CN206816255U - A kind of mountain highway tunnel neutrality country rock approximation full face tunneling structure - Google Patents

A kind of mountain highway tunnel neutrality country rock approximation full face tunneling structure Download PDF

Info

Publication number
CN206816255U
CN206816255U CN201720660974.1U CN201720660974U CN206816255U CN 206816255 U CN206816255 U CN 206816255U CN 201720660974 U CN201720660974 U CN 201720660974U CN 206816255 U CN206816255 U CN 206816255U
Authority
CN
China
Prior art keywords
tunnel
country rock
neutrality
shed
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720660974.1U
Other languages
Chinese (zh)
Inventor
朱汉华
邓之友
陈孟冲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Communications Planning Institute Co Ltd
Original Assignee
Ningbo Communications Planning Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Communications Planning Institute Co Ltd filed Critical Ningbo Communications Planning Institute Co Ltd
Priority to CN201720660974.1U priority Critical patent/CN206816255U/en
Application granted granted Critical
Publication of CN206816255U publication Critical patent/CN206816255U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of mountain highway tunnel neutrality country rock approximation full face tunneling structure, belong to construction field.The defects of the utility model in the poor tunnel construction of surrounding rock stability for that can not use tunneling boring construction method, using the longitudinal length for shortening tunnel partial excavation supporting construction, so that tunnel partial excavation supporting construction, close to plane mechanics problem, in mountain highway tunnel, stable (containing broken) the country rock Construction practices of approximate critical form two kinds of effective mountain highway tunnel approximate critical stabilizing surrounding rock approximation tunneling boring construction methods.

Description

A kind of mountain highway tunnel neutrality country rock approximation full face tunneling structure
Technical field
The utility model belongs to construction method field, and in particular to a kind of mountain highway tunnel neutrality country rock is approximate complete Section excavation structure and method.
Background technology
In recent years, as the extension of highway in China net, increasing Mountain Tunnels start to build.In general in approximation It is bigger compared with stabilizing surrounding rock that vcehicular tunnel difficulty is built in neutrality (containing broken) country rock.At present, what China was built is many near Constructed using CD/CRD methods, multi-step method or multiple combinations method like neutrality (containing broken) surrounding rock tunnel, such as schemed Shown in 1.But each branch longitudinal direction excavation supporting length difference be present can cause constructing tunnel process space stability deficiency or be difficult to Form effective bearing structure layer.Tunnel Design is plane mechanics problem, and tunnel partial excavation supporting construction is space mechanics There is difference in problem, Tunnel Design, enclosed when tunnel approximate critical is stable (containing broken) with partial excavation supporting construction mechanics problem When rock is poor, tend to occur constructing tunnel cave in phenomenon even casualty accident.
On the other hand, the construction method process such as CD/CRD methods, multi-step method is relatively complicated, and construction speed is slower, and breaks entirely The construction method process such as face method, benching tunneling method is relatively easy, can greatly promote construction speed.However, current tunneling boring When method, benching tunneling method directly apply to neutrality country rock, cave-in accident is easily caused.《Highway tunnel construction technical specification》 The excavation method scope of application and construction requirement in (JTJ042-94) to different classes of country rock have done relevant regulations:
5.2.2.1 full section method is applied to VI~IV class surrounding rock.The method can use deep hole blasting, and its depth desirable 3~ 3.5m.Full section method is not suitable for 3 track tunnels and parking tape section is excavated.
5.2.2.2 it is softer or the country rock of joints development, its construction requirement are as follows to be applied to IV~II class for benching tunnelling method:(1) on The distance between get out of a predicament or an embarrassing situation, equipment normal operation should be able to be met, and reduce and turn over slag workload.(2) when top rock crusher, construction Supporting need to closely follow when, can proper extension length of bench, reduce construction interference.
Therefore, current full section method, benching tunneling method there is no method opening applied to neutrality surrounding rock tunnel well In excavation construction, it is necessary to which it is further improved.
Utility model content
The purpose of this utility model be to solve in the prior art for stable (containing the broken) country rock of approximate critical it is poor when, Easily occur constructing tunnel cave in phenomenon the problem of, and a kind of mountain highway tunnel neutrality country rock approximation tunneling boring is provided and opened Digging structure and method, tunnel partial excavation supporting construction is set to be protected close to plane mechanics problem while improving and excavating efficiency Demonstrate,prove construction safety.
Concrete technical scheme is as follows used by the utility model:
The first mountain highway tunnel neutrality country rock approximation full face tunneling structure:Along tunnel wheel in tunnel surrounding Profile outer rim sets Shed-pipe Advanced Support with 2~10 ° of inclination angles interval, and cement mortar is filled in Shed-pipe Advanced Support, forms tunnel and pays in advance in advance Protection structure;Lower pilot tunnel, the wide and a height of 4~5m of excavation plane of described lower pilot tunnel are offered on face in tunnel contour line And along excavating the longitudinal advanced 3~5m in direction;The section excavation drilling depth clamped between described tunnel contour line and lower pilot tunnel outer rim For 1~2m;Preliminary bracing is provided with the tunnel excavated, for undertaking whole country rock loads.
Second of mountain highway tunnel neutrality country rock approximation full face tunneling structure:Along tunnel wheel in tunnel surrounding Profile outer rim sets Shed-pipe Advanced Support with 2~10 ° of inclination angles interval, and cement mortar is filled in Shed-pipe Advanced Support, forms tunnel and pays in advance in advance Protection structure;Offer up/down steps on face in tunnel contour line, top bar ratio is got out of a predicament or an embarrassing situation advanced 1~3m, up/down steps It is reserved with Core Soil;Preliminary bracing is provided with the tunnel excavated, for undertaking whole country rock loads.
It is preferred as any one above-mentioned structure, between described Shed-pipe Advanced Support at intervals of 45~55cm.
It is preferred as any one above-mentioned structure, a diameter of 108~120mm of φ of described Shed-pipe Advanced Support.
Preferred as any one above-mentioned structure, described preliminary bracing includes steelframe support and concrete layer, wherein Described steelframe support uses I-steel, is laid along tunnel longitudinal direction every 50~80cm intervals;Described concrete thickness 15~ 30cm, formed by 20~No. 30 concrete ejections in country rock surface.
The defects of the utility model in the poor tunnel construction of surrounding rock stability for that can not use tunneling boring construction method, Using the longitudinal length for shortening tunnel partial excavation supporting construction so that tunnel partial excavation supporting construction is close to planar forces knowledge Topic, in mountain highway tunnel, stable (containing broken) the country rock Construction practices of approximate critical form two kinds of effective mountain highway tunnels Approximate critical stabilizing surrounding rock approximation tunneling boring construction method.
Brief description of the drawings
Various partial excavation method for protecting support schematic diagrames in the planning of Fig. 1 tunnels or handbook;Wherein a)~d) it is respectively difference in 4 Excavation supporting method, the digitized representation sequence of excavation in figure.
Pilot tunnel appropriate advance approximation tunneling boring construction method schematic diagram under Fig. 2;A) it is wherein cross section, b) it is vertical section;
The short step remaining core soil in advance approximation tunneling boring construction method schematic diagrames of Fig. 3;A) be wherein cross section, b) to be vertical disconnected Face;
Embodiment
The utility model is further elaborated and illustrated with reference to the accompanying drawings and detailed description.In the utility model The technical characteristic of each embodiment can carry out respective combination on the premise of not colliding with each other.
In the utility model, for different country rock grades, there is provided two kinds of different mountain highway tunnel neutralities Country rock approximation tunneling boring construction method:The first be for face it is basicly stable when, it is preferably approximate using lower pilot tunnel appropriate advance Tunneling boring construction method;Second be for face neutrality when, preferably using short step remaining core soil in advance approximation tunneling boring Construction method.When face degree of stability is higher, preferentially from the first to improve efficiency of construction, when face degree of stability It is preferential using second of guarantee construction safety when relatively low.Which kind of during practice of construction, specifically needed using method according to country rock grade Carry out integrating determination etc. index.Two methods of the present utility model are applied to the excavation of III, IV, V level surrounding rock tunnel.
Embodiment 1
As shown in Fig. 2 when face is basicly stable during constructing tunnel, it is preferably approximate complete using lower pilot tunnel appropriate advance Section construction method.
The face of this method excavates structure such as Fig. 2) shown in, along tunnel contour line outer rim with 2~10 ° in tunnel surrounding Inclination angle interval 50cm has set φ 108~120mm Shed-pipe Advanced Supports, and cement mortar is filled in Shed-pipe Advanced Support, and it is pre- in advance to form tunnel Supporting construction.Offering the lower pilot tunnel on arc top on face in tunnel contour line, the excavation plane of lower pilot tunnel is wide and a height of 4~ 5m and along excavating the longitudinal advanced 3~5m in direction;The section excavation drilling depth clamped between tunnel contour line and lower pilot tunnel outer rim be 1~ 2m;Preliminary bracing is provided with the tunnel excavated, for undertaking whole country rock loads.
The construction procedure of lower pilot tunnel appropriate advance approximation tunneling boring construction method is as follows:
(1.1) III, IV, V level surrounding rock tunnel, every 50cm spacing, are beaten along tunnel contour line outer rim with 2~10 ° of inclination angles If φ 108~120mm Shed-pipe Advanced Supports, given with 5~8Pa pressure and fill No. 20 cement mortar in Shed-pipe Advanced Support, it is advanced to form tunnel Strong pre support.
(1.2) under the tunnel in advance protection of strong pre support, lower pilot tunnel is excavated.It is wide and high about that lower pilot tunnel excavates plane every time 4~5m, and the advanced 3~5m in longitudinal direction, only need pilot tunnel country rock to get rid of the danger, are also beneficial to mechanical tap.
(1.3) under the tunnel in advance protection of strong pre support, approximate tunneling boring (including tunnel contour line and lower pilot tunnel outer rim Between the section that clamps, do not include having excavated lower pilot tunnel section) excavate, each 1~2m of drilling depth.After the section excavation, continue pair Lower pilot tunnel longitudinally excavates identical depth, circulation driving.
(1.4) under the tunnel in advance protection of strong pre support, tunnel has been excavated in time part carry out longitudinal direction every 50~ 80cm sets H180~H200 I-steel to be supported as steelframe, while 20~No. 30 to country rock surface injection 15~30cm thickness are mixed Solidifying soil, forms strong preliminary bracing and undertakes whole load, it is ensured that tunnel structure work progress stable equilibrium.
In the present embodiment, the longitudinal direction circulation Excavation Length of tunnel partial excavation supporting construction is foreshortened into 1~2m so that tunnel Road partial excavation supporting construction is consistent, in approximate full face digging mode close to plane mechanics problem with Tunnel Design Under can also ensure the adjoining rock stability in tunnel.The supporting that this method also avoid steel supporting at initial stage intermediate node weak link is stable Sex chromosome mosaicism.Simultaneously because lower pilot tunnel opens up in advance, therefore during approximate full face tunneling, the section disintegrating slag above lower pilot tunnel is excavating Can directly it be fallen after departing from rock mass under mechanism, without carrying out other additional process.Compared to existing for critical steady Determine CD/CRD methods, multi-step method of surrounding rock tunnel excavation etc., the utility model can greatly improve efficiency of construction.
Embodiment 2
As shown in figure 3, when face neutrality during constructing tunnel, it is preferably approximate using short step remaining core soil in advance Tunneling boring construction method.
The face of this method excavates structure such as Fig. 3) shown in, along tunnel contour line outer rim with 2~10 ° in tunnel surrounding Inclination angle interval 50cm has set φ 108~120mm Shed-pipe Advanced Supports, and cement mortar is filled in Shed-pipe Advanced Support, and it is pre- in advance to form tunnel Supporting construction;Offering inclined up/down steps on face in tunnel contour line, top bar ratio is got out of a predicament or an embarrassing situation advanced 1~3m, Up/down steps are reserved with Core Soil;Preliminary bracing is provided with the tunnel excavated, for undertaking whole country rock loads.
The construction procedure of short step remaining core soil in advance approximation tunneling boring construction method is as follows:
(2.1) III, IV, V level surrounding rock tunnel, every 50cm spacing, are beaten along tunnel contour line outer rim with 2~10 ° of inclination angles If φ 108~120mm Shed-pipe Advanced Supports, given with 5~8Pa pressure and fill No. 20 cement mortar in Shed-pipe Advanced Support, it is advanced to form tunnel Strong pre support.
(2.2) under the tunnel in advance protection of strong pre support, face is excavated using short step method, top bar is super first 3~4m of preceding excavation, then got out of a predicament or an embarrassing situation 1~2m of excavation, and upper leave from office is excavated in a manner of remaining core soil in advance.In excavated section, Top bar ratio is got out of a predicament or an embarrassing situation advanced 1~3m, up/down steps circulation driving, average each 1~2m of drilling depth.
(2.3) under the tunnel in advance protection of strong pre support, carry out in time longitudinal direction every 50~80cm set H180~ H200 I-steel supports as steelframe, while sprays 20~No. 30 thick concrete of 15~30cm to country rock surface, is formed by force just Phase supporting simultaneously undertakes whole load, it is ensured that tunnel structure work progress stable equilibrium.
In the present embodiment, the longitudinal direction circulation Excavation Length of tunnel partial excavation supporting construction is also shortened, approximate complete disconnected Also the adjoining rock stability in tunnel can be ensured under the digging mode in face.But compared with Example 1, the up/down steps of the present embodiment are reserved There is core local method more suitable for the poor tunnel of surrounding rock stability.
Embodiment described above is a kind of preferable scheme of the present utility model, so itself and be not used to limit this practicality It is new.Those of ordinary skill about technical field, can be with the case where not departing from spirit and scope of the present utility model Make a variety of changes and modification.Therefore the technical scheme that all modes for taking equivalent substitution or equivalent transformation are obtained, all falls within In the scope of protection of the utility model.

Claims (5)

  1. A kind of 1. mountain highway tunnel neutrality country rock approximation full face tunneling structure, it is characterised in that edge in tunnel surrounding Tunnel contour line outer rim and Shed-pipe Advanced Support is set with 2~10 ° of inclination angles interval, cement mortar is filled in Shed-pipe Advanced Support, protected in tunnel Armored concrete has been poured on the basis of the flute profile that arch opening position is excavated and has protected arch, Shed-pipe Advanced Support combines integral, formation tunnel with shield arch Road leading pre-supporting structure;Offer lower pilot tunnel on face in tunnel contour line, described lower pilot drive plane it is wide and A height of 4~5m and along excavating the longitudinal advanced 3~5m in direction;The section clamped between described tunnel contour line and lower pilot tunnel outer rim Excavation drilling depth is 1~2m;Preliminary bracing is provided with the tunnel excavated, for undertaking whole country rock loads.
  2. A kind of 2. mountain highway tunnel neutrality country rock approximation full face tunneling structure, it is characterised in that edge in tunnel surrounding Tunnel contour line outer rim and Shed-pipe Advanced Support is set with 2~10 ° of inclination angles interval, cement mortar is filled in Shed-pipe Advanced Support, form tunnel Leading pre-supporting structure;Offering up/down steps on face in tunnel contour line, top bar ratio is got out of a predicament or an embarrassing situation advanced 1~3m, Up/down steps are reserved with Core Soil;Preliminary bracing is provided with the tunnel excavated, for undertaking whole country rock loads.
  3. 3. mountain highway tunnel neutrality country rock approximation full face tunneling structure as claimed in claim 1 or 2, its feature exist In, between described Shed-pipe Advanced Support at intervals of 45~55cm.
  4. 4. mountain highway tunnel neutrality country rock approximation full face tunneling structure as claimed in claim 1 or 2, its feature exist In a diameter of 108~120mm of φ of described Shed-pipe Advanced Support.
  5. 5. mountain highway tunnel neutrality country rock approximation full face tunneling structure as claimed in claim 1 or 2, its feature exist In described preliminary bracing includes steelframe support and concrete layer, wherein described steelframe support uses I-steel, along tunnel Laid every 50~80cm intervals longitudinal direction;Described concrete 15~30cm of thickness, by 20~No. 30 concrete ejections in country rock Surface forms.
CN201720660974.1U 2017-06-08 2017-06-08 A kind of mountain highway tunnel neutrality country rock approximation full face tunneling structure Active CN206816255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720660974.1U CN206816255U (en) 2017-06-08 2017-06-08 A kind of mountain highway tunnel neutrality country rock approximation full face tunneling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720660974.1U CN206816255U (en) 2017-06-08 2017-06-08 A kind of mountain highway tunnel neutrality country rock approximation full face tunneling structure

Publications (1)

Publication Number Publication Date
CN206816255U true CN206816255U (en) 2017-12-29

Family

ID=60759381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720660974.1U Active CN206816255U (en) 2017-06-08 2017-06-08 A kind of mountain highway tunnel neutrality country rock approximation full face tunneling structure

Country Status (1)

Country Link
CN (1) CN206816255U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107091092A (en) * 2017-06-08 2017-08-25 宁波市交通规划设计研究院有限公司 The approximate full face tunneling structure of mountain highway tunnel neutrality country rock and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107091092A (en) * 2017-06-08 2017-08-25 宁波市交通规划设计研究院有限公司 The approximate full face tunneling structure of mountain highway tunnel neutrality country rock and method

Similar Documents

Publication Publication Date Title
CN106761778B (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN104612698B (en) A kind of shallow-depth-excavation tunnel top bar interval wall construction method
CN105888703B (en) Super Shallow Covered Metro Station construction method under lateral canopy lid is performed in micro- pilot tunnel
CN108678769A (en) Deep Gateway anchor note cuts top master control and stays lane method
CN103899318B (en) The milling of medium ground tunnel is dug and supporting machinery construction
CN109209392B (en) Full-ring excavation method suitable for IV-V-grade surrounding rock of large-section tunnel
CN104653187B (en) Water-rich sand layer geology large cross-section tunnel excavation method
CN106337686A (en) Rock stratum underground excavation three-story subway station umbrella cover structure and construction method thereof
CN108035733B (en) A kind of perpendicular support partial excavation method of rock matter large section tunnel steelframe dike combination
CN106014449B (en) The construction method of two-wire small interval big cross section jointed rock mass subway tunnel
CN108487911A (en) The compound crossing method construction method of longspan tunnel bilateral wall under complex geological condition
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN110130927A (en) A kind of carbonaceous slate serious deformation control construction method
CN107091092A (en) The approximate full face tunneling structure of mountain highway tunnel neutrality country rock and method
CN206174963U (en) Cross shallow undercut tunnel supporting construction of burying of ground fissure crushed zone
CN111074781A (en) Method for quickly excavating suspension bridge tunnel anchor
AU2021105800A4 (en) Treatment method for side roof collapse of water-bearing broken soft rock tunnel
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN106498943A (en) Disposable high-pressure rotary-spray type enlarged footing Prestressed Soil anchor pole construction method
CN108756901B (en) Former times lattice reach special formation Shallow Tunnel Construction method
CN206888990U (en) A kind of Shallow Covered Metro Station separates open type structure
CN109057802A (en) Shallow tunnel with big cross-section underpass of freeways construction method
CN107514266A (en) Shield export & import bolt anchorage soil body construction method
CN206816255U (en) A kind of mountain highway tunnel neutrality country rock approximation full face tunneling structure