CN206873855U CN201720716618.7U CN201720716618U CN206873855U CN 206873855 U CN206873855 U CN 206873855U CN 201720716618 U CN201720716618 U CN 201720716618U CN 206873855 U CN206873855 U CN 206873855U
Authority
CN
China
Prior art keywords
frame structure
steel
steel cable
combined
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720716618.7U
Other languages
Chinese (zh)
Inventor
姚丽珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yutong Construction Labor Service Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720716618.7U priority Critical patent/CN206873855U/en
Application granted granted Critical
Publication of CN206873855U publication Critical patent/CN206873855U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a kind of frame structure of outdoor wall plastering, including frame structure, the right flank opening position of the frame structure is provided with a fluting, in the right flank of the frame structure, both sides opening position positioned at the fluting is provided with rolling wheel support, at least two steel rollers are combined with the single rolling wheel support, before the frame structure, trailing flank opening position is symmetrically arranged with four ring portions, preceding, steel cable is combined between the ring portion set afterwards, the steel cable bypasses the lower section of the frame structure, stop collar is combined with the steel cable, the steel cable is spacing in the bottom of the ring portion;The present apparatus is when in use; the exterior wall surface of building can be bonded by set steel roller so that the present apparatus is more stable when declining, can effective stationary frame structure by set steel cable; and coordinate stop collar on steel cable, play the effect of safeguard protection.

Description

A kind of frame structure of outdoor wall plastering
Technical field
It the utility model is related to a kind of frame structure of outdoor wall plastering.
Background technology
In outdoor wall plastering, it is necessary to set up hoist engine in roof, then framework is coordinated to complete wall by hoist engine Paint, but this class framework of the prior art is the platform for providing a carrying, its feature is poor, can not meet to use Need.
Based on above mentioned problem, it is desirable to provide a kind of frame structure of multi-functional outdoor wall plastering.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of frame structure of outdoor wall plastering.
The utility model is achieved through the following technical solutions:
A kind of frame structure of outdoor wall plastering, including frame structure, in the right flank position of the frame structure Place is provided with a fluting, and right flank in the frame structure, the both sides opening position positioned at the fluting are provided with roller branch Frame, screw is combined between the rolling wheel support and the frame structure, at least two are combined with the single rolling wheel support Individual steel roller, roller bearing is combined between the steel roller and the rolling wheel support, in the forward and backward side of the frame structure Opening position is symmetrically arranged with four ring portions, and the first screw is combined between the ring portion and the frame structure, in forward and backward setting The ring portion between be combined with steel cable, the steel cable bypasses the lower section of the frame structure, and the both ends of the steel cable pass through institute The hoist engine that peripheral hardware is connected after ring portion is stated, stop collar is combined with the steel cable, is matched somebody with somebody between the stop collar and the steel cable Conjunction has the second screw, and the steel cable is spacing in the bottom of the ring portion.
Preferably, the neck for positioning the steel cable is provided with the bottom of the frame structure.
Preferably, two material troughs are symmetrically arranged with the inside of the frame structure is forward and backward, by setting material trough can To deposit the material of plastering wall.
Preferably, the material trough has a bottom surface for being tilted towards bottom right setting, by the way that the bottom of material trough is set It is inclined, can be by solid accumulation close to the side of wall, one conveniently takes, and to be pressed in weight close to wall The side of body, steel roller fitting metope is helped, increases stability in use.
Preferably, locked component is combined between two adjacent steel cables, the locked component includes traction steel rope of cable, And cooperation passes through the stop collar in the stop collar at the traction steel rope of cable both ends, the steel cable.
The beneficial effects of the utility model are:The present apparatus when in use, can be bonded by set steel roller and be built Build the exterior wall surface of thing so that the present apparatus is more stable when declining, can effective fixed frame by set steel cable Structure, and coordinate stop collar on steel cable, the effect of safeguard protection is played, the structure of the present apparatus is relatively simple, and cost is more low It is honest and clean, it is adapted to promote the use of.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the right view of frame structure;
Fig. 3 is the top view of frame structure.
Embodiment
All features disclosed in this specification, or disclosed all methods or during the step of, except mutually exclusive Feature and/or step beyond, can combine in any way.
This specification(Including any accessory claim, summary and accompanying drawing)Disclosed in any feature, except non-specifically chatting State, can alternative features equivalent by other or with similar purpose replaced.I.e., unless specifically stated otherwise, each feature It is an example in a series of equivalent or similar characteristics.
A kind of frame structure of outdoor wall plastering as shown in Figure 1, Figure 2 and Figure 3, including frame structure 1, described The right flank opening position of frame structure 1 is provided with a fluting 101, right flank in the frame structure 1, positioned at the fluting 101 both sides opening position is provided with rolling wheel support 2, and screw is combined between the rolling wheel support 2 and the frame structure 1 201, at least two steel rollers 3, the steel roller 3 and the rolling wheel support 2 are combined with the single rolling wheel support 2 Between be combined with roller bearing 301, four ring portions 4, the ring are symmetrically arranged with the forward and backward lateral location of the frame structure 1 The first screw 401 is combined between portion 4 and the frame structure 1, steel cable is combined between the ring portion 4 of forward and backward setting 5, the steel cable 5 bypasses the lower section of the frame structure 1, and the both ends of the steel cable 5 pass through the volume of connection peripheral hardware after the ring portion 4 Machine is raised, stop collar 6 is combined with the steel cable 5, the second screw 601 is combined between the stop collar 6 and the steel cable 5, The steel cable 5 is spacing in the bottom of the ring portion 4.
A preferred embodiment in the utility model, the positioning steel cable 5 is provided with the bottom of the frame structure 1 Neck 121.
A preferred embodiment in the utility model, two are symmetrically arranged with the inside of the frame structure 1 is forward and backward Material trough 131, by setting material trough to deposit the material of plastering wall.
A preferred embodiment in the utility model, the material trough 131 have a bottom for being tilted towards bottom right setting Face 141, it is inclined by the way that the bottom of material trough is set, can be by solid accumulation close to the side of wall, one facilitates Take, and weight can be pressed in close to the side of wall, help steel roller fitting metope, increase stability in use.
A preferred embodiment in the utility model, locked component 7 is combined between two adjacent steel cables 5, The locked component 7 includes traction steel rope of cable 701, and coordinates the stop collar 702 at the both ends of traction steel rope of cable 701, the steel cable Through the stop collar.
The beneficial effects of the utility model are:The present apparatus when in use, can be bonded by set steel roller and be built Build the exterior wall surface of thing so that the present apparatus is more stable when declining, can effective fixed frame by set steel cable Structure, and coordinate stop collar on steel cable, the effect of safeguard protection is played, the structure of the present apparatus is relatively simple, and cost is more low It is honest and clean, it is adapted to promote the use of.
It is described above, only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to In this, any change or replacement expected without creative work, should all cover within the scope of protection of the utility model. Therefore, the scope of protection of the utility model should be determined by the scope of protection defined in the claims.

Claims (5)

  1. A kind of 1. frame structure of outdoor wall plastering, it is characterised in that:Including frame structure, on the right side of the frame structure A fluting is provided with lateral location, right flank in the frame structure, the both sides opening position positioned at the fluting are respectively provided with There is rolling wheel support, screw is combined between the rolling wheel support and the frame structure, coordinate on the single rolling wheel support There are at least two steel rollers, roller bearing is combined between the steel roller and the rolling wheel support, in the frame structure Four ring portions are symmetrically arranged with forward and backward lateral location, the first screw is combined between the ring portion and the frame structure, It is combined with steel cable between the ring portion of forward and backward setting, the steel cable bypasses the lower section of the frame structure, and the two of the steel cable The hoist engine of peripheral hardware is connected after holding through the ring portion, stop collar, the stop collar and the steel are combined with the steel cable The second screw is combined between rope, the steel cable is spacing in the bottom of the ring portion.
  2. 2. the frame structure of outdoor wall plastering according to claim 1, it is characterised in that:In the frame structure Bottom is provided with the neck for positioning the steel cable.
  3. 3. the frame structure of outdoor wall plastering according to claim 1, it is characterised in that:In the frame structure Inside is forward and backward to be symmetrically arranged with two material troughs.
  4. 4. the frame structure of outdoor wall plastering according to claim 3, it is characterised in that:The material trough has one The individual bottom surface for being tilted towards bottom right setting.
  5. 5. the frame structure of outdoor wall plastering according to claim 1, it is characterised in that:In two adjacent steel Locked component is combined between rope, the locked component includes traction steel rope of cable, and coordinates in the spacing of the traction steel rope of cable both ends Set, the steel cable pass through the stop collar.
CN201720716618.7U 2017-06-20 2017-06-20 A kind of frame structure of outdoor wall plastering Active CN206873855U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720716618.7U CN206873855U (en) 2017-06-20 2017-06-20 A kind of frame structure of outdoor wall plastering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720716618.7U CN206873855U (en) 2017-06-20 2017-06-20 A kind of frame structure of outdoor wall plastering

Publications (1)

Publication Number Publication Date
CN206873855U true CN206873855U (en) 2018-01-12

Family

ID=61334371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720716618.7U Active CN206873855U (en) 2017-06-20 2017-06-20 A kind of frame structure of outdoor wall plastering

Country Status (1)

Country Link
CN (1) CN206873855U (en)

Similar Documents

Publication Publication Date Title
CN204782005U (en) On --spot installation dolly of transporting of wallboard
CN204732836U (en) A kind of cable bearer for cable trough turning
CN207029216U (en) A kind of complicated landform power equipment conveying arrangement
CN107265373A (en) A kind of wind-powered electricity generation maintenance crane arm structure special tooling
CN206172883U (en) Large pipe support promotes device of taking one's place
CN206873855U (en) A kind of frame structure of outdoor wall plastering
CN105174080A (en) Multifunctional fishing and hoisting device
CN206828047U (en) Wind-powered electricity generation maintenance crane arm structure special tooling
CN204886019U (en) A cable pulley for trigeminy mouth of pipe department
CN205841985U (en) The cable bearer that in a kind of cable duct, space availability ratio is high
CN209913378U (en) Multifunctional protective support for power line laying
CN204310637U (en) The special travelling platform device of a kind of construction elevator
CN107386757A (en) A kind of electric pole with anticorrosive coat
CN206516988U (en) A kind of roller draw-gear of hydrogen fuel unmanned plane
CN205527009U (en) Novel multifunctional cable conveying equipment
CN207275513U (en) A kind of steel reinforcement cage conveying arrangement
CN108386052B (en) A kind of anemometer tower
CN206917221U (en) A kind of interior painting device for building
CN206693037U (en) A kind of plank road supporting structure of minority tourism
CN205634628U (en) Multi -functional chemical industry equipment hoist and mount frame
CN206023155U (en) A kind of communication cable take-up and pay-off device
CN206217954U (en) A kind of bus roof outer assembly support unit
CN205330510U (en) Steel pipe tower is with folding supplementary ladder
CN206850358U (en) A kind of circular arc horizontal curved
CN204354269U (en) Adjustable precast concrete joint bar locator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180808

Address after: 223800 Jiangsu Suqian economic and Technological Development Zone, three weeks ago, the Township Hall neighborhood office 101 room

Patentee after: YUTONG CONSTRUCTION INVESTMENT

Address before: 311811 Maple Bridge Town, Zhuji City, Shaoxing, Zhejiang

Patentee before: Yao Lizhen

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240729

Address after: Room 1, Building 2, Zhuzhuang Residents' Committee Office Building, Sankeshu Street, Suqian Economic and Technological Development Zone, Suqian City, Jiangsu Province 223802

Patentee after: Jiangsu Yutong Construction Labor Service Co.,Ltd.

Country or region after: China

Address before: 223800 Jiangsu Suqian economic and Technological Development Zone, three weeks ago, the Township Hall neighborhood office 101 room

Patentee before: YUTONG CONSTRUCTION INVESTMENT

Country or region before: China