CN206888500U - High-building construction scaffold fastenings - Google Patents

High-building construction scaffold fastenings Download PDF

Info

Publication number
CN206888500U
CN206888500U CN201720843788.1U CN201720843788U CN206888500U CN 206888500 U CN206888500 U CN 206888500U CN 201720843788 U CN201720843788 U CN 201720843788U CN 206888500 U CN206888500 U CN 206888500U
Authority
CN
China
Prior art keywords
fixed plate
standpipe
fixedly connected
building construction
transverse tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720843788.1U
Other languages
Chinese (zh)
Inventor
汤闯
崔巍
王聪
李晓琳
杨晓东
杜丽敏
王天成
刘任峰
张中威
安雨霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Vocational and Technical College
Original Assignee
Harbin Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Vocational and Technical College filed Critical Harbin Vocational and Technical College
Priority to CN201720843788.1U priority Critical patent/CN206888500U/en
Application granted granted Critical
Publication of CN206888500U publication Critical patent/CN206888500U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

It the utility model is related to a kind of high-building construction scaffold fastenings.All it is to be connected by bowl fastening type or disk button between the scaffold of high-building construction at present, connection is insecure, and spacer pin or plate are easily lost.The utility model composition includes:Standpipe(1), described standpipe and link(9)It is fixedly connected, described link includes two fixed plates(10), described fixed plate is buckled on described standpipe, is fixedly connected between the fixed plate described in two by four bolts, described fixed plate semicircular in shape, has groove in described fixed plate(12), described fixed plate is interior to have projection(13), clamp is placed with described groove(11), transverse tube(4)Circular hole through described fixed plate is fixedly connected with described clamp, and described standpipe passes through bearing diagonal frame with described transverse tube(2)It is fixedly connected.The utility model is used for high-building construction scaffold fastenings.

Description

High-building construction scaffold fastenings
Technical field:
It the utility model is related to a kind of high-building construction scaffold fastenings.
Background technology:
Most between the scaffold of high-building construction at present to be connected using bowl fastening type or disk button, bowl fastening type connection is adopted With positioning pin connection, alignment pin is easily lost, and the fastener of bottom easily comes off, and causes the accident, and is connected using disk button, and plate holds Easy to be lost, due to not being to be completely fixed connection, the phenomenon that plate comes off and fixed disk comes off is happened occasionally, and personal safety is produced It is raw to influence.
Utility model content:
The purpose of this utility model is to provide a kind of high-building construction scaffold fastenings.
Above-mentioned purpose is realized by following technical scheme:
A kind of high-building construction scaffold fastenings, its composition include:Standpipe, described standpipe are fixed with link Connection, described link include two fixed plates, and described fixed plate is buckled on described standpipe, the fixed plate described in two Between be fixedly connected by four bolts, described fixed plate semicircular in shape, there is groove in described fixed plate, described consolidates There is projection in fixed board, clamp is placed with described groove, transverse tube is consolidated through the circular hole of described fixed plate with described clamp Fixed connection, described standpipe are fixedly connected with described transverse tube by bearing diagonal frame.
Described high-building construction scaffold fastenings, described bearing diagonal frame include connecting tube, described connection One end of pipe is welded with described standpipe, and the other end and the bottom plate of described connecting tube weld, and described bottom plate is positioned at described The lower end of transverse tube, buckle are buckled on described transverse tube and are bolted to connection with described bottom plate, described buckle and described Bottom plate all for semicircle.
Beneficial effect:
1. provided by the utility model is a kind of high-building construction scaffold fastenings, each part when not in use may be used To be fully coupled together, will not generating means lose possibility, easy installation and removal when in use.
The utility model uses bearing diagonal frame, and the effect of support is served to cross bar, prevents that the load of end is excessive to even Connect frame to have an impact, prevent the generation of accident.
Clamp structure of the present utility model, there is restriction effect to the position of transverse tube so that installation is more firm, will not endanger Danger.
Bulge-structure of the present utility model, projection are in the groove of standpipe, prevent link from coming off, ensured link It is stable qualitative.
Brief description of the drawings:
Accompanying drawing 1 is front view of the present utility model;
Accompanying drawing 2 is top view of the present utility model;
Accompanying drawing 3 is A-A of the present utility model sectional view;
Accompanying drawing 4 is the structural representation that clamp of the present utility model is connected with transverse tube;
In figure:1st, standpipe;2nd, bearing diagonal frame;3rd, connecting tube;4th, transverse tube;6th, buckle;7th, bottom plate;9th, link;10th, it is fixed Plate;11st, clamp;12nd, groove;13rd, it is raised.
Embodiment:
Embodiment 1:
A kind of high-building construction scaffold fastenings, its composition include:Standpipe 1, described standpipe are solid with link 9 Fixed connection, described link include two fixed plates 10, and described fixed plate is buckled on described standpipe, consolidating described in two It is fixedly connected between fixed board by four bolts, described fixed plate semicircular in shape, there is groove 12, institute in described fixed plate There is projection 13 in the fixed plate stated, clamp 11, circular hole and institute of the transverse tube 4 through described fixed plate are placed with described groove The clamp stated is fixedly connected, and described standpipe is fixedly connected with described transverse tube by bearing diagonal frame 2.
Embodiment 2:
High-building construction scaffold fastenings according to embodiment 1, described bearing diagonal frame include connecting tube 3, one end of described connecting tube is welded with described standpipe, and the other end and the bottom plate 7 of described connecting tube weld, described bottom Plate is located at the lower end of described transverse tube, and buckle 6 is buckled on described transverse tube and is bolted to connection with described bottom plate, described Buckle and described bottom plate all for semicircle.

Claims (2)

1. a kind of high-building construction scaffold fastenings, its composition includes:Standpipe, it is characterized in that:Described standpipe and company Connect frame to be fixedly connected, described link includes two fixed plates, and described fixed plate is buckled on described standpipe, described in two Fixed plate between be fixedly connected by four bolts, described fixed plate semicircular in shape, there is groove in described fixed plate, There is projection in described fixed plate, be placed with clamp in described groove, transverse tube through described fixed plate circular hole with it is described Clamp be fixedly connected, described standpipe is fixedly connected with described transverse tube by bearing diagonal frame.
2. high-building construction scaffold fastenings according to claim 1, it is characterized in that:Described bearing diagonal frame bag Connecting tube is included, one end of described connecting tube is welded with described standpipe, and the other end and the bottom plate of described connecting tube weld, institute The bottom plate stated is located at the lower end of described transverse tube, and buckle is buckled on described transverse tube and is bolted company with described bottom plate Connect, described buckle and described bottom plate are all semicircle.
CN201720843788.1U 2017-07-12 2017-07-12 High-building construction scaffold fastenings Expired - Fee Related CN206888500U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720843788.1U CN206888500U (en) 2017-07-12 2017-07-12 High-building construction scaffold fastenings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720843788.1U CN206888500U (en) 2017-07-12 2017-07-12 High-building construction scaffold fastenings

Publications (1)

Publication Number Publication Date
CN206888500U true CN206888500U (en) 2018-01-16

Family

ID=61297031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720843788.1U Expired - Fee Related CN206888500U (en) 2017-07-12 2017-07-12 High-building construction scaffold fastenings

Country Status (1)

Country Link
CN (1) CN206888500U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108307883A (en) * 2018-03-20 2018-07-24 南京晶伏新能源科技有限公司 A kind of company photovoltaic green-house of waterproof
CN108560712A (en) * 2018-06-07 2018-09-21 包头恒久钢构有限公司 A kind of assembled tubular truss connecting sleeve node structure and its installation method
CN112360127A (en) * 2020-11-02 2021-02-12 森拓建设集团有限公司 Steel that municipal construction used constructs scaffold structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108307883A (en) * 2018-03-20 2018-07-24 南京晶伏新能源科技有限公司 A kind of company photovoltaic green-house of waterproof
CN108560712A (en) * 2018-06-07 2018-09-21 包头恒久钢构有限公司 A kind of assembled tubular truss connecting sleeve node structure and its installation method
CN108560712B (en) * 2018-06-07 2024-04-16 内蒙古恒久钢构(集团)有限公司 Assembled pipe truss connecting sleeve node structure and mounting method thereof
CN112360127A (en) * 2020-11-02 2021-02-12 森拓建设集团有限公司 Steel that municipal construction used constructs scaffold structure

Similar Documents

Publication Publication Date Title
CN206888500U (en) High-building construction scaffold fastenings
CN208831890U (en) A kind of high-strength anti-seismic suspension and support
CN204011517U (en) A kind of electric automobile battery box
CN201485787U (en) Bridge expansion joint device with capacity of performing vertical displacement
CN208605733U (en) A kind of fire safe type antidetonation suspension and support
CN208382125U (en) A kind of boiler steel frame vertical support connection node device
CN202990406U (en) Bowl buckle type scaffold
CN202689665U (en) Three-column type repair tower
CN206032950U (en) Strenghthened type rail brackets of elevator
CN204642133U (en) A kind of separation type marine main engine pedestal up and down
CN207568333U (en) A kind of economic and environment-friendly, repeatable assembled steel enclosing and enclosing component
CN201334729Y (en) Concrete beam side steel bracket structure
CN206581638U (en) One kind overlapping plate bracing frame
CN206189604U (en) Steel construction round steel supporting engaging lug
CN203783005U (en) Fixing device for cooling tower guardrail upright post
CN205873650U (en) Flip structure that footboard is prevented in hand elevator
CN213571577U (en) Novel maintenance of high mound of bridge device
CN201237394Y (en) Bearing tail support box of solar water heater thermal-collecting tube support frame
CN205276855U (en) A fastener for connecting steel pipe
CN205189142U (en) Steel structure connecting piece
CN204940827U (en) A kind of scaffold oblique pull fixed head for building
CN209339312U (en) A kind of steel construction wind-resistant column connecting column
CN106812304A (en) External scaffolding disk buckles attachment means
CN201636142U (en) Support and hanger steel grider clamp
CN205277707U (en) Lift bearing structure in wind generating set and wind generating set's pylon

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180116

Termination date: 20210712