CN206804825U - A kind of primary cut-out SF6Density monitor verifies component - Google Patents

A kind of primary cut-out SF6Density monitor verifies component Download PDF

Info

Publication number
CN206804825U
CN206804825U CN201720323512.0U CN201720323512U CN206804825U CN 206804825 U CN206804825 U CN 206804825U CN 201720323512 U CN201720323512 U CN 201720323512U CN 206804825 U CN206804825 U CN 206804825U
Authority
CN
China
Prior art keywords
triple
valve body
density monitor
primary cut
installing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720323512.0U
Other languages
Chinese (zh)
Inventor
张小平
翁新林
秦文红
刘小波
吴智超
黄斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Application granted granted Critical
Publication of CN206804825U publication Critical patent/CN206804825U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Breakers (AREA)

Abstract

The utility model discloses a kind of primary cut-out SF6Density monitor verifies component, including connecting line, triple-valve body, checking joint, SF6Density monitor and sealing installing plate, the triple-valve body is T-shaped, provided with three openings interconnected;The SF of one end connection primary cut-out of the connecting line6Air chamber, the other end connect an opening of the triple-valve body;The checking joint is plug-in type bidirectional self-sealing snap joint, and its one end is connected to another straight-through opening of the triple-valve body;The SF6Density monitor is the pressure gauge equipped with electric attachments, the influence for compensation system adjustment environment temperature;Its test side connects the vertical openings of the triple-valve body;The sealing installing plate is provided with least two mounting holes and is fixed on primary cut-out, and the triple-valve body is fixed on a mounting hole, the SF6The electric attachments of density monitor is fixed by another mounting hole.The utility model is easy to operate, just can be to SF without dismounting6Gas density relay enters accommodating verification or replacing, and on-line measuring device can be installed by not having a power failure, is brought convenience for the operation of maintainer.

Description

A kind of primary cut-out SF6Density monitor verifies component
Technical field
The utility model belongs to breaker apparatus SF6 Density parity check technical field, broken more particularly, to one kind for height The SF of road device6Density monitor verifies component.
Background technology
After primary cut-out long-play, relay assembly on breaker is severe due to condition of work, it is easy to goes out Existing problem;Especially breaker SF6The critical component of gas return path, such as SF6Gas relay, certificated valve etc. are due to designing, pacifying The factors such as dress, maintenance cause gas pressure change, bellows damage, can all cause SF6Density monitor malfunctions.This practicality is new Type is in analysis breaker SF6On the basis of density monitor structure composition and operation logic, Curve guide impeller is proposed, to solve because of dismounting Or verification SF6The easy gas leakage and SF that density monitor is brought6Density monitor compensates the problem of influenceing normal work by mistake.
The content of the invention
The utility model will solve technical problem and be to provide a kind of breaker SF6 density monitors verification component, pass through this Utility model preferably connects between realizing primary cut-out, avoids causing SF due to structure problem6In density monitor The problem of temperature compensating element malfunctions, and field-checking need to dismantle density monitor verification, sets so as to effectively eliminate Received shipment row hidden danger, improve the safety and stability of equipment operation.
The utility model solves above-mentioned technical problem by following scheme,
A kind of primary cut-out SF6Density monitor verify component, including connecting line, triple-valve body, checking joint, SF6Density monitor and sealing installing plate, it is characterised in that
The triple-valve body is T-shaped, provided with three openings interconnected;Two of which opening is straight-through opening, another Individual opening is the vertical openings vertical with two straight-through openings;
The SF of one end connection primary cut-out of the connecting line6Air chamber, the other end connect the triple-valve body One straight-through opening;
The checking joint is plug-in type bidirectional self-sealing snap joint, and its one end is connected to another of the triple-valve body Straight-through opening;
The SF6Density monitor is the pressure gauge equipped with electric attachments, the shadow for compensation system adjustment environment temperature Ring;Its test side connects the vertical openings of the triple-valve body;
The sealing installing plate is fixed on primary cut-out, and it is provided with least two mounting holes, and the triple-valve body is consolidated It is scheduled on the first mounting hole of the sealing installing plate, the SF6The electric attachments of density monitor is installed by the sealing Second mounting hole of plate is fixed.
As optimization, also rain cover, the rain cover tail end is provided with base, and is fixed on the sealing by base and pacifies In loading board, and it will block in the SF6The top of density monitor;
As optimization, O-ring seal is additionally provided with, between the mounting hole of triple-valve body 2 and first, the SF6Density relay The O-ring seal is provided between the electric attachments of device and the second mounting hole;
As optimization, the rain cover thickness 2mm, radius bend 15.24mm, release groove ratio 0.5;The SF6Density Relay is in the rain cover;
As optimization, the side wall of rain cover is shutter, and centre is provided with hollow hole;
As optimization, the checking joint is provided with seal cap;
As optimization, also rebound, the rebound is arranged between the sealing installing plate and primary cut-out, institute The sealing surface surrounding stated between rebound and the sealing installing plate and primary cut-out smears fluid sealant.
The utility model is easy to operate, just can be to SF without dismounting6Gas density relay enters accommodating verification or replacing, On-line measuring device can be installed by not having a power failure, be brought convenience for the operation of maintainer.The utility model, which has, to be stably connected with, tightly Gu breaker relay circuit, verification is not dismantled so as to efficiently solve density monitor, is in identical fortune with breaker body Row environment, improve equipment running quality, it is simple in construction, practical, effect is good the advantages of.
Brief description of the drawings
Fig. 1 is the utility model embodiment front view;
Fig. 2 is left view sectional view of the present utility model.
Embodiment
With reference to embodiment and compare accompanying drawing the utility model is described in further detail.
A kind of primary cut-out SF6Density monitor verify component, including connecting line 1, triple-valve body 2, verification connect First 5, SF6Density monitor 6, sealing installing plate 3, rebound and rain cover 4,
The triple-valve body 2 is T-shaped, provided with three openings interconnected;Two of which opening is straight-through opening, another Individual opening is the vertical openings vertical with two straight-through openings;
One end of the connecting line 1 matches the SF of fixed connection primary cut-out 7 by screw thread6Air chamber, the other end A straight-through opening of the triple-valve body 2 is fixedly connected with by screw thread matching;
The checking joint 5 is plug-in type bidirectional self-sealing snap joint, and the threeway is fixedly connected on by screw thread matching Another straight-through opening of valve body 2;The checking joint 5 is provided with seal cap, as the secondary sealer of checking joint 5, Ensure that checking joint 5 is air tight;The checking joint 5 possesses anti-oxidant, anti-corrosion capability using material, should not there is empty weldering ﹑ foldings Split and the problems such as mechanical damage;
The connecting line 1 designs with the size of checking joint 5 according to the inflatable interface of primary cut-out 7;
The SF6Density monitor 6 is the pressure gauge equipped with electric attachments, the shadow for compensation system adjustment environment temperature Ring;Its test side 61 connects the vertical openings of the triple-valve body 2;
The sealing installing plate 3 is fixed on primary cut-out 7, and its middle part is provided with least two φ 12mm mounting hole, The triple-valve body 2 is fixed on the first mounting hole;The SF6The electric attachments of density monitor is fixed by the second mounting hole And sealed with O-ring seal;
The rebound 31 be arranged on it is described sealing installing plate 3 and primary cut-out 7 between, the rebound 31 with it is described The sealing surface surrounding sealed between installing plate 3 and primary cut-out 7 smears fluid sealant;
The tail end of rain cover 4 is provided with base 41, and is fixed on by base 41 on the sealing installing plate 3, and blocks In the SF6The top of density monitor 6;The side wall of rain cover 4 is shutter, and centre is provided with hollow hole 42;It is described anti- Canopy 4 thickness 2mm, the mm of radius bend 15.24, release groove ratio 0.5;The SF6Density monitor 6 is in the rain cover 4 It is interior.
Before use, one end of connecting line 1 is first fixedly mounted on to the SF of breaker body 7 by screw thread matching6Gas Chamber pile crown, the other end of connecting line 1 are fixedly connected with a straight-through opening of the triple-valve body 2 again by screw thread matching; The checking joint 5 is fixedly mounted by screw thread matching in another straight-through opening of triple-valve body 2;The vertical of triple-valve body 2 is opened Mouth is fixedly connected with SF6Density monitor 6;Triple-valve body 2 is fixed on sealing installing plate 3 again, and will be close by fixing bolt Envelope installing plate 3 is fixed on primary cut-out 7;Rain cover 4 is finally covered on into SF6Behind the top of density monitor 6, then it is fixed on close Seal on installing plate 3.
In use, as discovery SF6When density monitor 6 works abnormal, after removing the seal cap on checking joint 5, then Verification pressure gauge is directly installed on checking joint 5, when finding that pressure is inconsistent, then the SF more renewed6Density monitor; When finding that pressure is less than setting value, verification pressure gauge is removed, then by SF6Gas cylinder is arranged on checking joint 5, to high pressure open circuit Device 7 supplements SF6Gas, when air pressure reaches setting value, remove SF6Gas cylinder, and seal cap is fixed on checking joint 5.
When carrying out gas componant test, sampler connection checking joint 5 is sampled, it is fast in bidirectional self-sealing when removing Automatic-sealed under quick coupling, then gas in sampler is transferred to laboratory and carries out gas componant test.
The former verification component of the utility model substitution, avoids the easy gas leakage of verification density monitor dismounting and density monitor misses Compensation influences the problem of normal work.The utility model is easy to operate, just can be to SF without dismounting6Gas density relay is carried out Convenient verification is changed, inflation inlet humanization designing, is brought convenience for the operation of maintainer.Meanwhile to circuit breaker mechanism case Junction uses the design method of protection sealing surface and sealing ring, does not influence the environmental performance of the secondary component of circuit breaker mechanism case It is required that it can ensure that SF6The safe operation of breaker.

Claims (6)

  1. A kind of 1. primary cut-out SF6Density monitor verifies component, including connecting line, triple-valve body, checking joint, SF6 Density monitor and sealing installing plate, it is characterised in that
    The triple-valve body is T-shaped, provided with three openings interconnected;Two of which opening is straight-through opening, and another is opened Mouth is the vertical openings vertical with two straight-through openings;
    The SF of one end connection primary cut-out of the connecting line6Air chamber, the other end connect one of the triple-valve body directly Open up mouth;
    The checking joint is plug-in type bidirectional self-sealing snap joint, its one end be connected to the triple-valve body another is straight-through Opening;
    The SF6Density monitor is the pressure gauge equipped with electric attachments, the influence for compensation system adjustment environment temperature;Its Test side connects the vertical openings of the triple-valve body;
    The sealing installing plate is fixed on primary cut-out, and it is provided with least two mounting holes, and the triple-valve body is fixed on On first mounting hole of the sealing installing plate, the SF6The electric attachments of density monitor passes through the sealing installing plate Second mounting hole is fixed.
  2. 2. primary cut-out SF as claimed in claim 16Density monitor verifies component, it is characterised in that there is rain cover, The rain cover tail end is provided with base, and is fixed on by base on the sealing installing plate, and will block in the SF6Density The top of relay.
  3. 3. primary cut-out SF as claimed in claim 26Density monitor verifies component, it is characterised in that the rain cover is thick Spend 2mm, radius bend 15.24mm, release groove ratio 0.5;The SF6Density monitor is in the rain cover.
  4. 4. the primary cut-out SF as described in Claims 2 or 36Density monitor verifies component, it is characterised in that rain cover Side wall is shutter, and centre is provided with hollow hole.
  5. 5. primary cut-out SF as claimed in claim 16Density monitor verifies component, it is characterised in that the checking joint It is provided with seal cap.
  6. 6. primary cut-out SF as claimed in claim 16Density monitor verifies component, it is characterised in that there is rebound, The rebound is arranged between the sealing installing plate and primary cut-out, the rebound and the sealing installing plate and height Sealing surface surrounding between voltage breaker smears fluid sealant.
CN201720323512.0U 2017-03-14 2017-03-30 A kind of primary cut-out SF6Density monitor verifies component Expired - Fee Related CN206804825U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2017202453753 2017-03-14
CN201720245375 2017-03-14

Publications (1)

Publication Number Publication Date
CN206804825U true CN206804825U (en) 2017-12-26

Family

ID=60731087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720323512.0U Expired - Fee Related CN206804825U (en) 2017-03-14 2017-03-30 A kind of primary cut-out SF6Density monitor verifies component

Country Status (1)

Country Link
CN (1) CN206804825U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110426312A (en) * 2019-09-04 2019-11-08 上海乐研电气有限公司 On-line sampling check-up gas density electrical relay with defencive function
CN111257745A (en) * 2020-02-28 2020-06-09 大唐水电科学技术研究院有限公司 Generator outlet circuit breaker state early warning method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110426312A (en) * 2019-09-04 2019-11-08 上海乐研电气有限公司 On-line sampling check-up gas density electrical relay with defencive function
CN111257745A (en) * 2020-02-28 2020-06-09 大唐水电科学技术研究院有限公司 Generator outlet circuit breaker state early warning method

Similar Documents

Publication Publication Date Title
CN104299843A (en) Gas density relay free of detachment in verification process
CN104299845B (en) A kind of gas density relay that does not have to dismounting and just can directly verify
CN206804825U (en) A kind of primary cut-out SF6Density monitor verifies component
CN204230151U (en) A kind of gas density relay of exempting to dismantle when verifying
CN205103375U (en) Online calibrating device of high -voltage switch density relay
CN201327795Y (en) Assembly joint for checking SF* gas density controller in SF* electric switch
CN204230155U (en) A kind ofly need not dismantle the gas density relay that just can directly verify
CN211061651U (en) Online checking valve device for density relay of converter transformer SF6 meter
CN102928020A (en) Device for detecting differential pressure and flow velocity
CN104215409A (en) Transformer bushing sealing condition monitoring method
CN201008249Y (en) Dust explosion-proof positive draft cabinet
CN113418002A (en) Air tightness detection, interface sealing and quick access device
CN205120317U (en) Electric nozzle air -tight test frock
CN205137061U (en) Exempt from to dismantle SF6 circuit breaker detection , fill air supplement unit
CN105784282A (en) Fuel accessory component oil leakage volume testing apparatus
CN201522412U (en) Gas density detecting device
CN114800464A (en) Explosion-proof type cooperative robot and explosion-proof method thereof
CN208750402U (en) A kind of sulfur hexafluoride gas micromanometer having aerification function
CN205282977U (en) Gas -insulated metal enclosed switchgear and gas density monitoring devices thereof
CN204514655U (en) A kind of closed coal dust sampling system
CN202814660U (en) While-drilling tool connecting sealing test device
CN108281206B (en) Pressurising test macro and method
CN201749010U (en) Connecting apparatus of leakage detector
CN209587230U (en) SF6Gas current transformer air valve
CN116706756B (en) GIS with high leakproofness connecting piece

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226

Termination date: 20180330

CF01 Termination of patent right due to non-payment of annual fee