CN206784547U - Job site is faced near water is electrically integrated arrangement system - Google Patents
Job site is faced near water is electrically integrated arrangement system Download PDFInfo
- Publication number
- CN206784547U CN206784547U CN201720440087.3U CN201720440087U CN206784547U CN 206784547 U CN206784547 U CN 206784547U CN 201720440087 U CN201720440087 U CN 201720440087U CN 206784547 U CN206784547 U CN 206784547U
- Authority
- CN
- China
- Prior art keywords
- fixture
- fixed
- feed pipe
- near water
- arrangement system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Face near water the utility model discloses a kind of job site and be electrically integrated arrangement system, it includes gutter, feed pipe and cable, and a fixed support has been horizontally set with above the gutter, and the support bracket fastened both ends are separately fixed at the both sides in the gutter;The feed pipe is fixed on the fixed support by the first fixture;The length direction of the feed pipe is provided with a line box on the feed pipe, the cable is placed in the line box, and the line box is erected on first fixture, and is fixed on by the second fixture above the feed pipe.First fixture and second fixture are in inverted U, are made up of round steel, and the both ends of the fixture of inverted U first and the both ends of the second fixture are separately fixed on the fixed support.
Description
Technical field
It the utility model is related to technical field of building construction, and in particular to a kind of job site is faced near water is electrically integrated arrangement system
System.
Background technology
Drainage system, water supply system and face the necessary change system that electric system is construction, at present in construction
When, general drainage system, water supply system and face electric system and set by the way of individually arranging, not only floor space is big, and
And fixation is insecure, easily shifts, so pipeline and cable are caused to damage, so as to cause construction cost to increase,
And it is also possible to cause the extension of construction period.
Utility model content
Technical problem to be solved in the utility model be to provide it is a kind of it is simple in construction, floor space is small, and integrate draining system
System, water supply system and face the job site that electric system is integrated and face near water and be electrically integrated arrangement system.
To realize above-mentioned technique effect, face near water the utility model discloses a kind of job site and be electrically integrated arrangement system,
It includes gutter, feed pipe and cable, and a fixed support has been horizontally set with above the gutter, and this support bracket fastened two
End is separately fixed at the both sides in the gutter;The feed pipe is fixed on the fixed support by the first fixture;Institute
State and the length direction of the feed pipe is provided with a line box on feed pipe, the cable is placed in the line box, the line
Box is fixed on above the feed pipe by the second fixture.
The utility model scene is faced near water to be electrically integrated the improvement of arrangement system and is that the fixed support is by channel-section steel and weldering
The angle steel for being connected on the channel-section steel both ends in succession is formed, and the angle steel is fixed on the both sides in the gutter.
The utility model scene face near water be electrically integrated arrangement system further improvement is that, the support bracket fastened both ends
Portion is fixed on the both sides in the gutter by expansion bolt, i.e. the angle steel at channel-section steel both ends is fixed on described by expansion bolt
The both sides in gutter.
The utility model scene face near water be electrically integrated arrangement system further improvement is that, first fixture in fall
U-shaped, the feed pipe is fastened in first fixture.
The utility model scene face near water be electrically integrated arrangement system further improvement is that, first fixture in fall
U-shaped, the line box is fastened on above the feed pipe in second fixture.
The utility model scene face near water be electrically integrated arrangement system further improvement is that, the two of first fixture
End is separately fixed on the fixed support, i.e., described channel-section steel is provided with mounting hole, and the both ends of first fixture are
It is plugged in the mounting hole of the channel-section steel, and fixed by nut.
The utility model scene face near water be electrically integrated arrangement system further improvement is that, the two of second fixture
End is separately fixed on the fixed support, i.e., described channel-section steel is provided with mounting hole, and the both ends of second fixture are
It is plugged in the mounting hole of the channel-section steel, and fixed by nut.
The utility model scene face near water be electrically integrated arrangement system further improvement is that, first fixture and institute
The second fixture is stated to be made of round steel.
The utility model scene is faced the line box being electrically integrated in arrangement system and is made up of discarded template and flitch near water, and shape
Into a hollow space, for placing the cable, the setting of the line box avoids cable from being drenched with rain by exposing to the weather, can be right
Cable plays a very good protection.Face simple in construction, the integrate draining system that is electrically integrated arrangement system near water at the utility model scene
System, water supply system and face electric system and be integrated, whole system is arranged on the inside of the enclosing of construction site, floor space
It is small, it can save space.In addition, channel-section steel and round steel can be used in turn, meet green construction requirement.
Brief description of the drawings
Fig. 1 is that the side view cutaway drawing for being electrically integrated arrangement system is faced at the utility model scene near water.
Embodiment
Below in conjunction with the accompanying drawings and embodiment is described in further detail to the utility model.
As shown in figure 1, the utility model job site is faced near water is electrically integrated arrangement system, including gutter 10, feed pipe
20 and cable 30, the top in the gutter 10 has been horizontally set with a fixed support 40, the both ends difference of the fixed support 40
It is fixed on the ground 90 of the both sides of gutter 10.The feed pipe 20 is fixed on the fixed support 40 by the first fixture 29
On, i.e., described fixed support 40 is used to support the feed pipe 20.Along the length direction of the feed pipe 20 on the feed pipe 20
A line box 35 is provided with, the cable 30 is placed in the line box 35, and the line box 35 is fixed on institute by the second fixture 39
State the top of feed pipe 20.
It is preferred that the quantity of the fixed support 40 is a plurality of, the top in the gutter 10 is disposed on, so
The quantity of first fixture 29 and the second fixture 39 is also to be a plurality of.In the present embodiment, between adjacent fixed support 40
Distance be 5 meters.
Further, fixed support 40 by channel-section steel 42 and is welded to connect the structure of angle steel 44 at the both ends of channel-section steel 42
Into, and the channel-section steel 42 is horizontally set with and is fixed on the ground 90 of the both sides of gutter 10 in the top in the gutter 10, the angle steel 44
On.It is preferred that the both ends of the fixed support 40 are fixed on the ground 90 of the both sides of gutter 10 by expansion bolt 45
On, i.e., angle steel 44 is fixed on by collided gudgeon 45 on the ground 90 of the both sides of gutter 10.
Further, first fixture 29 is in inverted U, and feed pipe 20 is fastened on the first fixture of the inverted U
In 29, and the both ends of first fixture of inverted U 29 are separately fixed on the channel-section steel 42 of fixed support 40.It is preferred that at this
In embodiment, the both ends of the first fixture 29 are the end of thread, are offered on channel-section steel 42 and 29 liang of ends of thread pair of the first fixture
The mounting hole answered, two ends of thread of first fixture 29 are plugged in the mounting hole respectively, and are tightened by nut 28
Fixed, thus, feed pipe 20 wears fixing in a plurality of the first fixtures of inverted U 29.
Further, second fixture 39 is in inverted U, and line box 35 is fastened on the institute in the second fixture of inverted U 39
The top of feed pipe 20 is stated, so as to which line box 35 is erected on first fixture 29, and the two of second fixture of inverted U 39
End is separately fixed on the channel-section steel 42 of fixed support 40.In the present embodiment, the cross-sectional width of line box 35 is more than feed pipe
20 diameter, therefore the size of the second fixture of inverted U 39 is more than the size of the first fixture of inverted U 29, so as to feed pipe 20, line
Cable 30 in box 35 and line box 35 is located in second fixture of inverted U 39.It is preferred that in the present embodiment,
The both ends of second fixture 39 are the end of thread, and installation corresponding with 39 liang of ends of thread of the second fixture is offered on channel-section steel 42
Hole, two ends of thread of second fixture 39 are plugged in the mounting hole respectively, and tighten fixation by nut 38, by
This, line box 35 is located in a plurality of the second fixtures of inverted U 29, and is erected on first fixture 29.
Preferably, the fixture 39 of the first fixture 29 and second is made of round steel.
It is preferred that in the present embodiment, line box 35 is made by discarded flitch 33 and template 34, and line box 35 has
One hollow space, for placing the cable 30.
The utility model job site is faced near water is electrically integrated arrangement system in construction, currently designed position construction drainage ditch
10, and fixed support 40 is fixed on to by expansion bolt 45 top in gutter 10, wherein expansion bolt 45 is by fixed support
40 both ends are fixed on the ground 90 of the both sides of gutter 10.Feed pipe 20 is then placed on fixed support 40, and is passed through
The feed pipe is fixed on fixed support 40 by the first fixture 29, wherein the both ends of the first fixture 29 are separately fixed at
On fixed support 40.The line box 35 that inside is placed with to cable 30 afterwards is set up on the first fixture 29, and passes through second
Line box 35 is fixed on the top of feed pipe 20 by fixture 39, wherein, the both ends of the second fixture 39 are separately fixed at fixed branch
On frame 40, thus complete the utility model job site and face the construction for being electrically integrated arrangement system near water.
The utility model job site is faced near water to be electrically integrated arrangement system and has the advantages that:
1) integrate draining system, water supply system and to face electric system and be integrated, be not only simple in structure, upper and lower connection and reasonable arrangement is orderly,
And the integrated arrangement system is arranged on the inside of construction site enclosing, and floor space is small, saves space;
2) feed pipe and line box are fixed using inverted U round steel, it is stable and firm, when avoiding traditional individually arrangement, feed pipe
And cable shifts, damage is produced;
3) line box is formed using discarded flitch and template construct, rationally using salvage property, and is also avoided that cable
Line is drenched with rain by exposing to the weather, and cable can be played a very good protection;
4) channel-section steel, angle steel and round steel convenient disassembly, and can be used in turn, meet green construction requirement.
Claims (8)
1. a kind of job site is faced near water is electrically integrated arrangement system, it is characterised in that:Including gutter, feed pipe and cable
Line, a fixed support has been horizontally set with above the gutter, the support bracket fastened both ends are separately fixed at the two of the gutter
Side;The feed pipe is fixed on the fixed support by the first fixture;Along the length of the feed pipe on the feed pipe
Degree direction is provided with a line box, and the cable is placed in the line box, and the line box is fixed on described by the second fixture
Above feed pipe.
2. scene according to claim 1 is faced near water is electrically integrated arrangement system, it is characterised in that:The fixed support is by groove
Steel and the angle steel being welded to connect at the channel-section steel both ends are formed, and the angle steel is fixed on the both sides in the gutter.
3. faced near water according to the scene described in claim 1 or 2 and be electrically integrated arrangement system, it is characterised in that:The fixed branch
The both ends of frame are fixed on the both sides in the gutter by expansion bolt.
4. scene according to claim 1 is faced near water is electrically integrated arrangement system, it is characterised in that:First fixture is in
Inverted U, the feed pipe are fastened in first fixture.
5. scene according to claim 1 is faced near water is electrically integrated arrangement system, it is characterised in that:Second fixture is in
Inverted U, the line box are fastened on above the feed pipe in second fixture.
6. the scene according to claim 1 or 4 is faced near water is electrically integrated arrangement system, it is characterised in that:Described first fixes
The both ends of part are separately fixed on the fixed support.
7. scene is faced near water according to claim 1 or 5 is electrically integrated arrangement system, it is characterised in that:Described second fixes
The both ends of part are separately fixed on the fixed support.
8. scene according to claim 1 is faced near water is electrically integrated arrangement system, it is characterised in that:First fixture and
Second fixture is made of round steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720440087.3U CN206784547U (en) | 2017-04-25 | 2017-04-25 | Job site is faced near water is electrically integrated arrangement system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720440087.3U CN206784547U (en) | 2017-04-25 | 2017-04-25 | Job site is faced near water is electrically integrated arrangement system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206784547U true CN206784547U (en) | 2017-12-22 |
Family
ID=60707947
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720440087.3U Active CN206784547U (en) | 2017-04-25 | 2017-04-25 | Job site is faced near water is electrically integrated arrangement system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206784547U (en) |
-
2017
- 2017-04-25 CN CN201720440087.3U patent/CN206784547U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100697841B1 (en) | Frame for a fabricated house | |
CN206784547U (en) | Job site is faced near water is electrically integrated arrangement system | |
CN201611730U (en) | Portable lightning rod | |
CN204089082U (en) | Lighting proof strip device | |
KR100982047B1 (en) | Multifunction overhead wire supporter | |
CN210739554U (en) | Stable form piping lane support convenient to installation | |
CN202100000U (en) | Adjustable bracket girder structure for building template | |
KR20100097496A (en) | Frame coupling apparatus for vinyl house | |
KR100843058B1 (en) | High Voltage Cable Supporter | |
CN204668762U (en) | A kind of mounting bracket of distribution box | |
KR101668056B1 (en) | Base block for installing the street light posts | |
CN106088514A (en) | A kind of stone material dry suspending slabstone fixed structure with high anti-seismic function | |
KR101282747B1 (en) | Width-pipe of expansion joint fence for possibility | |
CN205046938U (en) | Covering or awning on a car, boat, etc. room | |
CN202068784U (en) | Economic, practical and multi-purpose greenhouse shed | |
CN205531629U (en) | Movable airplane shed | |
KR101030702B1 (en) | Fixing structure of a tent | |
CN204570466U (en) | Bridge extension joint | |
CN204590466U (en) | A kind of combined water proof railing | |
CN205777136U (en) | Roof boarding connects assembly | |
KR101995980B1 (en) | T-shaped Apparatus for High Voltage Electric Pole and T-shaped Connecting Bar for The Same | |
CN220705115U (en) | Outer protection frame strutting arrangement for building | |
CN209461975U (en) | It is a kind of to lay multi-thread the top of a wall bracket along wall | |
CN207283118U (en) | A kind of cable clip | |
CN108820149A (en) | A kind of photovoltaic platform waterborne and its installation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |