CN206876030U - New energy heat accumulation steel pipe and new energy thermal storage device - Google Patents

New energy heat accumulation steel pipe and new energy thermal storage device Download PDF

Info

Publication number
CN206876030U
CN206876030U CN201720576457.6U CN201720576457U CN206876030U CN 206876030 U CN206876030 U CN 206876030U CN 201720576457 U CN201720576457 U CN 201720576457U CN 206876030 U CN206876030 U CN 206876030U
Authority
CN
China
Prior art keywords
new energy
inner tube
steel pipe
outer tube
heat accumulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720576457.6U
Other languages
Chinese (zh)
Inventor
张运国
徐晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cangzhou Sheng Jie Hardware Products Co Ltd
Original Assignee
Cangzhou Sheng Jie Hardware Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cangzhou Sheng Jie Hardware Products Co Ltd filed Critical Cangzhou Sheng Jie Hardware Products Co Ltd
Priority to CN201720576457.6U priority Critical patent/CN206876030U/en
Application granted granted Critical
Publication of CN206876030U publication Critical patent/CN206876030U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/14Thermal energy storage

Landscapes

  • Thermal Insulation (AREA)

Abstract

It the utility model is related to thermmal storage technical field, specifically, it is related to new energy heat accumulation steel pipe, new energy heat accumulation steel pipe includes inner tube, the outer tube being set in outside inner tube, the heat conduction phase change layer of end cap and setting between the inner and outer pipe sections, through hole is offered on end cap, the diameter of through hole is suitable with the external diameter of inner tube, inner tube is linked together with outer tube by end cap, end cap plays a part of closing heat conduction phase change layer simultaneously, when using new energy heat accumulation steel pipe, the heat conduction phase change layer being arranged between inner tube and outer tube can be undergone phase transition, therefore need to carry out seal operation, not so leakage phenomenon occurs, and by setting heat conduction phase change layer effectively to improve heat exchange efficiency between internal layer and outer layer;Scribble anticorrosive coat on inner tube and outer tube simultaneously, because inner tube use steel pipe with outer tube, therefore redox reaction can occur in use, for ensure equipment can permanent normal work, therefore in inner tube with scribbling anticorrosive coat on outer tube.

Description

New energy heat accumulation steel pipe and new energy thermal storage device
Technical field
Thermmal storage technical field is the utility model is related to, in particular to new energy new energy heat accumulation steel pipe and new energy Source thermal storage device.
Background technology
Energy resources are the important substance bases that global human is depended on for existence, with the swift and violent hair of high energy consumption global industry Exhibition, energy shortage problem is more and more concerned, " energy crisis ", " greenhouse effects " to be risen suddenly and sharply with crude oil price for mark The life of people is increasingly affected with environmental pollution.China's regenerative resource is very abundant, and developable wind energy resources is 2.5 × 108KW, hydraulic power potentials 7.54 × 104KW and abundant solar energy are from resource, but China human mortality is numerous, average resource per capita Equivalent to the half of world average level, per capita energy consumption is too low, has a strong impact on sustainable economic development and the people in China People's growth in the living standard.
The energy is in recent years and regenerative resource and industrial waste heat waste heat etc. for the problem of whole world institute extensive concern The development and utilization of clean energy resource is the hot issue of energy field.Phase-changing energy storage material is in Waste Heat Reuse and peak load shifting side There is a very big application in face, and from energy-conservation and it is economical from the point of view of, in order to keep meeting producing and life in energy heat supply and Continuous, the stable requirement of power supply, adjusts the mismatch of energy supply and demand, and key is to solve energy storage and heat exchange Problem.In terms of the research of heat-storing device, some domestic and international scholars are to heat accumulations such as phase-change thermal storage concentric tubes, cylindric or tabulars Device has carried out theoretical analysis of Heat Transfer.Although having exchanged thermal has a certain degree of research both at home and abroad, due to heat accumulation Device structure type, heat accumulating choose and packaged type difference, heat accumulation on phase-change thermal storage performance study and operative practice still So there are many an open questions, for example have in heat transfer process that output temperature is unstable, heat exchange efficiency is low and device is complicated The problems such as.
Therefore it provides it is a kind of can the high new energy heat accumulation steel pipe of heat exchange efficiency and new energy thermal storage device turn into this area skill Art personnel important technological problems to be solved.
Utility model content
The purpose of this utility model is to provide new energy heat accumulation steel pipe and new energy thermal storage device, to alleviate in the prior art The low technical problem of heat exchange efficiency.
A kind of new energy heat accumulation steel pipe provided by the utility model, including inner tube, the outer tube being set in said inner tube, end Cover and be arranged on the heat conduction phase change layer between said inner tube and the outer tube;
Through hole is offered on the end cap, the end cap is set in said inner tube to be coordinated with the outer tube, said inner tube Anticorrosive coat is scribbled with the outer tube.
Further, the outer length of tube is less than said inner tube length, and projection is provided with the outer tube, the end cap On be provided with groove with the male cooperation.
Further, the diameter of bore of said inner tube is arranged to 5mm-30mm.
Further, the diameter of bore of the outer tube is arranged to 10mm-50mm.
Further, said inner tube and the pipe thickness of the outer tube are 1mm-5mm.
A kind of new energy thermal storage device provided by the utility model, including housing, heat-insulation layer, support and the storage of described new energy Hot steel pipe;
The support is located at the enclosure interior, and the new energy heat accumulation steel pipe is located on the support, the heat-insulation layer On the housing exterior walls;
The water inlet and delivery port with the new energy heat accumulation fastener for connection are offered on the housing.
Further, it is provided with phase-change material in the housing.
Further, the water inlet is provided with seal with the water outlet.
Further, be provided with thermometer in the housing, the hull outside is provided with display, the display with The thermometer connection.
Further, the pneumatic stirring pipe that pneumatic stirring is carried out to phase-change material is provided with the housing.
Beneficial effect:
A kind of new energy heat accumulation steel pipe provided by the utility model, including inner tube, the upper tube being set in outside inner tube, end cap and Heat conduction phase change layer between the inner and outer pipe sections is set, through hole is offered on end cap, the diameter of through hole is suitable with the external diameter of inner tube, Inner tube is linked together with outer tube by end cap, while end cap plays a part of closing heat conduction phase change layer, can when installing end cap So that by welding, and sealing device can be added between end cap and inner tube and outer tube, when using new energy heat accumulation steel pipe, if The heat conduction phase change layer put between inner tube and outer tube can be undergone phase transition, it is therefore desirable to carry out seal operation, leakage not so occurs Phenomenon, and by setting heat conduction phase change layer effectively to improve heat exchange efficiency between internal layer and outer layer;Simultaneously inner tube with it is outer Anticorrosive coat is scribbled on pipe, because inner tube uses steel pipe with outer tube, therefore redox reaction can occur in use, be Ensure equipment can permanent normal work, therefore scribble anticorrosive coat on inner tube and outer tube.
A kind of new energy thermal storage device provided by the utility model, including housing, heat-insulation layer, support and new energy heat accumulation steel Pipe, support are located at the enclosure interior, and new energy heat accumulation steel pipe can be placed on enclosure interior, new energy under the support of support Heat accumulation steel pipe can be compiled into different shape and be placed on support, carry out heat exchange work to maximize, improve the efficiency of heat exchange, together When maximized utilization space, heat-insulation layer is set on housing exterior walls, the temperature that can effectively reduce in housing leaks, enable Source is maximized the use, while water inlet and delivery port are opened up on housing, and water inlet and delivery port are simultaneously with inputting steel Pipe connects, i.e., industrial wastewater flows into housing from water inlet, is then flowed out from delivery port, heat is retained in into new energy heat accumulation steel pipe It is interior, while new energy thermal storage device has the advantage of above-mentioned new energy heat accumulation steel pipe compared with prior art, it is no longer superfluous herein to chat.
Brief description of the drawings
, below will be right in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art The required accompanying drawing used is briefly described in embodiment or description of the prior art, it should be apparent that, describe below In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness On the premise of work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the overall structure diagram for the new energy heat accumulation steel pipe that the utility model embodiment provides;
Fig. 2 is Fig. 1 side view;
Fig. 3 is the structural representation of end cap in Fig. 1;
Fig. 4 is the overall structure diagram for the new energy thermal storage device that the utility model embodiment provides.
Icon:100- inner tubes;200- outer tubes;201- is raised;300- heat conduction phase change layers;400- end caps;401- leads to Hole;402- grooves;500- housings;501- water inlets;502- delivery ports;600- heat-insulation layers;700- supports;800- phases Become material.
Embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with accompanying drawing, it is clear that described Embodiment is the utility model part of the embodiment, rather than whole embodiments.Based on the embodiment in the utility model, sheet The every other embodiment that field those of ordinary skill is obtained under the premise of creative work is not made, belongs to this practicality Novel protected scope.
, it is necessary to explanation in description of the present utility model, term " " center ", " on ", " under ", it is "left", "right", " perpendicular Directly ", the orientation of the instruction such as " level ", " interior ", " outer " or position relationship are based on orientation shown in the drawings or position relationship, are only Described for the ease of description the utility model and simplifying, rather than instruction or imply signified device or element must have it is specific Orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.In addition, term " the One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that instruction or hint relative importance.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term " are pacified in description of the present utility model Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly Connection;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition Concrete meaning of the language in the utility model.
The utility model is described in further detail below by specific examples of the implementation and with reference to accompanying drawing.
Fig. 1 is the overall structure diagram for the new energy heat accumulation steel pipe that the utility model embodiment provides;Fig. 2 is Fig. 1's Side view;Fig. 3 is the structural representation of end cap in Fig. 1.
A kind of new energy heat accumulation steel pipe provided as shown in Figure 1-Figure 3 for the utility model embodiment, including inner tube 100, Outer tube 200, end cap 400 and the heat conduction phase change layer 300 being arranged between inner tube 100 and outer tube 200 being set in inner tube 100; Through hole 401 is offered on end cap 400, end cap 400 is set in inner tube 100 to be coordinated with outer tube 200, in inner tube 100 and outer tube 200 Scribble anticorrosive coat.
A kind of new energy heat accumulation steel pipe provided by the utility model, including inner tube 100, the outer tube that is set in inner tube 100 200th, end cap 400 and the heat conduction phase change layer 300 being arranged between inner tube 100 and outer tube 200, through hole is offered on end cap 400 401, the diameter of through hole 401 is suitable with the external diameter of inner tube 100, and inner tube 100 is linked together with outer tube 200 by end cap 400, together When end cap 400 play a part of closing heat conduction phase change layer 300, can be by welding when install end cap 400, and can hold Sealing device is added between lid 400 and inner tube 100 and outer tube 200, when using new energy heat accumulation steel pipe, is arranged on inner tube 100 Heat conduction phase change layer 300 between outer tube 200 can be undergone phase transition, it is therefore desirable to carried out seal operation, not so occurred that leakage is existing As, and by setting heat conduction phase change layer 300 effectively to improve heat exchange efficiency between internal layer and outer layer;Inner tube 100 simultaneously With scribbling anticorrosive coat on outer tube 200, because inner tube 100 uses steel pipe with outer tube 200, therefore oxygen can occur in use Change reduction reaction, for ensure equipment can permanent normal work, therefore scribble anticorrosive coat on inner tube 100 and outer tube 200.
It is pointed out that outer tube 200 is combined together by end cap 400 and inner tube 100, offered on end cap 400 logical Hole 401, inner tube 100 pass through this through hole 401, and to ensure sealing, inner tube 100 and end cap 400 are welded together, while will be outer Pipe 200 welds together with end cap 400.
It may also be noted that heat conduction phase change layer 300 is filled between inner tube 100 and outer tube 200, can be effectively by Heat transfer in pipe 100 comes out, and improves heat recovery rate.
It may also be noted that to ensure inner tube 100, outer tube 200 and the long-term normal use of end cap 400, applied thereon There is anticorrosive coat, anticorrosive coat can effectively suppress by its generation chemical attack of anti-corrosion and electrochemical corrosion.
It may also be noted that anticorrosive coat can select polyurethane paint, and its easy for construction, nontoxic, low cost, and it is resistance to Acid, salt tolerant and resistance to various diluents, cost is relatively low, and the injury to personnel is smaller;Epoxide coal bituminous, epoxy can also be selected Coal tar pitch is mainly made up of epoxy resin, coal tar pitch, filler and curing agent.It combines the high mechanical strength of epoxy resin, glued The advantages that relay is big, resistant to chemical media corrodes and coal tar pitch is corrosion-resistant, corrosion-inhibiting coating temperature in use between -40 to 150 DEG C, And soaked for a long time in the general diluent such as acid, alkali, salt, water, gasoline, kerosene, diesel oil unchanged, tubing can be made normally to make With more than 20 years;The anticorrosive coat of outer tube 200 can also select three polyethylene anti-corrosion coatings, and three polyethylene anti-corrosion coatings have good The performances such as mechanical strength, electrical property, uvioresistant, the stripping of anti-aging and anti-anode, anti-corrosion life was up to more than 20 years.
It may also be noted that inner tube 100 is also an option that polyurethane with the anti-corrosion layer material on the inwall of outer tube 200 Ester paint, polyurethanes paint highest heat resistance are 155 DEG C, there is good chemical resistance, oil resistivity, wearability and attachment Power, paint film toughness and electrical insulating property are preferable.
It may also be noted that inner tube 100 is also an option that inorganic zinc-rich with the anti-corrosion layer material on the inwall of outer tube 200 Paint.Inorganic zinc rich paint construction is simple, it is cheap, there is good water resistance, oil resistivity, solvent resistance and resistance to alternation of wetting and drying Salt fog, suitable for media such as seawater, clear water, marine atmosphere, industrial atmosphere and oils.Heat resistance is 160 DEG C or so.
In the alternative of the present embodiment, the length of outer tube 200 is less than the length of inner tube 100, and is provided with projection on outer tube 200 201, the grooves 402 coordinated with projection 201 are provided with end cap 400.
To enable new energy heat accumulation steel pipe to be connected with each other cooperation, set the length of outer tube 200 to be less than the length of inner tube 100, lead to Cross between inner tube 100 and link together, conveniently caused in connection, save extensive work amount, alleviate work.
It is pointed out that for preferably outer tube 200 and end cap 400 link together, set on outer tube 200 raised 201, the groove 402 corresponding to setting on end cap 400, in welding process, projection 201 is coordinated together with this with groove 402, Outer tube 200 can effectively be stablized, stable state is provided for welding, welding process simply, is conveniently improved operating efficiency.
It may also be noted that projection 201 is arranged on the both ends of outer tube 200, and setting is multiple, while the outside of end cap 400 Multiple grooves 402 corresponding with raised 201 are provided with edge.
In the alternative of the present embodiment, the diameter of bore of inner tube 100 is arranged to 5mm-30mm.
To meet most of demands, the diameter of bore of inner tube 100 is arranged to 5mm-30mm, within this range, Ke Yiman The use of the most of thermal storage devices of foot.
In the alternative of the present embodiment, the diameter of bore of outer tube 200 is arranged to 10mm-50mm.
To meet most of demands, the diameter of bore of outer tube 200 is arranged to 10mm-50mm, within this range, can be with Meet the use of most of thermal storage devices.
Outer tube 200 is more larger than the diameter of bore of inner tube 100 simultaneously, is easy to fill between inner tube 100 and outer tube 200 for leading The heat conduction phase change layer 300 of heat.
In the alternative of the present embodiment, inner tube 100 and the pipe thickness of outer tube 200 are 1mm-5mm.
To improve heat exchange efficiency, by the smaller of the pipe thickness setting of inner tube 100 and outer tube 200, between 1mm-5mm, In ability section, the hot water in inner tube 100 can be transferred heat to quickly in heat conduction phase change layer 300.
It is pointed out that the pipe thickness of outer tube 200 is not less than the pipe thickness of inner tube 100, it is therefore an objective to using thickening Outer tube 200 improves overall structural strength, and does not influence heat exchange efficiency.
Fig. 4 is the overall structure diagram for the new energy thermal storage device that the utility model embodiment provides.
A kind of new energy thermal storage device of the utility model embodiment offer, including housing 500, heat-insulation layer are provided 600th, the new energy heat accumulation steel pipe of the sum of support 700;Support 700 is located inside housing 500, and new energy heat accumulation steel pipe is located at support On 700, heat-insulation layer 600 is located on the outer wall of housing 500;The water inlet with new energy heat accumulation fastener for connection is offered on housing 500 501 and delivery port 502.
A kind of new energy thermal storage device provided by the utility model, including housing 500, heat-insulation layer 600, support 700 and new energy Source heat accumulation steel pipe, support 700 are located inside housing 500, and new energy heat accumulation steel pipe can be placed on shell under the support of support 700 Inside body 500, new energy heat accumulation steel pipe can be compiled into different shape and be placed on support 700, and heat exchange work is carried out to maximize Make, improve the efficiency of heat exchange, while maximized utilization space, heat-insulation layer 600 is set on the outer wall of housing 500, can be effective Reduction housing 500 in temperature leak, the energy is maximized the use, while open up water inlet 501 on housing 500 With delivery port 502, simultaneously with inputting fastener for connection, i.e. industrial wastewater flows into from water inlet 501 for water inlet 501 and delivery port 502 Housing 500, then flowed out from delivery port 502, heat is retained in new energy heat accumulation steel pipe, while new energy thermal storage device is with showing There is technology to compare the advantage with above-mentioned new energy heat accumulation steel pipe, it is no longer superfluous herein to chat.
It is pointed out that new energy thermal storage device fills thermal technology's journey:Pass through hot water using industrial exhaust heat or boiler hot new Energy heat accumulation steel pipe heating phase-change material 800, temperature is gradually risen to phase transformation temperature pointses, hair after phase-change material 800 absorbs heat Raw phase transformation simultaneously continues to absorb heat, and heating heat absorption is may continue to after phase transformation is complete, completes heat accumulation process.The heat release of new energy thermal storage device Journey:When hot water need to be used, by control valve switch by cold water by new energy heat accumulation steel pipe from the draw heat of phase-change material 800 It is for people to use to heat up into hot water, realizes immediate thermal function;With cold water constantly absorb heat the temperature of phase-change material 800 decline, in phase Temperature point is undergone phase transition, and discharges latent heat, and in phase transition process and phase transformation terminates the rear temperature of phase-change material 800 and continue decline to release Thermal discharge, complete exothermic process.
It may also be noted that new energy heat accumulation steel pipe is located inside housing 500, new energy heat accumulation steel pipe can be passed through Establishment arrangement, forms different internal structures.
It may also be noted that new energy heat accumulation steel pipe is placed on inside housing 500, multiple new energy heat accumulation steel pipes are mutual Connection, S-shaped structure or helical structure are formed, and be placed on support 700, while the new energy heat accumulation steel pipe to link together An only water inlet end and a water side, and the water inlet 501 with being arranged on housing 500 and delivery port 502 are connected.
It may also be noted that set heat-insulation layer 600 in the outside of housing 500, can effective less heat loss, wherein protecting Warm layer 600 can use polyurethane foam, and hard polyurethane foam is a kind of novel synthetic material with insulation and water-proof function, its Thermal conductivity factor is low, only 0.022-0.033W/ (m*K), is heat conduction in current all insulation materials equivalent to the half of extruded sheet Coefficient is minimum;Wherein polyurethane refers to a kind of flexibility polyurethane foam plastics with certain elasticity, and it is dosage maximum A kind of polyurethane products.Product mainly has high rebound foam, block sponge, low resilience urethane foam resilient foam, skinned foam and semi-rigid Energy-absorbing foam etc..The foam structure of soft polyurethane foam is mostly perforate.General have that density is low, elastic recovery is good, sound-absorbing, thoroughly The performances such as gas, insulation, it is mainly used as furniture mat material, vehicle seat cushion material, various soft liner laminar composites.Industry With it is civilian on also it is soft bubble be used as filtering material, acoustic material, packing, ornament materials, packaging material and heat-insulation and heat-preservation material Material etc..
In the alternative of the present embodiment, phase-change material 800 is provided with housing 500.
Further to improve the heat exchanger effectiveness and quantity of heat storage of new energy thermal storage device, the filling phase-change material in housing 500 800, the temperature in inner tube 100 can be quickly absorbed by the phase-change material 800 in the housing 500 of outer tube 200.
In the alternative of the present embodiment, water inlet 501 at delivery port 502 with being provided with seal.
Because being filled with phase-change material 800 in housing 500, can be undergone phase transition when phase-change material 800 absorbs certain heat, Therefore liquid phase may be flooded with housing 500, it is therefore desirable to carry out seal operation, not so the phase-change material 800 in housing 500 Meeting seepage is gone out.
In the alternative of the present embodiment, thermometer is provided with housing 500, the outside of housing 500 is provided with display, shown Show that device is connected with thermometer.
To learn the temperature conditions in housing 500, thermometer is provided with housing 500, it is aobvious in the installation of the outside of housing 500 Show device, display is connected with thermometer, the temperature conditions that can reflect in real time inside housing 500.
In the alternative of the present embodiment, it is provided with housing 500 and pneumatically stirring for pneumatic stirring is carried out to phase-change material 800 Mix pipe.
Further to improve the heat exchange efficiency of new energy thermal storage device, pneumatic stirring pipe is internally provided with housing 500, can be with Phase-change material 800 in housing 500 is stirred, heat is transmitted faster.
Finally it should be noted that:Various embodiments above is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should Understand:It can still modify to the technical scheme described in foregoing embodiments, either to which part or whole Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly The scope of each embodiment technical scheme of type.

Claims (10)

  1. A kind of 1. new energy heat accumulation steel pipe, it is characterised in that including:Inner tube, end cap, the outer tube being set in said inner tube and The heat conduction phase change layer being arranged between said inner tube and the outer tube;
    Through hole is offered on the end cap, the end cap is set in said inner tube and is engaged with the outer tube, said inner tube Anticorrosive coat is scribbled with the outer tube.
  2. 2. new energy heat accumulation steel pipe according to claim 1, it is characterised in that the outer length of tube is grown less than said inner tube Degree, and projection is provided with the outer tube, the groove with the male cooperation is provided with the end cap.
  3. 3. new energy heat accumulation steel pipe according to claim 2, it is characterised in that the diameter of bore of said inner tube is arranged to 5mm-30mm.
  4. 4. new energy heat accumulation steel pipe according to claim 3, it is characterised in that the diameter of bore of the outer tube is arranged to 10mm-50mm.
  5. 5. new energy heat accumulation steel pipe according to claim 4, it is characterised in that said inner tube and the thickness of pipe wall of the outer tube Spend for 1mm-5mm.
  6. A kind of 6. new energy thermal storage device, it is characterised in that including:Any one of housing, heat-insulation layer, support and claim 1-5 institute The new energy heat accumulation steel pipe stated;
    The support is located at the enclosure interior, and the new energy heat accumulation steel pipe is located on the support, and the heat-insulation layer is located at The housing exterior walls;
    The water inlet and delivery port with the new energy heat accumulation fastener for connection are offered on the housing.
  7. 7. new energy thermal storage device according to claim 6, it is characterised in that be provided with phase-change material in the housing.
  8. 8. new energy thermal storage device according to claim 7, it is characterised in that the water inlet is set with the water outlet There is seal.
  9. 9. new energy thermal storage device according to claim 8, it is characterised in that thermometer is provided with the housing, it is described Hull outside is provided with display, and the display is connected with the thermometer.
  10. 10. according to the new energy thermal storage device described in claim any one of 6-9, it is characterised in that be provided with the housing pair Phase-change material carries out the pneumatic stirring pipe of pneumatic stirring.
CN201720576457.6U 2017-05-23 2017-05-23 New energy heat accumulation steel pipe and new energy thermal storage device Expired - Fee Related CN206876030U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720576457.6U CN206876030U (en) 2017-05-23 2017-05-23 New energy heat accumulation steel pipe and new energy thermal storage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720576457.6U CN206876030U (en) 2017-05-23 2017-05-23 New energy heat accumulation steel pipe and new energy thermal storage device

Publications (1)

Publication Number Publication Date
CN206876030U true CN206876030U (en) 2018-01-12

Family

ID=61340066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720576457.6U Expired - Fee Related CN206876030U (en) 2017-05-23 2017-05-23 New energy heat accumulation steel pipe and new energy thermal storage device

Country Status (1)

Country Link
CN (1) CN206876030U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109612212A (en) * 2019-01-29 2019-04-12 贵州大学 A kind of photovoltaic and photothermal coupled solar drying device containing heat-storage medium
CN110715572A (en) * 2019-10-17 2020-01-21 国网安徽省电力有限公司电力科学研究院 Design method and design device of compressed air energy storage and heat storage system
WO2020055967A1 (en) * 2018-09-11 2020-03-19 Henkel IP & Holding GmbH Phase change material-coated heat exchange tubes
WO2021142304A1 (en) * 2020-01-10 2021-07-15 Phase Change Energy Solutions, Inc. Systems and methods for district heating and cooling

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020055967A1 (en) * 2018-09-11 2020-03-19 Henkel IP & Holding GmbH Phase change material-coated heat exchange tubes
CN112424557A (en) * 2018-09-11 2021-02-26 汉高知识产权控股有限责任公司 Heat exchange tube coated with phase change material
CN109612212A (en) * 2019-01-29 2019-04-12 贵州大学 A kind of photovoltaic and photothermal coupled solar drying device containing heat-storage medium
CN110715572A (en) * 2019-10-17 2020-01-21 国网安徽省电力有限公司电力科学研究院 Design method and design device of compressed air energy storage and heat storage system
WO2021142304A1 (en) * 2020-01-10 2021-07-15 Phase Change Energy Solutions, Inc. Systems and methods for district heating and cooling

Similar Documents

Publication Publication Date Title
CN206876030U (en) New energy heat accumulation steel pipe and new energy thermal storage device
CN204854437U (en) Heat -retaining formula heat exchanger
CN204535500U (en) A kind of inorganic material phase-change thermal storage heat-exchanger rig
CN206131840U (en) Anticorrosion phase change energy storage ware
CN101216216B (en) Architecture integral type wall-type solar heat-collector
CN104990128A (en) Phase-change heat accumulation type device
CN103759432A (en) Superthin superconducting-type heat absorbing plate core and flat-plate solar collector
CN205048077U (en) Adiabatic tubular product under water keeps warm
CN104634152A (en) Energy storage apparatus
CN207300022U (en) A kind of phase change material device
CN206488354U (en) A kind of electrical heating fused salt storing energy and supplying hot device
CN203671950U (en) Ultra-thin and super-conductive heat absorption plate core and flat plate type solar thermal collector
CN214620767U (en) Heat accumulation ball and heat accumulation tank
CN113292967A (en) Energy storage solvent based on inorganic salt, preparation method thereof and energy storage device
CN202149625U (en) S-shaped closed built-in heat-exchanging type flat plate collector
CN201615219U (en) Stainless steel corrugated pipe dual-sealing structure
CN209705540U (en) A kind of novel rubber-plastic thermal insulation pipe
CN202485498U (en) Heat exchanger in high-temperature geothermal well
CN206708643U (en) A kind of high polyurethane thermal pipe of structural strength
CN207395546U (en) The heat-exchange integrated device of energy storage
CN207262736U (en) Solar energy integrates heat-supply type and continuously stirs reaction unit
CN109470071A (en) A kind of hot water storage tank containing phase-change material
CN104864585A (en) Electric heating energy storage water heater
CN201014799Y (en) Secondary circulation solar water heater
CN204834794U (en) Lithium cell cooling plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180112

Termination date: 20190523

CF01 Termination of patent right due to non-payment of annual fee