CN206888526U - A kind of pipe built-in device - Google Patents
A kind of pipe built-in device Download PDFInfo
- Publication number
- CN206888526U CN206888526U CN201720791564.0U CN201720791564U CN206888526U CN 206888526 U CN206888526 U CN 206888526U CN 201720791564 U CN201720791564 U CN 201720791564U CN 206888526 U CN206888526 U CN 206888526U
- Authority
- CN
- China
- Prior art keywords
- main body
- tensioner
- locking post
- buried main
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of pipe built-in device, pre-buried main body including tubulose, pre-buried main body abuts template along the both ends on its axial direction and is provided with the fixation kit being fixed in template, fixation kit is plugged on the locking post in pre-buried main body including at least three sliding, the glide direction of locking post is axially in parallel with pre-buried main body, locking post is provided with the insertion tip for inserting template close to one end of template, and its other end is provided with for making locking post slide out pre-buried main body and inserting the tensioner component of template;Pre-buried main body is laid between wooden template, after pre-buried main body is put into specified location, operation tensioner component makes locking post be slid in pre-buried main body, tip is inserted it into be inserted into template from the end of pre-buried main body, pre-buried main body is set to be fixed between template, without it is fixed together with the reinforcing bar that can be stepped on and be subjected to displacement by workmen, position is firm, and stability is good.
Description
Technical field
Pipe built-in technical field is the utility model is related to, more specifically, it relates to a kind of pipe built-in device.
Background technology
At present, traditional installation of embedded parts method is the object of reference on the basis of the wall position of civil engineering or extension mould, to determine each household
The interior installation site for often covering each built-in fitting in toilet.
The embedded pipeline part setting-out component as disclosed in the Chinese patent that patent announcement number is CN202969939U, it includes master
Bar, the limit assembly for being vertically located in mobile jib one end and it is movably connected on secondary bar on mobile jib and vertical with mobile jib;It is spacing
Component includes the gag lever post fixed with mobile jib and the position-limited hoop for being fixedly arranged on gag lever post one end, and it can be quickly and accurately positioned out
The embedded pipeline part setting-out component of embedded pipeline part position.
But after the built-in fitting setting-out component in above-mentioned patent fixes good position in wooden template, built-in fitting is welded on
It is fixed on reinforcing bar, in concreting, can be stepped on the reinforcing bar of built-in fitting welding by construction worker askew, and built-in fitting then can
Rushed askew, or need to be done over again by the equipment of vibrating of concrete askew, the crooked built-in fitting that shakes, no by the concrete with impulsive force
Larger manpower and materials are only spent, and reduce efficiency of construction.
Utility model content
After being placed for existing embedded pipeline part in template, it can be rushed askew or set by concrete vibrating by concrete
Standby askew technical problem of shaking, the utility model provide a kind of pipe built-in device, it has, and structural stability is good, position is firm,
Advantage of convenient mounting.
To achieve the above object, the utility model provides following technical scheme:
A kind of pipe built-in device, includes the pre-buried main body of tubulose, and the pre-buried main body abuts along the both ends on its axial direction
Template and the fixation kit being fixed in the template is provided with, the sliding that the fixation kit includes at least three is plugged on institute
The locking post in pre-buried main body is stated, the glide direction of the locking post is axially in parallel with the pre-buried main body, the locking post
One end of the template is provided with the insertion tip for inserting the template, its other end is provided with for making the card
Fixed column slides out the pre-buried main body and inserts the tensioner component of the template.
Pass through above-mentioned technical proposal, pre-buried main body are laid between wooden template, when pre-buried main body is put into specified location
Afterwards, operation tensioner component makes locking post be slid in pre-buried main body, inserts it into tip and is inserted into mould from the end of pre-buried main body
In plate, pre-buried main body is set to be fixed between template, without it is fixed with the reinforcing bar that can be stepped on and be subjected to displacement by workmen
Together, position is firm, and stability is good.
Further, the tensioner component includes being opened in the pre-buried main body along the side on its axial direction and towards institute
State the tensioner groove of the side of locking post, in the tensioner groove sliding be plugged with tensioner post, the tensioner post is towards the locking post
One end be provided with the first inclined-plane, offered on the locking post abutted with first inclined-plane coordinate the second inclined-plane, it is described
The direction that the direction on the first inclined-plane and the locking post insert the template is at an acute angle, the direction on second inclined-plane and described the
The direction on one inclined-plane is opposite.
Pass through above-mentioned technical proposal, the first inclined-plane on tensioner post abuts with the second inclined-plane on locking post, if tensioner post
When in tensioner groove toward close to the insertion of the direction of locking post, the first inclined-plane slides on the second inclined-plane, is leaned on so that locking post is past
The direction movement of near-lying mode plate, allows insertion tip to insert in plank template.
Further, it is fixedly connected between the locking post and the pre-buried main body initial for limiting the locking post
The elastic component of position.
Pass through above-mentioned technical proposal, elastic component can in pre-buried main body connection card fixed column, make locking post when not working
The state of retraction is remained, is avoided when placing pre-buried main body, locking post stretches out the end of pre-buried main body and blocked pre-buried
Main body, pre-buried main body is prevented not to be put between template.
Further, it is fixedly connected with the tensioner post for preventing the tensioner post from departing from the spacing of the tensioner groove
Block, the defining flange for abutting and coordinating with the limited block is fixedly connected with the inwall of the tensioner groove.
Pass through above-mentioned technical proposal, defining flange abut limited block, tensioner post can not be departed from tensioner groove, prevent tensioner post
After departing from tensioner groove locking post can not be allowed to insert template.
Further, the tensioner component includes the embedded turn being rotatably connected on the side of the pre-buried main body
Part, the fixed tensioner rope being wrapped with for making the locking post insert the template, the tensioner on the periphery of the rotating part
Rope is corresponded with the locking post, and the deflecting wheel for making the tensioner rope deflecting is rotatably connected in the pre-buried main body, described
The one end of tensioner rope away from the rotating part is fixedly connected around the deflecting wheel is simultaneously reversely rear with the locking post.
Pass through above-mentioned technical proposal, rotating part can drive tensioner rope when rotating, and tensioner rope is pulled back by deflecting rotation
Tight locking post, tensioner rope pull locking post toward close to the direction of template, make insertion tip insertion template, a rotating part can band
Multiple locking posts are moved, it is convenient and practical without being operated one by one to multiple locking posts.
Further, it is fixedly connected with nut side in the one side away from the pre-buried main body on the rotating part.
Pass through above-mentioned technical proposal, spanner can be used to pull nut side for workmen, to improve rotating torque, allow locking post
It is deeper to insert the depth of template, improves firmness of the pre-buried main body in template.
Further, the locking post is plugged on the pre-buried main body along the end on its axial direction, the pre-buried main body
On be provided with slot for the locking post grafting, the tensioner component, which includes being connected to the locking post, inserts the slot
Soft air bag between the inwall of end and the slot, the side of the pre-buried main body is fixedly connected with to be connected with the air bag
Logical charging connector.
Pass through above-mentioned technical proposal, using air gun by charging connector to airbag aeration, inflated airbag then spreading make it is locking
Post stretches out pre-buried main body, then inserts template.
Further, the embedded side for being fixedly connected on the pre-buried main body of the charging connector, in the pre-buried main body
It is fixedly connected with the soft catch for closing the charging connector.
Pass through above-mentioned technical proposal, after locking post inserts template, air gun is unloaded, catch can block charging connector, avoid gas
Capsule gas leakage, prevent insertion tip from being loosened under the restoring force effect of template, maintain the steadiness of built-in fitting.
Compared with prior art, the beneficial effects of the utility model are:
1st, the locking post of template is can be inserted into by being set on the end in the axial direction of pre-buried main body, is set in pre-buried main body
The tensioner component of insertion tip insertion template that can be on driving card fixed column is put, pre-buried main body is laid between wooden template,
After pre-buried main body is put into specified location, operation tensioner component locking post is slid in pre-buried main body, insert it into tip from
The end of pre-buried main body is inserted into template, pre-buried main body is fixed between template, without it is stepped on meeting by workmen
Reinforcing bar that is dynamic and being subjected to displacement is fixed together, and position is firm, and stability is good;
2nd, tensioner component is used as by using the tensioner post abutted by inclined-plane with locking post, the first inclined-plane on tensioner post
Abutted with the second inclined-plane on locking post, if tensioner post inserts in tensioner groove toward the direction of close locking post, the first inclined-plane
Slided on the second inclined-plane, so that locking post moves toward close to the direction of template, allow and insert in tip insertion plank template;
3rd, rotating part is set by being rotated on the side on pre-buried inclined-plane, tensioner rope and locking post of the rotating part by steering
Linkage, rotating part can drive tensioner rope when rotating, and tensioner rope is tensed locking post backward by deflecting rotation, tensioner rope will be locking
Post pulls toward close to the direction of template, makes insertion tip insertion template, a rotating part can drive multiple locking posts, without to more
Individual locking post is operated one by one, convenient and practical.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the utility model embodiment one;
Fig. 2 is Fig. 1 A portions enlarged diagram;
Fig. 3 is the vertical section schematic diagram of the tensioner post of the utility model embodiment one radially;
Fig. 4 is the close-up schematic view of the rotating part of the utility model embodiment two;
Fig. 5 is the vertical section schematic diagram of the rotating part of the utility model embodiment two radially;
Fig. 6 is the vertical section schematic diagram of the charging connector of the utility model embodiment three radially.
Reference:1st, pre-buried main body;2nd, template;3rd, slot;4th, locking post;5th, insertion tip;6th, tensioner groove;7th, tensioner
Post;8th, the first inclined-plane;9th, the second inclined-plane;10th, limited block;11st, defining flange;12nd, elastic component;13rd, rotation slot;14th, rotating part;
15th, tensioner rope;16th, tensioner passage;17th, deflecting wheel;18th, nut side;19th, air bag;20th, charging connector;21st, catch.
Embodiment
With reference to the accompanying drawings and examples, the utility model is described in detail.
Embodiment one
A kind of pipe built-in device, as shown in Figures 1 and 2, include the pre-buried main body 1 of tubulose, pre-buried main body 1 can be cylinder
Shape is alternatively flat column, and pre-buried main body 1 abuts template 2 along the both ends on its axial direction, pre-buried so as to allow concrete cannot be introduced into
In main body 1, in the preformed hole that concreting is completed and left after form removal 2 to pass through for pipeline.Pre-buried main body 1 is along its axial direction
On be provided at both ends with fixation kit, fixation kit is used to make the both ends of pre-buried main body 1 be fixed on template 2.Fixation kit bag
Include the slot 3 for the flat column being opened in reserved body end, the opening direction of slot 3 towards template 2, in slot 3 grafting match somebody with somebody
Closing has the locking post 4 of flat column, and locking post 4 corresponds with slot 3, glide direction and the pre-buried master of the locking hypercard fixed column 4 of post 4
Body 1 it is axially in parallel, one end that locking post 4 is not inserted into slot 3 is provided with sharp insertion tip 5, and insertion tip 5 is used to insert simultaneously
It is fixed in template 2, tensioner component is provided with its other end, tensioner component is used to make locking post 4 slide out pre-buried main body 1 simultaneously
Insert template 2.Pre-buried main body 1 is provided with the not all the same locking post 4 at least three groups of positions and slot 3, the infull phase in three groups of positions
Between pre-buried main body 1 can be firmly secured at template 2 by same locking post 4, it will not be subjected to displacement and rotate.
Tensioner component includes being opened in pre-buried main body 1 tensioner groove 6 along the side on its axial direction, the direction of tensioner groove 6 with
The side of locking post 4 where it is vertical, and is connected with slot 3, as shown in figure 3, sliding is plugged with tensioner post 7 in tensioner groove 6,
One end of tensioner post 7 towards locking post 4 is provided with the first inclined-plane 8, is offered on locking post 4 and abuts what is coordinated with the first inclined-plane 8
Second inclined-plane 9, the direction of the direction on the first inclined-plane 8 and locking post 4 insertion template 2 is at an acute angle, the direction and first on the second inclined-plane 9
The direction on inclined-plane 8 is opposite.The first inclined-plane 8 on tensioner post 7 abuts with the second inclined-plane 9 on locking post 4, if tensioner post 7 is rising
When in tight groove 6 toward close to the insertion of the direction of locking post 4, the first inclined-plane 8 slides on the second inclined-plane 9, is leaned on so that locking post 4 is past
The direction movement of near-lying mode plate 2, allows insertion tip 5 to insert in plank template 2.It is welded with tensioner post 7 for preventing that tensioner post 7 is de-
From the limited block 10 of tensioner groove 6, the defining flange 11 for abutting and coordinating with limited block 10 is welded with the inwall of tensioner groove 6.It is spacing
Flange 11 abuts limited block 10, tensioner post 7 can not be departed from tensioner groove 6, prevents tensioner post 7 departs from from can not allow card after tensioner groove 6
Fixed column 4 inserts template 2.Elastic component 12 is welded between locking post 4 and pre-buried main body 1, elastic component 12 can use spring, elastic component
12 are used to limit the locking initial position of post 4.Elastic component 12 can in pre-buried main body 1 connection card fixed column 4, make locking post 4 not
The state of retraction is remained during work, is avoided when placing pre-buried main body 1, locking post 4 stretch out the end of pre-buried main body 1 and
Pre-buried main body 1 is blocked, prevents pre-buried main body 1 can not be put between template 2.
Between pipe built-in device is in use, be placed on two pieces of templates 2 by pre-buried main body 1, make pre-buried main body 1 along its axial direction
On both ends alignment template 2, now locking post 4 is contracted under the pulling force of elastic component 12 in slot 3, and locking post 4 passes through
The one end of tensioner post 7 away from locking post 4 is ejected tensioner groove 6 by two inclined-planes 9, then taps tensioner post 7, tensioner post 7 using hammer
Locking post 4 is set to be slid to outside slot 3 by the first inclined-plane 8, template 2 is inserted at the insertion tip 5 on locking post 4, and is fixed on mould
In plate 2, pre-buried main body 1 is set to be fixed between template 2, and without it is consolidated with that can be stepped on the reinforcing bar being subjected to displacement by workmen
It is scheduled on together, position is firm, and stability is good.
Embodiment two
A kind of pipe built-in device, as shown in figs. 4 and 5, the difference with embodiment one is, tensioner component includes opening up
Rotation slot 13 on the side of pre-buried main body 1, columned rotation is articulated with by rotating shaft on the inwall in rotation slot 13 outwardly
Moving part 14, rotating part 14 can use knob, and the axial line of turn is vertical with the side of the pre-buried main body 1 where it.Rotating part 14
Periphery on it is gluing and be wrapped with one or more tensioner ropes 15 for being used to make locking post 4 insert template 2, pre-buried main body 1
The tensioner passage 16 slid for tensioner rope 15, one end connection rotation slot 13 of tensioner passage 16 are opened up in side wall, its other end connects
The tight groove 6 of inflation, a tensioner rope 15 is corresponding with a locking post 4 to be connected, and is connected on the inwall of tensioner passage 16 by axis of rotation
Being connected to makes the deflecting wheel 17 of the deflecting of tensioner rope 15, the one end of tensioner rope 15 away from rotating part 14 around deflecting wheel 17 and reversely after with
Locking post 4 is gluing, and rotating part 14 can drive tensioner rope 15 when rotating, and tensioner rope 15 is tensed after the steering of deflecting wheel 17 locking
Post 4, tensioner rope 15 pull locking post 4 toward close to the direction of template 2, insertion tip 5 is inserted template 2, a rotating part 14
Multiple locking posts 4 can be driven, it is convenient and practical without being operated one by one to multiple locking posts 4.
The nut side 18 of hexagon is wholely set on rotating part 14 in one side away from pre-buried main body 1.Workmen can
Nut side 18 is pulled using spanner, to improve rotating torque, makes the depth of the locking insertion of post 4 template 2 deeper, pre-buried master can be strengthened
Soundness of the body 1 in template 2.
Embodiment three
A kind of pipe built-in device, as shown in fig. 6, being with the difference of embodiment one, tensioner component includes being connected to card
The soft air bag 19 that fixed column 4 is inserted between the end of slot 3 and the inwall of slot 3, the side of pre-buried main body 1 has been wholely set
The charging connector 20 connected with air bag 19, charging connector 20 are welded on the groove of the side of pre-buried main body 1, are adhesive with pre-buried main body 1
The soft catch 21 of Sealed valve 20.Air gun can be used to be inflated by charging connector 20 to air bag 19 for workmen, inflation
Air bag 19 then spreading and locking post 4 will be jacked up, so as to allow the locking end of post 4 insertion tip 5 insert template 2, make pre-buried main body 1
Fixed.After locking post 4 inserts template 2, air gun is unloaded, catch 21 can block charging connector 20, avoid the gas leakage of air bag 19, prevent
Only insertion tip 5 loosens under the restoring force effect of template 2, maintains the steadiness of built-in fitting.
Described above is only preferred embodiment of the present utility model, and the scope of protection of the utility model is not limited merely to
Above-described embodiment, all technical schemes belonged under the utility model thinking belong to the scope of protection of the utility model.It should refer to
Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and
Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.
Claims (8)
1. a kind of pipe built-in device, include the pre-buried main body of tubulose(1), it is characterised in that the pre-buried main body(1)Along its axle
Upward both ends abut template(2)And it is provided with and is fixed on the template(2)On fixation kit, the fixation kit include extremely
Few three sliding is plugged on the pre-buried main body(1)On locking post(4), the locking post(4)Glide direction with it is described
Pre-buried main body(1)Axially in parallel, the locking post(4)Close to the template(2)One end be provided with for inserting the mould
Plate(2)Insertion tip(5), its other end, which is provided with, to be used to make the locking post(4)Slide out the pre-buried main body(1)And insert
Enter the template(2)Tensioner component.
2. pipe built-in device according to claim 1, it is characterised in that the tensioner component is described pre- including being opened in
Bury main body(1)Along along the side on its axial direction and towards the locking post(4)Side tensioner groove(6), the tensioner groove(6)
Interior sliding is plugged with tensioner post(7), the tensioner post(7)Towards the locking post(4)One end be provided with the first inclined-plane(8),
The locking post(4)On offer and first inclined-plane(8)Abut the second inclined-plane coordinated(9), first inclined-plane(8)'s
Direction and the locking post(4)Insert the template(2)Direction it is at an acute angle, second inclined-plane(9)Direction and described
One inclined-plane(8)Direction it is opposite.
3. pipe built-in device according to claim 2, it is characterised in that the locking post(4)With the pre-buried main body
(1)Between be fixedly connected with for limiting the locking post(4)The elastic component of initial position(12).
4. pipe built-in device according to claim 3, it is characterised in that the tensioner post(7)On be fixedly connected it is useful
In preventing the tensioner post(7)Depart from the tensioner groove(6)Limited block(10), the tensioner groove(6)Inwall on fixed connect
It is connected to and the limited block(10)Abut the defining flange coordinated(11).
5. pipe built-in device according to claim 1, it is characterised in that the tensioner component includes the embedded company of rotation
It is connected on the pre-buried main body(1)Side on rotating part(14), the rotating part(14)Periphery on fixed be wrapped be used for
Make the locking post(4)Insert the template(2)Tensioner rope(15), the tensioner rope(15)With the locking post(4)One by one
It is corresponding, the pre-buried main body(1)On be rotatably connected to and make the tensioner rope(15)The deflecting wheel of deflecting(17), the tensioner rope
(15)Away from the rotating part(14)One end bypass the deflecting wheel(17)And the reverse rear and locking post(4)It is fixed to connect
Connect.
6. pipe built-in device according to claim 5, it is characterised in that the rotating part(14)It is upper remote described pre-buried
Main body(1)One side on be fixedly connected with nut side(18).
7. pipe built-in device according to claim 1, it is characterised in that the locking post(4)It is plugged on described pre-buried
Main body(1)Along along the end on its axial direction, the pre-buried main body(1)On be provided with for the locking post(4)The slot of grafting
(3), the tensioner component is including being connected to the locking post(4)Insert the slot(3)End and the slot(3)It is interior
Soft air bag between wall(19), the pre-buried main body(1)Side be fixedly connected with and the air bag(19)Connection is filled
Valve(20).
8. pipe built-in device according to claim 7, it is characterised in that the charging connector(20)It is fixedly connected on described
Pre-buried main body(1)Side, the pre-buried main body(1)On be fixedly connected with the closing charging connector(20)Soft catch
(21).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720791564.0U CN206888526U (en) | 2017-07-01 | 2017-07-01 | A kind of pipe built-in device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720791564.0U CN206888526U (en) | 2017-07-01 | 2017-07-01 | A kind of pipe built-in device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206888526U true CN206888526U (en) | 2018-01-16 |
Family
ID=61299249
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720791564.0U Expired - Fee Related CN206888526U (en) | 2017-07-01 | 2017-07-01 | A kind of pipe built-in device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206888526U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110630027A (en) * | 2019-09-30 | 2019-12-31 | 重庆华硕建设有限公司 | Protection device for be used for building to face limit entrance to a cave |
-
2017
- 2017-07-01 CN CN201720791564.0U patent/CN206888526U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110630027A (en) * | 2019-09-30 | 2019-12-31 | 重庆华硕建设有限公司 | Protection device for be used for building to face limit entrance to a cave |
CN110630027B (en) * | 2019-09-30 | 2021-05-04 | 重庆华硕建设有限公司 | Protection device for be used for building to face limit entrance to a cave |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109653130B (en) | Highway guardrail bar planting device | |
CN206888526U (en) | A kind of pipe built-in device | |
CN204475321U (en) | A kind of main muscle Recyclable anchor rope | |
CN208431475U (en) | A kind of efficient dock backfill assembling pipe joint | |
CN107060828A (en) | A kind of flexible bulkhead of compounded rubber vertical rod and its application method | |
CN206707734U (en) | A kind of tunnel double-lining compounded rubber lifts locking plug template | |
CN213685802U (en) | Towed non-excavation pipeline prosthetic devices | |
CN219319208U (en) | Blast hole high-efficiency blocking device for blasting construction | |
CN206706774U (en) | Larsen steel plate matches somebody with somebody i shaped steel foundation ditch sealing support system | |
CN108756070A (en) | A method of it improving building and builds efficiency | |
CN211820800U (en) | Gate valve for steel pipe column internal grouting | |
CN108411904B (en) | Reinforced concrete cloth bag pile structure for local filling of large karst stratum and process | |
CN208167720U (en) | A kind of cloth bag pilework equipped with expandable type framework of steel reinforcement | |
CN206801471U (en) | A kind of guiding grouting drill bit for horizontal grouting rig | |
CN111980092B (en) | Deep foundation pit excavating device and operation method | |
CN108166749A (en) | A kind of construction method of superelevation bare concrete wall steel form | |
CN210637681U (en) | Hydraulic push-pull water shutoff device suitable for various pipe diameters | |
CN207194430U (en) | A kind of scaffold sustaining wall device | |
CN112228690A (en) | Traction type trenchless pipeline repairing device and repairing method | |
CN106567386A (en) | Pouring type pile driver and pile driving method therefor | |
JPH0464696A (en) | Tunnel lining method and form device therefor | |
CN206071598U (en) | Self-propelled for tunnel excavation supporting bores quick-fried chassis | |
CN114457856B (en) | Water stop construction equipment for locally deepening foundation pit and water stop construction method thereof | |
CN215721661U (en) | Municipal administration pipeline rainwater recycle pipeline plugging device | |
CN214328850U (en) | Foundation pile structure of foundation engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180116 Termination date: 20210701 |