CN206869814U - Flange form electric hammer mounting bracket for high-altitude telescopic movable drilling platform - Google Patents

Flange form electric hammer mounting bracket for high-altitude telescopic movable drilling platform Download PDF

Info

Publication number
CN206869814U
CN206869814U CN201720826997.5U CN201720826997U CN206869814U CN 206869814 U CN206869814 U CN 206869814U CN 201720826997 U CN201720826997 U CN 201720826997U CN 206869814 U CN206869814 U CN 206869814U
Authority
CN
China
Prior art keywords
electric hammer
flange
mounting bracket
flange form
bearer carrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720826997.5U
Other languages
Chinese (zh)
Inventor
屈彩芳
高粉丽
李强
刘雅
黄朝伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No9 Metallurgical Construction Ltd Corp
Original Assignee
No9 Metallurgical Construction Ltd Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No9 Metallurgical Construction Ltd Corp filed Critical No9 Metallurgical Construction Ltd Corp
Priority to CN201720826997.5U priority Critical patent/CN206869814U/en
Application granted granted Critical
Publication of CN206869814U publication Critical patent/CN206869814U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of flange form electric hammer mounting bracket for high-altitude telescopic movable drilling platform is provided, there is the electric hammer fixed mechanism being made up of bearer carrier and fixed support portion, bearer carrier is integrated into by bottom mounting flange and upper end connecting pole concentric co-axial;Bearer carrier bottom is connected the more coaxial flange forms connection bar units docked with one heart;Collateral boom and the after-poppet arm of housing arm setting of the fixed support portion centered on bearer carrier by length staggeredly and along electric hammer head vertical direction forms, and hoop component is fixedly mounted in above-mentioned side, the end of after-poppet arm respectively.The utility model structural strength is higher, overall structure is simple, it is more reliable with the coaxial straight line punching perpendicular positioning construction of electric hammer high-frequency percussion action, in addition assembly and disassembly installation operation is convenient, can repeated disassembled and assembled assembling use, the length for connecting bar unit by increasing and decreasing flange form and may extend away whole flange form electric hammer mounting bracket, more application value.

Description

Flange form electric hammer mounting bracket for high-altitude telescopic movable drilling platform
Technical field
Auxiliary Tools Technology is fixedly mounted in the utility model category electric hammer, and in particular to one kind is stretched removable for high-altitude The flange form electric hammer mounting bracket of dynamic drilling platform.
Background technology
At present, in the electric hammer support that can solve the problem that high-altitude concrete drilling operation, with concrete beam plate bottom as shown in Figure 7 Slide buffering telescopic to may move based on the structure design of drilling platform, because it is by more ingenious and succinct structure, carry Supply a kind of on-fixed fulcrum and with the arm spring buffer-type elastic extension structure in certain elastic moving space, solve city Other flexible operation supports of high-altitude punching on face, deviation of gravity center, punching perpendicularity matter as existing for quadrilateral hinge supporting structure Amount is not high;Or telescopic adjustment existing for the flexible punching support structure of fishing rod type is complicated, and is influenceed fishing rod by electric hammer high-frequency percussion and stretched Contracting supporting construction intensity difference;And other high-altitude drilling operation supporting structures lack spring buffer part and therefore vibrate obvious, device Resistance to overturning is bad, and the bad problems of operative employee's usage comfort, therefore, telescopic movable drilling platform are to be at present Only ideal technical scheme.Realize that electric hammer exists to slide the removable drilling platform of buffering telescopic at concrete beam plate bottom The fixed installation of its cantilever tip opening position, there is provided one kind equally has high simple structure but structural strength, install convenient and steady concurrently Gu repeatable dismounting is applied in combination, and facilitates the electric hammer mounting bracket of development length, solves electric hammer mounting bracket under prior art Bracket can not realize that the extension extension of length, the structure of electric hammer binding supporting part have to be optimized and bracket base list in itself Stress distribution existing for the tight connected mode of side bolt lock is uneven, and coaxially connected intensity is not high, removes and installs the technical problem of inconvenience, Now propose following improved technology scheme.
Utility model content
Technical problem to be solved in the utility model is overcome the deficiencies in the prior art, there is provided one kind is stretched for high-altitude The flange form electric hammer mounting bracket of removable drilling platform, solving electric hammer mounting bracket bracket under prior art can not realize in itself The extension extension of length, the structure of electric hammer binding supporting part have the unilateral tight connection side of bolt lock to be optimized and bracket base Stress distribution existing for formula is uneven, and coaxially connected intensity is not high, removes and installs the technical problem of inconvenience.
The technical solution adopted in the utility model:Flange form electric hammer mounting bracket for high-altitude telescopic movable drilling platform Frame, there is electric hammer fixed mechanism, the electric hammer fixed mechanism is made up of bearer carrier and fixed support portion, and the bearer carrier is by bottom Mounting flange and the connecting pole concentric co-axial of upper end be integrated into;It is connected more by mounting flange positioned at bearer carrier bottom Coaxial docking with one heart realizes that electric hammer mounting bracket entire length expands extension and connects bar unit with the flange form of extension;The fixed branch The collateral boom of housing arm setting of the support part centered on bearer carrier by length staggeredly and along electric hammer head vertical direction props up with rear Boom forms, and hoop component is fixedly mounted in the end of above-mentioned collateral boom and after-poppet arm respectively.
As optimal technical scheme, the flange form connects bar unit by sleeve and positioned at sleeve both ends and its integration system Into ring flange composition.
As optimal technical scheme, the collateral boom is long-armed, its height and the housing wall of electric hammer installation arrangement of clutch Position is corresponding;The after-poppet arm is galianconism, and its height is corresponding with the housing wall position of electric hammer installation deceleration device.
Further to improve perpendicularity, enough strength supports, the center of bearer carrier 1 and electric hammer are provided for vertical perforating Tup perpendicular bisector overlap.
The utility model compared with prior art the advantages of:
1st, the connection between this case electric hammer fixed mechanism and flange form connection bar unit is by the way of flange installation To realize and be connected, the mode compared with eccentric bolt clamp connection support under prior art not only increases the dimension width scope of connection, And more can guarantee that the same shaft concentricity installed between support and electric hammer, it is quick and easy for installation, can rapidly Assembly And Disassembly, It is more guaranteed compared with threaded engagement connection intensity;
2nd, this programme not only realizes the fixed installation of electric hammer, and the more coaxial docking with one heart that bearer carrier bottom is provided with Flange form connection bar unit, realize electric hammer mounting bracket entire length expand extension and extension bearing height regulation, it is more sharp Punch and use in eminence;
3rd, the layout of this programme fixed support portion, using copy side before and after hand steered encirclement electric hammer, along electric hammer head direction shell Body wall, combination of long drives and drop shots structure and design, with reference to hoop component, electric hammer fix it is more firm;
4th, this programme simple structure, intensity are high, coaxial vertical degree is high, firm, the repeatable dismounting of install convenient is applied in combination, Extensible length, has application value.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model electric hammer fixed mechanism;
Fig. 2 is that the utility model electric hammer fixed mechanism connects the structural representation that a flange form connects bar unit;
Fig. 3 is the utility model overall structure diagram;
Fig. 4 is the structural front view that the utility model flange form connects bar unit;
Fig. 5 is the sectional view that the utility model flange form connects bar unit;
Fig. 6 is that the utility model assembles the structural representation after electric hammer;
Fig. 7 is that the concrete beam plate bottom removable drilling platform of slip buffering telescopic installs the utility model under prior art Use state diagram afterwards.
Embodiment
1-6 describes a kind of embodiment of the present utility model below in conjunction with the accompanying drawings.
For the flange form electric hammer mounting bracket of high-altitude telescopic movable drilling platform, there is electric hammer fixed mechanism, it is described Electric hammer fixed mechanism is made up of (as shown in Figure 1) bearer carrier 1 and fixed support portion 2, and the utility model is different under prior art Bearer carrier threaded engagement connection support, or eccentric bolt are fixedly connected with the difference of cantilever tip and are:The bearer carrier 1 is by bottom Mounting flange 101 and the concentric co-axial of connecting pole 102 of upper end be integrated into.Specifically, the diameter of connecting pole 102 can be 2 ~3.5cm, the external diameter of mounting flange 101 can be 4~6.5cm.It is connected more by mounting flange 101 positioned at the bottom of bearer carrier 1 Coaxial docking with one heart realizes that electric hammer mounting bracket entire length expands extension and connects bar unit 3 (such as Fig. 2, Fig. 3 with the flange form of extension It is shown).
It can be seen that in electric hammer fixed mechanism of the present utility model, the connection between bearer carrier 1 and flange form connection bar unit 3, And the connection between multiple flange form connection bar units 3 realizes connected, the flange of lowermost end by the way of flange installation The mode that formula connection bar unit 3 is installed again by flange connects the cantilever tip of high-altitude telescopic movable drilling platform.It is more existing The mode for having eccentric bolt clamp connection cantilever tip under technology not only increases the dimension width scope of connection, and can more protect The same shaft concentricity installed between card support entirety and electric hammer and electric hammer mounting bracket three, the mode of flange docking, centering It is quick and easy for installation, rapidly Assembly And Disassembly can be realized, it is more guaranteed compared with threaded engagement connection intensity.In addition, this practicality The new fixed installation for not only realizing electric hammer 4, and the more coaxial flange forms docked with one heart that the bottom of bearer carrier 1 is provided with connect Extension bar unit 3, realizes the bearing height regulation that electric hammer mounting bracket entire length expands extension and extension, and more conducively eminence is punched Regulation use.
As optimal technical scheme, the flange form connection bar unit 3 by sleeve 301 and is located at (as shown in Figure 4, Figure 5) The both ends of sleeve 301 form with ring flange 302 made of its is integrated, from sleeve 301, on the premise of concentric co-axial degree is ensured Have the function that alleviator is integrally conducted oneself with dignity.
The fixed support portion 2 is centered on bearer carrier 1 by length staggeredly and along the housing arm of the tup vertical direction of electric hammer 4 The collateral boom 201 and after-poppet arm 202 set forms, and the end of above-mentioned collateral boom 201 and after-poppet arm 202 is solid respectively Dingan County fills hoop component 5.Wherein, the reality that collateral boom 201 and after-poppet arm 202 are designed with fitting electric hammer 4 shell wall bending radian Heart rod-like element is made.Preferably, (as shown in Figure 6) described collateral boom 201 is long-armed that its height installs clutch dress with electric hammer 4 The housing wall position put is corresponding;The after-poppet arm 202 is galianconism, and its height installs the housing wall of deceleration device with electric hammer 4 Position is corresponding, the hoop component 5 for coordinating both ends to be fixedly mounted.The layout of this programme fixed support portion 2, using copying hand Help and surround electric hammer 4 forward and backward side, along electric hammer head direction housing wall it is long and short with reference to structure and design, not only structure is simplified, knot Hoop component 5 is closed, and the fixation of electric hammer 4 is more firm, and hoop component 5 can be selected the size being adapted with the model of electric hammer 4 and advise Lattice, it is welded and fixed in collateral boom 201 and the top of after-poppet arm 202 to realize.
Further to improve concentric vertical degree, enough strength supports are provided for vertical perforating, with the high frequency of the tup of electric hammer 4 Percussion action, the bottom of bearer carrier 1 can be supported concentrically at the tail end of electric hammer 4 all the time, the center of bearer carrier 1 and electric hammer 4 Tup perpendicular bisector overlaps.
In summary, the utility model overall structure is simple, but the position of each component and bonding strength have guarantor Card, with the percussion action of the high frequency of electric hammer 4, on the basis of enough strength supports are provided, coaxial straight line perpendicularity is high, vertically Punching positioning construction is more reliable.In addition assembly and disassembly installation operation is convenient, can repeated disassembled and assembled assembling use, pass through increase and decrease method Blue formula connection bar unit 3 may extend away the length of whole flange form electric hammer mounting bracket, more application value.
Above-described embodiment, simply preferred embodiment of the present utility model, not it is used for limiting the utility model practical range, Therefore all equivalence changes done with content described in the utility model claims, the utility model claims model all should be included in Within enclosing.

Claims (4)

1. for the flange form electric hammer mounting bracket of high-altitude telescopic movable drilling platform, there is electric hammer fixed mechanism, its feature It is:The electric hammer fixed mechanism is made up of bearer carrier (1) and fixed support portion (2), the bearer carrier (1) by bottom installation Connecting pole (102) concentric co-axial of flange (101) and upper end is integrated into;Pass through mounting flange positioned at bearer carrier (1) bottom (101) the more coaxial docking with one heart that are connected realize that electric hammer mounting bracket entire length expands the flange form connecting rod list of extension and extension First (3);The fixed support portion (2) is centered on bearer carrier (1) by length staggeredly and along the shell of electric hammer (4) tup vertical direction Collateral boom (201) and after-poppet arm (202) composition that body arm is set, and above-mentioned collateral boom (201) and after-poppet arm (202) End hoop component (5) is fixedly mounted respectively.
2. the flange form electric hammer mounting bracket according to claim 1 for high-altitude telescopic movable drilling platform, it is special Sign is:Flange form connection bar unit (3) by sleeve (301) and positioned at sleeve (301) both ends it is integrated with its made of Ring flange (302) forms.
3. the flange form electric hammer mounting bracket according to claim 1 for high-altitude telescopic movable drilling platform, it is special Sign is:The collateral boom (201) is long-armed, and its height is corresponding with the housing wall position of electric hammer (4) installation arrangement of clutch; The after-poppet arm (202) is galianconism, and its height is corresponding with the housing wall position of electric hammer (4) installation deceleration device.
4. the flange form electric hammer mounting bracket according to claim 1 for high-altitude telescopic movable drilling platform, it is special Sign is:Bearer carrier (1) center overlaps with the tup perpendicular bisector of electric hammer (4).
CN201720826997.5U 2017-07-10 2017-07-10 Flange form electric hammer mounting bracket for high-altitude telescopic movable drilling platform Active CN206869814U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720826997.5U CN206869814U (en) 2017-07-10 2017-07-10 Flange form electric hammer mounting bracket for high-altitude telescopic movable drilling platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720826997.5U CN206869814U (en) 2017-07-10 2017-07-10 Flange form electric hammer mounting bracket for high-altitude telescopic movable drilling platform

Publications (1)

Publication Number Publication Date
CN206869814U true CN206869814U (en) 2018-01-12

Family

ID=61329929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720826997.5U Active CN206869814U (en) 2017-07-10 2017-07-10 Flange form electric hammer mounting bracket for high-altitude telescopic movable drilling platform

Country Status (1)

Country Link
CN (1) CN206869814U (en)

Similar Documents

Publication Publication Date Title
CN206869814U (en) Flange form electric hammer mounting bracket for high-altitude telescopic movable drilling platform
GB2477475A (en) Lightweight draw-bar case
CN206533501U (en) A kind of multi-purpose microphone for news interview fixing device
CN201569843U (en) Camera bracket
CN204062389U (en) The angle supporting frame detaching structure of photographing foot stand
CN207896623U (en) A kind of pedestal linking cable bearer
CN207527144U (en) A kind of anchor ear support component for pipe fitting connection
CN213455530U (en) Multifunctional measuring device for highway design
CN206951428U (en) A kind of structure design of centrifuge vibration damping hanging basket
CN206942968U (en) A kind of weaving air compressor air storage tank
CN206398798U (en) A kind of quick detachable panel construction applied to cigarette machine
CN210117454U (en) Ingot furnace top heater mounting structure
CN204889112U (en) Lift table of adjustable length
CN209861556U (en) Fixed connection frame for fixing mechanism of agricultural seeder
CN206046987U (en) The support meanss of reinforcing strip in airduct
CN209664371U (en) A kind of slidingtype building template perforating device
CN209538009U (en) A kind of plank road supporting structure of tourism
CN209088487U (en) A kind of L-type double-head outlet bracket
CN211187375U (en) Combined infusion frame type wrist arthroscope traction tower
CN220203142U (en) A anti-bearing design structure for large-scale furred ceiling
CN214476292U (en) Display board for political and industrial work
CN207195831U (en) A kind of support bracket for Pipe installing
CN219138489U (en) Adjustable support frame
CN201097256Y (en) Foldable notebook computer bracket
CN216483165U (en) Measuring device for building engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant