CN206854281U - The equipment of barrier in a kind of removing pipeline - Google Patents

The equipment of barrier in a kind of removing pipeline Download PDF

Info

Publication number
CN206854281U
CN206854281U CN201720609755.0U CN201720609755U CN206854281U CN 206854281 U CN206854281 U CN 206854281U CN 201720609755 U CN201720609755 U CN 201720609755U CN 206854281 U CN206854281 U CN 206854281U
Authority
CN
China
Prior art keywords
tube
sacculus
barrier
micro
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720609755.0U
Other languages
Chinese (zh)
Inventor
董雪
薛萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Sheng Hang Technology Co Ltd
Original Assignee
Shenzhen Sheng Hang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Sheng Hang Technology Co Ltd filed Critical Shenzhen Sheng Hang Technology Co Ltd
Priority to CN201720609755.0U priority Critical patent/CN206854281U/en
Application granted granted Critical
Publication of CN206854281U publication Critical patent/CN206854281U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Surgical Instruments (AREA)

Abstract

This application discloses a kind of equipment for removing barrier in pipeline, the equipment includes hollow conduit, barrier isolation structures, cleaning structure and exhaust device.One end of hollow conduit is arranged at the inside of micro-tube, the other end is placed in outside micro-tube, barrier isolation structures are located at one end that hollow conduit is placed in inside micro-tube, it can pass through barrier and barrier is completely cut off into the set interval in micro-tube, clear up the hydrojet part that structure includes stretching out inside hollow conduit, micro-tube is cleared up for spraying liquid, exhaust device is connected to hollow conduit, for extracting the barrier after clearing up out.The utility model can improve the cleaning effect of micro-tube, simplify the cleaning difficulty of micro-tube.

Description

The equipment of barrier in a kind of removing pipeline
Technical field
It the utility model is related to pipeline cleaning technical field, and in particular to a kind of equipment for removing barrier in pipeline.
Background technology
It is to ensure pipeline flow smoothly necessary means to remove the obstacle in pipeline, in correlation technique for petroleum pipeline, The larger pipeline cleaning of water supply line, hot duct, natural gas line, blow-off line equal diameter has many technological means, For example with special equipment, robot etc., but for micro-tube, due to its pipe diameter very little (normally only number milli Rice), there is very big technical difficulty in pipeline cleaning, generally use is manually cleared up, and cleaning effect is bad, consumes people significantly The input of power, and the damage of micro-tube is easily caused in scale removal process.
Based on this, a equipment that can be cleared up micro-tube is needed badly.
Utility model content
The application is intended to one of technical problem at least solving in correlation technique to a certain extent.
Therefore, the utility model needs to provide a kind of equipment for removing barrier in pipeline, to solve in the prior art The problem of micro-tube cleaning is difficult, cleaning effect is bad.
According to embodiment of the present utility model, the equipment includes:
Hollow conduit, its one end are arranged inside micro-tube, and the other end is placed in outside micro-tube;
Barrier isolation structures, the barrier isolation structures are located at one end that hollow conduit is placed in inside micro-tube, It can pass through barrier and barrier is completely cut off into the set interval in micro-tube;
Structure is cleared up, the cleaning structure includes the hydrojet part stretched out inside hollow conduit, for spraying liquid to micro- Type pipeline is cleared up;And
Exhaust device, the exhaust device are connected to hollow conduit, for extracting the barrier after clearing up out.
As the further alternative of the equipment, the hollow conduit includes stereoplasm tube or flexible pipe.
As the further alternative of the equipment, the barrier isolation structures include the first foley's tube and the 3rd Sacculus, first foley's tube include the first conduit stretched out inside hollow conduit and on the first catheter length directions The first sacculus, the 3rd sacculus is placed in one end inside micro-tube located at the periphery of the hollow conduit, so that institute Cleaning structure is stated to be between the first sacculus and the 3rd sacculus.
As the further alternative of the equipment, the barrier isolation structures also include the first drive mechanism, institute State the first drive mechanism and be connected to the first foley's tube, for driving the movement of the first foley's tube.
As the further alternative of the equipment, first drive mechanism includes motor.
As the further alternative of the equipment, the hydrojet part is the second sacculus, and second sacculus is located at the On one conduit, and the rear in the first sacculus, second sacculus are provided with multiple spray holes.
As the further alternative of the equipment, the hydrojet part is the second foley's tube, and second sacculus is led Managing includes the second conduit of stretching and the second sacculus on the second catheter length direction inside hollow conduit, and described second Sacculus is provided with multiple spray holes.
As the further alternative of the equipment, the cleaning structure also includes the second drive mechanism, and described second Drive mechanism is connected to the second foley's tube, for driving the movement of the second foley's tube.
As the further alternative of the equipment, in addition to imaging device, the imaging device is from hollow conduit Inside is stretched out, for gathering the real-time image information of cleaning situation.
As the further alternative of the equipment, in addition to controller, the controller is connected to hollow conduit, barrier Hinder thing isolation structures, cleaning structure and exhaust device.
The beneficial effects of the utility model:
The utility model barrier isolation that isolation structures clear up needs that breaks the barriers limits in barrier isolation structures Within fixed section, then cleared up by cleaning structure in the section, then by exhaust device by the barrier after cleaning Discharged by hollow conduit, improve cleaning effect, simplify the cleaning difficulty of micro-tube.
Brief description of the drawings
Fig. 1 is that second sacculus opens, remaining sacculus is in the structural representation of closure state in embodiment one;
Fig. 2 is the structural representation that all sacculus are in closure state in embodiment one;
Fig. 3 is the structural representation that all sacculus are in open configuration in embodiment one;
Fig. 4 is that barrier is squeezed into Postductal structural representation after first sacculus opening in embodiment one;
Fig. 5 is the control block of embodiment one;
Fig. 6 is the structural representation that all sacculus are in closure state in embodiment two;
Fig. 7 is the structural representation that all sacculus are in open configuration in embodiment two;
Fig. 8 is that barrier is squeezed into Postductal structural representation after first sacculus opening in embodiment two.
Embodiment
The utility model is described in further detail below by embodiment combination accompanying drawing.It is wherein different to implement Similar component employs associated similar element numbers in mode.In the following embodiments, many detailed descriptions are In order that obtaining the application can be better understood.However, those skilled in the art can be without lifting an eyebrow recognize, which part Feature is dispensed in varied situations, or can be substituted by other elements, material, method.In some cases, The related certain operations of the application are not shown in the description or description, and this is the core in order to avoid the application Flooded by excessive description, and to those skilled in the art, be described in detail these associative operations be not it is necessary, They can completely understand associative operation at the general technology knowledge of description and this area in specification.
In addition, feature described in this description, operation or feature can combine to form respectively in any suitable way Kind embodiment.Meanwhile each step in method description or action can also can be aobvious and easy according to those skilled in the art institute The mode carry out order exchange or adjustment seen.Therefore, the various orders in specification and drawings are intended merely to clearly describe a certain Individual embodiment, necessary order is not meant to be, wherein some sequentially must comply with unless otherwise indicated.
It is herein part institute serialization number itself, such as " first ", " second " etc., is only used for distinguishing described object, Without any order or art-recognized meanings.And " connection ", " connection " described in the application, unless otherwise instructed, include directly and It is indirectly connected with (connection).
Embodiment one
The present embodiment one provides a kind of equipment for removing barrier in pipeline, refer to Fig. 1-5, and the equipment includes hollow Conduit 100, barrier isolation structures 200, cleaning structure 300 and exhaust device.
Wherein, one end of hollow conduit 100 is arranged at the inside of micro-tube, and the other end is placed in outside micro-tube, such as This, carries out material to micro-tube inside in the outside of micro-tube by the effect can of hollow conduit 100 and information is handed over Mutually and internal blood vessel is operated or controlled, such as controlled by the can of hollow conduit 100 in the outside of micro-tube Conveying cleaning fluid etc. is entered inside micro-tube.
Barrier isolation structures 200 are located at one end that hollow conduit 100 is placed in inside micro-tube, and it can pass through barrier And barrier is completely cut off into the set interval in micro-tube.So when the cross section of the clogging whole micro-tube of barrier, The barrier isolation structures 200 can still play its effect, by barrier isolation within set interval, without by micro-tube The influence of chocking-up degree.
Cleaning structure 300 is arranged within above-mentioned set interval, and it includes the hydrojet part stretched out from the inside of hollow conduit 100 310, micro-tube is cleared up for spraying liquid.Exhaust device is connected to hollow conduit 100, after extracting cleaning out Barrier.
In this way, pass through above-mentioned hollow conduit 100, barrier isolation structures 200, cleaning structure 300 and exhaust device Effect can realize the cleaning work to micro-tube.Specifically, the effect for the isolation structures 200 that break the barriers is needing to clear up Barrier isolation barrier isolation structures 200 limit section within, then carried out by cleaning structure 300 in the section Cleaning, then discharged the barrier after cleaning by hollow conduit by exhaust device, cleaning effect is improved, is simplified miniature The cleaning difficulty of pipeline.
In some embodiments, it is micro- to include but is not limited to water route micro-tube, oil circuit micro-tube, gas circuit for micro-tube Type pipeline.For different micro-tubes, it is internally formed different barriers.For example, for the micro-tube of water route, one As in the porch of pipeline be frequently provided with screen pack, the screen pack can stop that most of debris is entered in pipeline, but The exit of pipeline usually has some reptile class animals and entered in pipeline, ultimately forms the barrier in pipeline, forms pipe Road blocks.And for example, it is similar to be provided with special filtering net in the porch of pipeline for oil circuit micro-tube, it can prevent Bulky grain barrier enters within pipeline, and such pipeline, can shape because of the difference of oil, temperature change due to much time using Cause pipeline flow not smooth into shape thing is condensed, another low side pipeline precipitates for a long time, pure and impure separation can also form condensation shape thing causes Line clogging, circulation be not smooth;For gas circuit micro-tube, the barrier inside its pipeline is similar to water route micro-tube.
In view of this, the liquid that above-mentioned hydrojet part 310 sprays can be directed to different barriers and carry out different selections, such as For water route micro-tube and gas circuit micro-tube, its major obstacle thing is reptile etc., now in order to save Above two pipeline is cleared up on the basis of cost, cleared up using clear water, now, the effect of clear water essentially consists in punching The aggregation heap that reptile is formed is dissipated, so as to which barrier is discharged into micro-tube;For oil line pipe, its major obstacle Thing is grease, and now hydrojet can be used with the liquid that decomposition function is carried out to grease, for example, bases liquid or pipe-dredging Agent etc., grease is resolved into little particle or fritter discharges micro-tube.
In addition to above-mentioned micro-tube, the cleaning equipment is also particularly well suited to human body or animal body blood vessel and cavity, clearly Barrier in regulating blood condition pipe, cavity, the barrier such as thrombus in blood vessel, barrier such as bile duct (capsule) calculus in cavity, cleaning When adjusting liquid spraying part 310 pressure be equipped with suitable decoction, impact thrombus, calculus, then will break up blood clotting, blood cake, calculus Deng discharge.
Additionally, it is appreciated that hollow conduit 100 can be stereoplasm tube or flexible pipe.It is micro- that stereoplasm tube is primarily adapted for use in water route Type pipeline, oil circuit micro-tube, gas circuit micro-tube, flexible pipe are primarily adapted for use in blood vessel.
In some embodiments, above-mentioned exhaust device can use the machines such as drawing liquid pump, water pumper.
In some embodiments of the present utility model, Fig. 1-4 are refer to, barrier isolation structures 200 include the first ball The sacculus 220 of ductus bursae 210 and the 3rd, the first foley's tube 210 include the first conduit 211 stretched out from the inside of hollow conduit 100 And the first sacculus 212 on the length direction of the first conduit 211, the 3rd sacculus 220 are placed in miniature tube located at hollow conduit 100 One end inside road, so that cleaning structure 300 is between the first sacculus 212 and the 3rd sacculus 220.
In this way, by the effect of the first sacculus 212 and the 3rd sacculus 220, it may be such that barrier is isolated in the first sacculus 212 and the 3rd between sacculus 220.As long as it is appreciated that pipeline is carried out cleaning will to a certain extent to pipeline or it is more or Cause to damage less, present embodiment is by the way that barrier isolation can be reduced to the damage to pipeline to greatest extent in set interval. On the other hand, because the telescopic effect of sacculus, expansion and the contraction of sacculus can be controlled well, to adapt to various different sizes With the micro-tube of shape, after barrier isolation structures are extend at barrier, by controlling the first sacculus 212 and the The reasonable expansion of three sacculus 220, enables to balloon wall to abut to the inwall of pipeline so that barrier can be isolated completely In section between first sacculus and the 3rd sacculus, now cleared up again by clearing up structure, barrier can be directed to well And carry out.In some embodiments, barrier isolation structures 200 also include the first drive mechanism 230, first drive mechanism The first foley's tube 210 is connected to, for driving the movement of the first foley's tube 210.Now, in the effect of the first drive mechanism Under so that the first foley's tube 210 can also move, to adjust the section between the first sacculus 212 and the 3rd sacculus 220 Size.Specifically, (position is typically with close to barrier after the position when hollow conduit 100 in micro-tube is determined It is defined), it is possible to drive the first foley's tube 210 to pass through barrier by the first drive mechanism, stop after through barrier Only, the first sacculus 212 and the 3rd sacculus 220 is now controlled to open and can completely cut off barrier in the first sacculus 212 and the 3rd ball In section between capsule 220.
Fig. 2 is refer to, the diameter dimension of the first conduit 211 after hollow conduit 100 is very small (same to needle point, to be only Several millimeters of zero), it can be made up of real core metal (nonmetallic) material of different hardness, facilitate penetration of barrier.
Fig. 4, Fig. 8 are refer to, barrier such as thrombus can be squeezed into hollow conduit by control the mobile of the first foley's tube 210 In 100, microguide can be discharged it in conjunction with exhaust device.
On the other hand after cleaning structure 300 is cleared up, it is the barrier broken up in above-mentioned section, now, passes through control Drive mechanism causes the first sacculus 212 to be moved toward close to the direction of hollow conduit 100, and the first sacculus 212 can be by barrier pressure Enter in hollow conduit 100, improve the expulsion efficiency of barrier
With reference to foregoing, the barrier in micro-tube is likely distributed in the whole cross section of pipeline, therefore, above-mentioned first In the moving process of sacculus 212, the first conduit 211 may pass through the barrier so that the first foley's tube 210 can still play it Effect, by barrier isolation within set interval, without being influenceed by micro-tube chocking-up degree.
In some embodiments, the first drive mechanism includes motor, and the first foley's tube 210 is connected to driving electricity In the output end of machine, moved under the driving of motor.Further, stepper motor can be selected in motor, to tight Lattice control the movement of the first foley's tube 210.
Certainly, the movement of above-mentioned first foley's tube 210 can also be completed by manual system.
In the present embodiment, the hydrojet part 310 for clearing up structure 300 is the second sacculus, and second sacculus is led located at first On pipe 211, and the rear in the first sacculus 212, the second sacculus are provided with multiple spray holes 311.
In this way, after the first foley's tube 210 moves into place, it is possible to control the second sacculus to spray corresponding liquid to micro- Type pipeline is cleared up.
Further, the spray hole 311 on the second sacculus should be along the circumferential spaced set of the second sacculus, to cause from spray The more multizone that the liquid that fluid apertures 311 comes out can be covered in micro-tube.
In some cases it will be appreciated that, the barrier in micro-tube is more, and it is larger may to occupy micro-tube Scope or length, now, spray hole 311 spray liquid be difficult to clear up the barrier used in section.It is based on This, for the ease of all barriers are all cleaned out, please continue to refer to Fig. 1-4, the second sacculus is preferably provided at close to the At one sacculus 212, after the first foley's tube 210 moves into place, it is possible to control the second sacculus to work, along from the first sacculus Barrier is gradually cleaned out in the direction of 212 to the 3rd sacculus 220, and in the process, exhaust device can work simultaneously, with Gradually barrier is discharged.
In some embodiments of the present utility model, Fig. 1 is refer to, in order that obtaining the liquid energy that spray hole 311 sprays Enough a greater degree of covering barriers, the second sacculus are arranged to cylindric, and spray hole 311 is uniformly arranged on the appearance of the second sacculus Face.
In some embodiments of the present utility model, Fig. 2 is refer to, spray hole 311 can also be set directly at first On conduit 211, without the second sacculus, above-mentioned purpose can be equally completed.
Further, above-mentioned 311 jetting liquids of spray hole are pumped into by external dedicated equipment or are pumped into manually.
In some embodiments, for the effect for scale removal process being monitored or being detected in real time after cleaning, it is No needs repeat to clear up, and the equipment also includes imaging device 400, and imaging device 400 stretches out from the inside of hollow conduit 100, uses In the real-time image information of collection cleaning situation, imaging device 400 can be carried out by the way of the first foley's tube 210 is similar to It is mobile.So, it is possible to the cleaning situation checked in micro-tube in real time, can decide whether to take repetition to clear up accordingly, most The guarantee of limits is cleared up thorough.
Above-mentioned imaging device 400 can use CMOS, imaging fibre etc., and dress can be set and be imaged in the outside of micro-tube Connected display etc. is put, for showing cleaning situation in real time.
In some embodiments, Fig. 5 is refer to, equipment also includes controller 500, and controller 500 is connected to hollow lead Pipe 100, barrier isolation structures 200, cleaning structure 300, exhaust device and imaging device 400, for controlling, changing hollow lead Pipe 100, barrier isolation structures 200, the working condition for clearing up structure 300, exhaust device and imaging device 400.
Control of the controller 500 to hollow conduit 100 is mainly reflected in the movement of hollow conduit 100, hollow conduit 100 The mobile movement that can be similar to the first foley's tube 210, using stepper motor or manually etc..Controller 500 completely cuts off to barrier The control of structure 200 is mainly reflected in the movement of the first foley's tube 210 and the expansion of the first sacculus 212 and the 3rd sacculus 220 Open and shrink.Controller 500 is mainly reflected in the folding of spray hole 311 to the control for clearing up structure 300 and sprays intensity Regulation.Control of the controller 500 to exhaust device is then embodied in the startup and closing of exhaust device.Controller 500 fills to imaging Put 400 control be mainly reflected in imaging device 400 movement and illumination, shooting, transmission image, likewise, movement can be similar In the movement of the first foley's tube 210.
It should be noted that PTCA foley's tubes, therefore, the application can be selected in the first foley's tube 210 described above Structure can be carried out according to PTCA technologies to a certain extent.
Some features of the application and advantage are further illustrated with reference to the application of the application in the blood vessel.Specifically may be used Carried out according to the following steps:
1st, the detection of barrier (thrombus) position, the detection can in vitro by CT/ nuclear-magnetisms/B ultrasound/angiogram/X-ray/ Other modes detection obtains;
2nd, control the first sacculus and the 3rd sacculus to be in closure state, hollow conduit is manoeuvred into blood vessel, and it is preceding Detected position is proceeded to, this process hollow conduit can be entered by such as abdomen Femur blood vessel, limb vessel, Cervical Vessels etc.;
3rd, barrier (thrombus) is advanced to by first the first foley's tube of driving mechanisms control and is in the first sacculus and In the section that three sacculus are formed;
4th, the first sacculus and the 3rd balloon expandable are controlled, by barrier (thrombus) isolation in above-mentioned section;
5th, adaptable liquid is sprayed by the second sacculus and controls the pressure of spray hole to impact barrier to suitable pressure (thrombus);
6th, exhaust device is controlled to extract the blood clotting broken up, blood cake etc. out;
7th, the pressure of spray hole is controlled to exchange suitable decoction to suitable pressure, cleaning, melt focus;Control drainage system Extract inflammation purulence blood etc. out, the first foley's tube can also be controlled to be moved to the direction of hollow conduit in the process, now the 3rd The press-in hollow conduit such as blood clotting that sacculus will can break up, blood cake, then discharges blood vessel.
In above process in order to prevent to cause physiological effect for human body, after some seconds that work, should control the first sacculus with 3rd sacculus opens, and turns on blood vessel, above-mentioned steps are repeated after a period of time.
In addition, in some embodiments, for effect of the abundant expansion equipment to blood vessel, the equipment can also be to blood vessel Treated.Specifically, can be provided with inside hollow conduit for realize injection, hot melt, medication, fulguration, machine cut, The functional device of any function in bonding and laser transmission.Above-mentioned functional device is in the first sacculus and limited with the 3rd sacculus Section in.Now can to endovascular thrombus etc., treat by some focuses, such as when selecting function of injection device, Can be by injection head to focus liquid medicine injection;When tool functional device is selected a good opportunity in choosing, can by machine cut system by lesion resection, Tamper cut etc. can be taken out of in vitro by machine cut system or above-mentioned exhaust device.
The setting of above-mentioned functional device is enabled in human external by selecting different functional devices or different work( Can the combination of device focus reasonably treated.For example, it can individually select a kind of to focus of above-mentioned functional device Treated, such as when selecting medical treatment functions device, it is possible to relative medicine is directly sprayed onto in the method for medication focus or It is injected into focus;It can also select to heat functional device while medical treatment functions device is selected, be melted by melt process Blood vessel blockage thing is simultaneously equipped with medicine and treated.
Described above is only how using functional device to provide a kind of example, is not offered as functional device use and is only capable of Arrange in pairs or groups in the manner described above, i.e. functional device selection can arbitrarily be arranged in pairs or groups according to actual conditions, to complete the treatment to focus.This Outside, above-mentioned functional device type is also not limited to above-mentioned cited.In addition to application more than in the blood vessel, the application obviously may be used also To be used in water route micro-tube, oil circuit micro-tube, gas circuit micro-tube hereinbefore, specific scale removal process can copy blood vessel In application carry out.Such as in use, first hollow conduit can be controlled to be moved at barrier in the micro-tube of water route, then control First foley's tube passes through barrier, then controls the opening of the first sacculus and the 3rd sacculus to completely cut off barrier between them In section, it is that the cleaning to barrier can be achieved controlling the second sacculus injection liquid, exhaust device is controlled after cleaning by obstacle Thing extracts micro-tube out, completes cleaning.
Remove bile duct (capsule) calculus be using ERCP biopsy pipe enter (with ERCP perform the operation), afterwards process with it is above-mentioned It is identical to remove Intravascular Thrombus.
Embodiment two
The present embodiment two provides a kind of equipment for removing barrier in pipeline, refer to Fig. 6-8, the embodiment two and reality The principle and structure for applying example one are substantially the same, and difference is hydrojet part, in the present embodiment, refer to Fig. 6-8, this implementation Hydrojet part 310 in mode is the second foley's tube, and second foley's tube includes second stretched out from the inside of hollow conduit 100 Conduit 312 and the second sacculus on the length direction of the second conduit 312, the second sacculus are provided with multiple spray holes 311.
Now, hydrojet part 310 is the second foley's tube independently of the first foley's tube 210, in second foley's tube The second sacculus can equally eject liquid so as to reach and the identical effect of embodiment one;
In addition, in the present embodiment, cleaning structure 300 also includes the second drive mechanism, and the second drive mechanism is connected to Second foley's tube, for driving the movement of the second foley's tube.
In this way, the second sacculus can move in the section between the first sacculus 212 and the 3rd sacculus 220, now, work as obstacle When thing occupies scope or larger length, in order to clear up thoroughly, it is not necessary to the second sacculus is arranged into oval column, and passes through control Make movement of second sacculus in section, you can comprehensive cleaning barrier, cleaning are more thorough.
Use above specific case is illustrated to the utility model, is only intended to help and is understood the utility model, and Not limiting the utility model.For the utility model person of ordinary skill in the field, according to think of of the present utility model Think, some simple deductions, deformation can also be made or replaced.

Claims (10)

  1. A kind of 1. equipment for removing barrier in pipeline, it is characterised in that including:
    Hollow conduit, its one end are arranged inside micro-tube, and the other end is placed in outside micro-tube;
    Barrier isolation structures, the barrier isolation structures are located at one end that hollow conduit is placed in inside micro-tube, its energy Completely cut off the set interval in micro-tube through barrier and by barrier;
    Structure is cleared up, the cleaning structure includes the hydrojet part stretched out inside hollow conduit, for spraying liquid to miniature tube Road is cleared up;And
    Exhaust device, the exhaust device are connected to hollow conduit, for extracting the barrier after clearing up out.
  2. 2. equipment as claimed in claim 1, it is characterised in that the hollow conduit includes stereoplasm tube or flexible pipe.
  3. 3. equipment as claimed in claim 1, it is characterised in that the barrier isolation structures include the first foley's tube and the Three sacculus, first foley's tube include the first conduit stretched out inside hollow conduit and located at the first catheter length directions On the first sacculus, the 3rd sacculus is placed in one end inside micro-tube located at the periphery of the hollow conduit so that The cleaning structure is between the first sacculus and the 3rd sacculus.
  4. 4. equipment as claimed in claim 3, it is characterised in that the barrier isolation structures also include the first drive mechanism, First drive mechanism is connected to the first foley's tube, for driving the movement of the first foley's tube.
  5. 5. equipment as claimed in claim 4, it is characterised in that first drive mechanism includes motor.
  6. 6. equipment as claimed in claim 3, it is characterised in that the hydrojet part is the second sacculus, and second sacculus is located at On first conduit, and the rear in the first sacculus, second sacculus are provided with multiple spray holes.
  7. 7. equipment as claimed in claim 1, it is characterised in that the hydrojet part is the second foley's tube, second sacculus Conduit includes the second conduit stretched out inside the hollow conduit and the second sacculus on the second catheter length direction, and described the Two sacculus are provided with multiple spray holes.
  8. 8. equipment as claimed in claim 7, it is characterised in that the cleaning structure also includes the second drive mechanism, and described the Two drive mechanisms are connected to the second foley's tube, for driving the movement of the second foley's tube.
  9. 9. the equipment as any one of claim 1 to 8, it is characterised in that also including imaging device, the imaging device Stretched out from the inside of hollow conduit, for gathering the real-time image information of cleaning situation.
  10. 10. equipment as claimed in claim 9, it is characterised in that be also connected to hollow lead including controller, the controller Pipe, barrier isolation structures, cleaning structure and exhaust device.
CN201720609755.0U 2017-05-27 2017-05-27 The equipment of barrier in a kind of removing pipeline Active CN206854281U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720609755.0U CN206854281U (en) 2017-05-27 2017-05-27 The equipment of barrier in a kind of removing pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720609755.0U CN206854281U (en) 2017-05-27 2017-05-27 The equipment of barrier in a kind of removing pipeline

Publications (1)

Publication Number Publication Date
CN206854281U true CN206854281U (en) 2018-01-09

Family

ID=60825454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720609755.0U Active CN206854281U (en) 2017-05-27 2017-05-27 The equipment of barrier in a kind of removing pipeline

Country Status (1)

Country Link
CN (1) CN206854281U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107262465A (en) * 2017-05-27 2017-10-20 董涛 Equipment is removed in visualization in pipeline
WO2018218420A1 (en) * 2017-05-27 2018-12-06 董涛 Visualization cleaning device suitable for micro tube
CN109513093A (en) * 2018-11-27 2019-03-26 钱德慧 A kind of conduit for coronary artery thrombus dissolving
CN110056076A (en) * 2019-04-03 2019-07-26 中国农业科学院棉花研究所 A kind of sewage conduit cleaning equipment
CN111701961A (en) * 2020-06-04 2020-09-25 中国石油天然气股份有限公司 Flexible through pipe scale cleaning device and through pipe scale cleaning method
CN111939437A (en) * 2019-05-15 2020-11-17 日照市中医医院 Balloon dilatation catheter for hepatobiliary surgery
CN115055455A (en) * 2022-06-09 2022-09-16 江阴市人民医院 Auxiliary cleaning equipment for surgical nursing

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107262465A (en) * 2017-05-27 2017-10-20 董涛 Equipment is removed in visualization in pipeline
WO2018218420A1 (en) * 2017-05-27 2018-12-06 董涛 Visualization cleaning device suitable for micro tube
CN109513093A (en) * 2018-11-27 2019-03-26 钱德慧 A kind of conduit for coronary artery thrombus dissolving
CN110056076A (en) * 2019-04-03 2019-07-26 中国农业科学院棉花研究所 A kind of sewage conduit cleaning equipment
CN111939437A (en) * 2019-05-15 2020-11-17 日照市中医医院 Balloon dilatation catheter for hepatobiliary surgery
CN111701961A (en) * 2020-06-04 2020-09-25 中国石油天然气股份有限公司 Flexible through pipe scale cleaning device and through pipe scale cleaning method
CN115055455A (en) * 2022-06-09 2022-09-16 江阴市人民医院 Auxiliary cleaning equipment for surgical nursing

Similar Documents

Publication Publication Date Title
CN206854281U (en) The equipment of barrier in a kind of removing pipeline
CN107262465A (en) Equipment is removed in visualization in pipeline
US11540848B2 (en) Ultrasonic thrombus removing system
EP2921122B1 (en) Calculus removing/retrieving device
US10039900B2 (en) Fluid delivery and treatment device and method of use
US10470783B2 (en) Calculus retrieving/removing device and method
US9610087B2 (en) Calculus retrieving/removing device and method
US20150265298A1 (en) Calculus retrieving/removing device and method
US20030199819A1 (en) Filter wire system
EP2921119B1 (en) Calculus removing/retrieving device
US20230346416A1 (en) Thrombus removal systems and associated methods
US20070239182A1 (en) Thrombus removal device
AU2001275100A1 (en) Embolization protection system for vascular procedures
CN107397575B (en) Sheath tube for thrombus disruption system
EP2323567A1 (en) Method for removing kidney stones and endoscope suitable for said method
CN217244648U (en) Variable-diameter plug taking device
CN112568968A (en) Double-layer net cage type embolectomy support and assembly thereof
CN107212906A (en) The equipment observed and performed the operation can be implemented in the blood vessels
CN207532412U (en) A kind of structure for implementing intravascular observation and performing the operation
WO2022261462A1 (en) Thrombus removal systems and associated methods
US9636126B2 (en) Methods for removing calculus from an access sheath
WO2018218420A1 (en) Visualization cleaning device suitable for micro tube
CN205698001U (en) Laser surgery optical fiber introducer and laser operation apparatus
US10952758B1 (en) Kidney stone turbulent flow irrigator and system
CN219354073U (en) Thrombolysis device and thrombolysis device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant