CN206830195U - Construction section is coordinated by a kind of single-hole with four lanes tunnel branch for being applied to III grade of country rock - Google Patents
Construction section is coordinated by a kind of single-hole with four lanes tunnel branch for being applied to III grade of country rock Download PDFInfo
- Publication number
- CN206830195U CN206830195U CN201720490494.5U CN201720490494U CN206830195U CN 206830195 U CN206830195 U CN 206830195U CN 201720490494 U CN201720490494 U CN 201720490494U CN 206830195 U CN206830195 U CN 206830195U
- Authority
- CN
- China
- Prior art keywords
- pilot tunnel
- tunnel
- region
- hole
- dug
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720490494.5U CN206830195U (en) | 2017-05-04 | 2017-05-04 | Construction section is coordinated by a kind of single-hole with four lanes tunnel branch for being applied to III grade of country rock |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720490494.5U CN206830195U (en) | 2017-05-04 | 2017-05-04 | Construction section is coordinated by a kind of single-hole with four lanes tunnel branch for being applied to III grade of country rock |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206830195U true CN206830195U (en) | 2018-01-02 |
Family
ID=60769336
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720490494.5U Active CN206830195U (en) | 2017-05-04 | 2017-05-04 | Construction section is coordinated by a kind of single-hole with four lanes tunnel branch for being applied to III grade of country rock |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206830195U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110847206A (en) * | 2019-11-14 | 2020-02-28 | 中建八局轨道交通建设有限公司 | Construction method for newly-built subway tunnel to penetrate existing bridge piles |
-
2017
- 2017-05-04 CN CN201720490494.5U patent/CN206830195U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110847206A (en) * | 2019-11-14 | 2020-02-28 | 中建八局轨道交通建设有限公司 | Construction method for newly-built subway tunnel to penetrate existing bridge piles |
CN110847206B (en) * | 2019-11-14 | 2021-03-12 | 中建八局轨道交通建设有限公司 | Construction method for newly-built subway tunnel to penetrate existing bridge piles |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107060840B (en) | A kind of construction method of large cross-section tunnel V grades of country rock excavation supportings | |
CN104533446B (en) | Construction method and its structure that a kind of big cross section Support System in Soft Rock Tunnels bilayer pre- Geological disaster prevention of preliminary bracing occurs | |
CN103306680B (en) | Existing single-track tunnel enlarging is the construction method of multiple track tunnel | |
CN108035733B (en) | A kind of perpendicular support partial excavation method of rock matter large section tunnel steelframe dike combination | |
CN101858220A (en) | Tunnel double upper sidewall heading construction method | |
CN103061771B (en) | Second mining mine fully mechanized coal face cuts eye driving and supporting method thereof | |
CN102121385B (en) | Tunnel excavation method for extending existing single-hole tunnel into double-arch tunnel | |
CN102312672A (en) | Fast large-cross-section tunnel construction method adapting to complicated and variable geological conditions | |
CN103195432A (en) | Weak surrounding rock, tunnel intersection and arc-shaped pilot tunnel construction method | |
CN103244130A (en) | Quick excavation and expanding construction method of herringbone tunnel section | |
CN103485790A (en) | Shallow tunneling method for pipe-proof-supporting structure combined system | |
CN106968691A (en) | Improve CD method construction methods in a kind of extremely frigid zones silty clay tunnel | |
CN110439571A (en) | Flat pilot tunnel leads to the adit construction method and transverse passage-way of main tunnel | |
CN108166979A (en) | A kind of construction method of super-span tunnel top bar two side-wall pilot tunnel | |
CN107060825A (en) | Construction method is coordinated by a kind of single-hole with four lanes tunnel branch for being applied to III grade of country rock | |
CN108222959B (en) | Supporting structure for controlling tunnel primary supporting deformation based on monitoring measurement and construction method | |
CN108412502B (en) | A kind of deep tunnel passes through upper-soft lower-hard ground construction method | |
CN107130968A (en) | A kind of tunnel construction mid-board | |
CN106917628B (en) | Small-clear-distance tunnel construction technique | |
CN110362932B (en) | Shallow subsurface tunnel pipe curtain structure calculation model that buries under complicated environmental condition | |
CN102410031A (en) | Underground space structure constructed by pile wall construction method | |
CN206830195U (en) | Construction section is coordinated by a kind of single-hole with four lanes tunnel branch for being applied to III grade of country rock | |
CN109695457A (en) | The enlarging large section tunnel in situ and step construction method of hard rock | |
CN205805546U (en) | A kind of drift-sand stratum highway tunnel structure | |
CN110005440A (en) | Double side wall pilot tunnel formula construction method under lateral pipe shed support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 250031 Shandong Province Flyover District of Ji'nan city Shanxi Road No. 576. Patentee after: Shandong transportation planning and Design Institute Co.,Ltd. Patentee after: SHANDONG LUQIAO GROUP Co.,Ltd. Address before: 250031 Shandong Province Flyover District of Ji'nan city Shanxi Road No. 576. Patentee before: SHANDONG PROVINCIAL COMMUNICATIONS PLANNING AND DESIGN INSTITUTE Patentee before: SHANDONG LUQIAO GROUP Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 250031 No. 576 Wushanxi Road, Tianqiao District, Jinan City, Shandong Province Patentee after: Shandong transportation planning and Design Institute Group Co.,Ltd. Patentee after: SHANDONG LUQIAO GROUP Co.,Ltd. Address before: 250031 No. 576 Wushanxi Road, Tianqiao District, Jinan City, Shandong Province Patentee before: Shandong transportation planning and Design Institute Co.,Ltd. Patentee before: SHANDONG LUQIAO GROUP Co.,Ltd. |