CN206804749U - A kind of data center's fictitious load test system and device - Google Patents

A kind of data center's fictitious load test system and device Download PDF

Info

Publication number
CN206804749U
CN206804749U CN201720355461.XU CN201720355461U CN206804749U CN 206804749 U CN206804749 U CN 206804749U CN 201720355461 U CN201720355461 U CN 201720355461U CN 206804749 U CN206804749 U CN 206804749U
Authority
CN
China
Prior art keywords
casing
contactor
data center
load test
fictitious load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720355461.XU
Other languages
Chinese (zh)
Inventor
陈成元
任艳君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Tianyun Data Center Technology Co Ltd
Original Assignee
Wuxi Tianyun Data Center Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Tianyun Data Center Technology Co Ltd filed Critical Wuxi Tianyun Data Center Technology Co Ltd
Priority to CN201720355461.XU priority Critical patent/CN206804749U/en
Application granted granted Critical
Publication of CN206804749U publication Critical patent/CN206804749U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Temperature (AREA)

Abstract

The utility model provides a kind of data center's fictitious load test system and device, including:Industrial connector, No. 1 control circuit, No. 2 control circuits and No. 3 control circuits, the industrial connector fire wire output end is divided into No. 3 branch circuits, each branch circuit is connected with No. 1 live wire, No. 2 live wires and No. 3 live wires respectively, and 3 are selected using power input change-over switch between the affiliated branch circuit in tunnel, for selecting the connection of No. 1 control circuit, No. 2 control circuits, No. 3 control circuit live wires;The utility model meets PDU by AC power supplies socket or 309 sockets meet junction box(Junction box connects UPS output counters or first cabinet of each row), switched input mode by power input change-over switch and rotary switch of transferring the files and transferred the files, the various single-machine capacity test requests of computer room can be met.This device can meet the various test requests of computer room, various single-machine capacity requirements, rapid deployment, easy-to-connect, can save a large amount of costs of labor.

Description

A kind of data center's fictitious load test system and device
Technical field
The utility model relates generally to and data center machine room integration test technical field, more particularly to a kind of data center Fictitious load test system and device.
Background technology
At present, in order to ensure the quality and performance of data center machine room delivery, many newly-built computer rooms can all use false negative The mode of simulation real server load heating and electricity consumption is carried, the availability of whole room system is tested, the process claims For the integration test of computer room.Generally, the used fictitious load of computer room integration test be single service and fictitious load not Adjustable mode, function is single, can not meet the test request under computer room different situations, and disposes complexity, during connection charge, drop The operating efficiency of low user.
Utility model content
In place of the purpose of this utility model is to overcome above-mentioned deficiency, so as to provide a kind of data center's fictitious load test system System and device.The utility model is that solve above-mentioned technical problem by following technical proposals:A kind of data center's fictitious load is surveyed Test system, including:Industrial connector, No. 1 control circuit, No. 2 control circuits and No. 3 control circuits, No. 1 control circuit bag Include:No. 1 PTC thermistor, No. 1 PTC thermistor are connected with contactor K1, and the contactor K1 passes through wire and AC Power outlet connects, and wherein live wire is open circuit;
No. 2 control circuits include:No. 2 PTC thermistors, No. 2 PTC thermistors connect with contactor K2 Connect, the contactor K2 is connected by wire with AC power supplies socket, and wherein live wire is open circuit;
No. 3 control circuits include:No. 3 PTC thermistors, No. 3 PTC thermistors and contactor K3 connect Connect, the contactor K3 is connected by wire with AC power supplies socket, and wherein live wire is breaking, No. 1 control circuit, No. 2 controls Circuit processed and No. 3 control circuits realize independent control;
The industrial connector fire wire output end is divided into No. 3 branch circuits, each branch circuit respectively with No. 1 fire Line, No. 2 live wires and No. 3 live wire connections, and selected between the affiliated branch circuit in 3 tunnels using power input change-over switch, use In the connection for selecting No. 1 control circuit, No. 2 control circuits, No. 3 control circuit live wires.
Preferably, in addition to selection device of transferring the files, the selection device fire wire output end of transferring the files are divided into No. 3 branch circuits, Each branch circuit is connected with No. 1 live wire, No. 2 live wires and No. 3 live wires respectively, and is used between the affiliated branch circuit in 3 tunnels Rotary switch of transferring the files is selected.
Preferably, it is connected with cooling fan in No. 1 control circuit.
A kind of data center's fictitious load test device, including:Casing 1, radiating is installed with the side of the casing 1 Blower fan 2;The one side for not installing cooling fan 2 in the inner side of casing 1 is provided with 3, No. 2 PTC heat of No. 1 PTC thermistor Quick resistance 4 and No. 2 PTC thermistors 5;The inner bottom part of casing 1 is installed with contactor K16, contactor K27 and contact Device K38;Power input change-over switch 9 and rotary switch 10 of transferring the files, the casing 1 are installed in the upper side of the casing 1 Lower bottom part side on the power outlet 12 of AC power supplies socket 11 and 309 is installed.
Preferably, several heat emission holes 13 are uniformly offered on the side of the casing 1.
Preferably, the top of the casing 1 is provided with No. 1 handle 14.
Preferably, bonnet 15 is additionally provided with the casing 1, is bolted between the bonnet 15 and casing 1, institute State and No. 2 handles 16 are provided with bonnet 15.
The beneficial effects of the utility model:The utility model meets PDU by AC power supplies socket or 309 sockets meet junction box (Junction box connects UPS output counters or first cabinet of each row), by power input change-over switch and transfer the files rotary switch switching input mode and tune Shelves, can meet the various single-machine capacity test requests of computer room.This device can meet the various test requests of computer room, various unit work( Rate requirement, rapid deployment, easy-to-connect, can save a large amount of costs of labor.
Brief description of the drawings
Fig. 1 is a kind of circuit theory diagrams of data center's fictitious load test system of the present utility model;
Fig. 2 is a kind of selection device circuit theory diagrams of transferring the files of data center's fictitious load test system of the present utility model; Fig. 3 is a kind of internal structure schematic diagram of data center's fictitious load test device of the present utility model;
Fig. 4 is a kind of structure principle chart of data center's fictitious load test device of the present utility model.
In figure:1- casings;2- cooling fans;3-1 PTC thermistors;4-2 PTC thermistors;No. 2 PTC heat of 5- Quick resistance;6- contactors K1;7- contactors K2;8- contactors K3;9- power input change-over switches;10- transfers the files rotary switch; 11- AC power supplies sockets;12-309 power outlets;13- heat emission holes;14-1 handles;15- bonnets;16-2 handles.
Embodiment
It is specific embodiment of the utility model and with reference to accompanying drawing below, the technical solution of the utility model is made further Description, but the utility model is not limited to these examples.
As shown in figure 1, a kind of data center's fictitious load test system, including:Industrial connector, No. 1 control circuit, No. 2 Control circuit and No. 3 control circuits, No. 1 control circuit include:No. 1 PTC thermistor, No. 1 PTC thermistor It is connected with contactor K1, the contactor K1 is connected by wire with AC power supplies socket, and wherein live wire is open circuit;
No. 2 control circuits include:No. 2 PTC thermistors, No. 2 PTC thermistors connect with contactor K2 Connect, the contactor K2 is connected by wire with AC power supplies socket, and wherein live wire is open circuit;
No. 3 control circuits include:No. 3 PTC thermistors, No. 3 PTC thermistors and contactor K3 connect Connect, the contactor K3 is connected by wire with AC power supplies socket, and wherein live wire is breaking, No. 1 control circuit, No. 2 controls Circuit processed and No. 3 control circuits realize independent control;
The industrial connector fire wire output end is divided into No. 3 branch circuits, each branch circuit respectively with No. 1 fire Line, No. 2 live wires and No. 3 live wire connections, and power input change-over switch is used between the affiliated branch circuit in 3 tunnels(SA1)Selected Select, for selecting the connection of No. 1 control circuit, No. 2 control circuits, No. 3 control circuit live wires.
As shown in Fig. 2 in the present embodiment, it is preferred that also include selection device of transferring the files, the selection device live wire of transferring the files Output end is divided into No. 3 branch circuits, and each branch circuit is connected with No. 1 live wire, No. 2 live wires and No. 3 live wires respectively, and 3 Using rotary switch of transferring the files between the affiliated branch circuit in road(SA2)Selected;Reach adjustment PTC thermistor gear purpose, Generated heat by PTC thermistor, carry out analogue data central loading caloric value, reach data center's test purpose.
In the present embodiment, it is preferred that be connected with cooling fan in No. 1 control circuit;When device internal temperature mistake High cooling fan of opening in time radiates to it, prevents failure from producing.
As shown in Figure 3 and Figure 4, a kind of data center's fictitious load test device, including:Casing 1, the side of the casing 1 On be installed with cooling fan 2;The one side for not installing cooling fan 2 in the inner side of casing 1 is provided with No. 1 PTC heat Quick 3, No. 2 PTC thermistors 4 of resistance and No. 2 PTC thermistors 5;The inner bottom part of casing 1 be installed with contactor K16, Contactor K27 and contactor K38;Power input change-over switch 9 is installed in the upper side of the casing 1 and rotation of transferring the files is opened 10 are closed, the power outlet 12 of AC power supplies socket 11 and 309 is installed on the lower bottom part side of the casing 1.
In the present embodiment, it is preferred that several heat emission holes 13 are uniformly offered on the side of the casing 1.
In the present embodiment, it is preferred that the top of the casing 1 is provided with No. 1 handle 14;Conveniently take carrying.
In the present embodiment, it is preferred that bonnet 15 is additionally provided with the casing 1, is led between the bonnet 15 and casing 1 Cross bolt to fix, No. 2 handles 16 are provided with the bonnet 15;The setting of bonnet 15 is convenient to overhaul, the setting side of No. 2 handles 16 Just bonnet is removed.
It the foregoing is only preferred embodiment mode of the present utility model, it is impossible to protected to limit the utility model with this Scope, the change and replacement of any unsubstantiality that those skilled in the art is done on the basis of the utility model belong to The utility model scope claimed.

Claims (7)

1. a kind of data center's fictitious load test system, including:Industrial connector, No. 1 control circuit, No. 2 control circuits and No. 3 Control circuit, No. 1 control circuit include:No. 1 PTC thermistor, No. 1 PTC thermistor and contactor K1 connect Connect, the contactor K1 is connected by wire with AC power supplies socket, and wherein live wire is open circuit;
No. 2 control circuits include:No. 2 PTC thermistors, No. 2 PTC thermistors are connected with contactor K2, institute State contactor K2 to be connected with AC power supplies socket by wire, wherein live wire is open circuit;
No. 3 control circuits include:No. 3 PTC thermistors, No. 3 PTC thermistors are connected with contactor K3, institute State contactor K3 to be connected with AC power supplies socket by wire, wherein live wire is breaking, No. 1 control circuit, No. 2 control circuits Independent control is realized with No. 3 control circuits;
The industrial connector fire wire output end is divided into No. 3 branch circuits, each branch circuit respectively with No. 1 live wire, No. 2 Live wire and No. 3 live wire connections, and selected between the affiliated branch circuit in 3 tunnels using power input change-over switch, for selecting 1 The connection of number control circuit, No. 2 control circuits, No. 3 control circuit live wires.
2. a kind of data center's fictitious load test system according to claim 1, it is characterised in that also include selection of transferring the files Device, the selection device fire wire output end of transferring the files are divided into No. 3 branch circuits, each branch circuit respectively with No. 1 live wire, No. 2 live wires and No. 3 live wire connections, and selected between the affiliated branch circuit in 3 tunnels using rotary switch of transferring the files.
A kind of 3. data center's fictitious load test system according to claim 1, it is characterised in that No. 1 control electricity Cooling fan is connected with road.
4. a kind of data center's fictitious load test device, including:Casing(1), it is characterised in that the casing(1)Side on It is installed with cooling fan(2);The casing(1)Cooling fan is not installed in inner side(2)One side be provided with No. 1 PTC thermistor(3), No. 2 PTC thermistors(4)With No. 2 PTC thermistors(5);The casing(1)Inner bottom part fixes peace Equipped with contactor K1(6), contactor K2(7)With contactor K3(8);The casing(1)Upper side on to be provided with power supply defeated Enter change-over switch(9)With rotary switch of transferring the files(10), the casing(1)Lower bottom part side on AC power supplies socket is installed(11) With 309 power outlets(12).
A kind of 5. data center's fictitious load test device according to claim 4, it is characterised in that the casing(1)'s Several heat emission holes are uniformly offered on side(13).
A kind of 6. data center's fictitious load test device according to claim 5, it is characterised in that the casing(1)'s Top is provided with No. 1 handle(14).
A kind of 7. data center's fictitious load test device according to claim 6, it is characterised in that the casing(1)On It is additionally provided with bonnet(15), the bonnet(15)With casing(1)Between be bolted, the bonnet(15)On be provided with 2 Number handle(16).
CN201720355461.XU 2017-04-07 2017-04-07 A kind of data center's fictitious load test system and device Active CN206804749U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720355461.XU CN206804749U (en) 2017-04-07 2017-04-07 A kind of data center's fictitious load test system and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720355461.XU CN206804749U (en) 2017-04-07 2017-04-07 A kind of data center's fictitious load test system and device

Publications (1)

Publication Number Publication Date
CN206804749U true CN206804749U (en) 2017-12-26

Family

ID=60731945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720355461.XU Active CN206804749U (en) 2017-04-07 2017-04-07 A kind of data center's fictitious load test system and device

Country Status (1)

Country Link
CN (1) CN206804749U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109305181A (en) * 2018-08-31 2019-02-05 株洲联诚集团控股股份有限公司 A kind of urban rail drivers' cab ventilation unit and its ventilation unit change-over switch and circuit
WO2021056271A1 (en) * 2019-09-25 2021-04-01 北京硅基远航科技有限公司 Power distributor, and data center having same
CN113433989A (en) * 2021-06-21 2021-09-24 深圳市科信通信技术股份有限公司 Heat load system of communication equipment and control method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109305181A (en) * 2018-08-31 2019-02-05 株洲联诚集团控股股份有限公司 A kind of urban rail drivers' cab ventilation unit and its ventilation unit change-over switch and circuit
CN109305181B (en) * 2018-08-31 2024-05-28 株洲联诚集团控股股份有限公司 Urban rail cab ventilation unit, change-over switch for ventilation unit and circuit thereof
WO2021056271A1 (en) * 2019-09-25 2021-04-01 北京硅基远航科技有限公司 Power distributor, and data center having same
CN113433989A (en) * 2021-06-21 2021-09-24 深圳市科信通信技术股份有限公司 Heat load system of communication equipment and control method thereof

Similar Documents

Publication Publication Date Title
CN206804749U (en) A kind of data center's fictitious load test system and device
CN206790435U (en) A kind of photovoltaic energy storage equipment, rack and photovoltaic energy storage system
CN102844725B (en) For providing the calculating of physical separation and I/O resource with the system of implementation space and power save in the data in the heart
CN202468388U (en) Radiating system for data center
CN108520993A (en) Battery constant temperature system and cell charging-discharging management method
CN101790299A (en) Variable air volume intelligent air current control system
TW202207577A (en) Multi-module portable power station
CN104331130A (en) A system based on a whole cabinet server ultra-large-scale deployment
CN113433989B (en) Heat load system of communication equipment and control method thereof
CN207460090U (en) A kind of outdoor type energy-storage system cabinet
CN106877211A (en) Equipment rack distribution system
CN210116398U (en) Electric automobile fills electric pile fast
CN110403621A (en) Vehicle-mounted CT detector temperature balance control system and method
CN207148566U (en) A kind of data center's capacity management system
JP2014228188A (en) Air conditioning system
JP2018014115A (en) Air conditioning system
CN208368964U (en) A kind of Novel switch cabinet
CN207977985U (en) A kind of load equalizer with monitoring device
CN207765973U (en) A kind of battery charge controller of charging cabinet
CN207817504U (en) Integrated-type intelligent building bus communication monitoring device
CN205452812U (en) Novel UPS power module inserts frame
CN206671949U (en) A kind of power adaptation device assembly for possessing performance enhancement function
CN109149642A (en) A kind of photovoltaic power generation intelligent inverter control system
CN215298214U (en) Integrated test system of heat dissipation fan for energy storage
CN203968559U (en) The negative control of a kind of power equipment rack temperature control device

Legal Events

Date Code Title Description
GR01 Patent grant