CN206873314U - A kind of towed running gear of Hanging Basket - Google Patents
A kind of towed running gear of Hanging Basket Download PDFInfo
- Publication number
- CN206873314U CN206873314U CN201720548235.3U CN201720548235U CN206873314U CN 206873314 U CN206873314 U CN 206873314U CN 201720548235 U CN201720548235 U CN 201720548235U CN 206873314 U CN206873314 U CN 206873314U
- Authority
- CN
- China
- Prior art keywords
- piece
- hanging basket
- track
- walking
- running gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000009184 walking Effects 0.000 claims abstract description 63
- 238000010276 construction Methods 0.000 claims abstract description 34
- 230000001360 synchronised effect Effects 0.000 claims abstract description 9
- 239000003351 stiffener Substances 0.000 claims description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 208000002925 dental caries Diseases 0.000 claims description 7
- RKTYLMNFRDHKIL-UHFFFAOYSA-N copper;5,10,15,20-tetraphenylporphyrin-22,24-diide Chemical compound [Cu+2].C1=CC(C(=C2C=CC([N-]2)=C(C=2C=CC=CC=2)C=2C=CC(N=2)=C(C=2C=CC=CC=2)C2=CC=C3[N-]2)C=2C=CC=CC=2)=NC1=C3C1=CC=CC=C1 RKTYLMNFRDHKIL-UHFFFAOYSA-N 0.000 claims description 3
- 230000005611 electricity Effects 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 241001669679 Eleotris Species 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 238000000137 annealing Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Rehabilitation Tools (AREA)
Abstract
The utility model provides a kind of towed running gear of Hanging Basket, including power source and multiple tractions walking single-piece that synchronous walking is realized for drawing multiple hooks of Hanging Basket, and the hook for drawing walk single-piece and Hanging Basket, which corresponds, to be set;The traction walking single-piece include being arranged on track structure on case vault, with the hook connection of Hanging Basket and can the enterprising line slip of the track structure slide construction and connect the hook of Hanging Basket and the power connections of the power source.Using technical solutions of the utility model, effect is:Total is simplified, and cost is low;The hook of the traction walking single-piece and Hanging Basket, which corresponds, to be set, and is easy to implement multiple hook synchronous walkings of Hanging Basket;Traction walking single-piece includes track structure, slide construction and power connections, by modularized design, is easily installed, disassembly and assembly, easy to use.
Description
Technical field
It the utility model is related to technical field of bridge construction, and in particular to a kind of towed running gear of Hanging Basket.
Background technology
Hanging Basket is the important gadget of bridge cantilever construction, suitable for a variety of bridge types (such as beam bridge, rigid frame bridge,
Arch bridge, cable-stayed bridge etc.).Hanging Basket mainly has both of which (concrete cantilever pouring static mode of operation in cantilever pouring construction
With walking Move Mode).It is section construction because hanging blue cantilever construction, after the completion of a certain segmental construction, track needs to treat to next
Section extension of constructing is laid or upset reach, Hanging Basket is started next section along track travel to beam section front end has been poured
The cantilever casting construction of section.
For traditional Hanging Basket running gear more using being made up of track, sleeper beam and " back-pressure wheel ", the running gear has following characteristics:
Substantial amounts of sleeper beam is needed to carry out the track that place mat is made up of I-steel, steel requirement is big, increases cost;Back-pressure wheel is by being located at rail
I-steel web monosymmetric two parts in road are formed, and rim faces and the lower surface of I-steel top airfoil form work on back-pressure wheel
Pair, it is connected to because of back-pressure wheel on the level frame of girder truss, the deflection that the lifting gravity of level frame cantilever end is formed to level frame
Power is acted on track by back-pressure wheel, causes track to receive a upward power, this power is to being bolted on pillow
The security and stability of track on beam constitute a threat to;In addition back-pressure wheel and rail contact are only passed through when girder truss is walked
Anchoring, its fastness and stability are poor, asynchronous when especially walking to be easily caused the derailing of back-pressure wheel, cause Hanging Basket to topple.
In addition, in traditional Hanging Basket walking system, girder truss is contacted using the sliding surface of balladeur train with the sliding surface of track, in girder
The truss zero deflection masterpiece used time, its sliding surface frictional resistance is just very big, when girder truss issues unboiled water prosposition in deflecting force effect
During shifting, its sliding surface is converted into linear contact lay by face contact, force of sliding friction is increased suddenly, if as girder truss needs shifting walk, it is necessary to
By manual correction, exist time consuming.
Therefore, there is following defect using traditional back-pressure wheel running gear:(1) structure is excessively complicated, from great;(2)
It is more to expend material, cost of idleness;(3) Hanging Basket movement is slow, and shape must be rectified a deviation during walking by substantial amounts of manpower
Cooperating, general 4m long segments need to take 5-6 hours, directly influence the construction speed of structure on bridge;(4) existing apparatus is equal
Can not solve the problems, such as the retrogressing of Hanging Basket in the process of walking.
In summary, it is badly in need of that a kind of structure is simplified, be solid and reliable, easy to operate and high efficiency of construction Hanging Basket is filled with walking
Put to solve problems of the prior art.
Utility model content
The utility model purpose is to provide that a kind of structure is simplified, be solid and reliable, be easy to operate, efficiency of construction is high and can be very
Control the Hanging Basket of Hanging Basket walking as follows with towed running gear, concrete technical scheme well:
A kind of towed running gear of Hanging Basket, including power source and multiple hooks for drawing Hanging Basket are realized synchronously
The hook of multiple tractions walking single-piece of walking, the traction walking single-piece and Hanging Basket, which corresponds, to be set;
Track structure that the traction walking single-piece includes being arranged on case vault, it is connected with the hook of Hanging Basket and can be in institute
State the slide construction and the hook of connection Hanging Basket and the power connections of the power source of the enterprising line slip of track structure.
Preferable in above technical scheme, the track structure includes one group of track single-piece or at least two groups are sequentially connected in series
The track single-piece of setting, the track single-piece include sole-plate and two blocks of track side plates being set up in parallel, the sole-plate
With two pieces of rail side plate shapes into the walking track walked for the slide construction.
It is preferable in above technical scheme, the detachable company of case vault that the sole-plate passes through foundation bolt and Hanging Basket
Connect;At least one piece of stiffener plate is provided between the track side plate and the sole-plate, the stiffener plate is located at the row
Walk on the outside of track;Graduation mark is arranged with two blocks of track side plates.
Preferable in above technical scheme, the slide construction, which includes sliding ship and position-limited wheel group, the position-limited wheel group, to be included
Two groups of position-limited wheels being set up in parallel;The sliding ship is to be had by what upper plate, lower shoe, four blocks of side plates and one piece of dividing plate were formed
The tetragonal body structure of two cavitys being set up in parallel, appearance is respectively equipped with two blocks of side plates of setting parallel with the track side plate
Receive the opening of the position-limited wheel, two position-limited wheels are arranged in two cavitys of the sliding ship by rotating shaft, and described turn
The both ends of axle connect the upper plate and the lower shoe respectively.
It is preferable in above technical scheme, it is provided between the inwall of the position-limited wheel and the track side plate between 2-6mm
Gap;Junction between four blocks of side plates and the lower shoe is circular arc chamfering structure.
Preferable in above technical scheme, the power source includes motor and the hoist engine with the motor connection.
Preferable in above technical scheme, the power connections include pulley assembly, the both ends point being arranged on hook
Not Lian Jie the pull rope of hoist engine and the pulley assembly and spacing the leading of moving towards to carry out to the pull rope turn component;
The pulley assembly includes two groups of fixation otic placodes being set up in parallel, both ends connect fix otic placode described in two groups respectively
Bearing pin and it is set on the bearing pin and fixes the pulley between otic placode described in two groups;The one ends wound of the pull rope
The pulley sets and is fixed by line card;
It is described lead to turn component and lead including first turn single-piece and second and lead and turn single-piece, the pull rope bypasses described first successively
Lead and turn single-piece and described second and lead and turn single-piece setting, the pulley and described first leads institute's stress on the pull rope turned between single-piece
Direction be Hanging Basket direction of travel.
Preferable in above technical scheme, described first leads and turns single-piece and described second and lead to turn and set for connection between single-piece
Put, setting or detachable setting independently of each other;Described first leads and turns single-piece and described second and lead that to turn single-piece be pulley;It is described
Pull rope is steel wire rope.
Preferable in above technical scheme, the traction walking single-piece also includes being used to prevent the slide construction from departing from institute
State the derailing part of walking track.
Preferable in above technical scheme, the derailing part includes the combination of bearing pin or bearing pin and L-shaped block;
Relative on two blocks of track side plates to be provided with bearing pin mounting hole, the both ends of the bearing pin are separately positioned on described in two pieces
In bearing pin mounting hole on track side plate.
Using the technical solution of the utility model, have the advantages that:
(1) the towed running gear of Hanging Basket of the present utility model includes power source and multiple extensions for drawing Hanging Basket
Hook realizes multiple tractions walking single-piece of synchronous walking, the hook one-to-one corresponding setting of the traction walking single-piece and Hanging Basket;Institute
State track structure that traction walking single-piece includes being arranged on case vault, be connected with the hook of Hanging Basket and can be in the track structure
The slide construction and the hook of connection Hanging Basket and the power connections of the power source of enterprising line slip.Total is simplified,
Cost is low;The hook of the traction walking single-piece and Hanging Basket, which corresponds, to be set, and is easy to implement multiple hook synchronization lines of Hanging Basket
Walk;Traction walking single-piece includes track structure, slide construction and power connections, by modularized design, is easily installed, dismantles
And assembling, it is easy to use.
(2) the utility model middle orbit includes one group of track single-piece or at least two groups track lists for being sequentially connected in series setting
Part, the quantity of track single-piece select according to actual conditions, meet that the different walkings of Hanging Basket require;The track single-piece includes track
Bottom plate and two blocks of track side plates being set up in parallel, the sole-plate and two pieces of rail side plate shapes slide knot into for described
The walking track of structure walking.Walking track ensures that Hanging Basket is walked along specific direction.The sole-plate is by foundation bolt with hanging
The case vault detachable connection of basket, various ways can be used to connect, meet different demands.The track side plate and the track
At least one piece of stiffener plate is provided between bottom plate, the stiffener plate improves overall track knot on the outside of the walking track
The strength and stability of structure.Graduation mark is arranged with two blocks of track side plates, the setting of graduation mark, is both easy to observation to slide
Whether structure wanders off, and facilitates ensuring that multiple hooks synchronize walking again.
(3) slide construction includes sliding ship in the utility model and position-limited wheel group, the position-limited wheel group are set side by side including two groups
The position-limited wheel put;Sliding ship is the four directions with two cavitys formed by upper plate, lower shoe, four blocks of side plates and one piece of dividing plate
Body structure, the opening for accommodating the roller group is respectively equipped with two blocks of side plates of setting parallel with the track side plate, it is described
Roller group is arranged on the sliding ship by rotating shaft, and the both ends of the rotating shaft connect the upper plate and the bottom respectively
Plate.The structure of sliding ship is simplified, and is easy to make;The design of position-limited wheel group so that the friction between sliding ship and walking is reduced to minimum,
Improve the service life of operating efficiency and elongate member;It is provided between the inwall of position-limited wheel and the track side plate between 2-6mm
Gap;Junction between four blocks of side plates and the lower shoe is circular arc chamfering structure, can meet to work as Hanging Basket both sides
Automatic deviation correction can be realized when asynchronous by being rolled between track riser, and and can reduces rubbing between part to a certain extent
Wipe.
(4) power source includes motor in the utility model and the hoist engine with the motor connection, part are readily available,
It is easy to operate, smooth running, continue and quick;Power connections include pulley assembly, pull rope and led to turn component, assembly pulley
Part includes two groups of fixation otic placode, bearing pin and pulleys being set up in parallel;Lead to turn component and lead including first and turn single-piece and second and lead and turn
Single-piece, the structure of power connections are simplified;Pulley described in the one ends wound of pull rope sets and is fixed by line card, operates
Conveniently and the movement that whole slide construction is realized under the drive of hoist engine is can ensure that, so as to drive hook to advance;The traction
Rope led successively around described first turn single-piece and described second lead turn single-piece setting, the pulley and described first lead turn single-piece it
Between pull rope on institute's stress direction be Hanging Basket direction of travel, first leads and turns single-piece and second and lead and turn the combination of single-piece and set
Meter, it is easy to change the direction of tractive force, is easy to the multiple traction walking single-pieces of the same power source synchronous drive to be walked.
(5) the traction walking also included derailing part of single-piece in the utility model, for preventing the slide construction from taking off
From the walking track;Derailing part includes the combination of bearing pin or bearing pin and L-shaped block, can be selected according to actual conditions
Select, meet different requirements.
In addition to objects, features and advantages described above, the utility model also has other purposes, feature and excellent
Point.Below with reference to figure, the utility model is described in further detail.
Brief description of the drawings
The accompanying drawing for forming the part of the application is used for providing further understanding to of the present utility model, of the present utility model
Schematic description and description is used to explain the utility model, does not form to improper restriction of the present utility model.In accompanying drawing
In:
Fig. 1 is the Hanging Basket overall structure diagram of towed running gear in embodiment 1;
Fig. 2 is confined explosion's structural representation in Fig. 1;
Fig. 3 is the structural representation that sliding ship component removes upper plate in Fig. 2;
Fig. 4 is another structural representation of derailing part in Fig. 1;
Wherein, 1, power source, 1.1, motor, 1.2, hoist engine;
2nd, traction walking single-piece, 2.1, track structure, 2.11, track single-piece, 2.2, slide construction, 2.21, sliding ship,
2.22nd, position-limited wheel group, 2.3, power connections, 2.31, pulley assembly, 2.32, pull rope, 2.33, lead and turn component, 2.4, anticreep
Rail part, 2.41, anti-break pin, 2.42, L-shaped block;
3rd, link up with;
A1, sole-plate, A2, track side plate, A2.1, bearing pin mounting hole, A3, walking track, A4, foundation bolt, A5,
Stiffener plate;
B1, position-limited wheel, B2, rotating shaft;
C1, upper plate, C2, lower shoe, C3, side plate, C4, dividing plate, C5, opening;
D1, fixed otic placode, D2, bearing pin, D3, pulley;
E1, first, which are led, turns single-piece, and E2, second, which are led, turns single-piece.
Embodiment
Embodiment of the present utility model is described in detail below in conjunction with accompanying drawing, but the utility model can be according to power
Profit requires to limit and the multitude of different ways of covering is implemented.
Embodiment 1:
Refer to Fig. 1-Fig. 3, a kind of towed running gear of Hanging Basket, including power source 1 and for drawing Hanging Basket two
Individual to link up with two traction walking single-pieces 2 for realizing synchronous walking, the hook for drawing walk single-piece 2 and Hanging Basket, which corresponds, to be set
Put.The power source 1 includes motor 1.1 and the hoist engine 1.2 being connected with the motor 1.1.
The traction walking single-piece 2 includes passing through the detachable track knots being arranged on case vault of multiple foundation bolt A4
The lower surface of the hook of structure 2.1 and Hanging Basket is welded to connect and can be in the slip of the 2.1 enterprising line slip of track structure
The power connections 2.3 of the hook and the power source 1 of structure 2.2 and connection Hanging Basket, Details as Follows:
The track structure 2.1 includes one group of track single-piece 2.11 (can also use at least two according to actual conditions herein
Group is sequentially connected in series the track single-piece 2.11 of setting, can be carried out between two adjacent groups track single-piece 2.11 by connection otic placode and bearing pin
Connection).The track single-piece 2.11 includes sole-plate A1 and two pieces of track side plate A2 being set up in parallel, and refers to Fig. 1 and Fig. 2,
The sole-plate A1 and two pieces of track side plate A2 forms the walking track A3 for the slide construction 2.2 walking.Institute
State and be located at the row provided with polylith stiffener plate A5, the stiffener plate A5 between track side plate A2 and the sole-plate A1
Walk on the outside of track A3;Graduation mark is arranged with two pieces of track side plate A2, the design of graduation mark is easy to implement the same of hook
Walking is walked.
The slide construction 2.2 includes sliding ship 2.21 and position-limited wheel group 2.22, refers to Fig. 3, the position-limited wheel group 2.22 is wrapped
Include the two groups of position-limited wheel being set up in parallel B1;The sliding ship 2.21 is by upper plate C1, lower shoe C2, four pieces of side plate C3 and one piece
The tetragonal body structure with two cavitys being set up in parallel that dividing plate C4 is formed, the two of setting parallel with the track side plate A2
The open C 5 for accommodating the position-limited wheel B1 is respectively equipped with block side plate C3, two position-limited wheel B1 are arranged on by rotating shaft B2
In two cavitys of the sliding ship 2.21, and the both ends of the rotating shaft B2 connect the upper plate C1 and the lower shoe respectively
C2.2-6mm gap is provided between the position-limited wheel B1 and the track side plate A2 inwall;Four pieces of side plate C3 with it is described
Junction between lower shoe C2 is circular arc chamfering structure.
The power connections 2.3 are including being arranged on the pulley assembly 2.31 on linking up with, both ends connect hoist engine 1.2 respectively
Move towards to carry out with the pull rope 2.32 (preferred steel wire rope herein) of the pulley assembly 2.31 and to the pull rope 2.32
Component 2.33 is turned in spacing leading.The pulley assembly 2.31 (referring to Fig. 2) includes two groups of the fixation otic placode D1 being set up in parallel, both ends
The bearing pin D2 that otic placode D1 is fixed described in two groups is connected respectively and is set on the bearing pin D2 and is located at fixed ear described in two groups
Pulley D3 between plate D1;Pulley D3 described in the one ends wound of the pull rope 2.32 sets and is fixed by line card.Institute
State to lead to turn component 2.33 and lead to turn single-piece E1 and second and lead including first and turn single-piece E2, the pull rope 2.32 is successively around described
First leads to turn single-piece E1 and described second and lead and turns single-piece E2 settings, and the pulley D3 and described first, which is led, turns leading between single-piece E1
The direction of institute's stress is the direction of travel of Hanging Basket on messenger 2.32.Described first leads to turn single-piece E1 and described second and lead and turns single-piece
It is separate set (can also be according to actual conditions using connection or detachable setting) between E2;Described first leads and turns list
Part E1 and described second, which is led, turns the preferred pulleys of single-piece E2.
The traction walking single-piece 2 also includes being used to prevent the slide construction 2.2 from departing from the anti-of the walking track A3
Derail part 2.4, and the derailing part 2.4 includes anti-break pin 2.41 and (or may be used also according to actual conditions, derailing part
To use another structure, Fig. 4 is referred to, including anti-break pin 2.41 and L-shaped block 2.42, bearing pin are arranged on L-shaped block
Corner).
It is relative on two pieces of track side plate A2 to be provided with bearing pin mounting hole A2.1, the both ends difference of the anti-break pin 2.41
It is arranged in the bearing pin mounting hole A2.1 on two pieces of track side plate A2.
Using the Hanging Basket of the present embodiment with towed running gear, it is specifically:
The installation process of single traction walking single-piece 2 is as follows:Pulley assembly 2.31 is welded on the front end face of hook 3;
Track structure 2.1 is fixed on the case vault of Hanging Basket by foundation bolt A4;Derailing is installed in the front end of track structure 2.1
Part 2.4;Slide construction 2.2 is welded on the hook bottom surface of Hanging Basket, and slide construction 2.2 is placed on walking track A3
It is interior;It will lead and turn component 2.33, hoist engine 1.2 and motor 1.1 and be separately fixed on case vault;A traction is drawn from hoist engine
Rope 2.32 turns first in component 2.33 and leads and turn single-piece and second and lead and turn single-piece around leading successively respectively, then passes around and connects with hook
After drawing certain length after the pulley assembly 2.31 connect, it is fixed with rope card with the steel wire rope introduced, ensures pull rope 2.32
Center with walking track center superposition, complete the installation of running gear.
The method of advance of Hanging Basket includes:Step 1.1, power source open work;Step 1.2, multiple traction walking single-piece bands
Hook on dynamic Hanging Basket is synchronous with certain speed one segment distance of advance;Step 1.3, when Hanging Basket does not advance to target location, return
Return step 1.2;When Hanging Basket advances to target location, the advance of Hanging Basket is completed;Wherein:Traction walking single-piece drives hook to advance
Detailed process be:Power connections drive slide construction and the hook being disposed thereon while advanced.I.e.:Start motor
1.1, hoist engine 1.2 is started working (hoist engine drives pull rope to roll gathering with certain speed), and traction Hanging Basket blows slowly forward, directly
To Hanging Basket walking in place.
There is error in pull rope, i.e., be not located at orbit centre unavoidably in installation process, certainly will now cause to slide ship and rail
Frictional force increases suddenly between road riser, now by setting position-limited wheel, greatly reduces the frictional force in walking process, ensures simultaneously
It is as far as possible synchronous that ship is slided in the left and right sides.
The rear annealing method of Hanging Basket includes:Step 2.1, power source open work;Step 2.2, multiple traction walking single-pieces are equal
In without tractive force state, hook on Hanging Basket is synchronous to retreat a segment distance with certain speed;Step 2.3, do not retreat when Hanging Basket
During to target location, return to step 1.2;When Hanging Basket is retreated to target location, the retrogressing of Hanging Basket is completed.I.e.:Start motor, volume
Machine start-up operation is raised, voluntarily (velocity magnitude can put the speed of pull rope to hook by hoist engine according to the actual requirements with certain speed
Degree determines) retreat to target location.
Using the technical scheme of the present embodiment, effect is:(1) it is simple in construction, solid and reliable, light quality;(2) dismounting side
Just, assembling is simple;(3) smooth running and quick, speed reaches 4-6m/2.5h;(4) retaining is taken into account, effect is all good;(5) work is strong
Spend low, efficiency of construction height.
Preferred embodiment of the present utility model is the foregoing is only, is not limited to the utility model, for this
For the technical staff in field, the utility model can have various modifications and variations.It is all in the spirit and principles of the utility model
Within, any modification, equivalent substitution and improvements made etc., it should be included within the scope of protection of the utility model.
Claims (10)
1. the towed running gear of a kind of Hanging Basket, it is characterised in that including power source (1) and for drawing the multiple of Hanging Basket
Hook realizes the hook one-to-one corresponding of multiple tractions walking single-piece (2) of synchronous walking, the traction walking single-piece (2) and Hanging Basket
Set;
Track structure (2.1) that the traction walking single-piece (2) includes being arranged on case vault, it is connected with the hook of Hanging Basket and energy
In the slide construction (2.2) of the track structure (2.1) enterprising line slip and the hook and the power source (1) of connection Hanging Basket
Power connections (2.3).
2. the towed running gear of Hanging Basket according to claim 1, it is characterised in that track structure (2.1) bag
Include one group of track single-piece (2.11) or at least two groups track single-pieces (2.11) for being sequentially connected in series setting, the track single-piece
(2.11) sole-plate (A1) and two blocks of track side plates (A2) being set up in parallel are included, described in the sole-plate (A1) and two pieces
Track side plate (A2) forms the walking track (A3) for the slide construction (2.2) walking.
3. the towed running gear of Hanging Basket according to claim 2, it is characterised in that the sole-plate (A1) passes through
The case vault detachable connection of foundation bolt (A4) and Hanging Basket;Between the track side plate (A2) and the sole-plate (A1)
Provided with least one piece of stiffener plate (A5), the stiffener plate (A5) is on the outside of the walking track (A3);Two pieces of rails
Graduation mark is arranged with road side plate (A2).
4. the towed running gear of Hanging Basket according to claim 2, it is characterised in that slide construction (2.2) bag
Sliding ship (2.21) and position-limited wheel group (2.22) are included, the position-limited wheel group (2.22) includes two groups of position-limited wheels (B1) being set up in parallel;
The sliding ship (2.21) is the tool formed by upper plate (C1), lower shoe (C2), four pieces of side plates (C3) and one piece of dividing plate (C4)
There is the tetragonal body structure of two cavitys being set up in parallel, on two pieces of side plates (C3) of setting parallel with the track side plate (A2)
The opening (C5) for accommodating the position-limited wheel (B1) is respectively equipped with, two position-limited wheels (B1) are arranged on described by rotating shaft (B2)
In two cavitys of sliding ship (2.21), and the both ends of the rotating shaft (B2) connect the upper plate (C1) and the lower shoe respectively
(C2)。
5. the towed running gear of Hanging Basket according to claim 4, it is characterised in that the position-limited wheel (B1) with it is described
2-6mm gap is provided between the inwall of track side plate (A2);Between four pieces of side plates (C3) and the lower shoe (C2)
Junction is circular arc chamfering structure.
6. the towed running gear of Hanging Basket according to claim 4, it is characterised in that the power source (1) includes electricity
Machine (1.1) and the hoist engine (1.2) being connected with the motor (1.1).
7. the towed running gear of Hanging Basket according to claim 6, it is characterised in that the power connections (2.3)
Including being arranged on the pulley assembly (2.31) on linking up with, both ends connect hoist engine (1.2) and the pulley assembly (2.31) respectively
Pull rope (2.32) and to the pull rope (2.32) move towards carry out spacing leading turn component (2.33);
The pulley assembly (2.31) includes two groups of fixation otic placodes (D1) being set up in parallel, both ends connect fixed described in two groups respectively
The bearing pin (D2) of otic placode (D1) and it is set on the bearing pin (D2) and fixes the cunning between otic placode (D1) described in two groups
Take turns (D3);Pulley (D3) described in the one ends wound of the pull rope (2.32) sets and is fixed by line card;
It is described lead to turn component (2.33) and lead including first turn single-piece (E1) and second and lead and turn single-piece (E2), the pull rope (2.32)
Led successively around described first turn single-piece (E1) and described second lead turn single-piece (E2) setting.
8. the towed running gear of Hanging Basket according to claim 7, it is characterised in that described first leads and turn single-piece (E1)
And described second lead to turn and set between single-piece (E2), set independently of each other or detachable setting for connection;Described first leads and turns
Single-piece (E1) and described second leads that to turn single-piece (E2) be pulley;The pull rope (2.32) is steel wire rope.
9. the towed running gear of Hanging Basket according to claim 2-8 any one, it is characterised in that the traction row
Walking single-piece (2) also includes being used for the derailing part for preventing the slide construction (2.2) from departing from the walking track (A3)
(2.4)。
10. the towed running gear of Hanging Basket according to claim 9, it is characterised in that the derailing part (2.4)
Combination including anti-break pin (2.41) or anti-break pin (2.41) and L-shaped block (2.42);
It is relative on two pieces of track side plates (A2) to be provided with bearing pin mounting hole (A2.1), the both ends point of the anti-break pin (2.41)
It is not arranged on the bearing pin mounting hole (A2.1) on two pieces of track side plates (A2) Nei.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720548235.3U CN206873314U (en) | 2017-05-17 | 2017-05-17 | A kind of towed running gear of Hanging Basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720548235.3U CN206873314U (en) | 2017-05-17 | 2017-05-17 | A kind of towed running gear of Hanging Basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206873314U true CN206873314U (en) | 2018-01-12 |
Family
ID=61339798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720548235.3U Expired - Fee Related CN206873314U (en) | 2017-05-17 | 2017-05-17 | A kind of towed running gear of Hanging Basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206873314U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130526A (en) * | 2017-05-17 | 2017-09-05 | 贵州路桥集团有限公司 | A kind of Hanging Basket uses the traveling method of this device with towed running gear and Hanging Basket |
CN108147340A (en) * | 2018-02-09 | 2018-06-12 | 安徽兰兮工程技术开发有限公司 | A kind of walking mechanism |
-
2017
- 2017-05-17 CN CN201720548235.3U patent/CN206873314U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130526A (en) * | 2017-05-17 | 2017-09-05 | 贵州路桥集团有限公司 | A kind of Hanging Basket uses the traveling method of this device with towed running gear and Hanging Basket |
CN108147340A (en) * | 2018-02-09 | 2018-06-12 | 安徽兰兮工程技术开发有限公司 | A kind of walking mechanism |
CN108147340B (en) * | 2018-02-09 | 2020-02-11 | 安庆美特优智能科技有限公司 | Traveling mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638185B (en) | A kind of traveling process becomes automatically across track-laying machine and application method | |
CN107130526A (en) | A kind of Hanging Basket uses the traveling method of this device with towed running gear and Hanging Basket | |
CN202273179U (en) | High-altitude steel cable suspended working platform for construction and maintenance on outer side of bridge box girder | |
CN110053634A (en) | A kind of straddle-type track girder carrying implement and its application method | |
CN103790114A (en) | Hydraulic dragging and idler wheel walking combination cable carrying crane and walking method thereof | |
CN103074829B (en) | Railway switch changing construction method and railway switch track laying unit thereof | |
CN206873314U (en) | A kind of towed running gear of Hanging Basket | |
CN101890963A (en) | Variable-height continuous steel truss girder railway bridge inspection vehicle | |
CN207209809U (en) | A kind of extraordinary Dramatic Air Lifts | |
CN103306218A (en) | Bottom width overhaul hanging basket of bridge | |
CN104929000A (en) | Sectional railway track laying machine set and assembling method thereof | |
CN104452594A (en) | Multi-support cable guide method cable replacement device | |
CN205975236U (en) | Big parts of high -speed railway turnout trade to mat formation and are equipped with | |
CN207944341U (en) | Top chord check car system | |
CN108221512A (en) | Adjustable track laying machine | |
CN208416565U (en) | Tunnel double-lining circumferential reinforcement is laid with trolley | |
CN206721695U (en) | A kind of Hanging Basket roller type running gear | |
CN206752331U (en) | A kind of Hanging Basket band self-locking wheel-track type running gear | |
CN206873313U (en) | A kind of Hanging Basket slidingtype running gear | |
CN106505479B (en) | High-rise shelf cable laying method and device in tunnel | |
CN206156620U (en) | Movable track hoisting trolley of usefulness is demolishd with temporary track to shield tunnel construction | |
CN201963312U (en) | Automatic walking device used for walking on uneven ground | |
CN205975373U (en) | Novel frock of being under construction is synthesized to suspension bridge main push -towing rope and hoist cable | |
CN205346676U (en) | High -speed railway of not stopping transport across device's span beam becomes width of cloth rotary mechanism | |
CN102720103B (en) | Rail turnout unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180112 |
|
CF01 | Termination of patent right due to non-payment of annual fee |