CN206806897U - Middle phase insulation shunting line bracket - Google Patents

Middle phase insulation shunting line bracket Download PDF

Info

Publication number
CN206806897U
CN206806897U CN201720508774.4U CN201720508774U CN206806897U CN 206806897 U CN206806897 U CN 206806897U CN 201720508774 U CN201720508774 U CN 201720508774U CN 206806897 U CN206806897 U CN 206806897U
Authority
CN
China
Prior art keywords
hanging plate
insulation
component
clamp
shunting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720508774.4U
Other languages
Chinese (zh)
Inventor
章健军
唐力
周波
李江
胡弘莽
刘拓晟
陈坚平
周展帆
谢超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Live Working Center of State Grid Hunan Electric Power Co
Original Assignee
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Live Working Center of State Grid Hunan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hunan Electric Power Co Ltd, Live Working Center of State Grid Hunan Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201720508774.4U priority Critical patent/CN206806897U/en
Application granted granted Critical
Publication of CN206806897U publication Critical patent/CN206806897U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses the shunting line bracket that mutually insulated in one kind, and it includes hanging plate and the installation component being arranged at below hanging plate and the clamp component being arranged above hanging plate;The support is connected by installation component with existing device on bar, and insulation shunt line is connected by clamp component;The hanging plate is T-shaped hanging plate;The installation component includes flat clip hook and ox horn jacking block, and flat clip hook has two, is respectively arranged at the head both ends of T-shaped hanging plate, and ox horn jacking block is connected to the end of T-shaped hanging plate bar portion;The clamp component is T-shaped component, and its bar portion and head are insulation pipe, and the both ends of head pipe are connected with shunting wire clamp, V-groove is offered on the outside of shunting wire clamp, and VELCRO or band for wrapping up tight insulation shunt line are connected with shunting wire clamp.The shunt line that mutually insulated in Fast Installation can be realized, improves operating efficiency;And the fixation of insulation shunt line can be efficiently accomplished, eliminates the potential safety hazard of phase fault, improves operational security.

Description

Middle phase insulation shunting line bracket
Technical field
It the utility model is related to a kind of shunt line mounting bracket, more particularly to mutually insulation shunting line bracket in one kind.
Background technology
With the development of the social economy, requirement more and more higher of the people to power supply reliability.On-load changes matching somebody with somebody for damage Electric equipment can effectively improve power supply reliability, therefore change disconnecting switch, the item of on-pole switch using insulation shunt line on-load Mesh is more and more, how quickly, safety fulfil assignment be we study emphasis.But using traditional installation insulation shunt line Mode, be on the one hand unfavorable for the fixation of shunt line, easily swing;On the other hand insulation shunt line and shaft tower component are excessively near, need pair Insulation shunt line or shaft tower component carry out more insulation masking, increase workload, add the working time.
Utility model content
The purpose of this utility model is that providing one kind can fix using existing equipment on bar, and can easily carry out band Load changes the middle phase insulation shunting line bracket of controller switching equipment operation.
This middle phase insulation shunting line bracket provided by the utility model, it includes hanging plate and is arranged at below hanging plate Installation component and the clamp component being arranged above hanging plate;The support is connected by installation component with existing device on bar, is passed through Clamp component connection insulation shunt line;The hanging plate is T-shaped hanging plate;The installation component includes flat clip hook and ox horn jacking block, flat Clip hook has two, is respectively arranged at the head both ends of T-shaped hanging plate, and ox horn jacking block is connected to the end of T-shaped hanging plate bar portion;The folder Line components are T-shaped component, and its bar portion and head are pipe, and the both ends of head pipe are connected with shunting wire clamp, shunting wire clamp Outside offers V-groove, and VELCRO or band for wrapping up tight insulation shunt line are connected with shunting wire clamp.
The both ends of the bar portion pipe of the clamp component are equipped with nylon jacket, nylon jacket and institute of the bar portion pipe by bottom Hanging plate is stated to be connected, by the nylon jacket at top with head pipe be connected.
The material of the hanging plate, bar portion pipe and head pipe is insulation board, and the material of the shunting wire clamp is nylon.
The material of the flat clip hook and ox horn jacking block is insulation board.
The utility model is connected by existing device on the installation component and bar of its underpart when in use, then passes through its top Clamp component installation fixed insulation shunt line after can carry out operation, the shunt line that mutually insulated in Fast Installation can be realized, carried High operating efficiency;And the fixation of insulation shunt line can be efficiently accomplished by the setting of the present embodiment, eliminates phase fault Potential safety hazard, improve operational security.
Brief description of the drawings
Fig. 1 is the axle side schematic diagram of one preferred embodiment of the utility model.
Illustrate sequence number:
1-T-shaped hanging plate, 2-installation component, 3-clamp component, 21-flat clip hook, 22-ox horn jacking block, 31-head circle Pipe, 32-bar portion pipe, 33-shunting wire clamp, 34-VELCRO, 35-nylon jacket.
Embodiment
As shown in figure 1, this middle phase insulation shunting line bracket that the present embodiment provides, it includes T-shaped hanging plate 1 and set Installation component 2 below hanging plate and the clamp component 3 being arranged above hanging plate.
Installation component 2 includes flat clip hook 21 and ox horn jacking block 22, and flat clip hook has two, is respectively arranged at the head of T-shaped hanging plate Portion both ends, ox horn jacking block are connected to the end of T-shaped hanging plate bar portion.Two flat clip hooks hook flat armful from bottom to top respectively during installation, Ox horn jacking block withstands on shaft, so that this support is installed on bar on existing device.
Clamp component 3 is the T-shaped component that head pipe 31 and bar portion pipe 32 are formed, and the both ends of head pipe are connected with point Streamline presss from both sides 33, and V-groove is offered on the outside of shunting wire clamp, and the magic for wrapping up tight insulation shunt line is connected with shunting wire clamp Patch 34, the both ends of bar portion pipe 32 are equipped with nylon jacket 35, and bar portion pipe is connected with T-shaped hanging plate by the nylon jacket of bottom, is logical The nylon jacket for crossing top is connected with head pipe.T-shaped hole is set in the nylon jacket at top, its axial hole is used for and bar portion round bar phase Even, radial hole is used to be connected with head pipe.Bar portion pipe in use will be between insulation shunt line and grounding body effectively Keep apart, never do not have to insulation shunt line carry out secondary shield, simplify the course of work, reduce labor intensity, improve work Make efficiency.The material of hanging plate, bar portion pipe, head pipe, flat clip hook and ox horn jacking block will be divided from being insulation board simultaneously The material selection of streamline folder is nylon, to improve integral insulation performance.
By the present embodiment with the reliable fixation for realizing middle phase insulation shunt line, and through the V-type at shunting wire clamp The application of groove, VELCRO effectively prevents shunt line swing of insulating;It will be insulated by bar portion pipe between shunt line and grounding body It is effectively isolated, avoids the secondary shield of insulation shunt line;The shunt line that mutually insulated in Fast Installation is realized, is effectively eliminated The potential safety hazard of phase fault, improves operating efficiency.
The present embodiment is connected by the flat clip hook of its underpart with ox horn jacking block with existing device on bar when in use, then is passed through The shunting wire clamp and VELCRO on its top fix insulation shunt line, can then carry out operation, can realize in Fast Installation Mutually insulation shunt line, improves operating efficiency;And consolidating for insulation shunt line can be efficiently accomplished by the setting of the present embodiment It is fixed, the potential safety hazard of phase fault is eliminated, improves operational security.
VELCRO can also be replaced with band as another embodiment.

Claims (4)

1. mutually insulation shunts line bracket in one kind, it is characterised in that:It includes hanging plate and the installation structure being arranged at below hanging plate Part and the clamp component being arranged above hanging plate;The support is connected by installation component with existing device on bar, passes through clamp structure Part connection insulation shunt line;The hanging plate is T-shaped hanging plate;The installation component includes flat clip hook and ox horn jacking block, and flat clip hook has Two, the head both ends of T-shaped hanging plate are respectively arranged at, ox horn jacking block is connected to the end of T-shaped hanging plate bar portion;The clamp component For T-shaped component, its bar portion and head are insulation pipe, and the both ends of head pipe are connected with shunting wire clamp, shunting wire clamp it is outer Side offers V-groove, and VELCRO or band for wrapping up tight insulation shunt line are connected with shunting wire clamp.
2. middle phase insulation shunting line bracket according to claim 1, it is characterised in that:The bar portion pipe of the clamp component Both ends be equipped with nylon jacket, bar portion pipe is connected by the nylon jacket of bottom with the hanging plate, by the nylon jacket at top with Head pipe is connected.
3. middle phase insulation shunting line bracket according to claim 2, it is characterised in that:The hanging plate, bar portion pipe and head The material of portion's pipe is insulation board, and the material of the shunting wire clamp is nylon.
4. middle phase insulation shunting line bracket according to claim 1, it is characterised in that:The flat clip hook and ox horn jacking block Material is insulation board.
CN201720508774.4U 2017-05-09 2017-05-09 Middle phase insulation shunting line bracket Active CN206806897U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720508774.4U CN206806897U (en) 2017-05-09 2017-05-09 Middle phase insulation shunting line bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720508774.4U CN206806897U (en) 2017-05-09 2017-05-09 Middle phase insulation shunting line bracket

Publications (1)

Publication Number Publication Date
CN206806897U true CN206806897U (en) 2017-12-26

Family

ID=60739579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720508774.4U Active CN206806897U (en) 2017-05-09 2017-05-09 Middle phase insulation shunting line bracket

Country Status (1)

Country Link
CN (1) CN206806897U (en)

Similar Documents

Publication Publication Date Title
CN205960591U (en) String safety backup fastener that dangles that built on stilts cable used
CN203406429U (en) Ground wire apparatus
CN204789734U (en) Electrician's utensil is tested to portable high pressure
CN206806897U (en) Middle phase insulation shunting line bracket
CN202333678U (en) Conductive device for supporting type tubular bus and earthed switch in high-voltage distribution
CN204441491U (en) A kind of wire clamp
CN203895838U (en) Portable paying-off tackle
CN206712405U (en) Rigid insulation part flow arrangement
CN102916372B (en) 10kV multi-circuit lines on the same pole mesophase spherule wire lifting instrument
WO2016033872A1 (en) Tilting bracket for transformer iron core
CN203312010U (en) Device for fixing high-voltage lead of power transformer
CN203398619U (en) Line arrester replacing device
CN204068121U (en) By the terminal box of switch control rule break-make
CN202550337U (en) Special tool for carrying out on-load clip opening check and fastening lead wire clip of electric transmission and transformation equipment
CN202797842U (en) Aluminum alloy strain clamp
CN206921684U (en) A kind of transformer framework coiling fixture
CN205172470U (en) Portable wire rope checkpost
CN205543984U (en) Multi -functional turn -buckle of power transmission and transformation circuit
CN206293296U (en) A kind of crowbar switch
CN202308913U (en) Fire line connecting and disconnecting device of lead of strain section
CN204577637U (en) A kind of nuclear bridge Special grounding secure component
CN206059121U (en) transformer lead structure
CN206022079U (en) A kind of high pressure lead wire structure of transformer
CN205826734U (en) Pillar spark gap electroscope
CN204947129U (en) Short-circuit grounding wire

Legal Events

Date Code Title Description
GR01 Patent grant