CN206785010U - The Light trabses mounting structure of steel structure factory building - Google Patents

The Light trabses mounting structure of steel structure factory building Download PDF

Info

Publication number
CN206785010U
CN206785010U CN201720497892.XU CN201720497892U CN206785010U CN 206785010 U CN206785010 U CN 206785010U CN 201720497892 U CN201720497892 U CN 201720497892U CN 206785010 U CN206785010 U CN 206785010U
Authority
CN
China
Prior art keywords
hook
factory building
wallboard
keel
stay hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720497892.XU
Other languages
Chinese (zh)
Inventor
李能强
范立江
彭爱民
刘建兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO Electric Power Construction Co Ltd
Original Assignee
SEPCO Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO Electric Power Construction Co Ltd filed Critical SEPCO Electric Power Construction Co Ltd
Priority to CN201720497892.XU priority Critical patent/CN206785010U/en
Application granted granted Critical
Publication of CN206785010U publication Critical patent/CN206785010U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

It the utility model is related to the Light trabses mounting structure of steel structure factory building, including more factory building columns, every factory building column is respectively arranged with multiple brackets by default spacing, also include more lateral keels and vertical keel, lateral keel is connected with bracket, vertical keel is connected to lateral keel, vertical keel is provided with stay hook, the hook portion of stay hook is bent upwards, also include wallboard, wallboard mounting surface is provided with hook, hook hook portion is bent downwardly, wallboard is fastened by bolts with hook, hook stay hook, and stay hook is provided with cavity, the bolt head of bolt is located in cavity.Above-mentioned mounting structure, installed suitable for the frame-type factory building wallboard that shaped steel is built, it is that bracket is set on factory building column, lateral keel and vertical keel are installed on bracket, stay hook is set on keel, wallboard is arranged in stay hook by hook, stay hook is additionally provided with cavity, when wallboard is hung, its bolt head is just embedded in cavity, can form firm linking.

Description

The Light trabses mounting structure of steel structure factory building
Technical field
It the utility model is related to the wallboard installing structure of steel structure factory building.
Background technology
The factory building of steel structure is typically to build building frame, top laying shingle using shaped steel, and sidepiece sets wallboard.Steel The common wallboard of structure factory building is color steel, and its mounting means typically rivets or mode connects for screw is in the frame structure of factory building, by It is iron in color steel base material, corrosion can occurs after long-time use, it is especially more serious in the corrosion of each tie point position.Compare reason The metope alternative materials thought are corrosion-resistant Light trabses, have the advantages that burn into profile is not various attractive in appearance.But steel structure factory building does not have Concrete wall, existing keel add the mode of fastener installation wallboard to be not suitable for steel structure factory building.
Utility model content
Technical problem to be solved in the utility model is:A kind of Light trabses mounting structure of steel structure factory building is provided, fitted The frame-type factory building wallboard installation built for shaped steel.
Technical scheme is used by the utility model solves its technical problem:
The Light trabses mounting structure of steel structure factory building, including more factory building columns, every factory building column press default spacing point It is not provided with multiple brackets, in addition to the vertical keel of the lateral keel of more horizontally-parallel layouts and vertical parallel arrangement, institute State lateral keel to be connected with the bracket, vertical keel is connected to the lateral keel, and the vertical keel is away from factory building column Side be provided with stay hook, the hook portion of stay hook is bent upwards, in addition to wallboard, and the wallboard mounting surface is provided with hook, Hook hook portion is bent downwardly, and wallboard is fastened by bolts with hook, described to hook stay hook, and stay hook is close to bolt spiral shell The face of bolt head is provided with the cavity with bolt head size fit, and the bolt head of the bolt is located in cavity.
Further, the bracket includes horizontal stand and diagonal brace, and the horizontal stand, factory building column and diagonal brace connect into Triangular structure.
The beneficial effects of the utility model are:The Light trabses mounting structure of above-mentioned steel structure factory building, builds suitable for shaped steel The installation of frame-type factory building wallboard, be that bracket is set on factory building column, lateral keel and vertical keel, keel be installed on bracket Upper setting stay hook, wallboard are arranged in stay hook by hook, and stay hook is additionally provided with cavity, when wallboard is hung, its spiral shell Bolt head is just embedded in cavity, can form firm linking.
Brief description of the drawings
Fig. 1 is the schematic diagram of wallboard installing structure of the present utility model;
Fig. 2 is the enlarged diagram at hook in Fig. 1;
Reference is in figure:It is factory building column 1, bracket 2, diagonal brace 21, lateral keel 3, vertical keel 4, stay hook 5, recessed Chamber 51, wallboard 6, hook 61, bolt 62.
Embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples:
The Light trabses mounting structure of steel structure factory building, including more factory building columns 1, every factory building column 1 press default spacing It is respectively arranged with multiple brackets 2, in addition to the vertical keel of the lateral keel 3 of more horizontally-parallel layouts and vertical parallel arrangement 4, the lateral keel 3 is connected with the bracket 2, and vertical keel 4 is connected to the lateral keel 3, and the vertical keel 4 is remote The side of factory building column 1 is provided with stay hook 5, and the hook portion of stay hook 5 is bent upwards, in addition to wallboard 6, and the wallboard 6 is installed Face is provided with hook 61, and 61 hook portions of hook are bent downwardly, and wallboard 6 is fastened with hook 61 by bolt 62, and the hook 61 hooks Stay hook 5, and stay hook 5 is provided with and the cavity of bolt head size fit 51, the bolt close to the face of the bolt head of bolt 62 62 bolt head is located in cavity 51.
As shown in Figure 1, 2, steel structure factory building is built by shaped steel forms framework, and it includes the more factory building being vertically laid out columns 1, Every factory building column 1 sets multiple brackets 2 respectively, and spacing is set according to the size of wallboard 6 between bracket 2.
Bracket 2 is used to support keel, and its shape can be diversified forms, can be typically as shown in figure 1, bracket 2 Including horizontal stand and diagonal brace 21, the horizontal stand, factory building column 1 and diagonal brace 21 connect into triangular structure.
Lateral keel 3 is that multiple brackets 2 that horizontal direction extends respectively with transverse direction are connected, and vertical keel 4 is vertical direction Extension, is connected in lateral keel 3.
Vertical keel 4 is provided with stay hook 5, and the hook portion of stay hook 5 is bent upwards, and coordinates for the hook 61 with wallboard 6. As shown in Fig. 2 hook 61 hooks stay hook 5, wallboard 6 is set to be hung on keel, hook 61 is to be fastened on wallboard 6 by bolt 62 On.
Stay hook 5 is provided with cavity 51 close to the face of the bolt head of bolt 62, when 61 hooks of hook are located at stay hook 5, bolt 62 bolt head can be just embedded in cavity 51.
As shown in Fig. 2 when wallboard 6 is hung on stay hook 5, at the upper end of stay hook 5 and at the bolt head of bolt 62, together When there are two fulcrum forces, it can be ensured that hook more firm.

Claims (2)

1. the Light trabses mounting structure of steel structure factory building, including more factory building columns (1), it is characterised in that every factory building column (1) multiple brackets (2) are respectively arranged with by default spacing, in addition to the lateral keel (3) of more horizontally-parallel layouts and vertical The vertical keel (4) of parallel arrangement, the lateral keel (3) are connected with the bracket (2), and vertical keel (4) is connected to described Lateral keel (3), side of the vertical keel (4) away from factory building column (1) are provided with stay hook (5), the hook of stay hook (5) Portion is bent upwards, in addition to wallboard (6), and wallboard (6) mounting surface is provided with hook (61), and hook (61) hook portion is turned under Song, wallboard (6) are fastened with hook (61) by bolt (62), and the hook (61) hooks stay hook (5), and stay hook (5) is leaned on The face of nearly bolt (62) bolt head is provided with to be located at the cavity of bolt head size fit (51), the bolt head of the bolt (62) In cavity (51).
2. the Light trabses mounting structure of steel structure factory building as claimed in claim 1, it is characterised in that the bracket (2) includes Horizontal stand and diagonal brace (21), the horizontal stand, factory building column (1) and diagonal brace (21) connect into triangular structure.
CN201720497892.XU 2017-05-05 2017-05-05 The Light trabses mounting structure of steel structure factory building Expired - Fee Related CN206785010U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720497892.XU CN206785010U (en) 2017-05-05 2017-05-05 The Light trabses mounting structure of steel structure factory building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720497892.XU CN206785010U (en) 2017-05-05 2017-05-05 The Light trabses mounting structure of steel structure factory building

Publications (1)

Publication Number Publication Date
CN206785010U true CN206785010U (en) 2017-12-22

Family

ID=60710638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720497892.XU Expired - Fee Related CN206785010U (en) 2017-05-05 2017-05-05 The Light trabses mounting structure of steel structure factory building

Country Status (1)

Country Link
CN (1) CN206785010U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110211513A (en) * 2019-07-05 2019-09-06 黄山市古徽印象文化传媒有限公司 A kind of billboard
CN113585657A (en) * 2021-06-25 2021-11-02 筑友建筑装饰装修工程有限公司 BIM-based dry hanging pottery clay brick exterior facing mounting structure and mounting method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110211513A (en) * 2019-07-05 2019-09-06 黄山市古徽印象文化传媒有限公司 A kind of billboard
CN113585657A (en) * 2021-06-25 2021-11-02 筑友建筑装饰装修工程有限公司 BIM-based dry hanging pottery clay brick exterior facing mounting structure and mounting method

Similar Documents

Publication Publication Date Title
CN206785010U (en) The Light trabses mounting structure of steel structure factory building
CN103919504A (en) Waterproof base plate of integrated bathroom
CN209244039U (en) A kind of constructure screen wall structure of simple installation
CN204899108U (en) Node structure is hung futilely to marble
CN202450764U (en) Support for mounting hanging basket on single-sided gable
CN200940348Y (en) Hozirontal regulating part for curtain wall skeleton
CN202299033U (en) Back bolt stone curtain wall system
CN204715604U (en) One hangs the wide keel smallpox of boxlike
CN207892179U (en) A kind of cladding steel construction of stull no-welding
CN208501912U (en) A kind of modular cabinet bottom beam mounting structure
CN210887980U (en) Embedded leveling support and leveling construction tool for ground concrete
CN208870243U (en) A kind of curtain wall installing structure
CN202899643U (en) Full steel pipe adjustable ejector rod support
CN102767280A (en) Quick-dismounting system and installation method for top plate
CN203947637U (en) A kind of syndeton of Glass Rib
CN206844428U (en) The hanger structure of clay plate curtain wall
CN114775947B (en) Back-bolt type stone dry-hanging quick-mounting connection system
CN206245694U (en) A kind of construction and decoration ceiling mounting bracket
CN206016262U (en) A kind of civil engineering building template link
CN206110421U (en) Stone material curtain adjustable combination pendant is hung futilely to back of body bolt formula
CN205894662U (en) Modular triangle steel truss template
CN219175621U (en) Connecting piece and conversion system arranged between hanging bar and steel frame conversion layer
CN206888427U (en) A kind of decorative aluminum plate component of spacing stabilization
CN211341337U (en) Rail mounted mounting structure for wall brick
CN204492158U (en) The formwork erection structure of superelevation shear wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180309

Address after: 250014 Building No. 5, district three, Han Yu financial business center, Ji'nan, Shandong

Patentee after: China Power Construction Group Shandong Electric Power Construction Co.,Ltd.

Address before: 250000, No. ten, No. 10567, Ji'nan, Shandong

Patentee before: SEPCO ELECTRIC POWER CONSTRUCTION Corp.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171222