CN206827969U - Jib crane - Google Patents

Jib crane Download PDF

Info

Publication number
CN206827969U
CN206827969U CN201720778572.1U CN201720778572U CN206827969U CN 206827969 U CN206827969 U CN 206827969U CN 201720778572 U CN201720778572 U CN 201720778572U CN 206827969 U CN206827969 U CN 206827969U
Authority
CN
China
Prior art keywords
column
crossbeam
sole
otic placode
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720778572.1U
Other languages
Chinese (zh)
Inventor
杨良明
黄国臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shangyang Package Products Co Ltd Harbin
Original Assignee
Shangyang Package Products Co Ltd Harbin
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shangyang Package Products Co Ltd Harbin filed Critical Shangyang Package Products Co Ltd Harbin
Priority to CN201720778572.1U priority Critical patent/CN206827969U/en
Application granted granted Critical
Publication of CN206827969U publication Critical patent/CN206827969U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model provides a kind of jib crane.The upper end both sides of the column are respectively fixed with otic placode, sole is fixed on the lower end of column, column is according to thirty years of age of wall, otic placode is connected with the wall expansion bolt being arranged in wall, nut one is fastened with wall expansion bolt on the outside of otic placode, sole is connected with being arranged on the surface dilation bolt of subsurface, nut two is fastened with surface dilation bolt on the upside of sole, one end of cross track is fixedly connected with the top of column, it is 90 ° of settings between cross track and column, electric block is arranged on cross track, one end of rope on electric block is fixedly connected with the upper end of drawing plate, the lower end of drawing plate is fixedly connected with crossbeam, the both sides of crossbeam upper end are respectively equipped with spacer pin, it is provided with and is linked with the inside of the spacer pin of crossbeam both sides.The work for the taking-up aluminium foil that four people's cooperations of need of solving over could be completed, saves manpower and materials, improves operating efficiency, ensure that the intact of aluminium foil.

Description

Jib crane
Technical field
A kind of jib crane is the utility model is related to, belongs to crane technical field.
Background technology
Packing articles industry sometimes needs to use aluminium foil.Aluminium foil is a kind of very enervated material for being afraid of to touch, and is shipped When in wooden case, often roll up more than 300 jins and bad do outward.It is generally necessary to four people toward lift outside chest first have to chest to destroy Fall, waste time and energy, be also easy to encounter aluminium foil, cause unnecessary loss.
The content of the invention
The purpose of this utility model is to solve the above-mentioned problems of the prior art, and then a kind of single armed lifting of offer Machine.
The purpose of this utility model is achieved through the following technical solutions:
A kind of jib crane, including:Otic placode, wall expansion bolt, nut one, cross track, electric block, column, Spacer pin, rope, drawing plate, crossbeam, it is linked with, nut two, sole and surface dilation bolt, the upper end both sides difference of the column It is fixed with otic placode, sole is fixed on the lower end of column, and column is according to thirty years of age of wall, otic placode and the wall expansion bolt being arranged in wall It is connected, nut one, sole and the surface dilation bolt for being arranged on subsurface is fastened with the wall expansion bolt on the outside of otic placode It is connected, nut two is fastened with the surface dilation bolt on the upside of sole, one end of cross track and the top of column, which are fixed, is connected Connect, be arranged between cross track and column for 90 ° of settings, electric block on cross track, one of the rope on electric block End is fixedly connected with the upper end of drawing plate, and the lower end of drawing plate is fixedly connected with crossbeam, and the both sides of crossbeam upper end are respectively equipped with limit Position pin, the spacer pin inner side of crossbeam both sides, which is provided with, to be linked with.
The utility model is a kind of single-post single-arm formula crane, and solving over needs the taking-up that could complete of four people's cooperations The work of aluminium foil, saves manpower and materials, improves operating efficiency, ensure that the intact of aluminium foil, fill the chest of aluminium foil without Destroy, maintain the place in workshop clean dustless.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model jib crane.
Fig. 2 is Fig. 1 A direction views.
Fig. 3 is Fig. 1 B direction views.
Fig. 4 be linked with 11 structural representation.
Reference in figure, 1 is otic placode, and 2 be wall expansion bolt, and 3 be nut one, and 4 be cross track, and 5 be electronic Cucurbit, 6 be column, and 7 be spacer pin, and 8 be rope, and 9 be drawing plate, and 10 be crossbeam, and 11 is are linked with, and 12 be nut two, and 13 be pin Plate, 14 be surface dilation bolt, and 15 be hanging ring.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing:The present embodiment is with the utility model skill Implemented under premised on art scheme, give detailed embodiment, but the scope of protection of the utility model be not limited to it is following Embodiment.
As shown in Figure 1 to 4, a kind of jib crane involved by the present embodiment, including:Otic placode 1, wall expansion bolt 2nd, nut 1, cross track 4, electric block 5, column 6, spacer pin 7, rope 8, drawing plate 9, crossbeam 10, be linked with 11, nut 2 12, sole 13 and surface dilation bolt 14, the upper end both sides of the column 6 are respectively fixed with otic placode 1, and sole 13 is fixed on vertical The lower end of post 6, column 6 is according to thirty years of age of wall, and otic placode 1 is connected with the wall expansion bolt 2 being arranged in wall, the outside of otic placode 1 Nut 1 is fastened with wall expansion bolt 2, sole 13 is connected with being arranged on the surface dilation bolt 14 of subsurface, sole Nut 2 12 is fastened with the surface dilation bolt 14 of 13 upsides, one end of cross track 4 is fixedly connected with the top of column 6, It is arranged between cross track 4 and column 6 for 90 ° of settings, electric block 5 on cross track 4, the rope 8 on electric block 5 One end is fixedly connected with the upper end of drawing plate 9, and the lower end of drawing plate 9 is fixedly connected with crossbeam 10, the both sides point of the upper end of crossbeam 10 Not She You spacer pin 7, the inner side of spacer pin 7 of the both sides of crossbeam 10, which is provided with, is linked with 11.
The crossbeam 10 is made up of pipe or square tube.
Described to be linked with 11 be banded structure, and the both ends of banded structure are connected to hanging ring 15.
Described above, only the preferable embodiment of the utility model, these embodiments are all based on this Different implementations under utility model general idea, and the scope of protection of the utility model is not limited thereto, it is any ripe Those skilled in the art are known in the technical scope that the utility model discloses, the change or replacement that can be readily occurred in, all It should cover within the scope of protection of the utility model.Therefore, the scope of protection of the utility model should be with claims Protection domain is defined.

Claims (3)

1. a kind of jib crane, including:It is otic placode (1), wall expansion bolt (2), nut one (3), cross track (4), electronic Cucurbit (5), column (6), spacer pin (7), rope (8), drawing plate (9), crossbeam (10), it is linked with (11), nut two (12), sole (13) and surface dilation bolt (14), it is characterised in that the upper end both sides of the column (6) are respectively fixed with otic placode (1), sole (13) it is fixed on the lower end of column (6), column (6) is according to thirty years of age of wall, otic placode (1) and the wall expansion bolt being arranged in wall (2) it is connected, nut one (3) is fastened with the wall expansion bolt (2) on the outside of otic placode (1), sole (13) is with being arranged on ground Under surface dilation bolt (14) be connected, be fastened with nut two (12) on the surface dilation bolt (14) on the upside of sole (13), One end of cross track (4) is fixedly connected with the top of column (6), is 90 ° of settings, electricity between cross track (4) and column (6) Dynamic cucurbit (5) is arranged on cross track (4), and one end and the upper end of drawing plate (9) of the rope (8) on electric block (5) are consolidated Fixed connection, the lower end of drawing plate (9) are fixedly connected with crossbeam (10), and the both sides of crossbeam (10) upper end are respectively equipped with spacer pin (7), It is provided with and is linked with (11) on the inside of the spacer pin (7) of crossbeam (10) both sides.
2. jib crane according to claim 1, it is characterised in that the crossbeam (10) is made up of pipe or square tube.
3. jib crane according to claim 1, it is characterised in that described be linked with (11) are banded structure, banding knot The both ends of structure are connected to hanging ring (15).
CN201720778572.1U 2017-06-29 2017-06-29 Jib crane Active CN206827969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720778572.1U CN206827969U (en) 2017-06-29 2017-06-29 Jib crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720778572.1U CN206827969U (en) 2017-06-29 2017-06-29 Jib crane

Publications (1)

Publication Number Publication Date
CN206827969U true CN206827969U (en) 2018-01-02

Family

ID=60778346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720778572.1U Active CN206827969U (en) 2017-06-29 2017-06-29 Jib crane

Country Status (1)

Country Link
CN (1) CN206827969U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109042595A (en) * 2018-08-13 2018-12-21 江苏大学 A kind of scalable humidifier being equipped on greenhouse atomizing machine track mobile device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109042595A (en) * 2018-08-13 2018-12-21 江苏大学 A kind of scalable humidifier being equipped on greenhouse atomizing machine track mobile device
CN109042595B (en) * 2018-08-13 2021-10-12 江苏大学 Telescopic spraying mechanism carried on rail moving device of greenhouse sprayer

Similar Documents

Publication Publication Date Title
CN203159047U (en) Hydraulic span and height adjustable gantry crane
CN107178203A (en) A kind of planar dimension and adjustable for height operating platform
CN206858005U (en) A kind of lorry movable small crane
CN206827969U (en) Jib crane
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN204401395U (en) A kind of subgrade case
CN206957175U (en) A kind of planar dimension and adjustable for height operating platform
CN206016412U (en) Deflecting plate
CN204470863U (en) A kind of crane arm lower edge frock holding device
CN204873489U (en) Large -scale bridge crane girder inner structure
CN203715156U (en) Convenient crane
CN203345968U (en) Tower crane
CN204057662U (en) Fixed type screw compressor lifting appliance
CN203269403U (en) Low-level slewing portal luffing-jib crane
CN203740853U (en) Assembly type construction site lifting frame for lifting-transporting minimal machine on construction site
CN205558443U (en) Novel steel construction electric power rack
CN203499321U (en) Derrick for assembling electric transmission line iron tower
CN206352294U (en) A kind of flood-fighting piling machine
CN206384744U (en) A kind of simple and easy hoisting device
CN205397896U (en) Hoist anchoring device
CN203180314U (en) Lightning arrester capable of rising with steel structure rotatably
CN204384763U (en) A kind of crane arm tip structure
CN203160696U (en) Hanging box for constructional engineering construction
CN203998726U (en) Tower crane climbing frame anti-twisting equipment
CN203126808U (en) Telescopic chassis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Single boom crane

Effective date of registration: 20220922

Granted publication date: 20180102

Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd.

Pledgor: HARBIN SHANGYANG PACKAGING PRODUCTS CO.,LTD.

Registration number: Y2022230000065

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231010

Granted publication date: 20180102

Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd.

Pledgor: HARBIN SHANGYANG PACKAGING PRODUCTS CO.,LTD.

Registration number: Y2022230000065

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Single arm crane

Effective date of registration: 20231027

Granted publication date: 20180102

Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd.

Pledgor: HARBIN SHANGYANG PACKAGING PRODUCTS CO.,LTD.

Registration number: Y2023230000090