CN206858598U - Iron notch drill hoisting mechanism - Google Patents

Iron notch drill hoisting mechanism Download PDF

Info

Publication number
CN206858598U
CN206858598U CN201720728116.6U CN201720728116U CN206858598U CN 206858598 U CN206858598 U CN 206858598U CN 201720728116 U CN201720728116 U CN 201720728116U CN 206858598 U CN206858598 U CN 206858598U
Authority
CN
China
Prior art keywords
bracket
sleeve
screw rod
rail
lifting sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720728116.6U
Other languages
Chinese (zh)
Inventor
付光勇
刘建宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinosteel Xian Machinery Co Ltd
Original Assignee
Sinosteel Xian Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinosteel Xian Machinery Co Ltd filed Critical Sinosteel Xian Machinery Co Ltd
Priority to CN201720728116.6U priority Critical patent/CN206858598U/en
Application granted granted Critical
Publication of CN206858598U publication Critical patent/CN206858598U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of iron notch drill hoisting mechanism is the utility model is related to, including hangs frame, the lifting sleeve and adjusting screw rod that are connected with hanging frame top, the top for lifting sleeve is placed in the front end barrel bore of revolution cantilever, and the upper surface of front end sleeve is provided with gland;The top of lifting sleeve is provided with tapped through hole, and one end of adjusting screw rod sequentially passes through gland, lifting sleeve top, is threadedly coupled with the tapped through hole for lifting sleeve, lifts adjusting screw rod;Level board is provided with the hinge hole being hinged with bracket, and bracket upper end is hinged with level board by hinge hole;The bottom plate of bracket is fixedly connected with rig beam-and-rail;Dump ram is provided between hanging frame and bracket, head and the bracket of the dump ram are hinged, and bottom and the hanging frame of the dump ram are hinged.For the utility model when adjusting blowing angle to iron notch drill, scene directly rotates adjusting screw rod, you can hanging mechanism and beam-and-rail are highly changed, it is time saving, laborsaving so as to reach the effect of regulation blowing angle.

Description

Iron notch drill hoisting mechanism
Technical field
The utility model belongs to iron notch drill accessories field, and in particular to a kind of iron notch drill hoisting mechanism.
Background technology
Iron notch drill hanging mechanism is the part of connecting cantilever and rig beam-and-rail, can adjust rig beam-and-rail vertical height and inclines Rake angle, to meet iron notch drill work requirements.Scene is when rig beam-and-rail to be adjusted works angle of inclination, it is necessary to which adjustment is hung Bracket height is hung, situations such as regulation is cumbersome, and height dimension adjustment is not in place often occurs, influences operating efficiency and regulation Precision problem.
Hanging mechanism uses hanging frame to be had the disadvantages that for orifice plate attachment structure form at present:
1st, it is dump ram rod chamber oil-feed that rig beam-and-rail, which lifts flat process, and lifting force is smaller, and beam-and-rail is in when brill rushes dolly During front end, it may appear that rig beam-and-rail can not be lifted and put down, so that whole iron notch drill can not be turned back to resting guard and occur Accident.
2nd, adjusting iron notch drill work inclination angle (i.e. rig beam-and-rail inclination angle), just hanging bracket height need to be adjusted, and just must Must be first by hanging frame dismounting, then readjust joint hole position and be fixed, execute-in-place is relatively time-consuming, takes a lot of work.
3rd, the spacing of revolution cantilever front end riser hole position is immutable, and the height that frame is hung after conjunction is not available for again Fine adjustment, inevitably result in iron notch drill work inclination angle and certain error be present, do not reach expected blowing angle, to iron mouth passage Certain destructiveness can be produced.
Utility model content
During in order to solve to adjust iron notch drill work Inclination maneuver, first hanging frame is dismantled, then readjust joint hole Position is fixed, and causes that execute-in-place is relatively time-consuming, takes a lot of work, and the utility model provides a kind of iron notch drill hoisting mechanism. The technical problems to be solved in the utility model is achieved through the following technical solutions:
Iron notch drill hoisting mechanism, including hanging frame, the hanging frame are connected by vertical plate, with vertical plate upper end Level board composition, include with hanging frame top the lifting sleeve and adjusting screw rod that are connected, it is described to lift the upper of sleeve Portion is placed in the front end barrel bore of revolution cantilever, and the upper surface of the front end sleeve is provided with gland;
The top of the lifting sleeve is provided with tapped through hole, and one end of the adjusting screw rod sequentially passes through gland, lift lug Cylinder top, with lifted sleeve tapped through hole be threadedly coupled, lifted adjusting screw rod, lifting sleeve in the barrel bore of front end above and below It is mobile, so as to realize moving up and down for hanging frame;
The level board is provided with the hinge hole being hinged with bracket, and the bracket upper end passes through hinge hole with the level board It is be hinged so that bracket rotates around level board;
The bottom plate of the bracket is fixedly connected with rig beam-and-rail, so as to realize that bracket drives the motion of rig beam-and-rail;It is described to hang Dump ram is provided between on-hook frame and the bracket, head and the bracket of the dump ram are hinged, the bottom of the dump ram It is hinged with hanging frame, the dump ram is used to drive bracket, rig beam-and-rail to swing around hanging frame, so as to reach rig The work inclination angle of beam-and-rail.
Above-mentioned iron notch drill hoisting mechanism, the outer wall of the lifting sleeve are provided with feather key, the front end sleeve Inwall be provided with and be used to accommodate the keyway of feather key, the feather key moves up and down in keyway, to prevent from lifting sleeve Relative to revolution cantilever front end rotary drum.
Above-mentioned iron notch drill hoisting mechanism, the front end sleeve lower surface of the revolution cantilever are provided with locating part, the limit Position part is used to prevent feather key from departing from keyway, and the locating part is provided with through hole, between the through hole and lifting sleeve of the locating part Gap coordinates.
Above-mentioned iron notch drill hoisting mechanism, thrust bearing is additionally provided between the nut of the gland and adjusting screw rod, The inwall of the thrust bearing is fixedly connected with the outer wall of adjusting screw rod.
The beneficial effects of the utility model:
1. dump ram installation site is placed in rig beam-and-rail rear end position by the utility model, while works as rig beam-and-rail water When prosposition is put, the oil cylinder is that piston rod stretches out state, i.e., oil cylinder is in stroke maximum position, and rig beam-and-rail lifts flat process to incline Oblique oil cylinder rodless cavity oil-feed, lifting force are big;
2. the utility model when adjusting blowing angle to iron notch drill, does not dismantle any equipment, scene directly rotates and adjusted Save screw rod, you can hanging mechanism and beam-and-rail are highly changed, it is time saving, laborsaving so as to reach the effect of regulation blowing angle, Adjusting screw rod of the present utility model is rotated by thrust bearing, realizes the transmission of screw thread
3. the utility model can carry out any regulation to hanging mechanism and beam-and-rail height and position, so as to accurately control perforate Angle.
The utility model is described in further details below with reference to drawings and Examples.
Brief description of the drawings
Fig. 1 is positive structure schematic of the present utility model.
Fig. 2 is side structure schematic diagram of the present utility model.
Fig. 3 is the utility model A-A sectional views.
In figure:1st, cantilever is turned round;2nd, gland;3rd, thrust bearing;4th, adjusting screw rod;5th, feather key;6th, sleeve is lifted;7th, limit Position flange;8th, frame is hung;9th, dump ram;10th, bracket;11st, rig beam-and-rail.
Embodiment
For the technological means and effect that the utility model is reached predetermined purpose and taken is expanded on further, below in conjunction with accompanying drawing And embodiment describes in detail as follows to specific embodiment of the present utility model, architectural feature and its effect.
During in order to solve to adjust iron notch drill work Inclination maneuver, first hanging frame is dismantled, then readjust joint hole Position is fixed, and causes that execute-in-place is relatively time-consuming, takes a lot of work, and present embodiments provides a kind of tapping outlet as shown in Figure 1-Figure 3 Machine hoisting mechanism, including hanging frame 8, hanging frame 8 are made up of vertical plate, the level board being connected with vertical plate upper end, also Including the lifting sleeve 6 and adjusting screw rod 4 being connected with the top of hanging frame 8, the top of lifting sleeve 6 is placed in revolution cantilever 1 Front end barrel bore, the upper surface of front end sleeve is provided with gland 2;
The top of lifting sleeve 6 is provided with tapped through hole, and one end of adjusting screw rod 4, which sequentially passes through gland 2, lifts sleeve 6 pushes up Portion, it is threadedly coupled with the tapped through hole for lifting sleeve 6, lifts adjusting screw rod 4, lifting sleeve 6 is upper and lower in the barrel bore of front end It is mobile, so as to realize moving up and down for hanging frame 8;It is preferred that adjusting screw rod uses trapezoidal thread structure type, it is big to transmit torque;
Level board is provided with the hinge hole being hinged with bracket 10, and the upper end of bracket 10 is hinged by hinge hole with level board, made Bracket 10 is obtained to rotate around level board;
The bottom plate of bracket 10 is fixedly connected with rig beam-and-rail 11, so as to realize that bracket 10 drives rig beam-and-rail 11 to move;Hang Dump ram 9 is provided between on-hook frame 8 and bracket 10, the head and bracket 10 of the dump ram 9 are be hinged, the dump ram 9 Bottom and hanging frame 8 are be hinged, and dump ram 9 is used to drive bracket 10, rig beam-and-rail 11 to swing around hanging frame 8, so as to Reach the work inclination angle of rig beam-and-rail 11.
It is preferred that the outer wall of lifting sleeve 6 is provided with feather key 5, the inwall of front end sleeve, which is provided with, to be used to accommodate feather key 5 Keyway, feather key 5 moves up and down in keyway, to prevent from being lifted sleeve 6 relative to the revolution front end rotary drum of cantilever 1.
It is preferred that the front end sleeve lower surface of revolution cantilever 1 is provided with locating part, the locating part is used to prevent feather key 5 from departing from key Groove, locating part are provided with through hole, and through hole and lifting sleeve 6 gap of locating part coordinate.
It is preferred that thrust bearing 3 is additionally provided between the nut of gland 2 and adjusting screw rod 4, the inwall of the thrust bearing 3 and regulation The outer wall of screw rod 4 is fixedly connected.
The lifting sleeve of the present embodiment is slided using symmetric double feather key, is prevented using stop flange in adjusting screw rod process In, adjusting screw rod comes off with lifting sleeve.
As Figure 1-3, stop flange 7 mounted in lifting sleeve 6 it is cylindrical on, feather key 5 symmetrically is fixed on lifting sleeve 6 on Lifting sleeve 6 is loaded in the revolution front end cylinder of cantilever 1 afterwards, then stop flange 7 is fixed on revolution cantilever 1 front end cylinder bottom Portion, gland 2 are fixed on the revolution front end barrel top of cantilever 1, and for thrust bearing 3 loaded on adjusting screw rod 4, adjusting screw rod 4 passes through pressure It is connected through a screw thread after lid 2 with lifting sleeve 6, the top of hanging frame 8 is bolted company with the lifting flange in the bottom of sleeve 6 Connect, the bottom plate of bracket 10 is fixedly connected with rig beam-and-rail 11, and the top of bracket 10 and hanging frame 8 are be hinged, can rotate around it, tilt oil The one end of cylinder 9 and hanging frame 8 are be hinged, and one end is be hinged with bracket 10, and installation site is located at the rear end position of rig beam-and-rail 11.
When iron notch drill works, it turns round cantilever 1 and rotates to operating position and fixation, now dump ram in hanging mechanism 9 be elongation state, and (rig beam-and-rail 11 is connected rig beam-and-rail 11 by jointed shaft and dump ram 9 with hanging frame 8, can be around hinge Spindle rotates) it is horizontal level state, bracket 10 and rig beam-and-rail 11 are driven around hanging by the rod chamber oil-feed of dump ram 9 Frame 8 is swung, and reaches the work of iron notch drill rig beam-and-rail 11 inclination angle, can be by rig beam-and-rail when 9 rodless cavity oil-feed of dump ram 11 lifts are flat, and now the lifting force of dump ram 9 increases substantially, and help to lift horizontal drill machine beam-and-rail 11 safely and disengage it from linking up with, side Just iron notch drill integrally turns round, and away from iron mouth, avoids scaling loss.
When needing to change iron notch drill work inclination angle (i.e. the inclination angle of rig beam-and-rail 11), due to needing the position of perforate to fix It is motionless, turn round it is also fixed during 1 operating position of cantilever, if directly tilt rig beam-and-rail 11 is that different angle may result in brill The left front end of machine beam-and-rail 11 can not be directed at the position for needing perforate, high or low, can not meet perforate requirement, (now meet to incline When rake angle, the whole height of rig beam-and-rail 11 is unsatisfactory for, and integrally can only be improved or be reduced the height of rig beam-and-rail 11, can just make The left front end alignment apertures position of rig beam-and-rail 11).Therefore need first to change pylon and the high-low-position of rig beam-and-rail 11 before inclination Put, then rig beam-and-rail 11 is tilted to operating angle by dump ram 9 again, rig beam-and-rail 11 while reaching operating angle It is left front to correct alignment apertures position, to meet actual perforate demand.
When rig beam-and-rail 11 is horizontal, (the regulation of adjusting screw rod 4 can directly be rotated by changing pylon height and position Thrust bearing 3 is installed under the nut of screw rod 4), lifting sleeve 6 is connected by screw thread with adjusting screw rod 4, by screw thread transmission come real Now making lifting sleeve 6 drive hanging frame 8, rig beam-and-rail 11 to be moved axially along adjusting screw rod 4, (similar bolts and nuts connect Motion mode), i.e., vertically move (now turn round the front end cylinder of cantilever 1 it is fixed, lifted sleeve 6 on feather key 5 It is installed in cylinder inner wall keyway, the feather key 5 prevents from being lifted sleeve 6 relative to the revolution front end rotary drum of cantilever 1, promotes to carry Rise sleeve 6 can only be moved axially along adjusting screw rod 4), due to adjusting screw rod 4 and lifting sleeve 6 between threaded connection place without It is spacing, when the unlimited movement downwards of sleeve 6 is lifted, it can be come off from adjusting screw rod 4, cause whole pylon and rig beam-and-rail 11 come off, therefore install stop flange 7 in the revolution nose circle tube end plate of cantilever 1, when adjusting screw rod 4 is threadedly coupled with lifting sleeve 6 Before not disengaging, the feather key 5 lifted on sleeve 6 directly contacts stop flange 7, and the flange prevents feather key 5 from continuing downwards It is mobile, in case lifting sleeve 6 disengages from adjusting screw rod 4 and accident occurs.The distance of pylon movement meets that angle of inclination changes After distance needed for becoming, then the work inclination angle of rig beam-and-rail 11 is realized by dump ram 9, meet field demand.Due to adopting With threaded adjusting, arbitrary dimension regulation can be achieved in the distance of the movement, more accurately meets iron notch drill work inclination angle demand.
Above content is to combine specific preferred embodiment further detailed description of the utility model, it is impossible to Assert that specific implementation of the present utility model is confined to these explanations.For the ordinary skill of the utility model art For personnel, without departing from the concept of the premise utility, some simple deduction or replace can also be made, should all be regarded To belong to the scope of protection of the utility model.

Claims (4)

1. iron notch drill hoisting mechanism, including hanging frame (8), the hanging frame (8) is by vertical plate and vertical plate upper end The level board composition of connection, it is characterised in that also include lifting sleeve (6) and the regulation being connected with the top of hanging frame (8) Screw rod (4), the top of the lifting sleeve (6) are placed in the front end barrel bore of revolution cantilever (1), the upper end of the front end sleeve Face is provided with gland (2);
The top of the lifting sleeve (6) is provided with tapped through hole, and one end of the adjusting screw rod (4) sequentially passes through gland (2), carried Rise at the top of sleeve (6), be threadedly coupled with the tapped through hole of lifting sleeve (6), lifting adjusting screw rod (4), lifting sleeve (6) is preceding Moved up and down in the barrel bore of end, so as to realize moving up and down for hanging frame (8);
The level board is provided with the hinge hole being hinged with bracket (10), and bracket (10) upper end passes through hinge with the level board Connect hole to be hinged so that bracket (10) rotates around level board;
The bottom plate of the bracket (10) is fixedly connected with rig beam-and-rail (11), so as to realize that bracket (10) drives rig beam-and-rail (11) Motion;Dump ram (9), the head and support of the dump ram (9) are provided between the hanging frame (8) and the bracket (10) Frame (10) is be hinged, and the bottom of the dump ram (9) and hanging frame (8) are be hinged, and the dump ram (9) is used to drive bracket (10), rig beam-and-rail (11) is swung around hanging frame (8), so as to reach the work inclination angle of rig beam-and-rail (11).
2. iron notch drill hoisting mechanism as claimed in claim 1, it is characterised in that on the outer wall of the lifting sleeve (6) Provided with feather key (5), the inwall of the front end sleeve is provided with the keyway for being used for accommodating feather key (5), and the feather key (5) exists Moved up and down in keyway, to prevent from being lifted sleeve (6) relative to revolution cantilever (1) front end rotary drum.
3. iron notch drill hoisting mechanism as claimed in claim 2, it is characterised in that the front end sleeve of the revolution cantilever (1) Cylinder lower surface is provided with locating part, and the locating part is used to prevent feather key (5) from departing from keyway, and the locating part is provided with through hole, institute The through hole and lifting sleeve (6) gap for stating locating part coordinate.
4. iron notch drill hoisting mechanism as claimed in claim 1, it is characterised in that the gland (2) and adjusting screw rod (4) Nut between be additionally provided with thrust bearing (3), the inwall of the thrust bearing (3) is fixedly connected with the outer wall of adjusting screw rod (4).
CN201720728116.6U 2017-06-21 2017-06-21 Iron notch drill hoisting mechanism Withdrawn - After Issue CN206858598U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720728116.6U CN206858598U (en) 2017-06-21 2017-06-21 Iron notch drill hoisting mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720728116.6U CN206858598U (en) 2017-06-21 2017-06-21 Iron notch drill hoisting mechanism

Publications (1)

Publication Number Publication Date
CN206858598U true CN206858598U (en) 2018-01-09

Family

ID=60827537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720728116.6U Withdrawn - After Issue CN206858598U (en) 2017-06-21 2017-06-21 Iron notch drill hoisting mechanism

Country Status (1)

Country Link
CN (1) CN206858598U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107083463A (en) * 2017-06-21 2017-08-22 中钢集团西安重机有限公司 Iron notch drill hoisting mechanism

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107083463A (en) * 2017-06-21 2017-08-22 中钢集团西安重机有限公司 Iron notch drill hoisting mechanism

Similar Documents

Publication Publication Date Title
CN108465833A (en) A kind of drilling machine with safeguard function convenient for adjusting
CN206858597U (en) One kind hanging frame height regulating mechanism
CN206858598U (en) Iron notch drill hoisting mechanism
CN111101849B (en) Impact drilling equipment convenient for cleaning holes and used for pile foundation
CN205400627U (en) A centering device for coiled tubing fill head adjusts
CN102943638B (en) Water jet cleaning system for large-diameter deep well
CN201512396U (en) hydraulic elevator
CN203248444U (en) Hydraulic cylinder with locking device
CN107083463A (en) Iron notch drill hoisting mechanism
CN218600798U (en) Novel cable impact vibration rain test machine
CN107130073A (en) One kind hanging frame height regulating mechanism
CN208604488U (en) A kind of bridge maintenance elevating mechanism
CN215802315U (en) Concrete embedded part for civil engineering
CN212898331U (en) Hydraulic folding telescopic support for lifting drilling derrick
CN206858596U (en) A kind of hanging frame for connecting cantilever and rig beam-and-rail
CN205225074U (en) Harbour pile driver
CN210231645U (en) Pin pulling device for pulling out pin shaft of hydraulic support
CN104475472B (en) Recipient assembly positioner
CN106111962A (en) A kind of conticaster ladle stamp devices and methods therefor
CN208556035U (en) A kind of drilling machine with safeguard function convenient for adjusting
CN219604847U (en) Jacking device for supporting top of tall and big formwork scaffold
CN212450362U (en) Take drilling pump of multi-functional rotatory crane
CN219061586U (en) Blowout preventer for well control
CN215428668U (en) Machine-made sand turning device
CN213569185U (en) Installation and maintenance frame for hydropower station electric unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20180109

Effective date of abandoning: 20220607

AV01 Patent right actively abandoned

Granted publication date: 20180109

Effective date of abandoning: 20220607