CN206829253U - A kind of integrated charge supply equipment - Google Patents
A kind of integrated charge supply equipment Download PDFInfo
- Publication number
- CN206829253U CN206829253U CN201720719777.2U CN201720719777U CN206829253U CN 206829253 U CN206829253 U CN 206829253U CN 201720719777 U CN201720719777 U CN 201720719777U CN 206829253 U CN206829253 U CN 206829253U
- Authority
- CN
- China
- Prior art keywords
- pipe
- water
- perforate
- group part
- pump group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
A kind of integrated charge supply equipment,By house body,Pump group part in pipe,Go out Water Check Valve,Outlet pipe,Jointing clip,First cut-off water valve,Connecting tube,Blowdown cut-off water valve is formed,Before dodge gate is arranged on house body left upper end,Capsule type air-pressure tank is arranged on the left inside lower end of house body,Connecting tube one end connects with capsule type air-pressure tank,The upper end of first cut-off water valve is arranged under union elbow,The connecting tube other end is arranged under the first cut-off water valve,Two groups of blowdown cut-off water valves are arranged under two pipe joints,Pump group part is arranged on the right inside of house body in two groups of pipes,Two groups go out Water Check Valve upper end and are connected with outlet pipe bottom,Two groups go out Water Check Valve lower end and are connected with pump group part upper end in two groups of pipes,The water inlet pipe of pump group part is connected with water supply pipe by jointing clip in pipe,The delivery port of outlet pipe right part is connected with user pipe water intake end by second jointing clip,Electrical control cabinet connects with pump group part in pipe through wire.New cost is low, easy for installation, the engineering time is short for this.
Description
Technical field
Water facilities is the utility model is related to, particularly a kind of integrated charge supply equipment.
Background technology
At present, skyscraper is more and more, and because the pressure of supply water of city planting ductwork is limited, skyscraper is required for using two
Secondary pressurized water supply facility, after under-voltage tap water boosting, then input again to user pipe, enable the just conventional water of resident family.It is existing
Some secondary water-supply facilities, by structure is limited, before use, needing to build a special equipment installation room, as installation two
The space of all parts such as secondary water facilities electrical control cabinet, booster pump, capsule type air-pressure tank, then by municipal tap water pipeline and
User pipe, is introduced in canyon by pre-buried or crane span structure measure and the water inlet pipe of secondary water-supply facility, outlet conduit divide
Do not connect, external power cord is introduced into interior by way of pre-buried or crane span structure is connected with electrical control cabinet.It is special due to needing
Equipment installation room, canyon construction cost is high, and is limited to by construction area in residential quarters, it is impossible to will set as needed
The inconvenience that at the desired position, can not only cause in building is built in standby room, and after building well, when canyon from municipal administration from
Come grid water intake end, user pipe water intake end apart from it is remote when, and it is remote from a distance from the end of incoming cables of residential quarters when, due to, it is necessary to
Substantial amounts of pre-buried or crane span structure pipeline, and pre-buried or crane span structure cable, not only add difficulty of construction, extend the engineering time,
And construction cost is significantly greatly increased.
Utility model content
In order to overcome existing secondary water-supply facility, by structure limits the drawbacks of bringing, it is tight that the utility model provides structure
Gather, there is house body, all parts are arranged on inside house body, it is not necessary to build a special equipment installation room, house body can basis
Need to be easily installed in Residential Area Anywhere, during installation, it is only necessary on the right side of pump group part base support tube in first sleeve
End water inlet pipe connects with the water intake end of municipal tap water pipe network, and outlet pipe connects with residential quarters user's water inlet pipe front end, will
It can be come into operation after the connection of the lead-in wire terminal of service cable and electrical control cabinet, thus reach that cost is low, not occupy cell big
Installing space, a kind of integrated charge supply equipment easy for installation, engineering time short advantage.
Technical scheme is used by the utility model solves its technical problem:
A kind of integrated charge supply equipment, include the electric-controlled of the existing secondary water-supply facility booster pump working method of control
Cabinet and capsule type air-pressure tank processed, it is characterised in that by pump group part in house body, pipe, go out Water Check Valve, outlet pipe, jointing clip, first
End water valve, connecting tube, blowdown cut-off water valve to form, the interior left part of house body is vertically welded with a vertical clapboard, and vertical clapboard is by room
Body or so two parts are divided into two independent spaces, and respectively there is a perforate on the right side of house body for two up and down, house body left part space
Interior lower, transverse is welded with a diaphragm plate, and it is independent space that house body left part is spatially descended two parts by diaphragm plate, outlet pipe
Bottom have four perforates, the left part of outlet pipe has a perforate, and outlet pipe bottom first, the 3rd perforate lower end are respectively welded
There is a ring flange, outlet pipe bottom second, the 4th perforate lower end are respectively welded with a pipe joint, the left part of outlet pipe
Perforate outboard end is welded with a union elbow, and electrical control cabinet is before the interior upper end of house body left part, left part space upper end
Side is provided with a fan dodge gate, and dodge gate is arranged on by two hinges on front side of the upper end in house body left part space, capsule type air-pressure tank
There is a perforate between the subordinate end of interior lower end, house body or so two of house body left part, connecting tube one end enters room through perforate
Internal lower left quarter, connecting tube one end are connected by pipe joint with the water inlet pipe of capsule type air-pressure tank, and first ends the upper of water valve
Installed in the union elbow bottom of outlet pipe left part perforate outboard end, the connecting tube other end is arranged under the first cut-off water valve at end
End, blowdown cut-off water valve have two groups of an identical, two groups of blowdowns cut-off water valves be separately mounted to outlet pipe it is lower second, the 4th open
The bottom of hole lower channel joint, pump group part has two groups in pipe, and going out Water Check Valve has two groups of an identical, and pump group part is pacified in two groups of pipes
Mounted in the right inside of house body, two groups of ring flanges for going out Water Check Valve upper end respectively with the perforate of outlet pipe bottom first, the 3rd
The ring flange at end is connected by bolt and nut, two groups of ring flanges for going out Water Check Valve lower end respectively with pump group part upper end in two groups of pipes
Connected by bolt and nut, jointing clip there are more, and the water inlet pipe of pump group part is located at house body right lower quadrant perforate in one of which pipe
Outside, and connected with the pipeline of municipal tap water pipe network by first jointing clip, the delivery port of outlet pipe right part is located at room
On the outside of the perforate of body upper right quarter, and connected with residential quarters user pipe water intake end by second jointing clip, pump in two groups of pipes
The power input of component is connected in parallel, and the power input of electrical control cabinet is connected with 380V AC powers by wire,
The power input of pump group part is connected by wire in electrical control cabinet power output end and two groups of pipes.
The house body is made up of bottom plate, left fixed plate, right fixed plate, rear fixed plate, upper mounted plate, left fixed plate,
Right fixed plate lower end is separately mounted to top at left and right sides of bottom plate, and rear fixed plate lower end is arranged on bottom plate rear side
Respectively there is a perforate on portion, the right side of right fixed plate for two up and down, upper mounted plate lower end be arranged on left fixed plate, right fixed plate, after
The upper end of fixed plate, after installing, upper mounted plate is in inclined state by rear to preceding.
It is described go out the valve body of Water Check Valve, outlet pipe, the hoop body of jointing clip, the valve body of the first cut-off water valve, connecting tube,
The valve body of blowdown cut-off water valve is stainless steel.
Pump group part forms by base support tube, main body cover pipe, water pump connecting tube and vertical water pump in two sleeve pipe,
Base support tube, main body cover pipe, the pump body of water pump connecting tube and vertical water pump are stainless steels, water pump connecting tube it is upper
Respectively there are a ring flange, base branch in portion and middle part outside, two outsides up and down of main body cover pipe lower outside, base support tube
Stay tube bottom is in sealing state, and the base support tube right-hand end of pump group part respectively has a water inlet pipe in first set, the second sleeve pipe,
The base support tube left-hand end of pump group part has an outlet pipe in first sleeve, and base support tube top, which has to have in the middle part of in the of one, opens
First fixed support plate in hole, has multiple mounting holes around ring perforate, and main body cover pipe top has a middle part to have perforate
The second fixed support plate, there are multiple mounting holes around ring perforate, on the outside of the middle part for passing through vertical water pump itself inlet channel
Multiple mounting holes around ring flange perforate and the first fixed support plate perforate of base support tube, with bolt and nut vertical water pump
The middle part outer flange disk and the fixed support plate of base support tube first of itself inlet channel link together, water pump connecting tube
Bottom is arranged on the outlet conduit of vertical water pump, passes through the middle part outer flange disk perforate of water pump connecting tube and main body cover pipe
Multiple mounting holes around second fixed support plate perforate, with bolt and nut the middle part outer flange disk of water pump connecting tube and master
The external fixed support plate of package second links together, and after installing, base support tube and main body cover pipe are in state of isolation,
By the base support tube lower outside ring flange of pump group part in first set, the second sleeve pipe, with bolt and nut by first set, second
Pump group part is arranged on the bottom plate of the right inside of house body in sleeve pipe, and two groups of lower end ring flanges for going out Water Check Valve are separately mounted to
In two groups of pipes during the upper end of pump group part, the upper outside ring flange of two groups of lower end ring flanges for going out Water Check Valve and water pump connecting tube
Linked together by bolt and nut, pump in the base support tube left-hand end outlet pipe and the second sleeve pipe of pump group part in first sleeve
The base support tube right-hand end water inlet pipe of component is linked together by the 3rd jointing clip.
After pump group part installs in the first set, the second sleeve pipe, running water pump group part base from first sleeve supports
Pipe right-hand end water inlet pipe enters, and under electrical control cabinet control, the vertical water pump of pump group part obtains electrician in first set, the second sleeve pipe
Make, vertical water pump goes out after low pressure tap water boosting Water Check Valve unidirectionally by effect through two groups, inputted from outlet pipe to user
In pipeline.
The utility model beneficial effect is:This new structure is compact, using pump group part in pipe and it is supporting go out Water Check Valve etc.
Part, with reference to the electrical control cabinet that existing secondary water-supply facility uses and the bellows connected with electrical control cabinet by wire
Air pressure tank, you can normally come into operation, user's normal use will be supplied after under-voltage tap water boosting in work;Have because this is new
House body, all parts are all arranged in house body, it is not necessary to are built a special equipment installation room, can be facilitated room as needed
Body is arranged on any desired place of Residential Area, during installation, it is only necessary on the right side of pump group part base support tube in first sleeve
End water inlet pipe connects with the water intake end of municipal tap water pipe network, and outlet pipe connects with residential quarters user's water inlet pipe front end, will
It can be come into operation after the connection of the lead-in wire terminal of service cable and electrical control cabinet, thus reached that use cost is low, it is small not occupy
The big installing space in area, it is easy for installation, the engineering time is short the advantages of.More than being based on, so this new application prospect having had.
Brief description of the drawings
The utility model is described further with reference to the accompanying drawings and examples.
Fig. 1 is the utility model structure diagram.
Fig. 2 is pump group part cross-section structure sterogram in the sleeve pipe of the utility model second.
Fig. 3 is pump group part forward sight structural representation in the sleeve pipe of the utility model second.
Embodiment
Shown in Fig. 1, Fig. 2, Fig. 3, a kind of integrated charge supply equipment, including the existing secondary water-supply facility supercharging of control
The electrical control cabinet 1 and capsule type air-pressure tank 2 of pump work mode, by pump group part 4 in house body 3, pipe, go out Water Check Valve 5, outlet pipe 6,
Jointing clip 7, first ends water valve 8, connecting tube 9, blowdown cut-off water valve 10 and formed, and the interior left part of house body 3 is vertically welded with one
The two parts of house body 3 or so are divided into two independent spaces, two up and down, the right side of house body 3 by individual vertical clapboard 3-1, vertical clapboard 3-1
Respectively there are perforate 3-2, a 3-3, the interior lower, transverse in the left part space of house body 3 is welded with a diaphragm plate 3-4, and diaphragm plate 3-4 will
It is independent space that the left part of house body 3, which spatially descends two parts, and four perforates are arranged at the bottom of outlet pipe 6, and the left part of outlet pipe 6 has one
Individual perforate, the perforate lower end of 6 bottom of outlet pipe first, the 3rd are respectively welded with ring flange 6-1, a 6-2, the bottom of outlet pipe 6
Second, the 4th perforate lower end be respectively welded with pipe joint 6-3, a 6-4, the left part perforate outboard end welding of outlet pipe 6
There is a union elbow 6-5, electrical control cabinet 1 is arranged on the interior upper end of the left part of house body 1, and left part space upper end installed in front has one
Dodge gate 11 is fanned, dodge gate 11 is arranged on by two hinge 11-1 on front side of the upper end in the left part space of house body 3, capsule type air-pressure tank 2
Installed in the interior lower end of the left part of house body 3, house body 3 or so two has a perforate 3-5 between subordinate end, and the one end of connecting tube 9 is through perforate
3-5 enters lower left quarter in house body 3, and the one end of connecting tube 9 is connected by pipe joint with the water inlet pipe of capsule type air-pressure tank 2, and first
The upper end for ending water valve 8 is arranged on the union elbow 6-5 bottoms of the left part perforate outboard end of outlet pipe 6, the installation of the other end of connecting tube 9
In the lower end of the first cut-off water valve 8, blowdown cut-off water valve 10 has two groups of identical, and two groups of blowdown cut-off water valves 10 are separately mounted to
Outlet pipe 6 lower second, the 4th perforate lower channel joints 6-3,6-4 bottom, pump group part 4 has two groups in pipe, and water outlet stops
Returning valve 5 has two groups of an identical, and pump group part 4 is arranged on 3 right inside of house body, two groups of flanges for going out the upper end of Water Check Valve 5 in two groups of pipes
Ring flange 6-1, the 6-2 of disk respectively with first, the 3rd perforate lower end in outlet pipe bottom are connected by bolt and nut, and two groups go out
The ring flange of the lower end of Water Check Valve 5 is connected with the upper end of pump group part 4 in two groups of pipes by bolt and nut respectively, and jointing clip 7 has more
Only, in one of which pipe the water inlet pipe of pump group part 4 be located at house body right lower quadrant perforate 3-3 outside, and with municipal tap water pipe network
Pipeline is connected by first jointing clip 7, and the delivery port of the right part of outlet pipe 6 is located on the outside of house body upper right quarter perforate 3-2, and and
Residential quarters user pipe water intake end is connected by second jointing clip 7, and the power input of pump group part 4 is in parallel in two groups of pipes
Together, the power input of electrical control cabinet 1 is connected with 380V AC powers by wire, the output of the power supply of electrical control cabinet 1
End is connected with the power input of pump group part 4 in two groups of pipes by wire.
Shown in Fig. 1, Fig. 2, Fig. 3, house body 3 is by bottom plate 3-6, left fixed plate 3-7, right fixed plate 3-8, rear fixed plate
3-9, upper mounted plate 3-10 are formed, and left fixed plate 3-7, right fixed plate 3-8 lower ends are separately mounted at left and right sides of bottom plate 3-6
Top, rear fixed plate 3-9 lower ends are arranged on bottom plate 3-6 upper backs, and right fixed plate 3-8 right side respectively has one for two up and down
Individual perforate, upper mounted plate 3-10 lower ends are arranged on left fixed plate 3-7, right fixed plate 3-8, rear fixed plate 3-9 upper end, installed
Afterwards, upper mounted plate 3-10 is in inclined state by rear to preceding.Go out the valve body, outlet pipe 6, the hoop of jointing clip 7 of Water Check Valve 5
Body, the valve body of the first cut-off water valve 8, connecting tube 9, the valve body of blowdown cut-off water valve 10 are stainless steels.Pump in two sleeve pipes
Component 4 forms by base support tube 4-1, main body cover pipe 4-2, water pump connecting tube 4-3 and vertical water pump 4-4, base support
Pipe 4-1, main body cover pipe 4-2, water pump connecting tube 4-3 and vertical water pump 4-4 pump body are stainless steels, water pump connecting tube
4-3 top and middle part outside, main body cover pipe 4-2 lower outsides, base support tube 4-1 two outsides up and down respectively have one
Ring flange, base support tube 4-1 bottoms are in sealing state, and the base support tube 4-1 of pump group part is right in first set, the second sleeve pipe
Respectively there is a water inlet pipe 4-5 side, and the base support tube left-hand end of pump group part has an outlet pipe 4-6, base in first sleeve
The first fixed support plate 4-7 that one middle part has perforate is arranged at support tube 4-1 tops, has multiple mounting holes around ring perforate,
The second fixed support plate 4-8 that one middle part has perforate is arranged at main body cover pipe 4-2 tops, has multiple installations around ring perforate
Hole, middle part outer flange disk perforate and the fixed support plate of base support tube first by vertical water pump 4-4 itself inlet channel
Multiple mounting holes around 4-7 perforates, with bolt and nut the middle part outer flange disk of vertical water pump 4-4 itself inlet channel and
The first fixed support plate of base support tube 4-7 links together, and water pump connecting tube 4-2 bottom is installed in vertical water pump 4-4's
On outlet conduit, middle part outer flange disk perforate and the second fixed support plate of main body cover pipe 4-8 by water pump connecting tube 4-2
Multiple mounting holes around perforate, the middle part outer flange disk and main body cover pipe with bolt and nut water pump connecting tube 4-3
Two fixed support plate 4-8 link together, and after installing, base support tube 4-1 and main body cover pipe 4-2 are in state of isolation,
By the base support tube 4-1 lower outside ring flanges of pump group part 4 in first set, the second sleeve pipe, with bolt and nut by first set,
Pump group part 4 is arranged on the bottom plate 3-6 of the right inside of house body in second sleeve pipe, two groups of lower end ring flanges for going out Water Check Valve 5
When being separately mounted to the upper end of pump group part 4 in two groups of pipes, two groups of lower end ring flanges for going out Water Check Valve 5 and water pump connecting tube 4-3
Upper outside ring flange linked together by bolt and nut, the base support tube 4-1 left-hand ends of pump group part in first sleeve
The base support tube 4-1 right-hand end water inlet pipe 4-5 of pump group part pass through the 3rd jointing clip 7 in outlet pipe 4-6 and the second sleeve pipe
Link together.After pump group part 4 installs in first set, the second sleeve pipe, running water pump group part base from first sleeve supports
Pipe 4-1 right-hand end water inlet pipes 4-5 enters, under the control of electrical control cabinet 1, the vertical water of pump group part in first set, the second sleeve pipe
Pump 4-4 obtains electric work, and vertical water pump 4-4 goes out Water Check Valve 5 unidirectionally by acting on by after low pressure tap water boosting through two groups, from
Outlet pipe 6 is inputted to user pipe.
Shown in Fig. 1, Fig. 2, Fig. 3, this new structure is compact, using pump group part in pipe 4 and go out Water Check Valve 5, outlet pipe 6,
Jointing clip 7, first ends the parts such as water valve 8, connecting tube 9, blowdown cut-off water valve 10, makes with reference to existing secondary water-supply facility
Electrical control cabinet 1 and capsule type air-pressure tank 2, you can normally come into operation, user will be supplied after under-voltage tap water boosting in work
Normal use, has house body 3 because this is new, and all parts are all arranged in house body 3, it is not necessary to build a special equipment
Room is installed, can as needed facilitate and house body 3 is arranged on any desired place of Residential Area, during installation, it is only necessary to by first
Pump group part base support tube 4-1 right-hand end water inlet pipe 4-5 connect with the water intake end of municipal tap water pipe network in sleeve pipe, outlet pipe 6
Connect with residential quarters user's water inlet pipe front end, can be put into after service cable is connected with the lead-in wire terminal of electrical control cabinet 1
Use, thus reached that use cost is low, the advantages of not occupying the big installing space of cell, be easy for installation, the engineering time is short.Make
In, the power supply that electrical control cabinet 1 exports enters in pipe after the power input of pump group part 4, the vertical water pump 4- of pump group part 4 in pipe
4 and the booster pump of common secondary water-supply facility, the working method after being controlled by electrical control cabinet 1 is consistent, and pump group part 4 is vertical in pipe
After formula water pump 4-4 obtains electric work, base support tube 4-1 right-hand end water inlet pipe 4-5 of the running water through pump group part in first sleeve 4 enters
Enter in first sleeve in the base support tube 4-1 of pump group part 4, and through being brought out on the left of the base support tube 4-1 of pump group part in first sleeve 4
The base support tube 4-1 right-hand end outlet pipe 4-5 of pump group part 4, the pump group part 4 into the second sleeve pipe in water pipe 4-6, the second sleeve pipe
In base support tube 4-1, and supercharging, the water pump connecting tube 4-3 through pump group part 4 in two sleeve pipes are extracted out through two sets of vertical water pump 4-4
Output is exported to user pipe through outlet pipe 6 in outlet pipe 6, allow user's normal use be pressurized after running water, outlet pipe 6
Interior water enters in capsule type air-pressure tank 2 through connecting tube 9, and capsule type air-pressure tank 2 stores a part of water when flat, stop in vertical water pump 4-4
After machine, remain to provide the water of a period of time to community resident.
It is not new to limit it should be noted that the present embodiment is the utility model preferred embodiments, it is all in this reality
Apply and any modification, equivalent substitution and improvements etc. are done in a spirit, should be included within the scope of protection of the utility model.
Claims (5)
1. a kind of integrated charge supply equipment, include the electrical control of the existing secondary water-supply facility booster pump working method of control
Cabinet and capsule type air-pressure tank, it is characterised in that by pump group part in house body, pipe, go out Water Check Valve, outlet pipe, jointing clip, first section
Water check valve, connecting tube, blowdown cut-off water valve are formed, and the interior left part of house body is vertically welded with a vertical clapboard, and vertical clapboard is by house body
Left and right two parts are divided into two independent spaces, and respectively there is a perforate on the right side of house body for two up and down, house body left part space it is interior
Lower, transverse is welded with a diaphragm plate, and it is independent space that house body left part is spatially descended two parts by diaphragm plate, outlet pipe
Four perforates are arranged at bottom, and the left part of outlet pipe has a perforate, and outlet pipe bottom first, the 3rd perforate lower end are respectively welded with
One ring flange, outlet pipe bottom second, the 4th perforate lower end are respectively welded with a pipe joint, and the left part of outlet pipe is opened
Hole outboard end is welded with a union elbow, and electrical control cabinet is arranged on the interior upper end of house body left part, left part space upper end front side
One fan dodge gate is installed, dodge gate is arranged on by two hinges on front side of the upper end in house body left part space, capsule type air-pressure tank peace
There is a perforate between the subordinate end of interior lower end, house body or so two of house body left part, connecting tube one end enters house body through perforate
Interior lower left quarter, connecting tube one end are connected by pipe joint with the water inlet pipe of capsule type air-pressure tank, the upper end of the first cut-off water valve
Installed in the union elbow bottom of outlet pipe left part perforate outboard end, the connecting tube other end is arranged under the first cut-off water valve
End, blowdown cut-off water valve have two groups of an identical, two groups of blowdowns cut-off water valves be separately mounted to outlet pipe it is lower second, the 4th open
The bottom of hole lower channel joint, pump group part has two groups in pipe, and going out Water Check Valve has two groups of an identical, and pump group part is pacified in two groups of pipes
Mounted in the right inside of house body, two groups of ring flanges for going out Water Check Valve upper end respectively with the perforate of outlet pipe bottom first, the 3rd
The ring flange at end is connected by bolt and nut, two groups of ring flanges for going out Water Check Valve lower end respectively with pump group part upper end in two groups of pipes
Connected by bolt and nut, jointing clip there are more, and the water inlet pipe of pump group part is located at house body right lower quadrant perforate in one of which pipe
Outside, and connected with the pipeline of municipal tap water pipe network by first jointing clip, the delivery port of outlet pipe right part is located at room
On the outside of the perforate of body upper right quarter, and connected with residential quarters user pipe water intake end by second jointing clip, pump in two groups of pipes
The power input of component is connected in parallel, and the power input of electrical control cabinet is connected with 380V AC powers by wire,
The power input of pump group part is connected by wire in electrical control cabinet power output end and two groups of pipes.
2. a kind of integrated charge supply equipment according to claim 1, it is characterised in that house body is by bottom plate, Zuo Gu
Fixed board, right fixed plate, rear fixed plate, upper mounted plate composition, left fixed plate, right fixed plate lower end are separately mounted to a bottom plate left side
Right two upper lateral parts, rear fixed plate lower end are arranged on bottom plate upper back, and the right side of right fixed plate respectively has one for two up and down
Perforate, upper mounted plate lower end are arranged on left fixed plate, right fixed plate, the upper end of rear fixed plate, and after installing, upper mounted plate is by rear
Inclined state is in preceding.
3. a kind of integrated charge supply equipment according to claim 1, it is characterised in that go out the valve body of Water Check Valve, go out
Water pipe, the hoop body of jointing clip, the valve body of the first cut-off water valve, connecting tube, the valve body of blowdown cut-off water valve are stainless steels
Matter.
A kind of 4. integrated charge supply equipment according to claim 2, it is characterised in that in two sleeve pipes pump group part by
Base support tube, main body cover pipe, water pump connecting tube and vertical water pump composition, base support tube, main body cover pipe, water pump connection
The pump body of pipe and vertical water pump is stainless steel, on the outside of the top of water pump connecting tube and middle part, outside main body cover pipe bottom
Respectively there is a ring flange in side, two outsides up and down of base support tube, and base support tube bottom is in sealing state, first set,
The base support tube right-hand end of pump group part respectively has a water inlet pipe in second sleeve pipe, the base support tube of pump group part in first sleeve
Left-hand end has an outlet pipe, and the first fixed support plate that a middle part has perforate, ring perforate week are arranged at base support tube top
Enclose with multiple mounting holes, the second fixed support plate that a middle part has perforate arranged at main body cover pipe top, around ring perforate
It is solid by the middle part outer flange disk perforate of vertical water pump itself inlet channel and base support tube first with multiple mounting holes
Determine multiple mounting holes around supporting plate perforate, the middle part outer flange disk with bolt and nut vertical water pump itself inlet channel
Linked together with the fixed support plate of base support tube first, the bottom of water pump connecting tube is arranged on the outlet conduit of vertical water pump
On, by multiple around the middle part outer flange disk perforate and the second fixed support plate perforate of main body cover pipe of water pump connecting tube
Mounting hole, the middle part outer flange disk and the fixed support plate of main body cover pipe second of water pump connecting tube are connected to bolt and nut
Together, after installing, base support tube and main body cover pipe are in state of isolation, pass through pump group part in first set, the second sleeve pipe
Base support tube lower outside ring flange, with bolt and nut by pump group part in first set, the second sleeve pipe be arranged on the house body right side in
On the bottom plate in portion, when two groups of lower end ring flanges for going out Water Check Valve are separately mounted to the upper end of pump group part in two groups of pipes, two
Group goes out the lower end ring flange of Water Check Valve and the upper outside ring flange of water pump connecting tube is linked together by bolt and nut, the
The base support tube right-hand end of pump group part enters in the base support tube left-hand end outlet pipe and the second sleeve pipe of pump group part in sleeve
Water pipe is linked together by the 3rd jointing clip.
A kind of 5. integrated charge supply equipment according to claim 4, it is characterised in that pump in first set, the second sleeve pipe
After component installs, running water pump group part base support tube right-hand end water inlet pipe from first sleeve enters, in electrical control cabinet
Under control, the vertical water pump of pump group part obtains electric work in first set, the second sleeve pipe, vertical water pump by after low pressure tap water boosting,
Go out Water Check Valve unidirectionally by effect through two groups, inputted from outlet pipe to user pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720719777.2U CN206829253U (en) | 2017-06-20 | 2017-06-20 | A kind of integrated charge supply equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720719777.2U CN206829253U (en) | 2017-06-20 | 2017-06-20 | A kind of integrated charge supply equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206829253U true CN206829253U (en) | 2018-01-02 |
Family
ID=60776745
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720719777.2U Active CN206829253U (en) | 2017-06-20 | 2017-06-20 | A kind of integrated charge supply equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206829253U (en) |
-
2017
- 2017-06-20 CN CN201720719777.2U patent/CN206829253U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205617483U (en) | Bring water flow control's box no negative pressure water supply equipment into | |
CN206902825U (en) | A kind of pipe network laminated press frequency conversion water system | |
CN206829253U (en) | A kind of integrated charge supply equipment | |
CN110056770A (en) | A kind of gas pipeline pressurization stable-pressure device | |
CN107100225A (en) | A kind of municipal tap water is without negative pressure pipe network pressurized watering device | |
CN209412905U (en) | A kind of non-negative pressure method of water supply device with bidirectional traffics compensation function | |
CN203687407U (en) | Direct-heating split wall-mounted solar water heater | |
CN105926724A (en) | Component assembly type flexible indoor water supply system and installation method | |
CN210890264U (en) | Pipeline constant pressure device | |
CN104697137A (en) | Hydraulic balance distribution device | |
CN103499119A (en) | Preassembled type primary and secondary ring assembly and system applied to floor heating hydraulic system | |
CN204212219U (en) | Network pressure superposition water supply system is share in life fire-fighting | |
CN201195017Y (en) | Water fire extinguishing system of transforming plant with integrated structure | |
CN208280221U (en) | A kind of energy-saving compensated formula is without negative pressure pressure-superposed water supplying facility | |
CN110440039A (en) | Pipeline barostat | |
CN201615835U (en) | Water supply equipment performance test bed | |
CN201795960U (en) | Equipment system for high-efficiency process pipe pressure testing | |
CN216948534U (en) | Outdoor integral type booster pump station | |
CN218237605U (en) | Heating system for interconnection and intercommunication of municipal heating pipe network and independent boiler room | |
CN105179324A (en) | Horizontal type tubular pump device adopting voltage buildup gap installation | |
CN219240718U (en) | Combined secondary water supply equipment | |
CN205187862U (en) | Modular plate -type ozone generator | |
CN204730260U (en) | A kind of band is with the floor heating system of Cheng Buguan | |
CN204080951U (en) | A kind of water supply for secondary water-supply is integrated | |
CN104964347B (en) | HVAC end integrated pipeline system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |