CN206842294U - One kind building brick clamp - Google Patents
One kind building brick clamp Download PDFInfo
- Publication number
- CN206842294U CN206842294U CN201720485317.8U CN201720485317U CN206842294U CN 206842294 U CN206842294 U CN 206842294U CN 201720485317 U CN201720485317 U CN 201720485317U CN 206842294 U CN206842294 U CN 206842294U
- Authority
- CN
- China
- Prior art keywords
- holding rod
- clamping plate
- clamping
- clamping bar
- building brick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Clamps And Clips (AREA)
Abstract
The utility model provides a kind of building brick clamp, belong to building implement field, including detachably connected the first clamping bar and the second clamping bar, first clamping bar includes first clamping plate and the first holding rod being connected in angle, second clamping bar includes second clamping plate and the second holding rod being connected in angle, the described one end of second holding rod away from the second clamping plate has connecting pin, has the connecting hole to match with the connecting pin on first clamping bar;Second holding rod is stretching structure, including the sleeve and connecting rod to socket-connect, wherein second clamping plate described in the sleeve connection;The cartridge exterior is bolted with the regulating bolt in the portion of inserting into the inner, and the regulating bolt is outer-hexagonal structure, and the adjustment hole of the interior hexagonal structure to match with the regulating bolt is provided with first holding rod.This building brick clamp, its clamping ability can be adjusted according to actual conditions, can more easily be applied to real work.
Description
Technical field
Building implement field is the utility model is related to, brick clamp is built in particular to one kind.
Background technology
Brick clamp is one of currently used building implement, is come for polylith brick is picked up side by side.Brick clamp in the prior art
Simple in construction, application is smaller.
Utility model content
The utility model provides a kind of building brick clamp, it is intended to solves above mentioned problem of the prior art.
What the utility model was realized in:
One kind building brick clamp, including detachably connected the first clamping bar and the second clamping bar, first clamping bar are included in folder
The connected first clamping plate in angle and the first holding rod, second clamping bar include the second clamping plate being connected in angle and the second gripping
Bar, the described one end of second holding rod away from the second clamping plate have connecting pin, had and the company on first clamping bar
The connecting hole that pin matches;Second holding rod is stretching structure, including the sleeve and connecting rod to socket-connect, wherein the set
Cylinder connects the second clamping plate;The cartridge exterior is bolted with the regulating bolt in the portion of inserting into the inner, and the regulating bolt is outer six
Corner structure, the adjustment hole of the interior hexagonal structure to match with the regulating bolt is provided with first holding rod.
Preferably, the second clamping plate is vertical setting with second holding rod.
Preferably, the one end of the connecting rod away from the sleeve is provided with the quarter butt tilted with the connecting rod, the company
Pin is located at the end of the quarter butt;The connecting hole is located at the first clamping plate and the junction of the first holding rod.
Preferably, the end of the connecting pin has external screw thread, and the length of the connecting pin is more than the length of the connecting hole
Degree, its end sleeve is provided with nut after the connecting pin inserts the connecting hole.
Preferably, first holding rod is tubulose, and the first clamping plate and second clamping plate are tabular;The regulating bolt
Located at the sidepiece of the sleeve.
Building brick clamp provided by the utility model, in use, its clamping ability can be adjusted according to actual conditions,
Real work can be more easily applied to.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only
It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work
Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation for the building brick clamp that the utility model embodiment provides;
Fig. 2 is the structural representation of the second clamping bar in the building brick clamp that the utility model embodiment provides;
Fig. 3 is the schematic front view of the first clamping bar in the building brick clamp that the utility model embodiment provides;
Fig. 4 is the schematic top plan view of the second clamping bar in the building brick clamp that the utility model embodiment provides.
Reference collects:First clamping bar 11;Second clamping bar 12;First clamping plate 13;First holding rod 14;Second clamping plate
15;Second holding rod 16;Connecting pin 17;Connecting hole 18;Sleeve 19;Connecting rod 20;Regulating bolt 21;Adjustment hole 22;Quarter butt 23;Spiral shell
Cap 24.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Embodiment, refer to Fig. 1-Fig. 4.
A kind of building brick clamp is present embodiments provided, this building brick clamp can adjust its active length, applied to difference
In the case of, there is wider application.
Brick clamp, including detachably connected the first clamping bar 11 and the second clamping bar 12 are built, it is in angle that the first clamping bar 11, which includes,
The connected holding rod 14 of first clamping plate 13 and first, the second clamping plate 15 and second that the second clamping bar 12 includes being connected in angle grip
Bar 16, second one end of holding rod 16 away from second clamping plate 15 have connecting pin 17, had and connecting pin 17 on the first clamping bar 11
The connecting hole 18 to match;Second holding rod 16 is stretching structure, including the sleeve 19 and connecting rod 20 to socket-connect, its middle sleeve 19
Connect second clamping plate 15;The regulating bolt 21 in the portion of inserting into the inner is bolted with outside sleeve 19, regulating bolt 21 is outer-hexagonal structure,
The adjustment hole 22 of the interior hexagonal structure to match with regulating bolt 21 is provided with first holding rod 14.
First clamping bar 11 and the second clamping bar 12 are detachably connected, two are connected together when deployed, without the time-division
Open.And first clamping bar 11 and the second clamping bar 12 be hinged when connecting, can relatively rotate, fragment of brick can be picked up and.Pressing from both sides
During brick, first clamping plate 13 and second clamping plate 15 apply chucking power from two sides of fragment of brick, and fragment of brick is clamped, and worker holds first with a firm grip
The holding rod 16 of holding rod 14 and second, fragment of brick is mentioned.By the cooperation of connecting pin 17 and connecting hole 18, first can be realized
The relative rotation of the clamping bar 12 of clamping bar 11 and second.
As shown in figure 1, the telescoping mechanism that sleeve 19 and connecting rod 20 form, enables the second holding rod 16 to stretch.Needing
When adjusting the second 16 length of holding rod, regulating bolt 21 is unclamped, mobile connecting rod 20 locks regulating bolt to correct position
21, by can so adjust the length of the second holding rod 16, so as to change between first clamping plate 13 and first clamping plate 13 away from
From so as to change the fragment of brick quantity that can be pressed from both sides.In actual conditions, some fragments of brick are lighter, and some are heavier, compare in clamping
Can be adjusted during light fragment of brick the second holding rod 16 length make it possible to clamp, can when clamping heavier fragment of brick
With few several pieces of folder, convenient work.
Meanwhile as shown in figure 4, have adjustment hole 22 on the first holding rod 14, can directly it be exchanged by adjustment hole 22
Section bolt 21 is adjusted, and worker is carried unnecessary instrument, while by the leverage of the first holding rod 14 again
Closely regulating bolt 21 can be tightened.
Thus, it could be seen that the building brick clamp of this structure its clamping ability can be adjusted according to actual conditions, make it
Real work can be more easily applied to.
Second clamping plate 15 is vertical setting with the second holding rod 16.As illustrated, the second clamping plate 15 of this set and
Two holding rods 16, second clamping plate 15 is set to be contacted at work with bigger contact surface with fragment of brick, can be more stably by brick
Block, which picks up, to be come.
The one end of connecting rod 20 away from sleeve 19 is provided with the quarter butt 23 tilted with connecting rod 20, and connecting pin 17 is located at quarter butt 23
End;Connecting hole 18 is located at the junction of the holding rod 14 of first clamping plate 13 and first.As shown in figure 1, setting by quarter butt 23
Put, the first clamping bar 11 is more easily installed, while can unhinderedly be rotated after installing.
The end of connecting pin 17 has external screw thread, and the length of connecting pin 17 is more than the length of connecting hole 18, and connecting pin 17 is inserted
Its end sleeve is provided with nut 24 after entering connecting hole 18.In Fig. 1, by setting external screw thread and nut 24, make the first clamping bar 11 and
It is more stable after the connection of two clamping bars 12, be not in situation about dropping.
First holding rod 14 is tubulose, and first clamping plate 13 and second clamping plate 15 are tabular;Regulating bolt 21 is located at sleeve 19
Sidepiece.Such setting, the brick folding work of worker can be more convenient, improves operating efficiency.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or new using this practicality
Type.A variety of modifications to these embodiments will be apparent for those skilled in the art, determine herein
The General Principle of justice can be realized in other embodiments in the case where not departing from spirit or scope of the present utility model.Cause
This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein
The most wide scope consistent with features of novelty.
Claims (5)
1. one kind building brick clamp, it is characterised in that including detachably connected the first clamping bar and the second clamping bar, first clamping bar
Including the first clamping plate being connected in angle and the first holding rod, second clamping bar includes the second clamping plate and the being connected in angle
Two holding rods, the described one end of second holding rod away from the second clamping plate have a connecting pin, have on first clamping bar with
The connecting hole that the connecting pin matches;Second holding rod is stretching structure, including the sleeve and connecting rod to socket-connect, wherein
Second clamping plate described in the sleeve connection;The cartridge exterior is bolted with the regulating bolt in the portion of inserting into the inner, the regulating bolt
For outer-hexagonal structure, the adjustment hole of the interior hexagonal structure to match with the regulating bolt is provided with first holding rod.
2. building brick clamp according to claim 1, it is characterised in that the second clamping plate is with second holding rod in vertical
It is straight to set.
3. building brick clamp according to claim 1, it is characterised in that the one end of the connecting rod away from the sleeve is provided with
The quarter butt tilted with the connecting rod, the connecting pin are located at the end of the quarter butt;The connecting hole is located at the described first folder
The junction of plate and the first holding rod.
4. building brick clamp according to claim 3, it is characterised in that the end of the connecting pin has external screw thread, described
The length of connecting pin is more than the length of the connecting hole, and its end sleeve is provided with nut after the connecting pin inserts the connecting hole.
5. building brick clamp according to claim 1, it is characterised in that first holding rod is tubulose, first folder
Plate and second clamping plate are tabular;The regulating bolt is located at the sidepiece of the sleeve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720485317.8U CN206842294U (en) | 2017-05-04 | 2017-05-04 | One kind building brick clamp |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720485317.8U CN206842294U (en) | 2017-05-04 | 2017-05-04 | One kind building brick clamp |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206842294U true CN206842294U (en) | 2018-01-05 |
Family
ID=60794757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720485317.8U Expired - Fee Related CN206842294U (en) | 2017-05-04 | 2017-05-04 | One kind building brick clamp |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206842294U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109941664A (en) * | 2019-04-22 | 2019-06-28 | 南京林业大学 | A kind of simple portable handling brick device |
-
2017
- 2017-05-04 CN CN201720485317.8U patent/CN206842294U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109941664A (en) * | 2019-04-22 | 2019-06-28 | 南京林业大学 | A kind of simple portable handling brick device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206842294U (en) | One kind building brick clamp | |
CN212553453U (en) | Manual clamp for clamping automobile parts | |
CN201799945U (en) | Clamping position adjusting and fixing device for rapid clamp | |
CN207248629U (en) | A kind of material stretch test machine | |
CN107020585A (en) | A kind of component clamping device | |
CN110226963B (en) | Combined reduction forceps used during closed reduction of fracture | |
CN205394365U (en) | Wrench socket | |
CN206732840U (en) | A kind of component clamping device | |
CN205394381U (en) | Laborsaving wrench socket | |
CN110327139A (en) | A kind of Invasive lumbar fusion device impactor | |
CN205734101U (en) | A kind of quickly turning tool | |
CN205324953U (en) | High adjusting device of reinforcing bar | |
CN205394366U (en) | Improvement type wrench socket | |
CN217461363U (en) | Manual hand-held type concrete is thick receives face instrument | |
CN208528938U (en) | A kind of heat gun clamping device | |
CN205464856U (en) | Graphite sweat soldering mould | |
CN207579146U (en) | A kind of C lens fusion splicing devices | |
CN209319601U (en) | A kind of ball type fixture | |
CN207929417U (en) | A kind of corona polar line tensioning apparatus | |
CN202726303U (en) | Soldered joint mechanism for spot welding | |
CN111934103A (en) | Lightning protection grounding body connecting device and connecting method thereof | |
CN205497261U (en) | Fishing pincers with locking structure | |
CN206855377U (en) | Hammer that is a kind of detachable and changing torque arm length | |
CN206563498U (en) | Electric furnace graphite electrode automatic hydraulic torque screws balance telescopic system | |
CN206296862U (en) | A kind of multifunction tool pliers |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180105 |
|
CF01 | Termination of patent right due to non-payment of annual fee |