CN206818183U - A kind of measurement Sopwith staff of construction high stability - Google Patents
A kind of measurement Sopwith staff of construction high stability Download PDFInfo
- Publication number
- CN206818183U CN206818183U CN201720466757.9U CN201720466757U CN206818183U CN 206818183 U CN206818183 U CN 206818183U CN 201720466757 U CN201720466757 U CN 201720466757U CN 206818183 U CN206818183 U CN 206818183U
- Authority
- CN
- China
- Prior art keywords
- standard knot
- sopwith staff
- measurement
- high stability
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Length-Measuring Instruments Using Mechanical Means (AREA)
Abstract
The utility model discloses a kind of measurement Sopwith staff of construction high stability, including measuring Sopwith staff body, the measurement Sopwith staff body bottom portion is provided with heavy burden firm banking, fixed jack is offered above the heavy burden firm banking, and the first standard knot is socketed with fixed jack, the preceding surface both sides of the first standard knot are provided with graduation apparatus.In the utility model, the device in measurement Sopwith staff body bottom portion by setting heavy burden firm banking, it is fixed by the way that measurement Sopwith staff body is plugged in heavy burden firm banking, the device is set to change the shortcomings that traditional measurement Sopwith staff needs manually help chi, save artificial, the device in four corners of the first standard knot inwall by offering fixed card slot, and four corners of the second standard knot outer wall are provided with fixed glides, it is more with the standard knot of extraction to change traditional measurement Sopwith staff, bad stability, the shortcomings that measurement data is inaccurate.
Description
Technical field
It the utility model is related to technical field of building construction, more particularly to a kind of measurement tower of construction high stability
Chi.
Background technology
Construction refers to the production activity of engineering construction implementation phase, is the building course of all kinds of buildings, can also
Say it is various lines on design drawing, in specified place, become process in kind.It includes basic engineering construction, master
Body structure construction, roof construction, decorative engineering construction etc..The place of construction operation is referred to as " construction site " or cried
" job site.
It is in building construction process and it is a kind of instrument that each point absolute altitude is measured in a kind of building construction process to measure Sopwith staff
An essential instrument, but traditional measurement Sopwith staff needs special messenger to help chi to measure mostly, waste of manpower, and tradition
Measurement Sopwith staff can reduce stability above measurement Sopwith staff, so as to cause with the increase of the standard knot quantity of extraction mostly
Measurement data is inaccurate.
Utility model content
The purpose of this utility model is to solve shortcoming present in prior art, and a kind of construction proposed is used
The measurement Sopwith staff of high stability.
To achieve these goals, the utility model employs following technical scheme:A kind of construction high stability
Measurement Sopwith staff, including measurement Sopwith staff body, the measurement Sopwith staff body bottom portion be provided with heavy burden firm banking, it is described bear a heavy burden it is solid
Determine to offer fixed jack above base, and the first standard knot is socketed with fixed jack, the preceding surface two of the first standard knot
Side is provided with graduation apparatus, and the preceding surface centerline of the first standard knot offers the first fixation hole clipping, first mark
Zhun Jie inwalls corner offers fixed card slot, and the second standard knot, second standard are socketed with above first standard knot
Fixed glides are provided with section outer wall corner, the preceding surface centerline of the second standard knot offers the second fixing card
Hole, lower face centerline is provided with flexible fastening button before second standard knot.
As further describing for above-mentioned technical proposal:
The length and width of the fixed jack and the sole length and width of the first standard knot are in the same size.
As further describing for above-mentioned technical proposal:
First standard knot, the second standard knot and the 3rd standard knot volume are gradually successively decreased.
As further describing for above-mentioned technical proposal:
The 3rd standard knot is socketed with above second standard knot.
As further describing for above-mentioned technical proposal:
The fixed card slot offers four altogether, and four fixed card slots are between any two on the first standard knot center line phase
It is mutually symmetrical.
As further describing for above-mentioned technical proposal:
The fixed glides are provided with four altogether, and four fixed glides are between any two on the second standard knot centerline
Symmetrically.
In the utility model, first, the device by measurement Sopwith staff body bottom portion set heavy burden firm banking, pass through by
Measurement Sopwith staff body, which is plugged in heavy burden firm banking, to be fixed, and the device is changed traditional measurement Sopwith staff needs and is manually helped
The shortcomings that chi, save manpower, secondly, the device by offering fixed card slot in four corners of the first standard knot inwall, and
Four corners of the second standard knot outer wall are provided with fixed glides, change standard knot of the traditional measurement Sopwith staff with extraction
It is more, bad stability, the shortcomings that measurement data is inaccurate.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of construction high stability measurement Sopwith staff structural representation;
Fig. 2 be the utility model proposes a kind of construction high stability measurement Sopwith staff the first standard knot structure
Schematic diagram;
Fig. 3 be the utility model proposes a kind of construction high stability measurement Sopwith staff the second standard knot structure
Schematic diagram.
Marginal data:
1- heavy burdens firm banking, 2- fixed jacks, 3- measurement Sopwith staffs body, the standard knots of 4- first, 5- graduation apparatus, 6- second
Standard knot, the standard knots of 7- the 3rd, 8- first fix hole clipping, 9- fixed card slots, 10- fixed glides, 11- flexible fastenings button, 12-
Second fixes hole clipping.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.
Reference picture 1-3, a kind of measurement Sopwith staff of construction high stability, including measurement Sopwith staff body 3, measure Sopwith staff
The bottom of body 3 is provided with heavy burden firm banking 1, and the top of heavy burden firm banking 1 offers fixed jack 2, and the inner sleeve of fixed jack 2
The first standard knot 4 is connected to, 4 preceding surface both sides of the first standard knot are provided with graduation apparatus 5,4 preceding surface center of the first standard knot
The first fixation hole clipping 8 is offered at line, the inwall corner of the first standard knot 4 offers fixed card slot 9, the top of the first standard knot 4
The second standard knot 6 is socketed with, fixed glides 10,6 preceding surface of the second standard knot are provided with the outer wall corner of the second standard knot 6
Centerline offers the second fixation hole clipping 12, and lower face centerline is provided with flexible fastening button before the second standard knot 6
11。
The length and width of fixed jack 2 and the sole length and width of the first standard knot 4 are in the same size, the first standard knot
4th, the second standard knot 6 and the volume of the 3rd standard knot 7 are gradually successively decreased, and the top of the second standard knot 6 is socketed with the 3rd standard knot 7, fixed
Neck 9 offers four altogether, and four fixed card slots 9 are symmetrical on the centerline of the first standard knot 4 between any two, fixed
Slide plate 10 is provided with four altogether, and four fixed glides 10 are symmetrical on the centerline of the second standard knot 6 between any two, should
Device is by the way that measurement Sopwith staff body 3 is plugged in heavy burden firm banking 1, then heavy burden firm banking 1 is placed horizontally to be measured
Absolute altitude place, you can operating instrument measures, and changes the shortcomings that traditional measurement instrument at least needs two people to measure, and saves
Manpower.
Operation principle:In use, heavy burden firm banking 1 is lain in a horizontal plane in into absolute altitude place to be measured first, according to measurement need
The second standard knot 6 for measuring Sopwith staff body 3 is extracted out, and is moved to the flexible fastening button 11 of the lower section of the second standard knot 6
First fixes in hole clipping 8, then is inserted Sopwith staff body 3 is measured in the fixed jack 2 of the top of heavy burden firm banking 1, after the completion of, i.e.,
Operable instrument measures, and when needing to pack up, by pressing flexible fastening button 11, makes it into the first fixation hole clipping 8
Inside, then the second standard knot 6 is inserted in the first standard knot 4, complete packing up for measurement Sopwith staff body 3.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not
This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality
New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model
Within enclosing.
Claims (6)
1. a kind of measurement Sopwith staff of construction high stability, including measurement Sopwith staff body(3), it is characterised in that the survey
Measure Sopwith staff body(3)Bottom is provided with heavy burden firm banking(1), the heavy burden firm banking(1)Top offers fixed jack
(2), and fixed jack(2)Inside it is socketed with the first standard knot(4), first standard knot(4)Preceding surface both sides are provided with scale
Table(5), first standard knot(4)Preceding surface centerline offers the first fixation hole clipping(8), first standard knot
(4)Inwall corner offers fixed card slot(9), first standard knot(4)Top is socketed with the second standard knot(6), it is described
Second standard knot(6)Fixed glides are provided with outer wall corner(10), second standard knot(6)Preceding surface centerline
Offer the second fixation hole clipping(12), second standard knot(6)Preceding lower face centerline is provided with flexible fastening button
(11).
A kind of 2. measurement Sopwith staff of construction high stability according to claim 1, it is characterised in that the fixation
Jack(2)Length and width and the first standard knot(4)Sole length and width it is in the same size.
3. the measurement Sopwith staff of a kind of construction high stability according to claim 1, it is characterised in that described first
Standard knot(4), the second standard knot(6)With the 3rd standard knot(7)Volume is gradually successively decreased.
4. the measurement Sopwith staff of a kind of construction high stability according to claim 1, it is characterised in that described second
Standard knot(6)Top is socketed with the 3rd standard knot(7).
A kind of 5. measurement Sopwith staff of construction high stability according to claim 1, it is characterised in that the fixation
Neck(9)Four, and four fixed card slots are offered altogether(9)Between any two on the first standard knot(4)Centerline is mutually right
Claim.
A kind of 6. measurement Sopwith staff of construction high stability according to claim 1, it is characterised in that the fixation
Slide plate(10)Four, and four fixed glides are provided with altogether(10)Between any two on the second standard knot(6)Centerline is mutual
Symmetrically.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720466757.9U CN206818183U (en) | 2017-04-28 | 2017-04-28 | A kind of measurement Sopwith staff of construction high stability |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720466757.9U CN206818183U (en) | 2017-04-28 | 2017-04-28 | A kind of measurement Sopwith staff of construction high stability |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206818183U true CN206818183U (en) | 2017-12-29 |
Family
ID=60753869
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720466757.9U Expired - Fee Related CN206818183U (en) | 2017-04-28 | 2017-04-28 | A kind of measurement Sopwith staff of construction high stability |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206818183U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110470271A (en) * | 2019-09-03 | 2019-11-19 | 青岛德佰利餐饮管理有限公司 | A kind of novel measurement elevation Sopwith staff |
-
2017
- 2017-04-28 CN CN201720466757.9U patent/CN206818183U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110470271A (en) * | 2019-09-03 | 2019-11-19 | 青岛德佰利餐饮管理有限公司 | A kind of novel measurement elevation Sopwith staff |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206818183U (en) | A kind of measurement Sopwith staff of construction high stability | |
CN204535591U (en) | Student's special ball diameter measurement chi | |
CN204483244U (en) | Foot guage | |
CN205245942U (en) | Portable angular surveying chi | |
CN205175293U (en) | Nursery stock dipperstick | |
CN205716251U (en) | A kind of Novel tripod frame head | |
CN208952961U (en) | A kind of field surveys device of project cost | |
CN208968397U (en) | A kind of mining engineering quality tester | |
CN207881693U (en) | A kind of railway contact line pillar slope measurement instrument | |
CN206062250U (en) | A kind of Combined dress Cutting table | |
CN209459549U (en) | A kind of architectural design measuring scale | |
CN206974419U (en) | A kind of construction horizontal measuring instrument | |
CN206818184U (en) | A kind of construction management measurement apparatus | |
CN207231481U (en) | A kind of civil engineering portable surveying instrument support device | |
CN206847614U (en) | A kind of engineering survey Portable measuring device | |
CN206648565U (en) | A kind of diameter of a cross-section of a tree trunk 1.3 meters above the ground chi | |
CN206772156U (en) | A kind of clothes teaching aid measuring scale | |
CN201019746Y (en) | Cardiovascular measuring rule | |
CN207231473U (en) | A kind of new instrument of Construction of Civil Engineering measurement ground line gradient | |
CN208002798U (en) | A kind of novel orthopaedics invasive measurements ruler | |
CN206989842U (en) | It is a kind of can one man operation tape measure | |
CN215003277U (en) | Petroleum geology and development oil reservoir research inspection measuring tool | |
CN213932648U (en) | Multifunctional measuring device for building engineering management | |
CN207472178U (en) | The magnetic line of force is fallen | |
CN212056512U (en) | Building detecting instrument strutting arrangement convenient to adjust |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171229 Termination date: 20180428 |