CN206815186U - New construction bogey - Google Patents

New construction bogey Download PDF

Info

Publication number
CN206815186U
CN206815186U CN201720371198.3U CN201720371198U CN206815186U CN 206815186 U CN206815186 U CN 206815186U CN 201720371198 U CN201720371198 U CN 201720371198U CN 206815186 U CN206815186 U CN 206815186U
Authority
CN
China
Prior art keywords
loading plate
new construction
brace
fix bar
bogey
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720371198.3U
Other languages
Chinese (zh)
Inventor
刘方华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi University of Technology
Original Assignee
Jiangxi University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi University of Technology filed Critical Jiangxi University of Technology
Priority to CN201720371198.3U priority Critical patent/CN206815186U/en
Application granted granted Critical
Publication of CN206815186U publication Critical patent/CN206815186U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of new construction bogey, including fixed body and carrier, carrier includes the first loading plate, second loading plate and two English trusses, English truss includes support component, first brace, expansion link and hydraulic strut, support component includes fix bar and the motion bar being slidably connected with fix bar, fix bar is fixedly arranged on fixed body, first loading plate is fixedly arranged on the top of two fix bars, second loading plate is connected to two motion bars, so that the second loading plate can move relative to the first loading plate, first brace is fixedly arranged on fixed body, the both ends of expansion link are pivotally connected with the free terminal of the first brace and motion bar, hydraulic strut is articulated between fix bar and expansion link.New construction bogey in the utility model, second loading plate is stated the first loading plate relatively and can elongated or shortened, the regulation of the construction space of new construction bogey is realized, and the first brace, expansion link and hydraulic strut realize the firm of new construction bogey.

Description

New construction bogey
Technical field
Bridge construction technology field is the utility model is related to, more particularly to a kind of new construction bogey.
Background technology
With the continuous development of design meanses and design concept, the progress of bridge construction is also advanced by leaps and bounds, while bridge is built Build and expand its envelop of function, bridge function attractive in appearance is more and more valued by people, or even some Bridge Design persons are by scape Design pendulum is seen on critically important status, and then that constantly brings forth new ideas is dissolved into landscape feature in Bridge Design, causes bridge knot Structure is gradually novel.Such as Longspan Bridge king-tower is just become by common double limb structural developments into space four limbs structure, king-tower line style Change and shaped form is developed into by linear, while with the increase of height, the plan range between the four limbs of king-tower also increases therewith.
At present among the construction of bridge, it usually needs using bogey (construction platform) of correspondingly constructing, apply Worker person needs that the construction of bridge (such as bridge main tower) could be completed on construction bogey by station.
Among prior art, the construction bogey generally use stationary structure that uses at present causes it can be provided Construction space be fixed, can not be adjusted according to the actual requirements, it usually needs while multiple construction bogeys are set Construction requirement could be met, cause construction speed slowly and construction cost is higher.Therefore, held using the fixed construction of routine Carry the demand put and can not adapt to bridge construction.
Utility model content
Based on this, the purpose of this utility model is to provide a kind of adjustable new construction bogey of construction space.
A kind of new construction bogey, including fixed body and the carrier that is installed on the fixed body, the carrying Frame includes the first loading plate, the second loading plate and two English trusses, and described two English truss parallel intervals are installed on institute State on a side surface of fixed body, the English truss includes support component, the first brace, expansion link and hydraulic strut, described Support component includes fix bar and the motion bar being slidably connected with one end of the fix bar, the other end of the fix bar are fixed In on the fixed body, first loading plate is fixedly arranged on the top of two fix bars, and second loading plate is connected to Between two motion bars, so that second loading plate can move relative to first loading plate, first brace is consolidated On the fixed body, the both ends free terminal with corresponding first brace and the activity respectively of the expansion link Bar free terminal pivot joint, the hydraulic strut be articulated in corresponding between the fix bar and the expansion link.
Above-mentioned new construction bogey, because the motion bar and the fix bar are slidably connected, the fix bar is consolidated On the fixed body, and first loading plate is fixedly arranged on the top of two fix bars, and second loading plate connects It is connected between two motion bars, so that second loading plate can move relative to first loading plate, therefore described Relatively described first loading plate of two loading plates can extend and shorten, and realize the construction space of the new construction bogey Regulation.Meanwhile the new construction is realized by first brace, the expansion link and the hydraulic strut of setting Bogey consolidates, it is ensured that construction safety.
Further, each fix bar is equipped with the first cunning on a side surface of fix bar another described Rail, a side surface of the motion bar away from second loading plate are provided with a sliding block, the sliding block and corresponding described One slide rail is slidably connected, so that the motion bar can slide along the length direction of the corresponding fix bar.
Further, the carrier also includes at least one 3rd loading plate, and the 3rd loading plate is rotatable and can The top for being installed on second loading plate slided.
Further, the 3rd loading plate is installed on the top of second loading plate by a connection component, described Connection component includes a sliding members and rotary shaft, and the bottom of the 3rd loading plate is provided with the second slide rail, the rotary shaft One end is rotatably installed on the top of second loading plate, and the other end of the rotary shaft is connected with the sliding members, The sliding members is slidably installed on second slide rail.
Further, the carrier is also detachably connected component including one, and the component that is detachably connected is used for institute State the top that the 3rd loading plate is fixedly arranged on second loading plate.
Further, the English truss also includes at least one montant, and the montant is connected to the corresponding fixation Between bar and first brace.
Further, when the English truss includes multiple montants, adjacent two on each English truss One second brace is also associated between the individual montant, second brace forms one with two montants of corresponding connection " N " shape structure.
Further, the first guardrail is installed with the top of the fix bar, first guardrail extends to corresponding described The top of motion bar.
Further, the top both sides of the 3rd loading plate are respectively equipped with the second guardrail.
Further, the both ends of the expansion link bearing pin connection by way of with corresponding first brace oneself It is pivotally connected by the free terminal of end and the motion bar.
Brief description of the drawings
Fig. 1 is the dimensional structure diagram of the new construction bogey in the utility model first embodiment.
Fig. 2 is the side view of the new construction bogey in the utility model first embodiment.
Fig. 3 is the structural representation of the support component in the utility model first embodiment.
Fig. 4 is the decomposing schematic representation of the second supporting plate and the 3rd supporting plate in the utility model first embodiment.
Fig. 5 is that the cross section structure after the second supporting plate in the utility model first embodiment connects with the 3rd supporting plate shows It is intended to.
Fig. 6 is the dimensional structure diagram of the new construction bogey in the utility model second embodiment.
Main element symbol description:
Fixed body 10 Carrier 20
First loading plate 21 Second loading plate 22
English truss 23 3rd loading plate 24
Support component 231 First brace 232
Expansion link 233 Hydraulic strut 234
Fix bar 2311 Motion bar 2312
First slide rail 23111 Sliding block 23121
Connection component 25 Sliding members 251
Rotary shaft 252 Second slide rail 241
First guardrail 23112 Second guardrail 242
Montant 235 Second brace 236
Following embodiment will further illustrate the utility model with reference to above-mentioned accompanying drawing.
Embodiment
For the ease of understanding the utility model, the utility model is more fully retouched below with reference to relevant drawings State.Some embodiments of the present utility model are given in accompanying drawing.But the utility model can come in fact in many different forms It is existing, however it is not limited to embodiment described herein.On the contrary, the purpose for providing these embodiments is made to public affairs of the present utility model Open content more thorough and comprehensive.
It should be noted that when element is referred to as " being fixedly arranged on " another element, it can be directly on another element Or there may also be element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ", " right side " and similar statement are for illustrative purposes only.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with belonging to technology of the present utility model The implication that the technical staff in domain is generally understood that is identical.It is simply in term used in the description of the present utility model herein The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term as used herein " and/or " include The arbitrary and all combination of one or more related Listed Items.
Fig. 1 to Fig. 5 is referred to, the new construction bogey showing in the utility model first embodiment, including it is solid Determine body 10 and the carrier 20 being installed on the fixed body 10.
The fixed body 10 is engineering prefabricated components, as the pre-production of construction work (such as bridge construction engineering) A kind of carrying body for fixation from the later stage.
The carrier 20 is held including the first loading plate 21,22, two English trusses 23 of the second loading plate and two the 3rd Support plate 24.Two parallel intervals of English truss 23 are installed on a side surface of the fixed body 10.Each described three Angle truss 23 includes support component 231, the first brace 232, expansion link 233 and hydraulic strut 234.
Wherein, the support component 231 includes fix bar 2311 and is slidably connected with one end of the fix bar 2311 Motion bar 2312, the other end of the fix bar 2311 are fixedly arranged on the fixed body 10, the fix bar 2311 and the work Lever 2312 is horizontally disposed.First loading plate 21 is fixedly arranged on the top of two fix bars 2311, and described second holds Support plate 22 is connected between two motion bars 2312, so that second loading plate 22 can relatively described first loading plate 21 It is mobile.Specifically, each fix bar 2311 is equipped with first on a side surface of fix bar another described 2311 Slide rail 23111, a side surface of the motion bar 2312 away from second loading plate 22 is provided with a sliding block 23121, described Sliding block 23121 is slidably connected with corresponding first slide rail 23111, so that the motion bar 2312 can be along corresponding described solid The length direction of fixed pole 2311 slides, and then second loading plate 22 can be moved relative to first loading plate 21, i.e., Second loading plate 22 can move along the length direction of first loading plate 21.
Furthermore, it is to be understood that, stopping means is additionally provided between the fix bar 2311 and the motion bar 2312, and (figure is not Show), it is spacing to be carried out to the slip extreme position of the motion bar 2312.
Wherein, first brace 232 is fixedly arranged on the fixed body 10, the relatively described fixation of the first brace 232 The side surface of body 10 is inclined, and is tilted towards the direction of the corresponding support component 231, while first brace 232 are in same perpendicular with the corresponding fix bar 2311 and the motion bar 2312.
The both ends of the expansion link 233 free terminal with corresponding first brace 232 and the motion bar respectively 2312 free terminal pivot joint.Among the present embodiment, the both ends of the expansion link 233 by way of bearing pin connection with it is right The free terminal of first brace 232 and the free terminal of the motion bar 2312 answered are pivotally connected, and are easy to described flexible The dismounting and position adjustment of bar 233.
The hydraulic strut 234 be articulated in corresponding between the fix bar 2311 and the expansion link 233.Specifically, The bottom of the hydraulic strut 234 and the bottom of the fix bar 2311 are pivotally connected, the freedom of the piston rod of the hydraulic strut 234 End is pivotally connected with the expansion link 233, while the mode being pivotally connected can be the mode of bearing pin connection, be easy to the hydraulic strut 234 dismounting and position adjustment.
Wherein, the 3rd loading plate 24 is rotatable and is slidably installed on the top of second loading plate 22, and The lower surface of 3rd loading plate 24 contacts with the top surface of second loading plate 22.Specifically, the described 3rd hold Support plate 24 is installed on the top of second loading plate 22 by a connection component 25, to realize rotatably and slidably.It is described Connection component 25 includes a sliding members 251 and rotary shaft 252, and the bottom of the 3rd loading plate 24 is provided with the second slide rail 241, The top of second loading plate 22 offers a mounting groove, and one end of the rotary shaft 252 is rotatably installed on the peace The bottom of tankage, the other end of the rotary shaft 252 are connected with the sliding members 251, and the sliding members 251 is slidable It is installed on second slide rail 241, the sliding members 251 is in spherical, and can be slided along the inwall of second slide rail 241 It is dynamic.
Further, the carrier 20 is also detachably connected component (not shown) including one, described to be detachably connected group Part is used for the top that the 3rd loading plate 24 is fixedly arranged on to second loading plate 22.The component that is detachably connected can be Any one among screw connection structure, pin shaft connection structure or hinge engaging structure, when the position of the 3rd loading plate 24 Put after adjusting, the 3rd loading plate 24 can be fixed on by the carrier 20 on second loading plate 22.
Further, the top of the fix bar 2311 is installed with the first guardrail 23112, and first guardrail 23112 prolongs The top of the motion bar 2312 corresponding to extending.When workmen is in first loading plate 21 and second loading plate 22 During upper construction, first guardrail 23112 can provide protective action.
Further, the top both sides of the 3rd loading plate 24 are respectively equipped with the second guardrail 242.When workmen is in institute State when being constructed on the 3rd loading plate 24, second guardrail 242 can provide protective action.
Further, the fix bar 2311, first brace 232 (are such as threadedly coupled using structure is detachably fixed Structure, pin shaft connection structure etc.) it is fixedly connected with the fixed body 10.Pass through such setting so that held described in whole Carrier 20 is easy to disassemble, and then can pass through tower crane (or other lifting driving equipments), it is possible to achieve the height of the carrier 20 Degree regulation, further realizes the regulation of construction space.
To sum up, the new construction bogey among the utility model above-described embodiment, by the motion bar 2312 with The setting of the fix bar 2311 so that relatively described first loading plate 21 of second loading plate 22 can elongate or shorten, The regulation of the construction space of the new construction bogey is realized, while the both ends of the expansion link 233 are connected by bearing pin The mode connect is pivotally connected with the free terminal of corresponding first brace 232 and the free terminal of the motion bar 2312, The hydraulic strut 234 be articulated in by way of bearing pin connection corresponding to the fix bar 2311 and the expansion link 233 it Between, when relatively described first loading plate 21 of second loading plate 22 elongates or shortens, by disassembling and assembling pin shaft, can accordingly adjust The position of the hydraulic strut 234 and the expansion link 233 is saved, so as to change the structural system of the English truss 23, and then Preferable firm effect is played to the new construction bogey.Moreover, by the 3rd supporting plate 24 of setting, And make the 3rd loading plate 24 rotatable and be slidably installed on the top of second loading plate 22 so that the described 3rd Supporting plate 24 can extend, shorten and rotate relative to second loading plate 22, realize the further regulation of construction space, together (such as screw connection structure, bearing pin connection is tied using structure is detachably fixed for Shi Suoshu fix bars 2311, first brace 232 Structure etc.) it is fixedly connected with the fixed body 10, the height regulation of the carrier 20 is realized, further realizes and applies The regulation in work space.Therefore the construction space of the new construction bogey is adjustable, and the space adjusted is wide, disclosure satisfy that The larger construction environment of changes in amplitude (such as construction of Longspan Bridge king-tower), it is applied widely, it is not necessary to which that multiple constructions are set Platform, construction speed is improved, reduce construction cost.
Fig. 6 is refer to, the new construction bogey showing in the utility model second embodiment, among the present embodiment New construction bogey and the new construction bogey among first embodiment it is more or less the same, difference is:
Each English truss 23 also includes two montants 235, and the montant 235 is fixedly connected on corresponding described solid Between fixed pole 2311 and first brace 232, it is also connected between two montants 235 on each English truss 23 There is one second brace 236, second brace 236 forms " N " shape structure with two montants 235 of corresponding connection.It is logical Cross and the montant 235 and second brace 236 are set, further strengthen the English truss 23, it is ensured that described new Construction bogey consolidates.
It should be understood that among other embodiments, the English truss 23 can also include one or more The montant 235, to be reinforced to the English truss 23, and when the English truss 23 includes multiple montants 235 When, each it can also connect second brace between the two neighboring montant 235 on the English truss 23 236, second brace 236 will form " N " shape structure with two montants 235 of corresponding connection.
Embodiment described above only expresses several embodiments of the present utility model, and its description is more specific and detailed, But therefore it can not be interpreted as the limitation to the utility model patent scope.It should be pointed out that for the common of this area For technical staff, without departing from the concept of the premise utility, various modifications and improvements can be made, these all belong to In the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (10)

1. a kind of new construction bogey, including fixed body and the carrier that is installed on the fixed body, it is characterised in that The carrier includes the first loading plate, the second loading plate and two English trusses, two English truss parallel intervals It is installed on a side surface of the fixed body, the English truss includes support component, the first brace, expansion link and hydraulic pressure support Bar, the support component include fix bar and the motion bar being slidably connected with one end of the fix bar, the fix bar it is another One end is fixedly arranged on the fixed body, and first loading plate is fixedly arranged on the top of two fix bars, second carrying Plate is connected between two motion bars, so that second loading plate can move relative to first loading plate, described One brace is fixedly arranged on the fixed body, the both ends of the expansion link respectively with the free terminal of corresponding first brace and The motion bar free terminal pivot joint, the hydraulic strut be articulated in corresponding between the fix bar and the expansion link.
2. new construction bogey according to claim 1, it is characterised in that each fix bar is close to another The first slide rail is equipped with one side surface of the fix bar, on a side surface of the motion bar away from second loading plate Provided with a sliding block, the sliding block is slidably connected with corresponding first slide rail, so that the motion bar can be along corresponding described The length direction of fix bar slides.
3. new construction bogey according to claim 1, it is characterised in that the carrier also includes at least one 3rd loading plate, the 3rd loading plate is rotatable and is slidably installed on the top of second loading plate.
4. new construction bogey according to claim 3, it is characterised in that the 3rd loading plate passes through a connection Component is installed on the top of second loading plate, and the connection component includes a sliding members and rotary shaft, and the described 3rd holds The bottom of support plate is provided with the second slide rail, and one end of the rotary shaft is rotatably installed on the top of second loading plate, institute The other end for stating rotary shaft is connected with the sliding members, and the sliding members is slidably installed on second slide rail.
5. new construction bogey according to claim 3, it is characterised in that it is detachable that the carrier also includes one Connection component, the top for being detachably connected component and being used to for the 3rd loading plate to be fixedly arranged on second loading plate.
6. new construction bogey according to claim 1, it is characterised in that the English truss also includes at least one Individual montant, the montant be connected to corresponding between the fix bar and first brace.
7. new construction bogey according to claim 6, it is characterised in that when the English truss includes multiple institutes When stating montant, one second brace is also associated between the two neighboring montant on each English truss, described second Brace forms " N " shape structure with two montants of corresponding connection.
8. new construction bogey according to claim 1, it is characterised in that is installed with the top of the fix bar One guardrail, first guardrail extend to the top of the corresponding motion bar.
9. new construction bogey according to claim 3, it is characterised in that the top both sides of the 3rd loading plate It is respectively equipped with the second guardrail.
10. new construction bogey according to claim 1, it is characterised in that the both ends of the expansion link pass through The mode of bearing pin connection is pivotally connected with the free terminal of corresponding first brace and the free terminal of the motion bar.
CN201720371198.3U 2017-04-10 2017-04-10 New construction bogey Expired - Fee Related CN206815186U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720371198.3U CN206815186U (en) 2017-04-10 2017-04-10 New construction bogey

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720371198.3U CN206815186U (en) 2017-04-10 2017-04-10 New construction bogey

Publications (1)

Publication Number Publication Date
CN206815186U true CN206815186U (en) 2017-12-29

Family

ID=60752798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720371198.3U Expired - Fee Related CN206815186U (en) 2017-04-10 2017-04-10 New construction bogey

Country Status (1)

Country Link
CN (1) CN206815186U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948265A (en) * 2017-04-10 2017-07-14 江西科技学院 New construction bogey

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948265A (en) * 2017-04-10 2017-07-14 江西科技学院 New construction bogey

Similar Documents

Publication Publication Date Title
CN106948265B (en) Novel construction bogey
CN102708723B (en) Six-freedom-degree static-balance parallel motion simulation platform with large bearing surface
US20090272708A1 (en) Modular Counterweight Carriage for Cranes, in Particular for Large Crane
ATE457294T1 (en) CRANE, ESPECIALLY MOBILE CRANE WITH NARROW TRACK AND EXTENDED SUPPORT BASE
CN206815186U (en) New construction bogey
CN102395731A (en) Overhead form traveller and method
CN103774557B (en) A kind of luffing packaged type operation platform
CN104608145B (en) A kind of seven degrees of freedom copy man type mechanical arm system based on human engineering
CN103343626B (en) The T-shaped support slide installation method of template Elements of Space Grid Truss and structure thereof
CN115680181B (en) Material-saving and wind-resistant cable-membrane structure building and construction method thereof
CN209958161U (en) Linear adjusting equipment of track beam
RU183553U1 (en) CRANE ARM
CN207582690U (en) connecting node
JPH03110208A (en) Mobile scaffold device for bridge and assembling method for same
CN109868722A (en) A kind of pier method on box beam end construction and box beam convenient for upper pier
RU2722762C1 (en) Manipulator crane
RU2725367C1 (en) Loader crane
CN209396853U (en) Roll-over table
CN209568747U (en) A kind of steel construction applied to awning
CN210032183U (en) Civil engineering damping device
CN209051343U (en) A kind of stage area is convenient for the mobile stage vehicle of adjusting
CN206902572U (en) Construction mould bases
CN109773754B (en) Three-degree-of-freedom parallel motion platform with plane four-bar sub-closed loop folding branches
RU137558U1 (en) Dismountable UNIVERSAL BRIDGE
CN208022659U (en) A kind of civil engineering elevator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171229

Termination date: 20180410