1 is the utility model water supply pre-heating system fundamental diagram.
The implication of each label is in figure:
1- airhandling equipments, 2- humidifiers, 3- water return pipelines, 4- heat-exchanger rigs, 5- humidifier supply channels, 6- air Processing equipment supply channel, 7- first order heat-exchanger rigs, 8- second level heat-exchanger rig, 9- dividing plates, 10- filters, 11- heating Device, 12- blower fans.
Explanation is further explained in detail to particular content of the present utility model below in conjunction with accompanying drawing.
Embodiment
Specific embodiment of the utility model given below is, it is necessary to which explanation is that the utility model is not limited to following tool Body embodiment, all equivalents done on the basis of technical scheme each fall within the scope of protection of the utility model.
Present inventor has found that water drenching temperature is the main of influence wet-membrane humidifier humidifying effect by researching and analysing Factor.Northern area winter uses running water more when humidifying, and the water temperature of running water is very low (normally only 10~12 DEG C), with new blower fan Exemplified by group, the in line water humidification method of wet film such as is used, then because humidification is to subtract enthalpy humidification, causes humidification amount very little, Humidifying effect is poor, if now wind pushing temperature is too low, humidifying effect can become worse, near not humidifying.The system Two-stage preheating is carried out for water drenching of the backwater to wet-membrane humidifier or precooling, wet-membrane humidifier add using airhandling equipment hot water Moisture increase, humidification efficiency significantly improve.
Airhandling equipment of the present utility model, the well-known components for belonging to the industry are no longer introduced, such as can use fresh air Unit, combined air processing group, air-cooled ducted air conditioner.
Embodiment 1:
The utility model provides a kind of water supply pre-heating system of high performance moisture device for central air conditioning, and air is from air The air inlet air inlet processing equipment 1 of equipment 1 is managed, after filtered successively, heating or refrigeration and humidifier 2 humidify, from air The air outlet discharge of processing equipment 1;The water drenching that water system is used for the humidification of humidifier 2 carries out two-stage preheating or precooling.
Water system includes airhandling equipment water return pipeline 3, heat-exchanger rig 4, humidifier supply channel 5 and air-treatment Equipment supply channel 6;Heat-exchanger rig 4 is arranged on humidifier supply channel 5, including first order heat-exchanger rig 7 and the second level are changed Thermal 8, first order heat-exchanger rig 7 and second level heat-exchanger rig 8 are setting up and down and separated with dividing plate 9, and the length of dividing plate is less than The length of heat-exchanger rig 4 causes running water to flow to second level heat-exchanger rig 8 by first order heat-exchanger rig 7;
The backwater for coming from airhandling equipment 1 flows into heat-exchanger rig 4 through water return pipeline 3, after first order heat-exchanger rig 7 First heat exchange occurs with the running water that humidifier supply channel 5 provides;Come from the water supply of airhandling equipment supply channel 6 A part carries out secondary heat exchange after second level heat-exchanger rig 8 with the running water of first heat exchange, after secondary heat exchange from Water humidifies for humidifier 2.
First order heat-exchanger rig 7 or second level heat-exchanger rig 8 use coil exchanger or finned heat exchanger.Humidifier 2 be wet-membrane humidifier.
Embodiment 2:
As shown in figure 1, the present embodiment provides a kind of airhandling equipment, the airhandling equipment includes embodiment 1 Water system, airhandling equipment using Fresh air handing unit, first order heat-exchanger rig or second level heat-exchanger rig use wing Plate heat interchanger, humidifier use wet-membrane humidifier.
Heat-exchanger rig is cuboid, is divided into two layers up and down, centre is a metal material dividing plate, and dividing plate left side central portion has a leakage Mouthful, two layers up and down of connection.Heat-exchanger rig is arranged on the supply channel of wet-membrane humidifier, and the device is connected to air-treatment simultaneously Equipment supplies water return pipeline, and the A mouths of described device are wet-membrane humidifier water supply import, and B mouths are wet-membrane humidifier service water outlet, Supply water from A mouths enter, full of air conditioning hot in whole heat-exchanger rig, with heat exchanger in heat-exchanger rig for backwater two-stage heat exchange after from B mouths go out heat-exchanger rig.The CD mouths of the device are located at left and right sides of heat-exchanger rig top, and EF is located at heat-exchanger rig bottom or so two Side, the first heat-exchanger rig and the second heat-exchanger rig are corresponded to respectively.From D mouths enter heat-exchanger rig, C mouths go out, air conditioning hot supplies water backwater From F mouths enter heat-exchanger rig, E mouths go out subsequently into airhandling equipment.
Wet-membrane humidifier supplies water enters the first heat-exchanger rig by A mouths, is changed on device top and the backwater in CD segment pipes Heat, it is the second heat-exchanger rig to enter heat-exchanger rig bottom by dividing plate 9 after heat exchange, is then supplied with the air conditioning hot in EF segment pipes Water is exchanged heat, and by exchanging heat twice, humidifier supply water temperature can be improved to 40 DEG C, then from B mouths go out heat-exchanger rig enter it is wet Film humidifier.
In NORTHWEST CHINA area winter, outside air temperature is relatively low and dries, it is assumed that airhandling equipment is Fresh air handling units, outdoor new After wind enters Fresh air handling units filtering, constant humidity heating is carried out in heating dish pipeline section, now temperature is up to 30 DEG C, subsequently into wet film plus Wet device carries out equal-enthalpy humidifying, and water drenching is generally running water (10 DEG C or so), because water drenching temperature is relatively low, humidification amount now occurs The situation of very little.
Air conditioning hot is usually 60/50 DEG C for backwater, and by wet-membrane humidifier water system, wet-membrane humidifier supplies water and changed Thermal first order heat-exchanger rig by air conditioning hot backwater is preheated to 30 DEG C or so for the first time, subsequently into preheating device bottom, In the second level, heat-exchanger rig is supplied water by air conditioning hot be preheated to 40 DEG C for the second time.If the saturation efficiency of wet-membrane humidifier is 80%, 36.3% can be improved using the humidification efficiency of 40 DEG C of water drenchings and 10 DEG C of water drenching wet-membrane humidifier, air outlet slit state Temperature rise is 4 DEG C.
Counties of North-west Five area, it is a kind of system for saving and using using evaporation cooling technique due to the particularity of weather conditions Refrigeration technique, and wet-membrane humidifier is a kind of devaporizer in itself, now directly carries out constant enthalpy to air using wet-membrane humidifier Humidification, by the precooling of air conditioner cold water backwater (12 DEG C or so), water drenching temperature is reduced to 14 DEG C or so by 20 DEG C, to the drop of air Warm humidifying effect becomes apparent, and while a part of surface cooler load is shared, saves investment and operating cost.

Claims (6)

1. the water supply pre-heating system of a kind of high performance moisture device for central air conditioning, it is characterised in that in airhandling equipment (1) The water system of humidifier (2) includes water return pipeline (3), heat-exchanger rig (4), the humidifier feed pipe of airhandling equipment (1) Road (5) and airhandling equipment supply channel (6);
The heat-exchanger rig (4) is arranged on humidifier supply channel (5), including first order heat-exchanger rig (7) and the second level are changed Thermal (8), first order heat-exchanger rig (7) and second level heat-exchanger rig (8) are setting up and down and separated with dividing plate (9), dividing plate Length is less than the length of heat-exchanger rig (4) so that running water can flow to second level heat-exchanger rig by first order heat-exchanger rig (7) (8);
Heat-exchanger rig (4) is flowed into through water return pipeline (3) from the backwater of airhandling equipment (1), after first order heat-exchanger rig (7) First heat exchange occurs with the running water that humidifier supply channel (5) provides;Come from airhandling equipment supply channel (6) The running water through second level heat-exchanger rig (8) and first heat exchange that supplies water carries out secondary heat exchange, after secondary heat exchange Running water humidifies for humidifier (2);The first heat exchange or secondary heat exchange include preheating running water or precooling.
2. water supply pre-heating system as claimed in claim 1, it is characterised in that the first order heat-exchanger rig (7) or the second level are changed Thermal (8) uses coil exchanger or finned heat exchanger.
3. water supply pre-heating system as claimed in claim 1, it is characterised in that the humidifier (2) is wet-membrane humidifier or spraying Humidifier.
4. water supply pre-heating system as claimed in claim 1, it is characterised in that the airhandling equipment (1) include Fresh air handling units, Combined air processing group or air-cooled ducted air conditioner.
5. a kind of airhandling equipment, it is characterised in that the airhandling equipment includes the preheating system that supplied water described in claim 1 System.
6. airhandling equipment as claimed in claim 5, it is characterised in that the airhandling equipment includes Fresh air handling units, group Box-like air-treatment unit or air-cooled ducted air conditioner.
CN201720513492.3U 2017-05-10 2017-05-10 A kind of water supply pre-heating system of high performance moisture device for central air conditioning Active CN206890759U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720513492.3U CN206890759U (en) 2017-05-10 2017-05-10 A kind of water supply pre-heating system of high performance moisture device for central air conditioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720513492.3U CN206890759U (en) 2017-05-10 2017-05-10 A kind of water supply pre-heating system of high performance moisture device for central air conditioning

Publications (1)

Publication Number Publication Date
CN206890759U true CN206890759U (en) 2018-01-16

Family

ID=61340715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720513492.3U Active CN206890759U (en) 2017-05-10 2017-05-10 A kind of water supply pre-heating system of high performance moisture device for central air conditioning

Country Status (1)

Country Link
CN (1) CN206890759U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109855223A (en) * 2019-02-26 2019-06-07 广东美的暖通设备有限公司 Wet film water system and its temperature control method of water, device, air conditioner
CN111692652A (en) * 2020-06-09 2020-09-22 广东美的制冷设备有限公司 Temperature and humidity adjusting system and air conditioner humidity control method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109855223A (en) * 2019-02-26 2019-06-07 广东美的暖通设备有限公司 Wet film water system and its temperature control method of water, device, air conditioner
CN109855223B (en) * 2019-02-26 2021-12-17 广东美的暖通设备有限公司 Wet film water supply system, water temperature control method and device thereof and air conditioner
CN111692652A (en) * 2020-06-09 2020-09-22 广东美的制冷设备有限公司 Temperature and humidity adjusting system and air conditioner humidity control method

Similar Documents

Publication Publication Date Title
CN102425822B (en) Fresh air conditioner
CN105135572B (en) The heat pipe combined recovery type evaporative cooling air conditioning system of data center
CN101701738B (en) Fresh air handling unit for regulating humidity and controlling temperature by adopting solution and control method thereof
CN205065912U (en) Heat pipe - heat recovery type evaporative cooling air -conditioning system suitable for data center
CN104807116B (en) A kind of solution total heat recovery and dehumidification by condensation are combined Fresh air handing device
CN101979927A (en) Rotating wheel moisture removal and cooling-plate radiation cooling combined air conditioning system and air conditioning method thereof
CN104456875B (en) A kind of Fresh air handing device of indirect evaporating-cooling return air total heat recovery
CN103512156A (en) Energy saving method and fresh air load step processing device of air conditioner fresh air system
CN104613574A (en) Independent temperature and humidity control type air conditioning system based on energy gradient utilization
CN103712291B (en) Air conditioning device capable of manufacturing coolants or heating media and simultaneously treating air heat loads and humidity loads
CN206890759U (en) A kind of water supply pre-heating system of high performance moisture device for central air conditioning
CN105020807A (en) Supercooling heat pump type solution humidification and evaporation cooling compounded air conditioning system
CN208735813U (en) Indirect evaporating-cooling energy regenerating air conditioning system
CN207230773U (en) With reference to the two-stage residual heat recovery type fresh air conditioner-mechanical of indirect evaporative cooling technology
CN106765685A (en) A kind of heat pump driven indirect evaporating-cooling return air full heat recovery fresh air processing unit
CN201582926U (en) Solution moisture-temperature control fresh air air-conditioning unit
CN204313419U (en) Carry the solution-type all-air conditioning unit of whole low-temperature receiver and thermal source
CN105135552A (en) Air conditioner system
CN104864525A (en) Fresh air treatment device capable of indirect evaporative cooling
CN107588482A (en) Double-cold source fresh air handling unit
CN103134120A (en) Bilateral single cold source large temperature difference air conditioner with temperature and humidity controlled independently
CN206890760U (en) A kind of water supply pre-heating system for central air conditioning backwater UTILIZATION OF VESIDUAL HEAT IN
CN207350637U (en) Data center standpipe indirect evaporating-cooling and mechanical refrigeration combined air conditioning system
CN2926891Y (en) Ventilating and dehumidifying air-conditioner
CN104819523A (en) Refrigeration dehumidifying all-air conditioning unit with all cold and heat sources

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant