CN206803478U - A kind of Novel back-burning boiler - Google Patents

A kind of Novel back-burning boiler Download PDF

Info

Publication number
CN206803478U
CN206803478U CN201720430654.7U CN201720430654U CN206803478U CN 206803478 U CN206803478 U CN 206803478U CN 201720430654 U CN201720430654 U CN 201720430654U CN 206803478 U CN206803478 U CN 206803478U
Authority
CN
China
Prior art keywords
square chest
middle low
square
pressure boiler
deduster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720430654.7U
Other languages
Chinese (zh)
Inventor
张建
张俊强
王雪健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengde Yongtai environmental protection equipment Co., Ltd.
Original Assignee
张建
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张建 filed Critical 张建
Priority to CN201720430654.7U priority Critical patent/CN206803478U/en
Application granted granted Critical
Publication of CN206803478U publication Critical patent/CN206803478U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of new back firing boiler, it is related to field of boilers;It is included under shell, square chest one, square chest two, square chest three, deduster square chest, square chest six, middle low-pressure boiler pipe one, middle low-pressure boiler pipe two, middle low-pressure boiler pipe three, middle low-pressure boiler Guan Si, flue, square cleaning door, in square cleaning door, on square feeding port;Flue is provided with described shell, flue top side is provided with square chest two, the bottom of square chest two is connected with square chest one by middle low-pressure boiler pipe one and middle low-pressure boiler pipe two, the side of square chest one is provided with square chest five, the upper end of square chest five is connected to middle low-pressure boiler pipe three and middle low-pressure boiler Guan Si, its upper end of middle low-pressure boiler three connects square chest two, the upper end of middle low-pressure boiler pipe four connects square chest three, the side of square chest three is provided with deduster square chest, deduster square chest bottom is provided with deduster, and deduster bottom is provided with square chest six;There is simple in construction, manufacture to install for it, and easy, maintenance management is convenient, cost and operating cost are low.

Description

A kind of Novel back-burning boiler
Technical field
It the utility model is related to field of boilers, and in particular to a kind of Novel back-burning boiler.
Background technology
At present, China city possesses substantial amounts of coal-burning boiler, wherein being mostly distributed in city and surrounding city, due to burning Be all the high colm of sulfur content, because boiler is without desulfurizer, plus operating low factor, over-emitting black exhaust, sulphur pollution etc. directly The air quality on city and periphery is have impact on, to change gas, the cry of electricity very high therefore, cancelling city coal burning boiler and coal, and many cities City has taken action, but because source of the gas is nervous, electricity price is expensive, and the region that city thermal does not reach, produce little effect.
With the development of science and technology, some back firing boilers constantly occurs in market, it has the spies such as the abundant, thermal efficiency height of burning Point is widely used.But the back firing boiler occurred in the market, most unreasonable structure, installation is inconvenient, and exchanges heat Inefficient.
Utility model content
The defects of the purpose of this utility model is to be directed to prior art and deficiency, there is provided cyclone dust removal built in a kind of boiler Device, it is simple in construction, manufacture installation is easy, maintenance management is convenient, and cost and operating cost are low.
To achieve the above object, the technical solution adopted in the utility model is:A kind of Novel back-burning boiler, it includes outer Shell, square chest one, square chest two, square chest three, deduster square chest, square chest six, middle low-pressure boiler pipe one, middle low-pressure boiler pipe two, in it is low Press under boiler tube three, middle low-pressure boiler Guan Si, flue, square cleaning door, in square cleaning door, on square feeding port;Stove is provided with shell Courage, flue top side are provided with square chest two, and the bottom of square chest two is connected with by middle low-pressure boiler pipe one and middle low-pressure boiler pipe two Square chest one, the side of square chest one are provided with square chest five, and the upper end of square chest five is connected to middle low-pressure boiler pipe three and middle low-pressure boiler pipe Four, its upper end of middle low-pressure boiler three connection square chest two, the upper end of middle low-pressure boiler pipe four connection square chest three, the side of square chest three is provided with and removed Dirt device square chest, deduster square chest bottom are provided with deduster, and deduster bottom is provided with square chest six.
Further, described flue inner bottom is provided with square cleaning door.
Further, middle part is provided with square cleaning door inside described flue.
Further, described flue inner upper is provided with square feeding port.
After said structure, the beneficial effects of the utility model are:It installs cyclone dust collectors in boiler internal, and it has There are advantage, the cyclone dust removals such as simple in construction, manufacture installation is easy, maintenance management is convenient, cost and operating cost are low to coordinate outside stove Water dedusting, it can preferably reach environment protecting.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
1st, shell;2nd, square chest one;3rd, square chest two;4th, square chest three;5th, deduster square chest;6th, square chest five;7th, square chest six;8th, in Low pressure cooker boiler tube one;9th, middle low-pressure boiler pipe two;10th, middle low-pressure boiler pipe three;11st, middle low-pressure boiler Guan Si;12nd, flue;13、 Under square cleaning door;14th, in square cleaning door;15th, on square feeding port;16th, deduster.
Embodiment
Referring to shown in Fig. 1, the technical scheme that the present embodiment uses is:A kind of Novel back-burning boiler, it includes shell 1, side Case 1, square chest 23, square chest 34, deduster square chest 5, square chest 56, square chest 67, middle low-pressure boiler pipe 1, middle low-pressure boiler Filled out under pipe 29, middle low-pressure boiler pipe 3 10, middle low-pressure boiler pipe 4 11, flue 12, square cleaning door 14 in 13, square cleaning door, just 15, deduster 16 in material mouth;Flue 12 is provided with shell 1, the top side of flue 12 is provided with square chest 23, and the bottom of square chest 23 passes through Middle low-pressure boiler pipe 1 and middle low-pressure boiler pipe 29 are connected with square chest 1, and the side of square chest 1 is provided with square chest 56, square chest 56 Upper end is connected to middle low-pressure boiler pipe 3 10 and middle low-pressure boiler pipe 4 11, its upper end of middle low-pressure boiler 3 10 connection square chest 22, the upper end of middle low-pressure boiler pipe 11 4 connection square chest 34, the side of square chest 34 is provided with deduster square chest 5, the bottom of deduster square chest 5 End is provided with deduster 16, and the bottom of deduster 16 is provided with square chest 67.
Further, the described inner bottom of flue 12 is provided with 13 under square cleaning door.
Further, the described inside of flue 12 middle part is provided with 14 in square cleaning door.
Further, the described inner upper of flue 12 is provided with 15 on square feeding port.
The present embodiment has the beneficial effect that:It installs cyclone dust collectors in boiler internal, and it has simple in construction, manufacture peace The advantages such as dressing is easy, maintenance management is convenient, cost and operating cost are low, cyclone dust removal coordinate the outer water dedusting of stove, can be more preferable Reach environment protecting.
It is described above, it is merely to illustrate the technical solution of the utility model and unrestricted, those of ordinary skill in the art couple The other modifications or equivalent substitution that the technical solution of the utility model is made, without departing from technical solutions of the utility model Spirit and scope, it all should cover among right of the present utility model.

Claims (4)

  1. A kind of 1. Novel back-burning boiler, it is characterised in that it include shell, square chest one, square chest two, square chest three, deduster square chest, Square chest six, middle low-pressure boiler pipe one, middle low-pressure boiler pipe two, middle low-pressure boiler pipe three, middle low-pressure boiler Guan Si, flue, Fang Qing Under grey mouth, in square cleaning door, on square feeding port;Flue is provided with shell, flue top side is provided with square chest two, the bottom of square chest two Square chest one is connected with by middle low-pressure boiler pipe one and middle low-pressure boiler pipe two, the side of square chest one is provided with square chest five, on square chest five End be connected to middle low-pressure boiler pipe three and middle low-pressure boiler Guan Si, its upper end of middle low-pressure boiler three connection square chest two, in it is low The upper end of boiler tube four connection square chest three is pressed, the side of square chest three is provided with deduster square chest, and deduster square chest bottom is provided with deduster, removed Dirt device bottom is provided with square chest six.
  2. A kind of 2. Novel back-burning boiler according to claim 1, it is characterised in that:Described flue inner bottom is provided with side Under cleaning door.
  3. A kind of 3. Novel back-burning boiler according to claim 1, it is characterised in that:Middle part is provided with side inside described flue In cleaning door.
  4. A kind of 4. Novel back-burning boiler according to claim 1, it is characterised in that:Described flue inner upper is provided with side On feeding port.
CN201720430654.7U 2017-04-21 2017-04-21 A kind of Novel back-burning boiler Expired - Fee Related CN206803478U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720430654.7U CN206803478U (en) 2017-04-21 2017-04-21 A kind of Novel back-burning boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720430654.7U CN206803478U (en) 2017-04-21 2017-04-21 A kind of Novel back-burning boiler

Publications (1)

Publication Number Publication Date
CN206803478U true CN206803478U (en) 2017-12-26

Family

ID=60733391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720430654.7U Expired - Fee Related CN206803478U (en) 2017-04-21 2017-04-21 A kind of Novel back-burning boiler

Country Status (1)

Country Link
CN (1) CN206803478U (en)

Similar Documents

Publication Publication Date Title
CN206803478U (en) A kind of Novel back-burning boiler
CN201875684U (en) Environmentally friendly and highly efficient steam boiler
CN202349980U (en) Novel afterheat boiler for pyrite-based acid preparation
CN205002357U (en) Boiler with preheating water tank
CN204063091U (en) A kind of device for recovering afterheat of waste gas in boiler
CN2786438Y (en) High-efficiency smokeless boiler
CN208536627U (en) A kind of Industrial Boiler with exhaust gas cleaner
CN207751295U (en) Wind-distributing pipe road
CN201575581U (en) Vertical environment-friendly energy-saving boiler
CN205957206U (en) Integrative device of energy -efficient dust removal
CN204923440U (en) Many return strokes heat transfer formula biomass fuel furnace
CN204494456U (en) A kind of oil field gas residual heat from boiler fume utilizes skid-mounted unit
CN206861567U (en) A kind of vertical boiler energy saver
CN202675333U (en) Energy-saving biomass dust removal and heat exchange device
CN203928385U (en) A kind of chain-arranged type coal-fired hot-blast stove
CN206803204U (en) A kind of deduster that can improve utilization rate of waste heat
CN202485190U (en) Energy-saving boiler
CN203203014U (en) Biomass boiler for washing-dishes industry
CN203068798U (en) Energy-saving and cost-reducing thermal oil furnace
CN201811259U (en) Dry dust collector structure
CN201293339Y (en) Highly effective coal-fired boiler
CN202835317U (en) Vertical type boiler with towering pipe
CN200946905Y (en) Efficient environment-friendly energy-saving combined hot water boiler working at atmosphere
CN202902247U (en) Biomass steam boiler
CN207287025U (en) A kind of briquette boiler burning waste gas purification apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180126

Address after: A mountain industrial park of Chengde city in 067000 Hebei County of Chengde province (Jia Shan Zhen Shan Zui Cun)

Patentee after: Chengde Yongtai environmental protection equipment Co., Ltd.

Address before: 067499 Chengde City, Hebei province Chengde County under the Ban Cheng Zhen Ban Cheng Da Jie Jia Shu Lou a malleable steel factory building three unit 331

Patentee before: Zhang Jian

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226

Termination date: 20190421

CF01 Termination of patent right due to non-payment of annual fee