CN206820884U - Intelligent video monitoring system - Google Patents
Intelligent video monitoring system Download PDFInfo
- Publication number
- CN206820884U CN206820884U CN201720481371.5U CN201720481371U CN206820884U CN 206820884 U CN206820884 U CN 206820884U CN 201720481371 U CN201720481371 U CN 201720481371U CN 206820884 U CN206820884 U CN 206820884U
- Authority
- CN
- China
- Prior art keywords
- control device
- alarm signal
- time
- camera
- vibration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Closed-Circuit Television Systems (AREA)
- Alarm Systems (AREA)
Abstract
The utility model provides a kind of intelligent video monitoring system, including the pressure sensor for the pressure born for real-time detection pipeline, IP Camera, vibrating sensor, AV device and control device for real-time detection pipeline vibration value;Control device is in response to one of following two conditions:1) pressure value is more than the pressure threshold of setting, 2) vibration values in the range of time of vibration are more than the vibration threshold of setting, generate alarm signal, it is audio-visual that AV device plays warning;The alarm signal duration exceedes setting time scope, and control device sends alarm signal to the computer of Surveillance center, computer and transfers the monitored picture of the IP Camera of reference numeral, it is amplified into full screen display.The utility model can be audio-visual in the warning that event generation live play records in advance, reminds illegal personnel violating the regulations to eliminate risk case in time;If risk case does not eliminate after setting time, the monitoring picture of the amplification display scene of the accident on the display screen of Surveillance center.
Description
Technical field
Monitoring field is the utility model is related to, in particular to a kind of intelligent video monitoring system.
Background technology
Wisdom piping lane is to build a tunnel space in Urban Underground, and electric power, communication, combustion gas, heat supply, plumbing etc. is each
Kind utilities pipeline is integrated in one, and unified planning, Uniting, agrees to build and manages, and is the important foundation for ensureing city operations
Facility and " lifeline ".
However, during present piping lane management, often occur illegal above pipeline accounting for pressure, illegal construction, pipeline pilferage
Deng the various events to be threatened to pipeline safety, the operation to city brings very big trouble.
Existing monitoring system is typically the technology using video monitoring, i.e., in each crossing that needs monitor, pipeline, pipeline
Adjunct is placed around IP Camera, and IP Camera sends picture to the computer of Surveillance center in real time by network
It is interior, video matrix system is installed in the computer of Surveillance center, the picture that multiple IP Cameras are passed back is with matrix
Form be shown on giant-screen, checked for monitoring personnel, and be scheduled on this basis.
From preceding, this needs monitoring personnel often to watch close screen, and the illegal violating the regulations existing of appearance is possible at any time to observe
As this will undoubtedly expend the substantial amounts of time and efforts of monitoring personnel.
Therefore, image analysis software is introduced again in existing video monitoring system, what camera was passed back to by the software
Processing is first compared in picture, then is checked monitoring personnel is shown to after the potential danger mark in image.Although graphical analysis
The appearance of software significantly reduces the workload of monitoring personnel, but software is different from artificial judgement after all, among these unavoidably
Occur some leaks, or wrong report or fail to report.
Utility model content
The utility model purpose is to provide a kind of intelligent video monitoring system, can monitor to jeopardize pipeline safety
Risk case when occurring, it is audio-visual to occur the warning that live play records in advance in event, reminds illegal personnel violating the regulations timely
Eliminate risk case;If risk case does not eliminate after setting time, amplify on Surveillance center's computer screen
The monitoring picture of the scene of the accident is shown, is easy to monitoring personnel to intervene in time and excludes risk.
To reach above-mentioned purpose, the utility model proposes a kind of intelligent video monitoring system, installed in the control point of pipeline
Near, the monitored picture in the range of control point is transferred in the computer of Surveillance center, including the pressure above pipeline
Force snesor, the IP Camera near pipeline, along the vibrating sensor of line layout, AV device and control fill
Put;
The control device has a configuration part, and configuration part is used to set pressure threshold, vibration threshold and time of vibration
Scope;
The pressure sensor, IP Camera, vibrating sensor, AV device are connected with control device;
The IP Camera has independent numbering;
The control device has a network connection unit, for being built between control device and the computer of Surveillance center
Vertical data link;
The monitored picture that the IP Camera is used in the range of captured in real-time control point, and be passed back to it by network
The computer of Surveillance center;
The pressure sensor is used for the pressure that real-time detection pipeline is born, and it is fed back into control device;
The vibrating sensor is used for the vibration values of real-time detection pipeline, and it is fed back into control device;
The control device is configured in response to any one in following two conditions:1) pressure sensor feeds back
As a result be more than the pressure threshold of setting, 2) vibration values that are received in the range of time of vibration are more than the vibration threshold of setting, raw
Into alarm signal;
The AV device has the first memory cell, is stored with that the warning recorded in advance is audio-visual, and AV device is set
It is set in response to alarm signal, it is audio-visual plays warning;
The control device is further configured to exceed setting time scope in response to the alarm signal duration, sends one and contains
There is the alarm signal of affiliated IP Camera numbering to the computer of Surveillance center;
Video matrix system software is installed, computer is configured in response to alarm in the computer of the Surveillance center
Signal, the monitored picture of the IP Camera of reference numeral is transferred, it is amplified to full screen display.
Further, the control device has the second memory cell;
The control device is configured in response to alarm signal, and the monitored picture during alarm signal is intercepted and stored
Into the second memory cell.
Further, the setting time uses 2 minutes.
Further, the vibrating sensor uses distributed optical fiber vibration sensor.
Further, the control device, AV device, IP Camera are arranged on the electric pole of street lamp and/or signal lamp
On.
Further, the control device is further configured to the number in response to generating alarm signal in one day time range
More than setting number, an alarm signal containing belonging network camera numbering is sent to the computer of Surveillance center.
Further, the setting number uses 3 times.
Further, the Surveillance center has an alarm device, and alarm device is configured in response to alarm signal, hair
Go out alarm.
By above the technical solution of the utility model, compared with existing, its significant beneficial effect is that it is possible to monitoring
To when thering is the risk case for jeopardizing pipeline safety to occur, it is audio-visual to occur the warning that live play records in advance in event, reminds
Illegal personnel violating the regulations eliminate risk case in time;If risk case does not eliminate after setting time, calculated in Surveillance center
Amplification shows the monitoring picture of the scene of the accident on the display screen of machine, is easy to monitoring personnel to intervene in time and excludes risk.
It should be appreciated that as long as all combinations of aforementioned concepts and the extra design described in greater detail below are at this
Sample design it is not conflicting in the case of can be viewed as the disclosure utility model theme a part.In addition, want
Ask the theme of protection all combinations be considered as the disclosure utility model theme a part.
The foregoing and other side of the utility model teaching can be more fully appreciated from the following description with reference to accompanying drawing
Face, embodiment and feature.The feature and/or beneficial effect of other additional aspects such as illustrative embodiments of the present utility model
To be obvious in the following description, or learnt in the practice by the embodiment instructed according to the utility model.
Brief description of the drawings
Accompanying drawing is not intended to drawn to scale.In the accompanying drawings, each identical or approximately uniform group shown in each figure
It can be indicated by the same numeral into part.For clarity, in each figure, not each part is labeled.
Now, by example and the embodiment of various aspects of the present utility model will be described in reference to the drawings, wherein:
Fig. 1 is the structural representation of intelligent video monitoring system of the present utility model.
Embodiment
In order to know more about technology contents of the present utility model, especially exemplified by specific embodiment and institute's accompanying drawings are coordinated to be described as follows.
Each side of the present utility model is described with reference in the disclosure, shown in the drawings of the implementation of many explanations
Example.It is not intended to cover all aspects of the present utility model for embodiment of the disclosure.It should be appreciated that a variety of structures presented hereinbefore
Think and embodiment, and describe in more detail below those design and embodiment can in many ways in any one
To implement, because design disclosed in the utility model and embodiment are not limited to any embodiment.In addition, this practicality
New disclosed some aspects can be used alone, or with the utility model disclosed in it is otherwise it is any it is appropriately combined come
Use.
The utility model proposes a kind of intelligent video monitoring system, the intelligent video monitoring system is laid in underground pipe network
Each control point, by the picture real-time delivery near control point to Surveillance center.
On the selection of control point, because underground pipe network is long and route is complicated, generally we can bury according to underground pipe network
Situation, considered every possible angle from the installation of section, crossing typicalness and IP Camera, fiber cable laying facility, be monitored choosing a little
Select.
The risk case that pipeline nearby easily occurs includes following three kinds:
First, pipeline accounts for pressure, i.e., illegal above pipeline to account for the weights such as pressure heavy vehicle, mobile house, causes pipeline to bear
Pressure is excessive.
Second, illegal construction, i.e., illegal construction near control point, private, which is dug, disorderly builds, and causes pipeline to damage.
3rd, illegal pilferage, as its name suggests, steal the facilities such as pipeline, well lid.
Certainly, the risk case that pipeline can suffer from is far above above-mentioned three kinds, and above risk case is three more often occurred
Kind.
For foregoing three kinds of risk cases, in addition to artificially observation video monitoring picture, we are laid with one also directed to property
A little monitoring devices, for example, pressure sensor above pipeline, along vibrating sensor of line layout etc., pass through detection pipes
The various numerical value such as pressure that line is born, the Oscillation Amplitude of pipeline, to judge whether risk case occurred, if there is risk
Time, then information warning is first sent in the scene of the accident, the warning usually recorded in advance is audio-visual, carrys out the very first time with this and reminds
Illegal personnel violating the regulations eliminate risk as early as possible, such as vehicle is removed, informs that other side has pipeline not allow to construct or remind herein
Larceny has been observed that stopping etc. as early as possible.
This information warning is automatically stopped broadcasting when risk eliminates.
If information warning does not eliminate yet after continuing for some time, illustrate to need monitoring personnel artificial intervention to handle, now,
The monitored picture of the control point can be monitored the computer played in full screen at center, and send audible and visible alarm, remind monitoring personnel and
Shi Faxian, quickly discover whether as risk case, so as to be scheduled.This time should not too long, otherwise pipeline or other are attached
Category facility is subject to damage or stolen.Preferably, using 2 minutes.
Below in conjunction with the accompanying drawings, a kind of embodiment therein is specifically introduced.
With reference to Fig. 1, the intelligent video monitoring system includes being arranged on above pipeline to be born to press for real-time detection pipeline
The pressure sensor 1 of power, along line layout be used for real-time detection pipeline vibration value vibrating sensor 2, installed in control point
Neighbouring IP Camera 3, AV device 4 and control device 5.
Vibrating sensor can select to use distributed optical fiber vibration sensor, lay distance far, and feedback speed is fast, is applicable
In the detection of pipeline.
Control device 5 has a configuration part, and the configuration part is used to set pressure threshold, vibration threshold and time of vibration model
Enclose, this time of vibration scope use except provinces and cities written instructions allow construction in addition to the round-the-clock period.
One pipeline has several control points, and each control point is laid with least one aforementioned intelligent video monitoring system
System.
In order to distinguish each control point, we are configured with an independent numbering for belonging to it to IP Camera 3.
Control device 5 has a network connection unit, and by the network connection unit, control device 5 accesses network, and because
This sets up the data link with Surveillance center computer, and monitoring personnel is set every by the computer remote of Surveillance center
Pressure threshold, vibration threshold and the time of vibration scope of individual control point, when the live risk case for needing artificially to handle
When, control device 5 generate alarm signal can also real-time delivery to Surveillance center.
IP Camera 3 is directly accessed network, by the computer of monitored picture real-time delivery to Surveillance center, Surveillance center
Computer in video matrix system software is installed, computer synchronously shows the monitoring picture of multiple control points by matrix form
Face.Therefore, we can install a larger display device, such as big screen display screen or projector equipment in Surveillance center
Deng in order to which monitoring personnel is observed.
The pipeline that pressure sensor 1 detects bears the vibration values of the pipeline of pressure and the detection of vibrating sensor 2, in fact
When be transferred to control device, control device 5 has a comparing section, in response to any one in following condition:1) pressure received
The threshold pressure for being more than setting of the feedback of force snesor 1,2) vibration values that are received in the range of time of vibration are more than setting
Vibration threshold, generate an alarm signal, this alarm signal only when both of the aforesaid trigger condition is eliminated, can just stop
Only.
AV device 4 has the first memory cell, and it is audio-visual that the first memory cell contains the warning recorded in advance.
When control device 5 generates alarm signal, it drives AV device 4 to commence play out the warning shadow recorded in advance
Sound, the very first time remind illegal violator to eliminate risk case as early as possible.
And when the duration of the alarm signal has exceeded setting time scope, control device 5 then sends one containing affiliated
In warning information to the computer of Surveillance center of IP Camera numbering.
The computer of Surveillance center receives the warning information, transfers the monitored picture of the IP Camera 3 of reference numeral, will
Be amplified to full screen display, or half screen is shown.
Meanwhile understand for the ease of monitoring personnel not before screen and risk case occur, we set in Surveillance center
Put an alarm device, after the computer of Surveillance center receives the warning information, driving alarm device sends audible and visible alarm.
Control device 5, AV device 4, IP Camera 3 can be selectively mounted on the electric pole of street lamp and/or signal lamp,
Purpose is to remove electricity nearby, and the monitored picture of IP Camera 3 can the computer through optical cable transmission to Surveillance center
In.
Control device 5 also has the second memory cell, and control device 5 is in response to alarm signal, by during alarm signal
Monitored picture is intercepted and stored into the second memory cell, and it is risk case or doubtful wind to be recorded in monitored picture therein
Dangerous event, and also having time, location information, further reduce range of search, are easy to Surveillance center quickly to collect evidence, verification is existing
Field information etc..
Storage information in second memory cell can also periodically send to Surveillance center and achieve.
If within the scope of a period of time, same monitoring point frequently generates alarm signal, even risk case is soon
Eliminated, also illustrate that the monitoring point the problem of more serious occurs, it is necessary to be paid attention to, therefore control device 5 goes back quilt
It is arranged to exceed setting number in response to the alarm signal number generated in the range of a period of time, can equally generates one containing affiliated
The alarm signal of IP Camera numbering is into the computer of Surveillance center, and we could be arranged to 1 day this time range, if
Number is determined for 3 times.
So as to, the utility model proposes intelligent video monitoring system, can monitor to jeopardize the wind of pipeline safety
It is audio-visual in the warning that event generation live play records in advance when dangerous event occurs, remind illegal personnel violating the regulations to eliminate in time
Risk case;If risk case does not eliminate after setting time, amplify display on Surveillance center's computer screen
The monitoring picture of the scene of the accident, it is easy to monitoring personnel to intervene in time and excludes risk.
Although the utility model is disclosed above with preferred embodiment, so it is not limited to the utility model.This reality
With new those of ordinary skill in the art, do not departing from spirit and scope of the present utility model, it is each when that can make
The change and retouching of kind.Therefore, the scope of protection of the utility model is worked as and is defined depending on those as defined in claim.
Claims (8)
1. a kind of intelligent video monitoring system, near the control point of pipeline, the monitored picture in the range of control point is passed
It is handed in the computer of Surveillance center, it is characterised in that including the pressure sensor above pipeline, attached installed in pipeline
Near IP Camera, vibrating sensor, AV device and control device along line layout;
The control device has a configuration part, and configuration part is used to set pressure threshold, vibration threshold and time of vibration scope;
The pressure sensor, IP Camera, vibrating sensor, AV device are connected with control device;
The IP Camera has independent numbering;
The control device has a network connection unit, for establishing number between control device and the computer of Surveillance center
According to communication link;
The monitored picture that the IP Camera is used in the range of captured in real-time control point, and it is passed back to by monitoring by network
The computer at center;
The pressure sensor is used for the pressure that real-time detection pipeline is born, and it is fed back into control device;
The vibrating sensor is used for the vibration values of real-time detection pipeline, and it is fed back into control device;
The control device is configured in response to any one in following two conditions:1) result of pressure sensor feedback
More than the pressure threshold of setting, 2) vibration values received in the range of time of vibration are more than the vibration threshold of setting, generation police
Show signal;
The AV device has the first memory cell, is stored with that the warning recorded in advance is audio-visual, and AV device is configured to
In response to alarm signal, it is audio-visual to play warning;
The control device is further configured to exceed setting time scope in response to the alarm signal duration, sends one containing
Belong to the alarm signal of IP Camera numbering to the computer of Surveillance center;
Video matrix system software is installed, computer is configured in response to alarm signal in the computer of the Surveillance center
Number, the monitored picture of the IP Camera of reference numeral is transferred, it is amplified to full screen display.
2. intelligent video monitoring system according to claim 1, it is characterised in that the control device has the second storage
Unit;
The control device is configured in response to alarm signal, and the monitored picture during alarm signal is intercepted and stored to
In two memory cell.
3. intelligent video monitoring system according to claim 1, it is characterised in that the setting time uses 2 minutes.
4. intelligent video monitoring system according to claim 1, it is characterised in that the vibrating sensor is using distributed
Optical fibre vibration sensor.
5. intelligent video monitoring system according to claim 1, it is characterised in that the control device, AV device, net
Network camera is arranged on the electric pole of street lamp and/or signal lamp.
6. intelligent video monitoring system according to claim 1, it is characterised in that the control device is further configured to ring
The number of generation alarm signal exceedes setting number in Ying Yuyi days time ranges, sends one and is numbered containing belonging network camera
Alarm signal to Surveillance center computer.
7. intelligent video monitoring system according to claim 6, it is characterised in that the setting number uses 3 times.
8. intelligent video monitoring system according to claim 1, it is characterised in that the Surveillance center fills with an alarm
Put, alarm device is configured to, in response to alarm signal, send alarm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720481371.5U CN206820884U (en) | 2017-05-03 | 2017-05-03 | Intelligent video monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720481371.5U CN206820884U (en) | 2017-05-03 | 2017-05-03 | Intelligent video monitoring system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206820884U true CN206820884U (en) | 2017-12-29 |
Family
ID=60755054
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720481371.5U Active CN206820884U (en) | 2017-05-03 | 2017-05-03 | Intelligent video monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206820884U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109064715A (en) * | 2018-08-08 | 2018-12-21 | 国网山东省电力公司惠民县供电公司 | A kind of monitoring system and monitoring method of for transformer |
CN111366134A (en) * | 2020-03-18 | 2020-07-03 | 济南热力工程有限公司 | Well lid slope trigger control system |
CN111507300A (en) * | 2020-04-26 | 2020-08-07 | 上海同岩土木工程科技股份有限公司 | Method for rapidly identifying piling and drilling behaviors in protected area |
CN113516383A (en) * | 2021-06-30 | 2021-10-19 | 南通四建集团有限公司 | Building construction safety control method and device |
CN118053240A (en) * | 2024-01-24 | 2024-05-17 | 深圳鸿拾控股有限公司 | Data processing method of vertical advertising machine and vertical advertising machine |
CN118053240B (en) * | 2024-01-24 | 2024-11-05 | 深圳鸿拾控股有限公司 | Data processing method of vertical advertising machine and vertical advertising machine |
-
2017
- 2017-05-03 CN CN201720481371.5U patent/CN206820884U/en active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109064715A (en) * | 2018-08-08 | 2018-12-21 | 国网山东省电力公司惠民县供电公司 | A kind of monitoring system and monitoring method of for transformer |
CN111366134A (en) * | 2020-03-18 | 2020-07-03 | 济南热力工程有限公司 | Well lid slope trigger control system |
CN111507300A (en) * | 2020-04-26 | 2020-08-07 | 上海同岩土木工程科技股份有限公司 | Method for rapidly identifying piling and drilling behaviors in protected area |
CN113516383A (en) * | 2021-06-30 | 2021-10-19 | 南通四建集团有限公司 | Building construction safety control method and device |
CN113516383B (en) * | 2021-06-30 | 2024-05-03 | 南通四建集团有限公司 | Building construction safety control method and device |
CN118053240A (en) * | 2024-01-24 | 2024-05-17 | 深圳鸿拾控股有限公司 | Data processing method of vertical advertising machine and vertical advertising machine |
CN118053240B (en) * | 2024-01-24 | 2024-11-05 | 深圳鸿拾控股有限公司 | Data processing method of vertical advertising machine and vertical advertising machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206820884U (en) | Intelligent video monitoring system | |
CN106097642B (en) | A kind of city integrated piping lane intelligent monitoring and warning device | |
CN102999813B (en) | Social unit fire-fighting comprehensive information management platform and implementation method thereof | |
CN203204743U (en) | Mobile external-damage-preventive remote monitoring device of electric transmission line | |
CN107786640A (en) | A kind of city intelligent manhole cover system and management method | |
CN111569346B (en) | Intelligent fire extinguisher remote monitoring and management system | |
CN107590764A (en) | A kind of municipal things safe early warning and emergency scheduling platform | |
CN203616006U (en) | Remote monitoring system for preventing spontaneous combustion of coal fields | |
CN206772439U (en) | A kind of anti-mountain fire on-line monitoring system | |
CN203733243U (en) | Power transmission line on-line monitoring device capable of preventing construction mechanical force damages | |
CN210324484U (en) | Inspection well cover monitoring system | |
CN104616421A (en) | Urban underground pipe system safety monitoring system | |
CN107730806A (en) | Preventing damage to power transmission line caused by external force laser-correlation monitoring warning device | |
CN110703672A (en) | Urban underground environment and equipment monitoring and alarming system | |
CN204270435U (en) | A kind of cable well lid real time monitoring apparatus of intelligent alarm localization of fault | |
CN113870504A (en) | AI and radar detection based overhead line external damage prevention monitoring system and method | |
CN204946251U (en) | A kind of full-automatic unmanned radiation monitoring system on duty | |
CN205015422U (en) | Distributed type cable state monitoring system | |
CN112363450A (en) | Underground comprehensive pipe gallery monitoring, operation and maintenance integration method | |
CN116684555A (en) | Construction site on-site comprehensive data acquisition method and system | |
CN205105339U (en) | Construction project quality safety remote monitering system | |
CN205049936U (en) | Automatic monitored control system of exhaust valve well | |
CN112163765A (en) | Building site integrated management system | |
CN203849600U (en) | Transformer station monitoring device | |
CN104581017A (en) | Security and protection resource integration and relevance application method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 210000 No.23, Changqing street, moling street, Jiangning District, Nanjing City, Jiangsu Province (Jiangning Development Zone) Patentee after: Nanjing Longkun Suchang industrial Internet Co., Ltd Address before: No. 199 Zhong Fang Road, Jiangning Economic Development Zone, Nanjing, Jiangsu Province Patentee before: NANJING LUCULENT CO., LTD. |