CN206842902U - A kind of construction Machines lifting support - Google Patents

A kind of construction Machines lifting support Download PDF

Info

Publication number
CN206842902U
CN206842902U CN201720468010.7U CN201720468010U CN206842902U CN 206842902 U CN206842902 U CN 206842902U CN 201720468010 U CN201720468010 U CN 201720468010U CN 206842902 U CN206842902 U CN 206842902U
Authority
CN
China
Prior art keywords
support
bloom
construction machines
top plate
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720468010.7U
Other languages
Chinese (zh)
Inventor
高月涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720468010.7U priority Critical patent/CN206842902U/en
Application granted granted Critical
Publication of CN206842902U publication Critical patent/CN206842902U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a kind of construction Machines lifting support, including support, fixed plate has been bolted on the support, the top of the support is welded with top plate, and the inside of top plate offers penetrating via, the side of the top plate is welded with fixed pulley, the side bottom of the support is provided with hoist engine, one end of the hoist engine is connected with steel wire rope, one end of the steel wire rope is fixedly connected with elevator crib by fixed pulley, contiguous block is welded with above the both sides of the elevator crib, the one end of the contiguous block away from elevator crib is fixedly connected with main bloom and secondary bloom, the side of the relatively main bloom of the support offers main chute, the side of the relatively secondary bloom of the support offers secondary chute, the opposite side of the support is provided with stabiliser bar.The utility model make it that lift cabinet causes security incident to lift without departing from lifting support when being lifted.

Description

A kind of construction Machines lifting support
Technical field
Lifting technology field is the utility model is related to, specially a kind of construction Machines lifting support.
Background technology
As China's mechanical technique is ripe, various plant equipment develop very fast, and a part of equipment needs when in use Carry out descending operation.In building trade, mechanical upgrading machine is a kind of conventional jacking equipment, is easy to worker in higher building The conveying of material and other equipment can be carried out between layer.Mechanical elevating support is the important component of mechanical elevator, so And existing lifting machine support is lifted by the interaction with pulley, pulley so be present and be easily separated from track Hidden danger, there is larger security threat.
The content of the invention
The purpose of this utility model is to provide a kind of construction Machines lifting support, to solve to carry in above-mentioned background technology The problem of going out.
To achieve the above object, the utility model provides following technical scheme:A kind of construction Machines lifting support, including Support, the quantity of the support is 4, has been bolted fixed plate on the support, the top of the support is welded with Top plate, and the inside of top plate offers penetrating via, the side of the top plate is welded with fixed pulley, the side bottom of the support Hoist engine is installed, one end of the hoist engine is connected with steel wire rope, and one end of the steel wire rope is fixed by fixed pulley Connect elevator crib, be welded with contiguous block above the both sides of the elevator crib, the contiguous block away from elevator crib one End is fixedly connected with main bloom and secondary bloom, and secondary bloom is symmetrically installed on main bloom, the relatively main bloom of the support Side offer main chute, the side of the relatively secondary bloom of the support offers secondary chute, and the opposite side of the support is provided with Stabiliser bar.
Preferably, pulley is installed on the penetrating via of the top plate.
Preferably, the side of the fixed plate shape and support is agreed with.
Preferably, the bottom of the elevator crib is provided with damping device.
Preferably, the both ends of the stabiliser bar are fixedly connected by bolt with support respectively.
Preferably, the quantity of the contiguous block is 4 pieces.
Compared with prior art, the beneficial effects of the utility model are:In use, under hoist engine drive, steel wire rope edge Fixed pulley and enter line slip, lifted so as to which elevator crib be driven.The contiguous block installed on elevator crib is connected with main steel Block and secondary bloom, the side of support offers main chute and secondary chute, and the extension of main bloom and secondary bloom is stuck in In the cavity of main chute and secondary chute, when being lifted, elevator crib causes security incident without departing from lifting support.Separately Outside, being provided with damping device in the bottom of elevator crib has preferable protective effect.
Brief description of the drawings
Fig. 1 is the utility model top view;
Fig. 2 is structural representation of the present utility model.
In figure:1 hoist engine, 2 supports, 3 steel wire ropes, 4 fixed plates, 5 top plates, 6 fixed pulleys, 7 elevator cribs, 8 contiguous blocks, 9 Secondary bloom, 10 secondary chutes, 11 main blooms, 12 main chutes, 13 stabiliser bars.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of construction Machines lifting support, including branch Frame 2, the quantity of the support 2 is 4, and fixed plate 4, the top welding of the support 2 have been bolted on the support 2 There is top plate 5, and the inside of top plate 5 offers penetrating via, the side of the top plate 5 is welded with fixed pulley 6, the support 2 Side bottom is provided with hoist engine 1, and one end of the hoist engine 1 is connected with steel wire rope 3, and one end of the steel wire rope 3 leads to Cross fixed pulley 6 and be fixedly connected with elevator crib 7, contiguous block 8, the contiguous block 8 are welded with above the both sides of the elevator crib 7 One end away from elevator crib 7 is fixedly connected with main bloom 11 and secondary bloom 9, and secondary bloom 9 is symmetrical on main bloom 11 Installation, the side of the relatively main bloom 11 of the support 2 offer main chute 12, and the side of the relatively secondary bloom 9 of the support 2 opens up There is secondary chute 10, the opposite side of the support 2 is provided with stabiliser bar 13.
Operation principle:Under the drive of hoist engine 1, steel wire rope 3 enters line slip along fixed pulley 6, so as to by the band of elevator crib 7 It is dynamic to be lifted.The contiguous block 8 installed on elevator crib 7 is connected with main bloom 11 and secondary bloom 9, and the side of support 2 offers Main chute 12 and secondary chute 10, and the extension of main bloom 11 and secondary bloom 9 is stuck in the 10 of main chute 12 and secondary chute In cavity, when being lifted, main bloom 11 and secondary bloom 9 move up and down with elevator crib 7 in chute.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of construction Machines lifting support, including support(2), the support(2)Quantity be 4, it is characterised in that:Institute State support(2)On be bolted fixed plate(4), the support(2)Top be welded with top plate(5), and top plate(5)'s Inside offers penetrating via, the top plate(5)Side be welded with fixed pulley(6), the support(2)Side bottom installation There is hoist engine(1), the hoist engine(1)One end be connected with steel wire rope(3), the steel wire rope(3)One end pass through it is fixed Pulley(6)It is fixedly connected with elevator crib(7), the elevator crib(7)Both sides above be welded with contiguous block(8), the company Connect block(8)Away from elevator crib(7)One end be fixedly connected with main bloom(11)With secondary bloom(9), and secondary bloom(9)On master Bloom(11)Symmetrically installation, the support(2)Relatively main bloom(11)Side offer main chute(12), the support (2)Relatively secondary bloom(9)Side offer secondary chute(10), the support(2)Opposite side be provided with stabiliser bar(13).
A kind of 2. construction Machines lifting support according to claim 1, it is characterised in that:The top plate(5)Run through Pulley is installed on passage.
A kind of 3. construction Machines lifting support according to claim 1, it is characterised in that:The fixed plate(4)Shape And support(2)Side agree with.
A kind of 4. construction Machines lifting support according to claim 1, it is characterised in that:The elevator crib(7)'s Bottom is provided with damping device.
A kind of 5. construction Machines lifting support according to claim 1, it is characterised in that:The stabiliser bar(13)Two End passes through bolt and support respectively(2)It is fixedly connected.
A kind of 6. construction Machines lifting support according to claim 1, it is characterised in that:The contiguous block(8)Number Measure as 4 pieces.
CN201720468010.7U 2017-04-29 2017-04-29 A kind of construction Machines lifting support Expired - Fee Related CN206842902U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720468010.7U CN206842902U (en) 2017-04-29 2017-04-29 A kind of construction Machines lifting support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720468010.7U CN206842902U (en) 2017-04-29 2017-04-29 A kind of construction Machines lifting support

Publications (1)

Publication Number Publication Date
CN206842902U true CN206842902U (en) 2018-01-05

Family

ID=60793426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720468010.7U Expired - Fee Related CN206842902U (en) 2017-04-29 2017-04-29 A kind of construction Machines lifting support

Country Status (1)

Country Link
CN (1) CN206842902U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111675135A (en) * 2020-05-14 2020-09-18 北京点域科技有限公司 Construction machine with lifting device for charging process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111675135A (en) * 2020-05-14 2020-09-18 北京点域科技有限公司 Construction machine with lifting device for charging process

Similar Documents

Publication Publication Date Title
CN107311069B (en) A kind of lifting device for construction
CN201220891Y (en) Bridge crane with guide elevating function
CN206768618U (en) A kind of lowering or hoisting gear for bridge installation
CN106995186A (en) Building materials transporting equipment for building and its method of work provided with pressure sensor
CN204689430U (en) To Construction of Silo movable hoisting device
CN206842902U (en) A kind of construction Machines lifting support
CN203667797U (en) Simple lifting appliance tooling for SK-2 type double-block sleepers
CN204368924U (en) A kind of indoor car formula weight tensioning arrangement
CN202643061U (en) Coal mine main shaft lifting system
CN206798994U (en) Crane machinery anti-roll device
CN207759953U (en) A kind of people's air defense door leaf hoisting machine
CN202558444U (en) Steel penstock hoisting balance beam device
CN211813061U (en) Large steel structure hoisting with safety protection function
CN201495028U (en) Horizontal hoisting tool for large-tonnage concrete segments of tunnel
CN211998523U (en) Lifting equipment for building construction
CN207330139U (en) A kind of symmetrical plate holder device with eccentric wheel
CN202924578U (en) Special hoisting device for ship clearing machinery
CN212893340U (en) A safe elevating gear for housing construction
CN208413637U (en) A kind of crane hanger
CN106121254A (en) Heavy component transportation system after disassembly by reverse construction method and construction method
CN206108702U (en) A hoist for high accuracy guide rail
CN206219104U (en) Steel wire rope overspeed preventer device
CN206705531U (en) Bridge crane hoisting mechanism
CN205034646U (en) Cereal material hopper formula lifting machine
CN204778426U (en) Seesaw beam type anti -swing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180105

Termination date: 20190429