CN206824374U - Air-conditioning boring positioning sewage collection equipment - Google Patents

Air-conditioning boring positioning sewage collection equipment Download PDF

Info

Publication number
CN206824374U
CN206824374U CN201720081267.7U CN201720081267U CN206824374U CN 206824374 U CN206824374 U CN 206824374U CN 201720081267 U CN201720081267 U CN 201720081267U CN 206824374 U CN206824374 U CN 206824374U
Authority
CN
China
Prior art keywords
fixed frame
conditioning
air
sewage
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720081267.7U
Other languages
Chinese (zh)
Inventor
王柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720081267.7U priority Critical patent/CN206824374U/en
Application granted granted Critical
Publication of CN206824374U publication Critical patent/CN206824374U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model belongs to air-conditioning installation apparatus field, more particularly to air-conditioning boring positioning sewage collection equipment.Described device includes fixed frame, and fixed frame one end is provided with the installation neck for connection staircase, and the other end is provided with sewage collecting cylinder, is connected on the cylinder of sewage collecting cylinder and be provided with drainage tube, cylinder and the fixed frame of sewage collecting cylinder are movably hinged.The utility model is simple in construction, ingenious in design, can be directed to the high-efficient homework that most walls carry out isolating sewage, and wall is not caused to damage.

Description

Air-conditioning boring positioning sewage collection equipment
Technical field
The utility model belongs to air-conditioning installation apparatus field, more particularly to air-conditioning boring positioning sewage collection equipment.
Background technology
Air-conditioning needs to wall drilling in a pre-installation, and hole knockout of the prior art is mostly water drilling punching, due to water drilling Water and dust, the mixture of rock ballast can be constantly discharged during punching, it is therefore desirable to gluing isolation is used at bore position or is set Sewage collecting bag is put, to be collected to sewage, prevents it from, along wall downstream to ground, causing the pollution on wall and ground.It is existing With the presence of the following drawback of sewage isolation method in technology:1)Double faced adhesive tape or sewage collecting bag will be changed per subjob, and Interfered by the specific situation of metope, such as surface of wall depainting, rough whole, cause double faced adhesive tape and sewage collecting bag and wall The combination effect in face is unsatisfactory;2)Caused vibration easily makes gluing stripping during drilling work, influences anti-fouling effect not Stablize, and the adhesive residue of metope can be caused using adhesive means;3)Because the overall length of water drilling is larger, work people is caused Member it is too remote from wall, especially high-order homework when, staircase crank can be caused easily to trigger potential safety hazard.In general, existing skill Sewage isolation method and instrument in art are difficult to meet real work demand.
Utility model content
The purpose of this utility model is to provide a kind of air-conditioning boring positioning sewage collection equipment, the letter of the utility model structure It is single, it is ingenious in design, the high-efficient homework that most walls carry out isolating sewage can be directed to.
In order to solve the above technical problems, the technical solution adopted in the utility model is as follows:
Air-conditioning boring positioning sewage collection equipment, described device include fixed frame, and fixed frame one end, which is provided with, to be used for The installation neck of connection staircase, the other end are provided with sewage collecting cylinder, are connected on the cylinder of sewage collecting cylinder and be provided with drainage tube, sewage The cylinder of surge drum is movably hinged with fixed frame.
Preferably, the fixed frame is connected by connecting rod with U-shaped arc plate, two vertical portions of U-shaped arc plate by bearing pin with The cylinder of sewage collecting cylinder is hinged.
Preferably, the fixed frame is provided with horizon bar, positioning sleeve is arranged with horizon bar, positioning sleeve is by hanging down Straight-bar is slidably connected with the height regulating sleeve being sheathed on outside connecting rod.
Preferably, the body of rod of the connecting rod away from U-shaped arc plate one end is provided with two extension springs, extension spring and fixed frame both sides Fixed hook is detachably connected, and is linked up with away from installation neck and between spring and U-shaped arc plate.
Preferably, cylinder one end of the sewage collecting cylinder is provided with sponge washer, and the other end is provided with plastic cement seal washer.
Preferably, the fixed frame is installed with tool palette in the framework of installation neck.
Preferably, framework end of the fixed frame away from installation neck is provided with revetment rubber cushion.
The utility model when in use, adjusts staircase height according to bore position first, and by the peace of fixed frame end Be loaded the both sides ladder beam clamping of groove and staircase, after then staff climbs up staircase, utilizes the weight mix wall of itself and staircase Body pushes down fixed frame so that fixed frame is crimped on wall by revetment rubber cushion.Boring various works are placed on tool palette Tool, according to bore position, mobile positioning sleeve makes it be moved along horizon bar, while adjusts height regulating sleeve and make it along vertical bar It is mobile so that pull bar drives sewage collecting cylinder to correspond to drill hole, and sewage collecting cylinder contacts wall by sponge washer, then will even Two extension springs of boom end are connected with the hook of fixed frame both sides, spring using tensile force drivening rod and sewage collecting cylinder with Wall, which compresses, realizes positioning, then the drill bit of rig is passed through from sewage collecting cylinder, and the vibration of rig can be effectively by sewage collecting Cylinder is compacted to wall, and sewage is blocked by sponge washer and plastic cement seal washer, and extraneous received can only be drained under drainage tube Collection.
The utility model compared with prior art, has the following advantages that:
1)At the both ends of sewage collecting cylinder, high-density sponge packing ring and plastic cement seal washer are set respectively, can be effectively to entering The sewage entered in sewage collecting cylinder is blocked, and sewage flows out on rear side of rig, while high-density sponge has certain plastotype Ability, various walls can be well adapted for and be brought into close contact;
2)The position of sewage collecting cylinder can be adjusted according to the actual requirements, facilitate practical operation to use, staff Centre of body weight it is stable, enhance operating efficiency and safety;
3)The connection neck and staircase spiral-lock of fixed frame, assembling and disassembling is all very convenient, and fixed frame contacts with metope The revetment rubber cushion at position is also avoided that fixed frame causes to damage to metope.
Brief description of the drawings
Fig. 1 is the overlooking the structure diagram of air-conditioning boring positioning sewage collection equipment in embodiment.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining The utility model, it is not used to limit the utility model.
As shown in figure 1, air-conditioning boring positioning sewage collection equipment, described device includes fixed frame 1, fixed frame 1 One end is provided with the installation neck 2 for connection staircase, and the other end is provided with sewage collecting cylinder 10, and fixed frame 1 is close to installation neck Framework on be installed with tool palette 13, framework end of the fixed frame 1 away from installation neck is provided with revetment rubber cushion 3, sewage collecting Connection is provided with drainage tube 11 on the cylinder of cylinder 10, and fixed frame 1 is provided with horizon bar 4, and positioning sleeve 5 is arranged with horizon bar 4, Positioning sleeve 5 is connected with by vertical bar 16 with the height regulating sleeve 6 being sheathed on outside connecting rod 7, and connecting rod 7 connects with U-shaped arc plate 8 Connect, two vertical portions of U-shaped arc plate 8 are hinged by the cylinder of bearing pin 9 and sewage collecting cylinder 10.Cylinder one end of sewage collecting cylinder 10 Provided with sponge washer, the other end is provided with plastic cement seal washer 12, and the body of rod of the connecting rod 7 away from U-shaped one end of arc plate 8 is provided with two drawings Spring 14, the hook 15 fixed with the both sides of fixed frame 1 of extension spring 14 are detachably connected, link up with away from installation neck and positioned at spring with Between U-shaped arc plate.
The utility model when in use, adjusts staircase height according to bore position first, and by the peace of fixed frame end Be loaded the both sides ladder beam clamping of groove and staircase, after then staff climbs up staircase, utilizes the weight mix wall of itself and staircase Body pushes down fixed frame so that fixed frame is crimped on wall by revetment rubber cushion.Boring various works are placed on tool palette Tool, according to bore position, mobile positioning sleeve makes it be moved along horizon bar, while adjusts height regulating sleeve and make it along vertical bar It is mobile so that pull bar drives sewage collecting cylinder to correspond to drill hole, and sewage collecting cylinder contacts wall by sponge washer, then will even Two extension springs of boom end are connected with the hook of fixed frame both sides, spring using tensile force drivening rod and sewage collecting cylinder with Wall, which compresses, realizes positioning, then the drill bit of rig is passed through from sewage collecting cylinder, and the vibration of rig can be effectively by sewage collecting Cylinder is compacted to wall, and sewage is blocked by sponge washer and plastic cement seal washer, and extraneous received can only be drained under drainage tube Collection.
Drainage tube can connect container by drainpipe, facilitate sewage collecting.

Claims (7)

1. air-conditioning boring positioning sewage collection equipment, it is characterised in that described device includes fixed frame, fixed frame one end Provided with the installation neck for connection staircase, the other end is provided with sewage collecting cylinder, connects to be provided with the cylinder of sewage collecting cylinder and draws Flow tube, cylinder and the fixed frame of sewage collecting cylinder are movably hinged.
2. air-conditioning boring positioning sewage collection equipment as claimed in claim 1, it is characterised in that the fixed frame passes through Connecting rod is connected with U-shaped arc plate, and two vertical portions of U-shaped arc plate are hinged by the cylinder of bearing pin and sewage collecting cylinder.
3. air-conditioning boring positioning sewage collection equipment as claimed in claim 2, it is characterised in that set on the fixed frame There is horizon bar, positioning sleeve is arranged with horizon bar, positioning sleeve is adjusted by vertical rod and the height being sheathed on outside connecting rod Sleeve is slidably connected.
4. air-conditioning boring positioning sewage collection equipment as claimed in claim 3, it is characterised in that the connecting rod is away from U-shaped The body of rod of arc plate one end is provided with two extension springs, and the extension spring hook fixed with fixed frame both sides is detachably connected, and hook is remote Neck is installed and between spring and U-shaped arc plate.
5. air-conditioning boring positioning sewage collection equipment as claimed in claim 1, it is characterised in that the sewage collecting cylinder Cylinder one end is provided with sponge washer, and the other end is provided with plastic cement seal washer.
6. air-conditioning boring positioning sewage collection equipment as claimed in claim 1, it is characterised in that the fixed frame is close Install and be installed with tool palette in the framework of neck.
7. air-conditioning boring positioning sewage collection equipment as claimed in claim 1, it is characterised in that the fixed frame is remote The framework end of installation neck is provided with revetment rubber cushion.
CN201720081267.7U 2017-01-22 2017-01-22 Air-conditioning boring positioning sewage collection equipment Expired - Fee Related CN206824374U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720081267.7U CN206824374U (en) 2017-01-22 2017-01-22 Air-conditioning boring positioning sewage collection equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720081267.7U CN206824374U (en) 2017-01-22 2017-01-22 Air-conditioning boring positioning sewage collection equipment

Publications (1)

Publication Number Publication Date
CN206824374U true CN206824374U (en) 2018-01-02

Family

ID=60780421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720081267.7U Expired - Fee Related CN206824374U (en) 2017-01-22 2017-01-22 Air-conditioning boring positioning sewage collection equipment

Country Status (1)

Country Link
CN (1) CN206824374U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135278A (en) * 2021-11-11 2022-03-04 山东大学 Intelligent identification and prediction system and method for perception of unfavorable geology while drilling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135278A (en) * 2021-11-11 2022-03-04 山东大学 Intelligent identification and prediction system and method for perception of unfavorable geology while drilling
CN114135278B (en) * 2021-11-11 2024-01-02 山东大学 Intelligent identification and prediction system and method for perception-while-drilling bad geology

Similar Documents

Publication Publication Date Title
CN1316140C (en) Combined working platform for oil/water well
CN204827222U (en) Hydrodrill with drill way blowout preventer
CN206824374U (en) Air-conditioning boring positioning sewage collection equipment
CN208040328U (en) A kind of well head auxiliary casing centralization seat slip system
CN107790787A (en) The lengthening support that a kind of packaged type electric drill drills vertically upward
CN219548844U (en) Wellhead falling object preventing device for petroleum drilling engineering
CN204159929U (en) Mobile adjustable drilling sectional shelf-unit
CN205976699U (en) Fluid pressure type pole setting device
CN210302918U (en) Movable upward drilling dust removal device
CN210256096U (en) Pipe fitting rack for civil engineering
CN208534513U (en) A kind of Anchor Agent sleeve
CN202673191U (en) Multi-functional maintenance service device for petroleum drilling machine
CN201554399U (en) Double-riser high-pressure hose landing prevention device
CN203756029U (en) Pneumatic column type drilling machine
CN109610507A (en) Nerve of a covering running gear between a kind of support of open-cut station
CN211817875U (en) Scaffold mesh connector arranged on lifting scaffold
CN219316925U (en) Integrated small repair wellhead operation operating platform and special wellhead side valve opening and closing mechanism
CN220903761U (en) Be used for special drilling equipment of fire control engineering installation
CN214657049U (en) Lifting supporting structure for anti-grouting pipe of grouting machine
CN210264601U (en) Drilling fluid wellhead non-landing automatic recovery device
CN109935977A (en) A kind of building machinery temporary electricity earthing or grounding means
CN214403651U (en) Portable dust device of tunnel whitewashing
CN209761489U (en) Dust fall blowout prevention integrated device
CN201474647U (en) Oil well anti-jack apparatus
CN216197792U (en) Municipal administration inspection shaft construction ladder with safety protection function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180102

Termination date: 20190122