CN206823398U - Off-gas cleaning equipment - Google Patents

Off-gas cleaning equipment Download PDF

Info

Publication number
CN206823398U
CN206823398U CN201720655788.9U CN201720655788U CN206823398U CN 206823398 U CN206823398 U CN 206823398U CN 201720655788 U CN201720655788 U CN 201720655788U CN 206823398 U CN206823398 U CN 206823398U
Authority
CN
China
Prior art keywords
layer
filter
scrubbing tower
filter layer
waste gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720655788.9U
Other languages
Chinese (zh)
Inventor
余耀明
谢勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Kerui Hung Water Engineering Co Ltd
Original Assignee
Hefei Kerui Hung Water Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Kerui Hung Water Engineering Co Ltd filed Critical Hefei Kerui Hung Water Engineering Co Ltd
Priority to CN201720655788.9U priority Critical patent/CN206823398U/en
Application granted granted Critical
Publication of CN206823398U publication Critical patent/CN206823398U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Off-gas cleaning equipment, including air inlet, dedusting structure, sludge collection case, upper filter, lower filter, scrubbing tower;The dedusting structure is located at the scrubbing tower side, and is connected between the dedusting structure and the scrubbing tower by connecting tube, and the connecting tube periphery is provided with cooling tube;The upper filter and the lower filter are arranged in a crossed manner;The scrubbing tower includes the first filter layer, the second filter layer, the 3rd filter layer, dehumidifying layer, exhaust outlet, fixed plate;Several nozzles are equipped with below each fixed plate.The beneficial effects of the utility model are:(1)Upper filter and lower filter are arranged in a crossed manner, and the speed of waste gas advance is slow down in certain degree, the effective time is provided for dust-filtering in waste gas;(2)Three layer filtration layer and a dehumidifying layer, what is walked deeply has purified waste gas;(3)EGT before cooling tube makes to enter scrubbing tower is reduced, and ensure that the temperature needed for whole washing process.

Description

Off-gas cleaning equipment
Technical field
It the utility model is related to exhaust-gas treatment field, and in particular to off-gas cleaning equipment.
Background technology
Waste gas purification (Flue gas purification) is primarily referred to as industrial waste gas caused by industrial site such as The work that dust particle, flue gas flue dust, gas with foreign flavor, toxic and harmful gas are administered.Common waste gas purification has factory Fume and exhaust gas purifying, workshop dust waste gas purification, organic waste-gas purification, the purification of waste gas peculiar smell, acid-base waste gas purifying, chemical emission Purification etc..
Off-gas cleaning equipment is commonly utilized in chemical plant, Electronics Factory, spray painting factory, automobile factory, coating factory, petrochemical industry row Industry, Furniture Factory, food factory, rubber plant, plastic cement factory etc. produce peculiar smell, stink, the industry of toxic and harmful gas.
The gaseous species that off-gas cleaning equipment mainly purifies have benzene,toluene,xylene, ethyl acetate, acetone butanone, second The acid-base waste gas purifyings such as the organic exhaust gas such as alcohol, acrylic acid, formaldehyde, hydrogen sulfide, sulfur dioxide, ammonia and organic waste-gas purification.Waste gas Mainly active charcoal waste gas purification absorption method, medicament absorb method for treating exhaust gas, the catalysis burning waste gas method of purification, heating power to purification method The burning waste gas method of purification, plasma waste gas cleaning method etc..During from exhaust gas purifying method, expense should be selected as the case may be It is low, power consumption less, non-secondary pollution, as far as possible accomplish save energy consumption, it is environmental.Such as, waste gas purification industry typical flat -- on The CHO-91 Tower for purifying waste gas of Hai'an Ju Le bio tech ltd production uses five heavy waste gas adsorption filtration cleaning systems, gives up Gas Depurative design is careful, purification filtering waste gas layer by layer, once successfully undertakes the construction of the purification of Olympic Games racing boat lacquer spraying waste gas, effect is preferable.
Tower for purifying waste gas typically has acid mist Tower for purifying waste gas, Waste gas purifying column made of glass fibre reinforced, biological Tower for purifying waste gas, PP sprays Tower for purifying waste gas etc..The soda acid exhaust-gas treatment of waste gas treatment equipment(Spray column)Main function mode be continuous acid mist waste gas by Airduct introduces purifying column, and by packing layer, waste gas carries out gas-liquid two-phase with sodium hydroxide absorbing liquid and fully contacts absorption neutralization instead Should, acid mist waste gas is discharged into air after purification, then after demisting plate dehydrating demisting by blower fan.Absorbing liquid increases in bottom of towe through water pump After pressure tower top spray and under, be finally back to bottom of towe recycling.Acid mist waste gas after purification reaches the discharge of Guangdong Province place The emission request of standard, less than discharging standards.
During waste gas purification, dust granules big in waste gas should be intercepted filtering first, pass through scrubbing tower again afterwards. During dust granules filter, if the excessive velocities that waste gas passes through, cause waste gas filtering not thorough, cause filtering Effect is bad;In addition, the spray structure in scrubbing tower only has independent one layer, makes washing process not thorough, causes waste gas purification Not exclusively;Produce waste gas in the industry simultaneously, be all high-temperature gas after dust granules filtering, into before scrubbing tower such as Fruit by mercury dropped, then can not influence whole clean result.
Utility model content
The purpose of this utility model is to overcome deficiency of the prior art, there is provided off-gas cleaning equipment, in solution Technical problem is stated, the technical solution of the utility model is:
Off-gas cleaning equipment, including air inlet, dedusting structure, sludge collection case, upper filter, lower filter, scrubbing tower; The dedusting structure is located at the scrubbing tower side, and is connected between the dedusting structure and the scrubbing tower by connecting tube, The connecting tube periphery is provided with cooling tube, and the cooling tube upper and lower ends are respectively equipped with cooling medium inlet and cooling medium goes out Mouthful;The dedusting structure interior side is equidistantly longitudinally provided with several described upper filters, dedusting structure inside opposite side Equidistant longitudinal direction is provided with several described lower filters, and the upper filter and the lower filter are arranged in a crossed manner;
The scrubbing tower includes the first filter layer, the second filter layer, the 3rd filter layer, dehumidifying layer, exhaust outlet;Described first Filter layer, the second filter layer, the 3rd filter layer, dehumidifying layer are respectively laterally inside the scrubbing tower and successively from the washing Tower bottom upstream sequence spread configuration;First filter layer, the second filter layer, the 3rd filter layer, dehumidifying layer bottom pass through Fixed plate is fixed on the washing inner wall of tower, and several nozzles are equipped with below each fixed plate, each fixation Accumulation has a point water polo on plate;The exhaust outlet is located at the scrubbing tower top.
Preferably, the dedusting structure bottom is provided with the sludge collection case.
Preferably, the sludge collection bottom portion is provided with movable bottom.
Preferably, it is equidistant between first filter layer, the second filter layer, the 3rd filter layer, dehumidifying layer and be parallel to each other.
The beneficial effects of the utility model are:(1)Upper filter and lower filter are arranged in a crossed manner, subtract in certain degree The speed of waste gas advance is delayed, the effective time is provided for dust-filtering in waste gas;(2)Contain three layer filtration layer in scrubbing tower With a dehumidifying layer, while deep step has purified waste gas, also enable the gas drying of discharge can be discharged into air;(3)Cooling EGT before pipe makes to enter scrubbing tower is reduced, and be ensure that the temperature needed for whole washing process, is improved and wash Wash effect.
Brief description of the drawings
Accompanying drawing 1 is the utility model structure diagram.
Embodiment
The effect of to make to architectural feature of the present utility model and being reached, has a better understanding and awareness, to compared with Good embodiment and accompanying drawing coordinate detailed description, are described as follows:
As shown in Figure 1, off-gas cleaning equipment, including air inlet 100, dedusting structure 200, sludge collection case 400, upper mistake Filter plate 500, lower filter 600, scrubbing tower 800;The bottom of dedusting structure 200 is provided with the sludge collection case 400, described heavy The bottom of slag collecting box 400 is provided with movable bottom.Dust after filtering is fallen in the sludge collection case 400, is cleared up afterwards When only need the movable bottom of the bottom of sludge collection case 400 opening cleaning.
The dedusting structure 200 is located at the side of scrubbing tower 800, and the dedusting structure 200 and the scrubbing tower 800 Between connected by connecting tube 300, the periphery of the connecting tube 300 is provided with cooling tube 700, and the upper and lower ends of cooling tube 700 are divided Not She You cooling medium inlet 702 and cooling medium outlet 701, the cooling medium inlet 702 and the cooling medium outlet The 701 cooling medium flow directions set are with waste gas flow direction on the contrary, the effect reversely to cool like this will be played, cooling-down effect is more Add.
The interior side of dedusting structure 200 is equidistantly longitudinally provided with several described upper filters 500, the dedusting structure 200 inside opposite sides are equidistantly longitudinally provided with several described lower filters 600, the upper filter 500 and the lower filter 600 is arranged in a crossed manner;Because the upper filter 500 and the lower filter 600 intersect setting, like this, waste gas from After the air inlet 100 enters, flow velocity will be slack-off, when will like this provide favourable for waste gas dedusting process Between, improve the filter effect of dust.
The scrubbing tower 800 include the first filter layer 801, the second filter layer 802, the 3rd filter layer 803, dehumidifying layer 804, Exhaust outlet 808;First filter layer 801, the second filter layer 802, the 3rd filter layer 803, dehumidifying layer 804 are laterally located at respectively Inside the scrubbing tower 800 and successively from the bottom up order spread configuration of the scrubbing tower 800;First filter layer 801, Second filter layer 802, the 3rd filter layer 803, the bottom of dehumidifying layer 804 are fixed in the scrubbing tower 800 by fixed plate 805 It is equidistant between first filter layer 801, the second filter layer 802, the 3rd filter layer 803, dehumidifying layer 804 and mutually flat on wall OK;Each lower section of fixed plate 805 is equipped with several nozzles 807, and being accumulated in each fixed plate 805 has a point water polo 806;The exhaust outlet 808 is located at the top of scrubbing tower 800.Four filter layers being provided with the scrubbing tower 800, will be useless Washing is conducted batch-wise in gas, makes the clean result of waste gas better;The nozzle 807 can provide sodium hydroxide absorbing liquid, with acid mist The abundant haptoreaction of waste gas, purify waste gas;Waste gas after washing is purified, and moisture is removed by the damp-proof layer 804, then It is discharged into by the exhaust outlet 808 in air.
The beneficial effects of the utility model are:(1)Upper filter and lower filter are arranged in a crossed manner, subtract in certain degree The speed of waste gas advance is delayed, the effective time is provided for dust-filtering in waste gas;(2)Contain three layer filtration layer in scrubbing tower With a dehumidifying layer, while deep step has purified waste gas, also enable the gas drying of discharge can be discharged into air;(3)Cooling EGT before pipe makes to enter scrubbing tower is reduced, and be ensure that the temperature needed for whole washing process, is improved and wash Wash effect.
It should be understood by those skilled in the art that the utility model is not restricted to the described embodiments, above-described embodiment and Simply principle of the present utility model described in specification, this practicality on the premise of the spirit and scope of the utility model is not departed from New also to have various changes and modifications, these changes and improvements are both fallen within claimed the scope of the utility model.This The protection domain of utility model requirement is defined by appended claims and its equivalent.

Claims (4)

1. off-gas cleaning equipment, it is characterised in that:Including air inlet, dedusting structure, sludge collection case, upper filter, lower filtering Plate, scrubbing tower;The dedusting structure is located at the scrubbing tower side, and passes through company between the dedusting structure and the scrubbing tower Adapter connection, connecting tube periphery are provided with cooling tube, and the cooling tube upper and lower ends are respectively equipped with cooling medium inlet and cold But media outlet;The dedusting structure interior side is equidistantly longitudinally provided with several described upper filters, in the dedusting structure Portion's opposite side is equidistantly longitudinally provided with several described lower filters, and the upper filter and the lower filter are arranged in a crossed manner;
The scrubbing tower includes the first filter layer, the second filter layer, the 3rd filter layer, dehumidifying layer, exhaust outlet;First filtering Layer, the second filter layer, the 3rd filter layer, dehumidifying layer are respectively laterally inside the scrubbing tower and successively from the scrubbing tower bottom Portion's upstream sequence spread configuration;First filter layer, the second filter layer, the 3rd filter layer, dehumidifying layer bottom pass through fixation Plate is fixed on the washing inner wall of tower, and several nozzles are equipped with below each fixed plate, in each fixed plate Accumulation has a point water polo;The exhaust outlet is located at the scrubbing tower top.
2. off-gas cleaning equipment according to claim 1, it is characterised in that:The dedusting structure bottom is provided with the sediment Collecting box.
3. off-gas cleaning equipment according to claim 1, it is characterised in that:The sludge collection bottom portion is provided with dump bottom Lid.
4. off-gas cleaning equipment according to claim 1, it is characterised in that:First filter layer, the second filter layer, It is equidistant and be parallel to each other between three filter layers, dehumidifying layer.
CN201720655788.9U 2017-06-07 2017-06-07 Off-gas cleaning equipment Expired - Fee Related CN206823398U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720655788.9U CN206823398U (en) 2017-06-07 2017-06-07 Off-gas cleaning equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720655788.9U CN206823398U (en) 2017-06-07 2017-06-07 Off-gas cleaning equipment

Publications (1)

Publication Number Publication Date
CN206823398U true CN206823398U (en) 2018-01-02

Family

ID=60773307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720655788.9U Expired - Fee Related CN206823398U (en) 2017-06-07 2017-06-07 Off-gas cleaning equipment

Country Status (1)

Country Link
CN (1) CN206823398U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108619888A (en) * 2018-07-11 2018-10-09 安徽京仪自动化装备技术有限公司 A kind of acid-base neutralization equipment of semiconductor waste gas processing
CN108786288A (en) * 2018-06-20 2018-11-13 耿学威 A kind of pharmacy emission-control equipment
CN108905431A (en) * 2018-07-24 2018-11-30 王鹏 A kind of multistage VOCs industrial tail gas processing system
CN113457845A (en) * 2021-08-02 2021-10-01 瑞燃(上海)环境工程技术有限公司 Device for treating oil smoke tail gas and process method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108786288A (en) * 2018-06-20 2018-11-13 耿学威 A kind of pharmacy emission-control equipment
CN108619888A (en) * 2018-07-11 2018-10-09 安徽京仪自动化装备技术有限公司 A kind of acid-base neutralization equipment of semiconductor waste gas processing
CN108905431A (en) * 2018-07-24 2018-11-30 王鹏 A kind of multistage VOCs industrial tail gas processing system
CN108905431B (en) * 2018-07-24 2021-03-02 通化鑫鸿新材料有限公司 Multistage VOCs industry tail gas processing system
CN113457845A (en) * 2021-08-02 2021-10-01 瑞燃(上海)环境工程技术有限公司 Device for treating oil smoke tail gas and process method thereof

Similar Documents

Publication Publication Date Title
CN206823398U (en) Off-gas cleaning equipment
CN106731395A (en) A kind of paint spray booth emission-control equipment
CN201223759Y (en) Equipment for processing production exhaust-gas of reclaimed rubber
CN205269378U (en) Industrial waste gas dust removal desulfurization denitrogenation waste heat reutilization processing system
CN104259037A (en) Paint mist collecting and purifying device of paint spray booth
CN105194964A (en) Method and device for washing and hot mass transfer of pollutants in gas
CN206064141U (en) A kind of coal-fired flue-gas treatment and purification device
CN113578013A (en) Environment-friendly industrial waste gas purifies uses low temperature plasma SOx/NOx control device
CN205796820U (en) A kind of desulfurating dust-removing equipment
CN206793413U (en) Flue gas purification system
CN205867863U (en) Flue gas purification treatment device
CN203694900U (en) Coal stove flue gas treatment device
CN205435430U (en) It sprays processing apparatus to mix acid -base waste gas biological purification
CN104707462A (en) Method for removing ammonia and dust from exhaust gas generated during fertilizer preparation
CN201997253U (en) Minitype purifying device for cremating flue gas
CN209828596U (en) Novel UV exhaust-gas treatment of paint spray booth device
CN209049172U (en) A kind of industrial waste gas processing system
CN204034539U (en) A kind of ammonia type flue gas desulfurizing purifier
CN207324501U (en) A kind of desulphurization denitration purifying and dedusting device of flue gas
CN203355583U (en) Flue gas purifier
CN110207143A (en) Flue gas condensing takes off white system and its control method
CN2375370Y (en) Smoke desulfurizing dust remover
CN108355451A (en) A kind of flue dust desulfurization and denitrification integral deduster
CN211799931U (en) Waste gas treatment system
CN209791264U (en) High-efficient SOx/NOx control exhaust gas purification device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180102

Termination date: 20180607