CN206832055U - A kind of hanging compartment furnace top construction of support beam - Google Patents

A kind of hanging compartment furnace top construction of support beam Download PDF

Info

Publication number
CN206832055U
CN206832055U CN201720666123.8U CN201720666123U CN206832055U CN 206832055 U CN206832055 U CN 206832055U CN 201720666123 U CN201720666123 U CN 201720666123U CN 206832055 U CN206832055 U CN 206832055U
Authority
CN
China
Prior art keywords
hanging
wall
support
top construction
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720666123.8U
Other languages
Chinese (zh)
Inventor
冯蕾
董泊宁
杜桂英
习朋欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Silver Magnesium Equipment Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720666123.8U priority Critical patent/CN206832055U/en
Application granted granted Critical
Publication of CN206832055U publication Critical patent/CN206832055U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

It the utility model is related to a kind of hanging compartment furnace top construction of support beam, it is characterised in that:Including multiaspect furnace wall, support is poured in described every face furnace wall upper surface and pours wall, support, which pours, pours hanging anchoring body in wall, hang the upper end connection suspending assembly of anchoring body, and suspending assembly is connected with the hanging I-beam being fixedly installed on ceiling;The span that wall is poured per the adjacent support in two sides sets vault.The utility model employs support hanging structure, overcomes the influence of high-alumina brick furnace wall long-play sedimentation, it is ensured that the service life of furnace roof, can apply to be equipped with the combined type furnace roof of furnace roof burner and furnace roof perforate and similar top construction;It is in 45 ° of contact of incline plane structures that arch furnace roof of the present utility model and support, which pour wall, is pasted with high-temperature fibre paper on contact surface, and ramp structure can discharge vault while meeting and supporting and expand with heat and contract with cold caused stress.

Description

A kind of hanging compartment furnace top construction of support beam
Technical field
The utility model belongs to metal reduction furnace technical field, and in particular to a kind of hanging compartment furnace furnace roof knot of support beam Structure.
Background technology
Currently with the development of science and technology and being further sought for operating environment, labor intensity and operating cost, Pi Jiang Method(Vacuum ferrosilicon process)The reduction furnace of process for smelting magnesium, by horizontal reduction furnace(It is called horizontal tank reduction furnace)Gradually to shaft reduction stove (It is called vertical reducing furnace or perpendicular tank reduction furnace)Improve, traditional shaft reduction furnace structure is as shown in figure 1, due to shaft reduction stove Architectural characteristic, it has advantages below:1st, it is easy to operate, in that context it may be convenient to which that realization takes on material;2nd, labor intensity is small;3rd, employment It is few;4th, energy consumption index is low, and the ㎏ of coal 2000 is used in the reduction of ton crude magnesium;5th, reductive jar long lifespan.
As can be seen that the furnace roof of shaft reduction stove is designed as domes from furnace binding, while to reduce overall thermal Stress rupture, arch top construction are designed as polylith combining form, i.e., are divided into some pieces of arch brick combinations, arch according to structural condition Shape furnace roof is erected on the furnace wall of furnace chamber both sides, and its top construction is as shown in Figure 2.
The material for setting up arch furnace roof is high-alumina brick(It is changed to high alumina prefabricated section), in actual moving process, with operation The extension of time and being heated evenly property of furnace wall influence, and both sides high alumina brick wall produces sedimentation and deformation, after furnace wall sedimentation and denaturation Cause vault to be contacted completely with furnace wall face, while bear the stress of furnace wall deformation, cause furnace roof to damage and influence stove The life-span is used continuously in body.When furnace wall material selects low-creep refractory brick, furnace roof service life relative can extend but using two Nian Hou, also begin to gradually damage.
The content of the invention
The purpose of this utility model is to provide a kind of hanging compartment furnace top construction of support beam, overcomes existing shaft reduction The problem of furnace wall of stove is settled and deformed after long-play, and then ensure the furnace roof service life of shaft reduction stove.
To reach above-mentioned purpose, the technical solution of the utility model is:
A kind of hanging compartment furnace top construction of support beam, including multiaspect furnace wall, poured in the upper surface per face furnace wall Build support and pour wall, support, which pours, pours hanging anchoring body in wall, hang the upper end connection suspending assembly of anchoring body, hanging Component is connected with the hanging I-beam being fixedly installed on ceiling;The span that wall is poured per the adjacent support in two sides sets vault.
Described support pours that the thin hypomere of wall epimere is thick, by 45 degree of chamfered transition between thin and thick wall;The arch The close support for being crossed on its both ends is held out against to pour between 45 degree of inclined-planes of wall.
Described hanging anchoring body is screwed column structure, and the upper end for hanging anchoring body is provided with hanging groove.
Described hanging anchoring body is hanging anchored brick.
Described hanging anchoring body is the hanging anchorage screw of metal.
Described vault is made up of polylith arch high-alumina brick.
The support pours is pasted with high-temperature fibre paper between wall and 45 degree of sloped contact surfaces of vault.
Described suspending assembly includes cable wire and cable wire winding pipe.
The beneficial effects of the utility model are:
1. the utility model employs support hanging structure, the influence of high-alumina brick furnace wall long-play sedimentation is overcome, The service life of furnace roof is ensure that, can apply to be equipped with the combined type furnace roof of furnace roof burner and furnace roof perforate and similar Top construction;
2. it is in 45 ° of contact of incline plane structures that arch furnace roof of the present utility model and support, which pour wall, it is pasted with contact surface High-temperature fibre paper, ramp structure can discharge vault while meeting and supporting and expand with heat and contract with cold caused stress.
Brief description of the drawings
Fig. 1 is the overall structure diagram of shaft reduction stove in conventional art;
Fig. 2 is the top construction schematic diagram of shaft reduction stove in conventional art;
Fig. 3 is the structural representation of the hanging compartment furnace top construction of the utility model support beam;
In figure, 1- furnace walls, 2- supports pour wall, 3- hanging anchoring bodys, 4- suspending assemblies, 5- hanging I-beams, 6- arches Top.
Embodiment
The utility model is further detailed below in conjunction with the accompanying drawings:
Referring to Fig. 3, present applicant proposes a kind of hanging compartment furnace top construction of support beam, including multiaspect furnace wall 1, in institute The upper surface for stating every face furnace wall 1 pours support and pours wall 2, and support pours and hanging anchoring body 3 is poured in wall 2, hanging anchoring The upper end connection suspending assembly 4 of body 3, suspending assembly 4 are connected with the hanging I-beam 5 being fixedly installed on ceiling;Per two sides phase The span that adjacent support pours wall 2 sets vault 6.Described vault 6 is made up of polylith arch high-alumina brick.
Described support pours that the thin hypomere of the epimere of wall 2 is thick, by 45 degree of chamfered transition between thin and thick wall;The arch The support that top 6 is closely crossed on its both ends is poured between 45 degree of inclined-planes of wall 2.
Described hanging anchoring body 3 is screwed column structure, and the upper end of hanging anchoring body 3 is provided with hanging groove. Described suspending assembly 4 includes cable wire and cable wire winding pipe.
Described hanging anchoring body 3 can be the hanging anchorage screw of hanging anchored brick or metal.
The support pours is pasted with high-temperature fibre paper between wall 2 and 45 degree of sloped contact surfaces of vault 6.
Using above-mentioned top construction, reduction furnace can reach 5~8 years without the expection of overhaul service life, be realized for enterprise Consumption reduction synergy creates condition.
Content of the present utility model is not limited to cited by embodiment, and those of ordinary skill in the art are new by reading this practicality Type specification and any equivalent conversion taken technical solutions of the utility model, are claim institute of the present utility model Cover.

Claims (8)

  1. A kind of 1. hanging compartment furnace top construction of support beam, it is characterised in that:Including multiaspect furnace wall(1), described per face stove Wall(1)Upper surface pour support and pour wall(2), support and pour wall(2)Inside pour hanging anchoring body(3), hanging anchoring Body(3)Upper end connection suspending assembly(4), suspending assembly(4)With the hanging I-beam being fixedly installed on ceiling(5)Connection; Wall is poured per the adjacent support in two sides(2)Span set vault(6).
  2. 2. the hanging compartment furnace top construction of support beam according to claim 1, it is characterised in that:Described support pours Wall(2)The thin hypomere of epimere is thick, by 45 degree of chamfered transition between thin and thick wall;The vault(6)Closely be crossed on its two The support at end pours wall(2)45 degree of inclined-planes between.
  3. 3. the hanging compartment furnace top construction of support beam according to claim 1 or 2, it is characterised in that:Described hanging Anchoring body(3)For screwed column structure, anchoring body is hung(3)Upper end be provided with hanging groove.
  4. 4. the hanging compartment furnace top construction of support beam according to claim 3, it is characterised in that:Described hanging anchoring Body(3)To hang anchored brick.
  5. 5. the hanging compartment furnace top construction of support beam according to claim 4, it is characterised in that:Described hanging anchoring Body(3)For the hanging anchorage screw of metal.
  6. 6. the hanging compartment furnace top construction of support beam according to claim 5, it is characterised in that:Described vault(6) It is made up of polylith arch high-alumina brick.
  7. 7. the hanging compartment furnace top construction of support beam according to claim 6, it is characterised in that:Walling is poured in the support Body(2)With vault(6)45 degree of sloped contact surfaces between be pasted with high-temperature fibre paper.
  8. 8. the hanging compartment furnace top construction of support beam according to claim 7, it is characterised in that:Described suspending assembly (4)Including cable wire and cable wire winding pipe.
CN201720666123.8U 2017-06-09 2017-06-09 A kind of hanging compartment furnace top construction of support beam Active CN206832055U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720666123.8U CN206832055U (en) 2017-06-09 2017-06-09 A kind of hanging compartment furnace top construction of support beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720666123.8U CN206832055U (en) 2017-06-09 2017-06-09 A kind of hanging compartment furnace top construction of support beam

Publications (1)

Publication Number Publication Date
CN206832055U true CN206832055U (en) 2018-01-02

Family

ID=60775153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720666123.8U Active CN206832055U (en) 2017-06-09 2017-06-09 A kind of hanging compartment furnace top construction of support beam

Country Status (1)

Country Link
CN (1) CN206832055U (en)

Similar Documents

Publication Publication Date Title
CN202494329U (en) Mosaic suspension-type tunnel kiln
CN101666147B (en) Construction method of mixed build furnace wall
CN206832055U (en) A kind of hanging compartment furnace top construction of support beam
CN201621941U (en) Heating furnace for producing titanium sponge
CN203501785U (en) Suspended precast block and one-piece casting combined furnace top construction
CN201138139Y (en) Roof structure of continuous furnace
CN103788966A (en) High-temperature resistant expansion joint for dry quenching
CN201116734Y (en) Petrochemical industry device heating furnace dew point corrosion resisting composite lining
CN202339106U (en) High-loading softening heat-insulation brick for heating furnace
CN201463566U (en) Detachable refractory prefabricated brick structure
CN202547387U (en) Novel brick pulling furnace lining
CN205897856U (en) Not resistant firebrick of silicon
CN209783294U (en) prefabricated block for reinforcing radiation heat transfer of steel rolling heating furnace
CN202808559U (en) Novel bottom structure for tank furnace
CN203586817U (en) Reinforced refractory material lining anchoring nail
CN202031185U (en) Outer wall hanging sandwich insulating layer
CN202083229U (en) Heating furnace Water beam with thermal insulating cap
CN203866243U (en) High-temperature-resistant expansion joint for dry quenching
CN206073716U (en) Kiln mouth upper limb wall combination brick structure
CN205362646U (en) Cylinder -packing in middle of fast -assembling presintering combination
CN202973907U (en) Prefabricated brick convenient to install
CN203148207U (en) All-fiber well crucible melting furnace
CN204043402U (en) A kind of fluidized bed furnace wall reinforcement drag hook
CN214115608U (en) Converter mouth stove cap inside lining masonry structure
CN216282689U (en) Steel structural member for prolonging service life of castable in rotary kiln

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181203

Address after: Room 706, No. 10 Nanjie, Beilin District, Xi'an City, Shaanxi Province

Patentee after: Xi'an silver magnesium Equipment Co., Ltd.

Address before: 710001 Room 706, Xi'an Nonferrous Metallurgical Design and Research Institute, No. 10 Nanjie, Beilin District, Xi'an City, Shaanxi Province

Co-patentee before: Dong Boning

Patentee before: Feng Lei

TR01 Transfer of patent right