CN206800161U - Bridge bilayer main beam section construction is built in a kind of highway, railway or track traffic jointly - Google Patents

Bridge bilayer main beam section construction is built in a kind of highway, railway or track traffic jointly Download PDF

Info

Publication number
CN206800161U
CN206800161U CN201720103502.6U CN201720103502U CN206800161U CN 206800161 U CN206800161 U CN 206800161U CN 201720103502 U CN201720103502 U CN 201720103502U CN 206800161 U CN206800161 U CN 206800161U
Authority
CN
China
Prior art keywords
highway
railway
girder
bridge
track traffic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720103502.6U
Other languages
Chinese (zh)
Inventor
王应良
童登国
袁明
艾宗良
曾辉辉
鄢勇
向律楷
王宜平
李恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201720103502.6U priority Critical patent/CN206800161U/en
Application granted granted Critical
Publication of CN206800161U publication Critical patent/CN206800161U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Bridge bilayer main beam section construction is built in a kind of highway, railway or track traffic jointly, significantly to save the connection charge of two sides, greatly reduces influencing each other for railway in operation and highway, and be obviously improved the gap bridge landscape of highway and railway passenger.Including left side highway girder, right side highway girder, and positioned at railway trusses between the two.The railway trusses uses double-layer structural with left side highway girder, right side highway girder, railway trusses is located at upper strata, left side highway girder and right side highway girder are located at lower floor, and railway trusses underface and left side highway girder, right side highway girder set the 4th road between inner side.

Description

Bridge bilayer main beam section construction is built in a kind of highway, railway or track traffic jointly
Technical field
The utility model belongs to technical field of bridge engineering, and bridge is built in more particularly to a kind of highway, railway or track traffic jointly Beam bilayer main beam section constructs.
Background technology
With the fast development of our national bridge constructions, increasing long-span highway, railway or track traffic are closed Bridge construction beam is built, but many complicated landforms are got down the highway, railway or track traffic build adaptation of the bridge to two sides wiring jointly Property and operation the maintenance stage the problem that influences each other it is outstanding day by day.
At present, the highway of home and overseas, railway or the dual-purpose bridge of track traffic use highway in upper, railway or rail substantially Rebuilding scheme of the road traffic under, or highway, railway or track traffic flat bed arrangement, girder using steel truss girder or Flat bed steel box-girder is arranged.It is however, along with the constraint for more repeating miscellaneous wiring condition and dual-purpose to highway, railway or track traffic Bridge operation, the continuous attention of maintenance, traditional highway in rebuilding scheme under of upper, railway or track traffic and Flat bed girder also runs into some problems.
The subject matter of double-deck girder pattern of the highway in upper, railway or track traffic under is embodied in:Some landform bars Part can not be arranged as highway upper, and bilayer of the railway under builds form jointly.If highway above railway, can cause two by force Bank highway access bridge length is very long, and the maintenance and maintenance of highway bridge have a strong impact on the operation of railway;Truss upper strata bolt breaks Splitting can have an impact to railway operation;Highway and the division of the working interface of railway maintenance are unintelligible;Driving visual angle is poor;Train Fire jeopardizes main beam structure safety etc..
The problem of girder of highway, railway or track traffic flat bed arrangement, is embodied in:Some orographic conditions determine if Be arranged to the girder pattern that rail-road flat bed is built jointly, can also cause highway, the absolute altitude of railway or a track traffic wherein side raise or Reduce, even if being arranged as the bridge that highway, railway or track traffic flat bed are built jointly, be also required to set anti-throwing between highway and railway Net, Bridge Landscape is had a strong impact on, and increase the wind load of bridge;If the beam wind of train can cause the cross force of automobile, Driving safety is influenceed, therefore typically wants the ventilative wind barrier of setting unit;To be set between highway and railway or track traffic anti- Higher ranked anti-collision wall is hit, otherwise highway errant vehicle easily hits railway.Highway, railway or track traffic flat bed arrangement, And railway is located at both sides, railway passenger can be caused to can only see highway bridge, can't see river and valley positioned at centre, highway Beautiful scenery, and train by when, have psychological impact to the driver of road vehicle.
Utility model content
The utility model type technical problem to be solved is to provide a kind of highway, railway or track traffic and builds bridge pair jointly Layer main beam section construction, significantly to save the connection charge of two sides, influencing each other for railway in operation and highway is greatly reduced, and It is obviously improved the gap bridge landscape of highway and railway passenger.
Technical scheme is as follows used by the utility model solves its technical problem:
Bridge main beam cross-section structure, including left side highway are built in a kind of highway, railway or track traffic of the present utility model jointly Girder, right side highway girder, and positioned at railway trusses between the two, it is characterized in that:The railway trusses and left side highway Girder, right side highway girder use double-layer structural, and railway trusses is located at upper strata, and left side highway girder and right side highway girder are located at Lower floor, railway trusses underface and left side highway girder, right side highway girder set the 4th road between inner side.
4th road is pavement, is either bicycle lane or is pavement and bicycle lane.
The beneficial effects of the utility model are can to greatly save the connection charge of two sides, while highway and railway or track Traffic is mutually independent of each other with maintenance, especially highway bridge overhaul and railway or the shadow of meeting of track traffic bridge floor overhaul Ring, operation and maintenance cost greatly reduce;Automobile and the train travel visual field are relatively open, and pedestrian can also pass through transparent floorings See river, Bridge Landscape effect is preferable;On the left of highway or right side girder can be initially formed in construction, can also once be formed Highway girder, the web member and lower boom of railway trusses being set up above Zai highway girders, railway girder may be readily formed as welding trusses entirely, The difficulty of bridge construction and the maintenance of railway girder are substantially reduced, and because not having bolt, will not also produce high-strength bolt Delayed fracture, it is ensured that the operation security of pedestrian, non-motor vehicle and highway;It is applied widely, can be used as beam bridge, arch bridge, tiltedly Draw the girder of bridge and suspension bridge.
Brief description of the drawings
This specification includes following six width accompanying drawing:
Fig. 1 is the section that bridge bilayer main beam section construction is built in a kind of highway of the utility model, railway or track traffic jointly Figure;
Fig. 2 is the lower floor that bridge bilayer main beam section construction is built in a kind of highway of the utility model, railway or track traffic jointly Bridge floor flat functional figure;
Fig. 3 is the lower floor that bridge bilayer main beam section construction is built in a kind of highway of the utility model, railway or track traffic jointly Bridge deck structure plan;
Fig. 4 is that the disconnected of bridge bilayer main beam section construction is built in a kind of highway of the utility model, railway or track traffic jointly Face figure;
Fig. 5 is the section that bridge bilayer main beam section construction is built in a kind of highway of the utility model, railway or track traffic jointly Figure;
Fig. 6 is that a kind of highway of the utility model, railway or track traffic are built bridge bilayer main beam section jointly and be configured to Component and corresponding mark are shown in sectional drawing figure when cable-stayed bridge or suspension bridge:Left side highway girder 1, left side top plate 11 are left Outboard web 12, left-side bottom 13, left inside coxostermum 14;Right side highway girder 2, right side top plate 21, right outboard web 22, right side Bottom plate 23, Right Inboard web 24;Connecting cross beam 3;Railway deck 41, winds up 42, web member 43, lower edge 44, railway or track traffic Shock-absorption track plate 5;Left side floorings 6a, right side floorings 6b, transparent floorings 7;Left web 81, right web 82 are left Web 83, right median ventral plate 84, top plate 85, bottom plate 86.
Embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples.
Bridge bilayer main beam section construction is built in reference picture 1, a kind of highway, railway or track traffic of the present utility model jointly, Including left side highway girder 1, right side highway girder 2, and positioned at railway trusses between the two.The railway trusses and left side Highway girder 1, right side highway girder 2 use double-layer structural, and railway trusses is located at upper strata, left side highway girder 1 and right side highway Girder 2 is located at lower floor, and railway trusses underface and left side highway girder 1, right side highway girder 2 set the 4th between inner side Road.4th road is pavement, is either bicycle lane or is pavement and bicycle lane.Railway trusses position In upper strata, the connection charge of two sides can be greatlyd save, while highway and railway are mutually independent of each other with safeguarding, can especially avoid Highway bridge overhaul and railway or track traffic bridge floor overhaul influence each other, and operation and maintenance cost greatly reduce.
Reference picture 1, the left side highway girder 1 and right side highway girder 2 are independent box beam, along bridge to spaced Connecting cross beam 3 connects as one the box beam of both sides.Reference picture 1 and Fig. 4, the left side highway girder 1 include left side top plate 11, Left outside coxostermum 12, left-side bottom 13, and left inside coxostermum 14.The right side highway girder 2, right side top plate 21, right outer flank Plate 22, right side bottom plate 23 and Right Inboard web 24.The railway trusses is by railway deck 41, wind up 42, lower edge 44 and web member 43 It is welded, wherein lower edge 44 is left inside coxostermum 14, the Right Inboard web of right side highway girder 2 of left side highway girder 1 24。
Reference picture 1, Fig. 2 and Fig. 3, the 4th road include left side floorings 6a and right side floorings 6b, left side bridge floor Plate 6a is arranged at outside the inner side of left side highway girder 1, and right side floorings 6b is arranged at outside the inner side of right side highway girder 2.Reference Fig. 2 and Fig. 4, the 4th road can also include the transparent bridge floor being arranged between left side floorings 6a, right side floorings 6b Plate 7.Because railway deck is located above the 4th road, for pedestrian, a shelter bridge is formed, railway deck is pedestrian Or non-motor vehicle driver keeps out wind and rain, while pedestrian can be walked on the transparent bridge floor of centre, enjoy the beautiful scenery in following river And experience the sensation walked with dainty steps.The railway passenger on upper strata and the highway driving person of lower floor can see the river of outside when driving a vehicle Or mountain valley, landscape effect are good.In order to solve influence of the train noise to following pedestrian (non-motor vehicle car owner), railway deck uses Damping noise reduction track plates 5.
Reference picture 5, the left side highway girder 1, right side highway girder 2 are the both sides of an integrated box girder, the body formula Box beam includes left web 81, right web 82, top plate 85 and bottom plate 86, and direction across bridge is arranged at intervals at the left side in the middle part of casing Median ventral plate 83, right median ventral plate 84;The railway trusses is welded to connect in the middle part of the integrated box girder, and its lower edge 44 is the entirety Left web 83, the right median ventral plate 84 of formula box beam.4th road includes left side floorings 6a and right side floorings 6b, and Row is arranged on the top plate 85 between left web 83, right median ventral plate 84.
Left side highway girder 1 and right side highway girder 2 can be initially formed during construction, can also once form highway girder, The web member 44 and lower edge 43 of railway trusses are set up above Zai highway girders, railway trusses may be readily formed as welding trusses entirely, subtract significantly The small difficulty of bridge construction and the maintenance of railway girder, and because there is no bolt, will not also produce the delay of high-strength bolt Fracture, it is ensured that the operation security of pedestrian, non-motor vehicle and highway.
Foregoing description only gives highway or the section form of beam bridge is built in track traffic jointly, reference picture 6, can also be The anchor of suspension cable or hoist cable should be set on section, forms the cable-stayed bridge or outstanding that highway, railway or track traffic are built jointly Cable bridge.
It is double-deck main that bridge is built in simply explain through diagrams a kind of highway of the utility model, railway or track traffic described above jointly Some principles of beam cross-section structure, it is not intended to for the utility model to be confined to shown and described concrete structure and the scope of application It is interior, therefore every corresponding modification for being possible to be utilized and equivalent, belong to the apllied the scope of the claims of the utility model.

Claims (9)

1. bridge bilayer main beam section construction, including left side highway girder (1), the right side are built in a kind of highway, railway or track traffic jointly Side highway girder (2), and positioned at railway trusses between the two, it is characterized in that:The railway trusses and left side highway girder (1), right side highway girder (2) uses double-layer structural, and railway trusses is located at upper strata, left side highway girder (1) and right side Highway Main Beam (2) is located at lower floor, and railway trusses underface and left side highway girder (1), right side highway girder (2) set the 4th between inner side Road.
2. bridge bilayer main beam section construction, its feature are built in a kind of highway, railway or track traffic as claimed in claim 1 jointly It is:4th road is pavement, is either bicycle lane or is pavement and bicycle lane.
3. bridge bilayer main beam section construction is built in a kind of highway, railway or track traffic as claimed in claim 1 or 2 jointly, its It is characterized in:The left side highway girder (1) and right side highway girder (2) are independent box beam, along bridge to spaced connection Crossbeam (3) connects as one the box beam of both sides.
4. bridge bilayer main beam section construction, its feature are built in a kind of highway, railway or track traffic as claimed in claim 3 jointly It is:The left side highway girder (1) includes left side top plate (11), left outside coxostermum (12), left-side bottom (13), and left inside flank Plate (14);The right side highway girder (2), right side top plate (21), right outboard web (22), right side bottom plate (23) and Right Inboard abdomen Plate (24).
5. bridge bilayer main beam section construction, its feature are built in a kind of highway, railway or track traffic as claimed in claim 4 jointly It is:The railway trusses by railway deck (41), wind up (42), lower edge (44) and web member (43) are welded, wherein lower edge (44) it is left inside coxostermum (14), the Right Inboard web (24) of right side highway girder (2) of left side highway girder (1).
6. bridge bilayer main beam section construction, its feature are built in a kind of highway, railway or track traffic as claimed in claim 3 jointly It is:4th road includes left side floorings (6a) and right side floorings (6b), and it is public that left side floorings (6a) are arranged at left side Outside the inner side of road girder (1), right side floorings (6b) are arranged at outside the inner side of right side highway girder (2).
7. bridge bilayer main beam section construction, its feature are built in a kind of highway, railway or track traffic as claimed in claim 6 jointly It is:4th road also include be arranged at left side floorings (6a), right side floorings (6b), between transparent floorings (7).
8. bridge bilayer main beam section construction is built in a kind of highway, railway or track traffic as claimed in claim 1 or 2 jointly, its It is characterized in:The left side highway girder (1), right side highway girder (2) are the both sides of an integrated box girder, the integrated box girder It is arranged at intervals at including left web (81), right web (82), top plate (85) and bottom plate (86), and direction across bridge in the middle part of casing Left web (83), right median ventral plate (84);The railway trusses is welded to connect in the middle part of the integrated box girder, its lower edge (44) it is left web (83), the right median ventral plate (84) of the body formula box beam.
9. bridge bilayer main beam section construction, its feature are built in a kind of highway, railway or track traffic as claimed in claim 8 jointly It is:4th road includes left side floorings (6a) and right side floorings (6b), is arranged at parallel in left web (83), the right side On top plate (85) between web (84).
CN201720103502.6U 2017-01-23 2017-01-23 Bridge bilayer main beam section construction is built in a kind of highway, railway or track traffic jointly Withdrawn - After Issue CN206800161U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720103502.6U CN206800161U (en) 2017-01-23 2017-01-23 Bridge bilayer main beam section construction is built in a kind of highway, railway or track traffic jointly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720103502.6U CN206800161U (en) 2017-01-23 2017-01-23 Bridge bilayer main beam section construction is built in a kind of highway, railway or track traffic jointly

Publications (1)

Publication Number Publication Date
CN206800161U true CN206800161U (en) 2017-12-26

Family

ID=60729542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720103502.6U Withdrawn - After Issue CN206800161U (en) 2017-01-23 2017-01-23 Bridge bilayer main beam section construction is built in a kind of highway, railway or track traffic jointly

Country Status (1)

Country Link
CN (1) CN206800161U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758739A (en) * 2017-01-23 2017-05-31 中铁二院工程集团有限责任公司 Bridge bilayer main beam section construction is built in a kind of highway, railway or track traffic jointly

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758739A (en) * 2017-01-23 2017-05-31 中铁二院工程集团有限责任公司 Bridge bilayer main beam section construction is built in a kind of highway, railway or track traffic jointly
CN106758739B (en) * 2017-01-23 2019-04-12 中铁二院工程集团有限责任公司 Bridge bilayer main beam section construction is built in a kind of highway, railway or rail traffic jointly

Similar Documents

Publication Publication Date Title
CN106758739B (en) Bridge bilayer main beam section construction is built in a kind of highway, railway or rail traffic jointly
CN109371815B (en) Beam-body corrugated steel combined protective shed frame and manufacturing method thereof
CN106149539B (en) The dual-purpose bridge staggered floor main beam section construction of highway-railway
CN207958993U (en) A kind of section steel beam pillar Bridge guardrail structure
CN208293453U (en) In a kind of railway beam plus the anti-fall stone structure of vault hangar tunnel
CN203065950U (en) Railway bridge composed of simply-supported T-shaped beams
CN206800161U (en) Bridge bilayer main beam section construction is built in a kind of highway, railway or track traffic jointly
CN108018772A (en) Non-major P.E.subject flat bed main beam section constructs
CN207633189U (en) Non-major P.E.subject flat bed main beam section constructs
CN206428550U (en) A kind of novel integral crossing plates
CN206173781U (en) No end bay half -through tie rod ribbon arched bridge
CN107642010A (en) Medium-and low-speed maglev traffic system straightway support rail beam
CN1439558A (en) Overhead road and train and security device against off-rail
CN215976803U (en) Suspension type bridge of people's bank of china system of walking slowly
CN202194062U (en) Inclined pulling type cross-street pedestrian overpass
CN111636294A (en) High-pier large-span station bridge structure of high-speed railway in hard mountain area
CN202989775U (en) A bridge deck structure for a flatwise tensile rope bridge
CN206530340U (en) A kind of tunnel structure suitable for suspension type monorail
CN205134176U (en) Device that suppresses suo cheng bridge expansion joint disease
CN209703380U (en) A kind of median strip magnetic-type basis steel guard rail structure
CN201363154Y (en) Mobile trestle bridge
CN211142772U (en) Highway-railway same-layer hybrid beam suspension cable stayed cooperative bridge
CN207987705U (en) RPC steel truss combined bridge deck, combined double-layer bridge floor and combined double-layer continuous bridge
CN202064268U (en) Street crossing pedestrian bridge
CN105297615A (en) Device and method capable of restraining expansion joint disease of cable-supported bridge

Legal Events

Date Code Title Description
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20171226

Effective date of abandoning: 20190412

AV01 Patent right actively abandoned