Prior art keywords
fixedly connected
base
block
fixed block
slide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720504503.1U
Other languages
Chinese (zh)
Inventor
薛桂荣
祝文庆
宋杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720504503.1U priority Critical patent/CN206862390U/en
Application granted granted Critical
Publication of CN206862390U publication Critical patent/CN206862390U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses building engineering construction detection means, including base, construction wall detection device is fixedly connected with the top of the base, the first fixed block is fixedly connected with the top of the base inner wall, the bottom of first fixed block is connected with two support bars by first rotating shaft, and two one end of support bar away from the first fixed block are connected with the second fixed block by the second rotating shaft.The utility model is by setting being used cooperatively for base, construction wall detection device, the first fixed block, support bar, the second fixed block, the first sliding block, the first slide rail, supporting plate, limiting plate, the second slide rail, the second sliding block, fix bar, roller, expansion link and controller, solves existing wall detection means when in use, the problem of height can not being adjusted according to the height of user, the building engineering construction detection means, possess the advantages of regulation height, add comfortable attitude when user uses.

Description

Building engineering construction detection means
Technical field
Building engineering construction monitoring device technical field is the utility model is related to, specially building engineering construction is filled with detection Put.
Background technology
Architectural engineering, refer to by the construction to all kinds of building constructions and its affiliated facility and the circuit supporting with it, pipeline, The engineering entity that the installation activity of equipment is formed.Wherein building construction, which refers to, top cover, beam column, wall, basis and being capable of shape Into inner space, meet people's production, live, learn, the engineering of public activity needs.
Need to use wall detection means when construction, but existing wall detection means is using When, height can not be adjusted according to the height of user, user can not be made to keep comfortable posture work, reducing makes Comfort level when user uses, it has not been convenient to which user uses.
Utility model content
The purpose of this utility model is to provide building engineering construction detection means possess the advantages of regulation height, solution Existing wall detection means determined when in use, the problem of height can not being adjusted according to the height of user.
To achieve the above object, the utility model provides following technical scheme:Building engineering construction detection means, including Base, construction wall detection device is fixedly connected with the top of the base, is fixedly connected with the top of the base inner wall One fixed block, the bottom of first fixed block are connected with two support bars by first rotating shaft, and two support bars are remote One end of first fixed block is connected with the second fixed block by the second rotating shaft, and the bottom of second fixed block is fixedly connected There is the first sliding block, the basal sliding of first sliding block is connected with the first slide rail, and the bottom of first slide rail is fixedly connected with Supporting plate, the both sides of first slide rail are fixedly connected with limited location plate, and the bottom of the limiting plate and the top of supporting plate are consolidated Fixed connection, is fixedly connected with the second slide rail on rear side of the base inner wall, and the front surface of second slide rail slidably connects the Two sliding blocks, the front surface of second sliding block are fixedly connected with fix bar, and the bottom of the fix bar passes through the 3rd rotating shaft activity Roller is connected with, the bottom of the roller contacts with the surface of connecting rod, and the back side of first fixed block, which is fixedly connected with, stretches Contracting bar, the both ends of the expansion link are fixedly connected with two fix bars, and the bottom of the base, which offers to coordinate with supporting plate, to be made Opening, controller is fixedly connected with the left of the construction wall detection device, the controller electrically connects with expansion link Connect.
Preferably, the both sides at the top of the supporting plate have been fixedly connected with locating dowel, and the both sides of the base inner wall are solid Surely positioning sleeve is connected with, the top of positioning sleeve is through at the top of the locating dowel, and two locating dowels are respectively positioned at two limits The outside of position plate.
Preferably, the bottom of the supporting plate is fixedly connected with non-slipping block, and the bottom of the non-slipping block offers anti-slip veins.
Preferably, the surface of the support bar offers the chute being used cooperatively with roller, and the bottom of roller and chute Bottom land contact.
Preferably, the both sides of second slide rail are fixedly connected with limited location block, in the back side and base of the limited block It is fixedly connected on rear side of wall.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, the utility model is by setting base, construction wall detection device, the first fixed block, support bar, second to fix Block, the first sliding block, the first slide rail, supporting plate, limiting plate, the second slide rail, the second sliding block, fix bar, roller, expansion link and control Device is used cooperatively, and solves existing wall detection means when in use, can not be adjusted according to the height of user The problem of saving height, the building engineering construction detection means, possess the advantages of regulation height, add when user uses Comfortable attitude, facilitate user's use.
2nd, the utility model plays a part of positioning supporting plate, avoids branch by the setting of locating dowel and positioning sleeve There is the phenomenon offset when in use in fagging, facilitates user's use, adds construction wall detection device use When stability, by the setting of non-slipping block, play anti-skidding effect, avoid the construction wall detection device use when The phenomenon for occurring sliding is waited, stability when construction wall detection device uses is added, passes through non-slipping block skidproof bottom line Set, further add skidproof effect, by the setting of limited block, the work being defined to the motion track of the second sliding block With avoiding the second sliding block and occur the phenomenon departed from occur with the second slide rail when in use, ensure that the second sliding block and Two slide rails can be with normal operation.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the front section view of the utility model base.
In figure:1 base, 2 construction wall detection devices, 3 first fixed blocks, 4 support bars, 5 second fixed blocks, 6 first are slided Block, 7 first slide rails, 8 supporting plates, 9 limiting plates, 10 second slide rails, 11 second sliding blocks, 12 fix bars, 13 rollers, 14 expansion links, 15 controllers, 16 locating dowels, 17 positioning sleeves, 18 non-slipping blocks, 19 limited blocks.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-2, building engineering construction detection means, including base 1 are referred to, the top of base 1, which is fixedly connected with, to be built Walling physical examination measurement equipment 2, the first fixed block 3 is fixedly connected with the top of the inwall of base 1, the bottom of the first fixed block 3 passes through One rotating shaft is connected with two support bars 4, and the one end of two support bars 4 away from the first fixed block 3 passes through the second rotating shaft activity The second fixed block 5 is connected with, the bottom of the second fixed block 5 is fixedly connected with the first sliding block 6, and the basal sliding of the first sliding block 6 connects The first slide rail 7 is connected to, the bottom of the first slide rail 7 is fixedly connected with supporting plate 8, and the both sides at the top of supporting plate 8 have been fixedly connected with Locating dowel 16, by the setting of locating dowel 16 and positioning sleeve 17, play a part of positioning supporting plate 8, avoid supporting plate 8 and exist Occur the phenomenon offset when use, facilitate user's use, add steady when the construction wall detection device 2 uses Qualitative, the both sides of the inwall of base 1 have been fixedly connected with positioning sleeve 17, and the top of locating dowel 16 is through to the top of positioning sleeve 17, And two locating dowels 16, respectively positioned at the outside of two limiting plates 9, the bottom of supporting plate 8 is fixedly connected with non-slipping block 18, passed through The setting of non-slipping block 18, anti-skidding effect is played, avoid the construction wall detection device 2 and occur what is slided when in use Phenomenon, stability when construction wall detection device 2 uses is added, the bottom of non-slipping block 18 offers anti-slip veins, by anti- The setting of the skidproof bottom line of sliding block 18, skidproof effect is further added, the surface of support bar 4 offers to be coordinated with roller 13 The chute used, and the bottom of roller 13 contacts with the bottom land of chute, the both sides of the first slide rail 7 are fixedly connected with limited location plate 9, The bottom of limiting plate 9 is fixedly connected with the top of supporting plate 8, is fixedly connected with the second slide rail 10 on rear side of the inwall of base 1, and second The both sides of slide rail 10 are fixedly connected with limited location block 19, and by the setting of limited block 19, the motion track of the second sliding block 11 is entered The effect that row limits, avoid the second sliding block 11 and occur the phenomenon departed from occur with the second slide rail 10 when in use, ensure Second sliding block 11 and the second slide rail 10 can with normal operation, the back side of limited block 19 with being fixedly connected on rear side of the inwall of base 1, The front surface of second slide rail 10 slidably connects the second sliding block 11, and the front surface of the second sliding block 11 is fixedly connected with fix bar 12, The bottom of fix bar 12 is connected with roller 13 by the 3rd rotating shaft, and the bottom of roller 13 contacts with the surface of connecting rod 12, The back side of first fixed block 3 is fixedly connected with expansion link 14, and the both ends of expansion link 14 are fixedly connected with two fix bars 12, base 1 bottom offers the opening being used cooperatively with supporting plate 8, and the left side of construction wall detection device 2 is fixedly connected with controller 15, controller 15 is electrically connected with expansion link 14.
In use, controlling expansion link 14 to run by controller 15, two fix bars are driven when expansion link 14 shrinks 12 movements, fix bar 12 drive roller 13, and roller 13 drives two support bars 4 to middle close, when two support bars 4 are to centre When close, support bar 4 promotes supporting plate 8, and when supporting plate 8 contacts with ground, base 1 leaves ground, conversely, two Support bar 4 to both sides move when, supporting plate 8 withdraws the inside of base 1, and the bottom of base 1 contacts with ground, you can reaches Adjust the effect of building engineering construction detection means height.
In summary:The building engineering construction detection means, by setting base 1, construction wall detection device 2, One fixed block 3, support bar 4, the second fixed block 5, the first sliding block 6, the first slide rail 7, supporting plate 8, limiting plate 9, the second slide rail 10, Second sliding block 11, fix bar 12, roller 13, expansion link 14 and controller 15 are used cooperatively, and solve existing wall detection Device when in use, the problem of height can not being adjusted according to the height of user.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. building engineering construction detection means, including base (1), it is characterised in that:It is fixedly connected at the top of the base (1) There is construction wall detection device (2), the first fixed block (3) is fixedly connected with the top of base (1) inwall, described first is solid The bottom for determining block (3) is connected with two support bars (4) by first rotating shaft, and two support bars (4) are away from the first fixed block (3) one end is connected with the second fixed block (5) by the second rotating shaft, and the bottom of second fixed block (5) is fixedly connected There is the first sliding block (6), the basal sliding of first sliding block (6) is connected with the first slide rail (7), the bottom of first slide rail (7) Portion is fixedly connected with supporting plate (8), and the both sides of first slide rail (7) are fixedly connected with limited location plate (9), the limiting plate (9) bottom is fixedly connected with the second slide rail with being fixedly connected at the top of supporting plate (8) on rear side of base (1) inwall (10), the front surface of second slide rail (10) slidably connects the second sliding block (11), the front surface of second sliding block (11) Fix bar (12) is fixedly connected with, the bottom of the fix bar (12) is connected with roller (13) by the 3rd rotating shaft, described The bottom of roller (13) contacts with the surface of connecting rod (12), and the back side of first fixed block (3) is fixedly connected with expansion link (14), the both ends of the expansion link (14) are fixedly connected with two fix bars (12), and the bottom of the base (1) offers and propped up The opening that fagging (8) is used cooperatively, controller (15) is fixedly connected with the left of the construction wall detection device (2), it is described Controller (15) is electrically connected with expansion link (14).
2. building engineering construction detection means according to claim 1, it is characterised in that:At the top of the supporting plate (8) Both sides be fixedly connected with locating dowel (16), the both sides of base (1) inwall have been fixedly connected with positioning sleeve (17), described The top of positioning sleeve (17) is through at the top of locating dowel (16), and two locating dowels (16) are located at two limiting plates (9) respectively Outside.
3. building engineering construction detection means according to claim 1, it is characterised in that:The bottom of the supporting plate (8) Portion is fixedly connected with non-slipping block (18), and the bottom of the non-slipping block (18) offers anti-slip veins.
4. building engineering construction detection means according to claim 1, it is characterised in that:The table of the support bar (4) Face offers the chute being used cooperatively with roller (13), and the bottom of roller (13) contacts with the bottom land of chute.
5. building engineering construction detection means according to claim 1, it is characterised in that:Second slide rail (10) Both sides are fixedly connected with limited location block (19), and the back side of the limited block (19) on rear side of base (1) inwall with being fixedly connected.
CN201720504503.1U 2017-05-09 2017-05-09 Building engineering construction detection means Expired - Fee Related CN206862390U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720504503.1U CN206862390U (en) 2017-05-09 2017-05-09 Building engineering construction detection means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720504503.1U CN206862390U (en) 2017-05-09 2017-05-09 Building engineering construction detection means

Publications (1)

Publication Number Publication Date
CN206862390U true CN206862390U (en) 2018-01-09

Family

ID=60823464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720504503.1U Expired - Fee Related CN206862390U (en) 2017-05-09 2017-05-09 Building engineering construction detection means

Country Status (1)

Country Link
CN (1) CN206862390U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112485145A (en) * 2020-11-28 2021-03-12 阜阳市金亮涂料有限公司 Building wall's hardness and toughness detection device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112485145A (en) * 2020-11-28 2021-03-12 阜阳市金亮涂料有限公司 Building wall's hardness and toughness detection device

Similar Documents

Publication Publication Date Title
CN204581897U (en) A kind of spiral outdoor waist shoulder masseur
CN206862390U (en) Building engineering construction detection means
CN205912649U (en) Slatted floor for sheep house
CN205534926U (en) Improved generation nottable laptop stand
CN205994076U (en) A kind of bedstead with movable bed board
CN209179095U (en) The slope device in gutter
CN205276833U (en) Floating ware of ceramic tile for construction
CN108674982B (en) Building construction is with being suitable for arc glass's storage rack
CN207409183U (en) Assembly concrete knows figure instructional device
CN207300221U (en) A kind of spirit level for architectural engineering
CN214942465U (en) Support and use building equipment template
CN206908968U (en) A kind of elevator controlling room switch board
CN213147781U (en) Product outline acquisition device for industrial design
CN205121429U (en) Computer display
CN207957677U (en) A kind of architectural engineering lifting gear
CN204001498U (en) A kind of step ladder that can servo-actuated lifting
CN210372712U (en) Adjustable LCD (liquid crystal display)
CN203709554U (en) Adjustable-type drawing table for art design
CN113940503A (en) Design drawing platform for territory space planning
CN106037301A (en) Liftable storage cabinet
CN206408751U (en) A kind of steel-structured circular pin adjusts bearing
CN218683340U (en) Historical progress display structure
CN208080984U (en) A kind of exhibition wall with movable show board
CN207019661U (en) A kind of spirit level for architectural engineering
CN204057606U (en) The supporting construction of elevator landing sill

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180109

Termination date: 20180509