CN206791174U - A kind of novel agricultural greenhouse - Google Patents
A kind of novel agricultural greenhouse Download PDFInfo
- Publication number
- CN206791174U CN206791174U CN201720722341.9U CN201720722341U CN206791174U CN 206791174 U CN206791174 U CN 206791174U CN 201720722341 U CN201720722341 U CN 201720722341U CN 206791174 U CN206791174 U CN 206791174U
- Authority
- CN
- China
- Prior art keywords
- greenhouse
- embedded board
- connects
- column
- fixing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/25—Greenhouse technology, e.g. cooling systems therefor
Abstract
A kind of novel agricultural greenhouse, including greenhouse column, big side plates, greenhouse beam, right brace, left brace, right fixed plate, the greenhouse column top connects greenhouse beam, greenhouse beam connects big side plates, greenhouse column bottom has groove, embedded board bottom connects embedded bar, embedded board connection screw thread reinforcing bar, the spiral connects ground through embedded board, embedded board connects ground, embedded bar connects ground, there is No.1 fixing groove inside embedded board, there is projection inside the No.1 fixing groove, groove is adapted with projection, greenhouse column bottom connects No.1 fixing groove, in projection insertion groove, in greenhouse column insertion No.1 fixing groove, there are No. two fixing grooves inside No. two necks, embedded board top connects No. two fixing grooves, the embedded board top is inserted in No. two fixing grooves.
Description
Technical field
It the utility model is related to greenhouse field, more particularly to a kind of novel agricultural greenhouse.
Background technology
Built on the sand, resistance to overturning is poor for the connection on existing agricultural greenhouse column and ground, in the case where wind-force is larger,
The connection on agricultural greenhouse column and ground is not enough to low-grade wind-force, in turn results in agricultural greenhouse and tilts or topple over, so that making
Into huge economic loss.
Utility model content
The utility model is directed to deficiencies of the prior art, there is provided a kind of a kind of constitutionally stable Novel rural sparetime university
Canopy.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of novel agricultural greenhouse, including greenhouse column, big side plates, greenhouse beam, right brace, left brace, the right side
Fixed plate, the greenhouse column top connect greenhouse beam, and greenhouse beam connects big side plates, and greenhouse column bottom has recessed
Groove, embedded board bottom connection embedded bar, embedded board connection screw thread reinforcing bar, the spiral connect ground through embedded board,
Embedded board connects ground, embedded bar connection ground, and embedded board inside has No.1 fixing groove, had inside the No.1 fixing groove
There is projection, groove is adapted with projection, greenhouse column bottom connection No.1 fixing groove, and in projection insertion groove, greenhouse column is inserted
Enter in No.1 fixing groove, there are No. two fixing grooves inside No. two necks, embedded board top connects No. two fixing grooves, the embedded board
Top is inserted in No. two fixing grooves, and No. two fixing groove top has connecting hole, greenhouse column connection connecting hole, the greenhouse
Column passes through connecting hole, has No. two necks inside No. two fixing grooves, has No.1 neck, fixture block side on the outside of embedded board
No.1 neck is connected, the fixture block is stuck in No.1 neck, and the fixture block opposite side connects No. two necks, and the fixture block is stuck in two
In number neck, fixed cover bottom connects embedded board by spiral.
The spiral sequentially passes through embedded board, fixed cover connection clamp nut, and fixed cover top passes through No. two fixations
Bolt connection greenhouse column, left fixed plate have left engaging lug, and the left fixed plate connects greenhouse by No.1 fixing bolt and stood
Post, left engaging lug connect left brace top, the left brace bottom connection ground by roller bearing.
In the left brace bottom insertion ground, right fixed plate has right engaging lug, and right fixed plate is fixed by No.1
Bolt connection greenhouse column, right engaging lug connect right brace top by roller bearing, and No.1 fixing bolt sequentially passes through left fixation
Plate, greenhouse column, right fixed plate connection clamp nut, the right brace bottom connection ground, right brace bottom insertion ground
Face.
Beneficial effect:Greenhouse column top connects greenhouse beam, and greenhouse beam connects big side plates, the connection of embedded board bottom
Embedded bar, embedded board connection screw thread reinforcing bar, spiral connect ground, pre-buried steel through embedded board connection ground, embedded board
Muscle connects ground, and groove is adapted with projection, greenhouse column bottom connection No.1 fixing groove, and in projection insertion groove, greenhouse is stood
In post insertion No.1 fixing groove, fixture block side connection No.1 neck, fixture block is stuck in No.1 neck, and fixture block opposite side connects No. two
Neck, fixture block is stuck in No. two necks, in the presence of fixture block, improve compactness that fixed cover is connected with embedded board with it is firm
Property, make structure more stable, fixed cover bottom connects embedded board by spiral, and spiral sequentially passes through embedded board, fixation
Set connection clamp nut, fixed cover top connect greenhouse columns by No. two fixing bolts, No. two fixing bolts, fixed cover,
Under the common cooperation of spiral, the steadiness that greenhouse column is connected with embedded board is effectively raised, makes structure more stable, it is left
Fixed plate connects greenhouse column by No.1 fixing bolt, and left engaging lug connects left brace top, left brace by roller bearing
Bottom connects ground, and left brace bottom is inserted in ground, in left fixed plate with being effectively increased under the cooperation of left brace
Greenhouse column makes the connection of greenhouse column and embedded board more firm, makes structure more stable to the active force of embedded board, right fixed plate
Greenhouse column is connected by No.1 fixing bolt, right engaging lug connects right brace top by roller bearing, No.1 fixing bolt according to
Secondary to connect clamp nut through left fixed plate, greenhouse column, right fixed plate, right brace bottom connects ground, under right brace
Portion inserts ground, and active force of the greenhouse column to embedded board is effectively increased under the cooperation of right fixed plate and right brace,
Make the connection of greenhouse column and embedded board more firm, make structure more stable.
Brief description of the drawings
Fig. 1 is a kind of novel agricultural greenhouse partial sectional view described in the utility model.
Fig. 2 is a kind of novel agricultural greenhouse fixed plate front view described in the utility model.
Fig. 3 is a kind of novel agricultural greenhouse structure schematic diagram described in the utility model.
Embodiment
The utility model is described in further detail below according to drawings and examples:
A kind of novel agricultural greenhouse, including greenhouse column 01, big side plates 02, greenhouse beam 03, right brace 04, a left side are tiltedly
Lacing wire 05, right fixed plate 06, the top of greenhouse column 01 connect greenhouse beam 03, and greenhouse beam 03 connects big side plates 02,
The bottom of greenhouse column 01 has groove 15, the bottom of embedded board 08 connection embedded bar 20, the connection screw thread reinforcing bar 12 of embedded board 08, institute
State spiral 12 and connect ground through embedded board 08, embedded board 08 connects ground, and embedded bar 20 connects ground, embedded board 08
Inside has No.1 fixing groove 13, and the inside of No.1 fixing groove 13 has projection 14, and groove 15 is adapted with projection 14, greenhouse
The bottom of column 01 connection No.1 fixing groove 13, projection 14 is inserted in groove 15, and greenhouse column 01 is inserted in No.1 fixing groove 13, and two
The inside of number neck 19 has No. two fixing grooves 17, and No. two fixing grooves 17 of the top of embedded board 08 connection, the top of embedded board 08 is inserted
Enter in No. two fixing grooves 17, No. two fixing grooves 17 top has connecting hole 23, and greenhouse column 01 connects connecting hole 23, described
Greenhouse column 01 passes through connecting hole 23, and the inside of No. two fixing grooves 17 has No. two necks 19, and the outside of embedded board 08 has one
Number neck 18, the side of fixture block 16 connection No.1 neck 18, the fixture block 16 is stuck in No.1 neck 18, the opposite side of fixture block 16
No. two necks 19 are connected, the fixture block 16 is stuck in No. two necks 19, and the bottom of fixed cover 09 connects pre-buried by spiral 12
Plate 08.
The spiral 12 sequentially passes through embedded board 08, fixed cover 09 connects clamp nut, and the top of fixed cover 09 passes through
No. two fixing bolts 11 connect greenhouse column 01, and left fixed plate 07 has left engaging lug 21, and the left fixed plate 07 passes through No.1
Fixing bolt 10 connects greenhouse column 01, and left engaging lug 21 connects the left top of brace 05, the left brace 05 by roller bearing
Bottom connects ground.
In the bottom of the left brace 05 insertion ground, right fixed plate 06 has right engaging lug 22, and right fixed plate 06 passes through
No.1 fixing bolt 10 connects greenhouse column 01, and right engaging lug 22 connects the right top of brace 04 by roller bearing, and No.1 fixes spiral shell
Bolt 10 sequentially passes through left fixed plate 07, greenhouse column 01, right fixed plate 06 and connects clamp nut, and the right bottom of brace 04 connects
Ground is inserted in ground plane, the right bottom of brace 04.
The top of greenhouse column 01 connects greenhouse beam 03, and greenhouse beam 03 connects big side plates 02, and the bottom of embedded board 08 connects
Embedded bar 20, the connection screw thread reinforcing bar 12 of embedded board 08 are connect, spiral 12 connects ground through embedded board 08, and embedded board 08 connects
Ground plane, embedded bar 20 connect ground, and groove 15 is adapted with projection 14, the bottom of greenhouse column 01 connection No.1 fixing groove
13, projection 14 is inserted in groove 15, and greenhouse column 01 is inserted in No.1 fixing groove 13, the side of fixture block 16 connection No.1 neck 18,
Fixture block 16 is stuck in No.1 neck 18, and the opposite side of fixture block 16 connects No. two necks 19, and fixture block 16 is stuck in No. two necks 19, in card
In the presence of block 16, compactness and steadiness that fixed cover 09 is connected with embedded board 08 are improved, makes structure more stable, fixed cover
09 bottom connects embedded board 08 by spiral 12, and spiral 12 sequentially passes through embedded board 08, the connection fastening of fixed cover 09
Nut, the top of fixed cover 09 connect greenhouse columns 01 by No. two fixing bolts 11, No. two fixing bolts 11, fixed cover 09,
Under the common cooperation of spiral 12, the steadiness that greenhouse column 01 is connected with embedded board 08 is effectively raised, makes structure more
Stable, left fixed plate 07 connects greenhouse column 01 by No.1 fixing bolt 10, and left engaging lug 21 connects left oblique pull by roller bearing
The top of muscle 05, the left bottom of brace 05 connect ground, and the left bottom of brace 05 is inserted in ground, in left fixed plate 07 and left oblique pull
Active force of the greenhouse column 01 to embedded board 08 is effectively increased under the cooperation of muscle 05, makes greenhouse column 01 and embedded board 08
Connection is more firm, makes structure more stable, and right fixed plate 06 connects greenhouse column 01, right engaging lug 22 by No.1 fixing bolt 10
The right top of brace 04 is connected by roller bearing, No.1 fixing bolt 10 sequentially passes through left fixed plate 07, greenhouse column 01, right fixation
Plate 06 connects clamp nut, and the right bottom of brace 04 connects ground, and ground is inserted in the right bottom of brace 04, right fixed plate 06 with
Active force of the greenhouse column 01 to embedded board 08 is effectively increased under the cooperation of right brace 04, make greenhouse column 01 with it is pre-buried
The connection of plate 08 is more firm, makes structure more stable.
Claims (3)
1. a kind of novel agricultural greenhouse, it is characterized in that:Including greenhouse column, big side plates, greenhouse beam, right brace, a left side tiltedly
Lacing wire, right fixed plate, the greenhouse column top connect greenhouse beam, and greenhouse beam connects big side plates, greenhouse column bottom
Connected with groove, embedded board bottom connection embedded bar, embedded board connection screw thread reinforcing bar, the spiral through embedded board
Ground, embedded board connection ground, embedded bar connection ground, embedded board inside has No.1 fixing groove, the No.1 fixing groove
Inside has projection, and groove is adapted with projection, greenhouse column bottom connection No.1 fixing groove, in projection insertion groove, greenhouse
In column insertion No.1 fixing groove, there are No. two fixing grooves, embedded board top connects No. two fixing grooves, described inside No. two necks
Embedded board top is inserted in No. two fixing grooves, and No. two fixing groove top has connecting hole, greenhouse column connection connecting hole, institute
State greenhouse column and pass through connecting hole, there are No. two necks inside No. two fixing grooves, there is No.1 neck on the outside of embedded board, block
Block side connects No.1 neck, and the fixture block is stuck in No.1 neck, and the fixture block opposite side connects No. two necks, the fixture block
It is stuck in No. two necks, fixed cover bottom connects embedded board by spiral.
2. a kind of novel agricultural greenhouse according to claim 1, it is characterized in that:The spiral sequentially passes through pre-buried
Plate, fixed cover connection clamp nut, fixed cover top connect greenhouse column by No. two fixing bolts, and left fixed plate has left company
Lug, the left fixed plate connect greenhouse column by No.1 fixing bolt, and left engaging lug is connected in left brace by roller bearing
Portion, the left brace bottom connection ground.
3. a kind of novel agricultural greenhouse according to claim 2, it is characterized in that:The left brace bottom insertion ground
In, right fixed plate has right engaging lug, and right fixed plate connects greenhouse column by No.1 fixing bolt, and right engaging lug passes through roller bearing
Right brace top is connected, No.1 fixing bolt sequentially passes through left fixed plate, greenhouse column, right fixed plate connection clamp nut,
The right brace bottom connection ground, ground is inserted in right brace bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720722341.9U CN206791174U (en) | 2017-06-21 | 2017-06-21 | A kind of novel agricultural greenhouse |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720722341.9U CN206791174U (en) | 2017-06-21 | 2017-06-21 | A kind of novel agricultural greenhouse |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206791174U true CN206791174U (en) | 2017-12-26 |
Family
ID=60749242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720722341.9U Active CN206791174U (en) | 2017-06-21 | 2017-06-21 | A kind of novel agricultural greenhouse |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206791174U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108522083A (en) * | 2018-05-04 | 2018-09-14 | 湖北永耕农业有限公司 | A kind of double sunshade automatic adjustment systems of agricultural modernization plantation |
-
2017
- 2017-06-21 CN CN201720722341.9U patent/CN206791174U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108522083A (en) * | 2018-05-04 | 2018-09-14 | 湖北永耕农业有限公司 | A kind of double sunshade automatic adjustment systems of agricultural modernization plantation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206791174U (en) | A kind of novel agricultural greenhouse | |
CN205406630U (en) | Lead -carbon storage battery grid | |
CN204781361U (en) | Alternately open last quarter node fastener of string truss structure | |
CN207570905U (en) | A kind of fixture for bamboo chip tension test | |
CN206252205U (en) | Improvement type shelf post | |
CN207462597U (en) | Novel feather ball-collecting rack fixing device | |
CN213589689U (en) | Concatenation formula basketball rack | |
CN110654993B (en) | Tower machine standard festival convenient to transportation dismouting | |
CN206844112U (en) | Stringing pole insulation guy anchor | |
CN208138805U (en) | A kind of fingerprint attendance machine being easily installed | |
CN206864137U (en) | A kind of educational propaganda column device | |
CN207054223U (en) | Novel corn breeding cultivation rack device | |
CN206198641U (en) | A kind of convenient reassembling type score frame | |
CN206686764U (en) | A kind of vegetables seedling raising greenhouse device | |
CN206007873U (en) | A kind of trampoline safety net collar attachment structure | |
CN105156015A (en) | Special ladder for power distribution pole and tower signboard | |
CN206571141U (en) | One kind building pin hand support connection structure | |
CN205444474U (en) | Lightweight steel wall body and concrete foundation's mounting structure | |
CN206941957U (en) | A kind of constitutionally stable beam column of filling the span of a man's arms | |
CN204141873U (en) | Solar bracket and ground plinth jockey | |
CN214784772U (en) | Horizontal inner support dismantling structure | |
CN209609406U (en) | New Forestry arboriculture frame | |
CN209720558U (en) | A kind of fixed device of nonpetroleum storage tank | |
CN207283085U (en) | A kind of electromechanical installation cable support frame | |
CN209809377U (en) | Novel fitness training horizontal bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant |